Public Works Committee
Regular MeetingTumwater, WA · June 9, 2022
Minutes
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Eileen Swarthout and Councilmembers Michael Althauser and Charlie
Schneider.
Staff: City Attorney Karen Kirkpatrick, Transportation and Engineering
Director Brandon Hicks, Water Resources & Sustainability Director Dan
Smith, Water Resources and Sustainability Utilities Operations Manager Steve
Craig, Transportation Manager Mary Heather Ames, Engineering Services
Manager Bill Lindauer, Water Resources Specialist Dave Kangiser, and
Administrative Assistant Cathy Nielsen.
Others: Meridith Greer, Consultant.
APPROVAL OF
MINUTES - MAY 5,
2022
MOTION: Councilmember Althauser moved, seconded by Councilmember
Schneider, to approve the minutes of May 5, 2022, as published. A voice
vote approved the motion unanimously.
DRAINAGE Specialist Kangiser reported the update of the Tumwater Drainage Design and
DESIGN AND Erosion Control Manual (DDECM) includes revisions required by the
EROSION Department of Ecology and revisions discussed internally by staff and deemed
CONTROL important to include in the update. He reviewed some of the required
MANUAL revisions:
REVISIONS:
Text throughout the Department of Ecology’s 2019 Stormwater
Management Manual for Western Washington (SWMMWW) was
updated to require continuous simulation models to include:
The ability to directly model best management practices (BMPs)
that may be used in LID (Low Impact Development) applications,
such as bioretention, permeable pavement, and green roofs.
15-minute time steps
Incorporation of algorithms to model water movement through soil.
Redevelopment Project Thresholds were updated to allow a project
proponent to provide Stormwater Management BMPs for an equivalent
area. The equivalent area may be on-site or off-site if the area drains to
the same receiving water and the guidance for in-basin transfers is
followed.
Several source control BMPs updated include:
Nurseries and Greenhouses
Irrigation
Color Events BMP
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 2
Goose Waste
Concrete
Wash out areas
Concrete floors
Updated in Volume 1 Section 2.4.9 - Minimum Requirement #8:
Wetlands Protection to model wetlands for stormwater treatment.
An update deemed important by staff included:
The bond amount changed from 15% to 25% for stormwater
construction costs to align with other jurisdictions in the region.
Specialist Kangiser requested the committee recommend the City Council
approve a motion adopting the revisions to the Drainage Design Erosion
Control Manual effective July 2022 to meet Department of Ecology’s
deadline.
Chair Swarthout questioned the timeline for regular updates of the manual.
Specialist Kangiser explained that updates to the manual are prompted by the
Department of Ecology when the agency revises the SWMMWW, which is
currently in progress. The update includes BMPS to address climate change.
Updating is a continuous process monitored by staff.
CONSENSUS: The Public Works Committee recommended the City Council approve a
motion as part of the consent calendar to adopt the revisions to the
Drainage Design Erosion Control Manual as presented.
PSE SCHEDULE 74 Manager Lindauer reported that as part of the I-5/Trosper Road/Capitol
PROJECT PLAN: Boulevard Reconfiguration Project, all overhead utilities including power will
be converted to underground systems. The proposed agreement between Puget
Sound Energy (PSE) and the City of Tumwater outlines the scope of work
required to complete the work. The agreement was prepared by PSE and
includes a scope of work to complete undergrounding of the distribution
system, construction documents (plans and specifications), operating rights for
PSE to access private property to complete undergrounding to businesses,
information regarding construction scheduling, and general construction cost
estimates completed by PSE for City construction costs. The project cost is a
60/40 split between PSE (60) and the City (40). The project includes specific
responsibilities by each party to the agreement. PSE is responsible for
supplying the conduits and transformers to install the underground system.
PSE will install the electrical system and is the only party to work on any
energized system on the project. PSE will coordinate and complete the
cutover and transfers to new service for nine businesses and tie-ins to adjacent
businesses. PSE will remove and deactivate the existing overhead electrical
system and provide inspection services during the project to ensure work by
City contractors meet PSE requirements.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 3
The City is responsible for constructing the utility trench and conduits and
installing surface transformers for final wiring connections.
Manager Lindauer displayed an aerial map of the project site, which is one
component of the larger roundabout project.
The work is funded through the Transportation Capital Facilities Plan (CFP).
The City’s estimated cost per the agreement is $165,000 to $195,000
dependent upon the actual work and the amount of inspection time. The City’s
construction cost estimate for trenching and other work is part of the overall
project construction contract for the roundabouts of approximately $240,500
with the total estimated City cost for the underground conversion estimated at
$405,500 to $435,000.
Councilmember Schneider asked about the timeline for the project and impact
to traffic in the area. Manager Lindauer said the intent is to maintain one open
traffic lane (minimum) with night work scheduled for undergrounding work to
minimize traffic impacts. No full roadway closures are anticipated other than
some intermittent disruptions in traffic when required. The project is expected
to take one week to complete or up to two weeks dependent upon the
complexity of the work. The work will be released for bidding with
construction likely commencing in September-October 2022. The actual work
involves utility trenching, as other utilities are required for installation as part
of the overall project.
CONSENSUS: The Public Works Committee unanimously recommended the City
Council place the request on the consent calendar for authorization for
the Mayor to sign the PSE Schedule 74 Project Plan, an agreement to
complete utility undergrounding conversion for the I-5/Trosper
Road/Capitol Boulevard Reconfiguration Project.
INTERLOCAL Manager Ames briefed the committee on the proposed interlocal agreement
AGREEMENT with the Tumwater School District for the Barnes Boulevard and Ridgeway
BETWEEN THE Loop Crossing Improvement project.
CITY OF
TUMWATER AND The Tumwater School District (TSD) approached the City about installing an
TUMWATER enhanced crosswalk with Rectangular Rapid Flashing Beacons (RRFBs) at the
SCHOOL intersection of Barnes Boulevard and Ridgeview Loop. The crossing is
DISTRICT FOR located near Tumwater Hill Elementary School to the south. The City has the
THE BARNES experience and resources to administer the project. Staff worked with
BOULEVARD AND Tumwater School District staff to determine the project cost. The school
RIDGEVIEW district agreed to reimburse the City for the project. The total estimated cost of
LOOP CROSSING the project is $125,000. The type of work required to complete the crossing
IMPROVEMENTS: aligns within the 2022 Pedestrian Improvements Project, which was previously
reviewed by the committee on March 17, 2022.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 4
The cost estimate and budget presented to the committee on March 17, 2022,
for the 2022 Pedestrian Improvements Project was $300,000. With the
addition of the crossing, the budget increases by another $125,000 for a total
budget of $425,000 to complete the total project. City and school district staff
drafted an agreement for completion of the crossing project. The agreement
includes the school district’s cost of $91,000, a match equal to the City’s
typical grant for similar projects.
Staff requests the Public Works Committee recommend the City Council
authorize the Mayor to sign the Interlocal Agreement between the City of
Tumwater and Tumwater School District for the Barnes Boulevard and
Ridgeview Loop Crossing Improvements, as well as authorize staff to solicit
bids for construction of the Barnes Boulevard and Ridgeview Loop Crossing
Improvements as an element of the 2022 Pedestrian Improvements Project and
recommend the City Council approve a motion to award and authorize the
Mayor to sign a public works contract with the lowest responsible bidder.
Manager Ames invited questions.
Chair Swarthout supported the project. She asked about the timeline for
installation of the new crossing. Manager Ames advised that staff is working
on the total bid for the Pedestrian Improvements Project. The crossing project
would likely be completed later in the summer dependent upon the lead-time
required for materials.
CONSENSUS: Public Works Committee unanimously recommended the City Council
authorize the Mayor to sign the Interlocal Agreement between the City of
Tumwater and Tumwater School District for the Barnes Boulevard and
Ridgeview Loop Crossing Improvements.
CONSENSUS: The Public Works Committee unanimously authorized staff to solicit bids
for construction of the Barnes Boulevard and Ridgeview Loop Crossing
Improvements as an element of the 2022 Pedestrian Improvements
Project and recommended the City Council approve a motion to award
and authorize the Mayor to sign a public works contract with the lowest
responsible bidder.
PIONEER PARK Consultant Meridith Greer reported the project site is located at Pioneer Park.
RIPARIAN The project focuses on one section of riparian area within the park. The
RESTORATION Deschutes River runs along Pioneer Park and is active with the riverbank
SERVICE shifting approximately 10 feet each year. The impetus for the project is
PROVIDER because of the location, which is an important area for water quality and fish
AGREEMENT: habitat. Within the Deschutes River many limiting factors are elevated water
temperature, lack of shade cover, fine sediment affecting water quality and
aquatic life, and insufficient wood and riparian conditions. With the park
adjacent to the river, other considerations include public safety during the
summer. The area experiences high flood risks during winter storms as
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 5
evidenced last winter when the entire park flooded. The park and the river
attract many users during the summer months.
The project was initiated in 2014 when the City received a grant from the
Salmon Recovery Funding Board. The South Puget Salmon Enhancement
Group worked on conceptual and preliminary designs for the project. The
design hinged on an existing island in the river. The intent was adding rock
barbs to slow water flow and direct rafters in the summer away from the rock
areas. The City was unsuccessful in securing construction funding and with
changes in the river over time, the island no longer exists and a new design is
necessary
The City subsequently received construction and design funding from the
Department of Ecology of $450,000 to complete the project. Following a
competitive Request for Qualifications (RFQ), the City selected Stantec
Consulting Services to assist in completing the design and permitting for the
project. The company has worked previously with the South Puget Sound
Enhancement Salmon Group and has much experience working on riparian
restoration projects throughout the region.
The grant agreement was executed with the Department of Ecology in January
2022. The goal is to seek City Council approval of the service provider
agreement with Stantec Consulting Services by the end of the month. Design
and permitting will occur over the next two years with construction moving
forward in summer 2024.
Ms. Greer invited questions from the committee.
Responding to questions about the continuous movement of the river affecting
project design, Ms. Greer explained that the design completed in the spring
following the winter should not be impacted as construction is scheduled in
summer 2024 when the river is at its lowest level.
CONSENSUS: The Public Works Committee unanimously recommended the City
Council approve and authorize the Mayor to sign the Pioneer Park
Riparian Restoration Service Provider Agreement.
PERCIVAL Manager Craig reported that earlier in the year the committee received an
CREEK SEWER update on management actions and operational efforts related to sanitary sewer
OVERFLOW overflows in the area of Somerset Hill Drive and Percival Creek. Staff
UPDATE – reported on efforts to secure and install level monitoring equipment providing
SMARTCOVER advance warning of potential sewer backups to maintenance staff in an effort
LEVEL to prevent sewer overflows.
MONITOR:
As of April 4, 2022, the first remote manhole level monitoring system was
activated at the location of Somerset Hill Drive along Percival Creek. The
smartcover level monitoring is a fully self-contained system installed in the
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 6
manhole. The system uses an ultrasonic level transducer via satellite
communications to monitor water levels in the sewer manhole and provide
notification to staff in the event a blockage occurs. Notifications are
transmitted 24 hours each day affording the ability to respond and implement
corrective action before a sewer overflow or release occurs.
Manager Craig shared photographs of the equipment installed on the underside
of the manhole lid. The battery pack has an anticipated lifespan of three to
five years and is monitored by the system. As the battery nears end of life,
notifications are transmitted to staff. He described how the equipment
measures the height of the water level. Staff has the ability to adjust the alarm
notification level. The equipment includes a web-based interactive dashboard
and mobile applications to access the control and monitoring functions.
Manager Craig provided a demonstration of the live dashboard and its
monitoring capabilities. A map identifies the location of monitors. The City
plans to consider installing other monitors in other locations throughout the
City. The system enables tracking and identification of numerous monitors.
The equipment also enables staff to monitor the status of the systems, as well
as accessing battery conditions. Battery notification alarms provide a 30-day
window for staff to replace the battery.
Satellite communications with the Tumwater area with heavy tree cover was
one concern by staff. The system enables staff to check signal strength to
ensure connectivity of the equipment. The system will send an alarm if
communications have been compromised, as well as when manholes are
opened. The system also monitors temperature and conditions within the
manhole.
Manager Craig invited questions from members.
Chair Swarthout thanked staff for such a quick response to prevent future
sewer overflows. The solution is much more economical than other options
staff explored. She asked how vandalism would be addressed. Manager Craig
said the City has not experienced vandalism of sewer manholes. However,
several years ago, some catch basin grates were stolen for recycling of copper
wire. The problem was a short-term activity. The equipment provides alarm
notifications each time the manhole cover is opened.
Chair Swarthout thanked staff for providing the update.
HOPKINS Director Smith reported earlier in the year, Mat Jackmond, a Commissioner of
DRAINAGE Hopkins Drainage District 2, testified before the Council that recent storms
DISTRICT #2 increased the volume of stormwater from the Preserve development to such a
UPDATE: point that it created a challenging situation for the Ditch District to continue
maintaining its property. During the testimony, Mr. Jackmond noted that
repair work was necessary in excess of $75,000. On February 1, 2022, Mr.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 7
Jackmond testified before the Council reiterating his concerns that the
development pressure had increased maintenance needs downstream of the
Preserve development. At that time, no information was presented to the City
to validate the claim or evaluate the validity of the assertions. Several months
later, Mr. Jackmond requested a meeting with City staff.
Prior to that request, Engineering and Water Resources staff evaluated
conditions that led to some of the claims. The City’s response is in a letter
from City Administrator Doan dated February 15, 2022. The second
paragraph of the letter states, “Theoretically, an increased stormwater flow
may be possible with any project that increases impermeable surface area.
However, the likelihood of the development causing any adverse impacts is
precluded by mitigation. Engineering measures account for soil strata and the
hydrology of the development site. City staff followed all requirements for
reviewing studies and reports by industry professionals. It was demonstrated
there would be no change between pre- and post-development conditions
related to stormwater downstream of the site. City staff have further reviewed
the reports following your comments and have reconfirmed the adequacy of
the development’s stormwater design and the professional opinions of no
effect.”
Director Smith added that the City’s storm drain manual requirements for any
new development requires the developer to match pre-development conditions
in terms of the amount of stormwater that can discharge from a site. Under
natural conditions, developers and engineers are required to model to match
hydrologic curves to document the understanding of natural conditions of
discharge based on rainfall, soil strata, and hydrology of the site. That
information is compared with a post-development modeled scenario that
applies built environment with additional impervious surface throughout the
area. The modeling is compared to create a stormwater system to match pre-
developed site conditions. Following development, theoretically, there is no
discharge from the site beyond what is experienced during natural conditions.
Staff reviewed all Preserve development engineering reports and modeling and
noted that the information was adequate and appropriate and that the City
supports the professional opinions of the engineers who completed the work
and analysis. Theoretically, there should be no downstream impacts
experienced by the Drainage District caused by the development of the
Preserve subdivision.
The winter event in January 2022 revealed that all but two of the gauges in the
study area, including those in District basins, recorded their highest water
elevations in the history of those gauges, most of which have collected
between 10 and 23 years of data. Staff reviewed precipitation data at the
Olympia Airport rain gauge that has collected data for over 75 years. The
Olympia Airport rain gauge measured the third-highest amount of rainfall on
record from October until January 14, when Mr. Jackmond contacted the City.
The measured precipitation for January 1-14, 2022, at the Olympia Airport
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 8
rain gauge was by far the most on record (approximately 50% higher than the
next highest), at a time when the water table was already high, all while snow
and ice were melting. The storms represent unprecedented events that led to
the creation of a lake at the outlet of the Preserve subdivision.
Shortly thereafter, Mr. Jackmond requested a meeting with Directors Hicks
and Smith to discuss the District’s concerns. During that meeting, similar
concerns as previously aired with the Council were shared with City staff. At
the conclusion of the meeting, Mr. Jackmond presented a proposal to the City
requesting 2.5% of the City’s stormwater budget. He categorized the request
as a request from the surplus of the stormwater budget. The funds are not
considered surplus but are reserve funds earmarked for future projects should
the City not receive grant funding, as the City’s CFP is predicated on a
significant amount of grant funding for projects. Additionally, some projects
are in design and could require additional funds. The funds are dedicated to
the City’s management of the stormwater system for the benefit of the
residents of the City. At that time, the initial estimate was approximately
$75,000. When Mr. Jackmond met with them, the amount had increased to
$360,000. Mr. Jackmond indicated that if the City failed to agree to the
District’s request, he would pursue the imposition of revenue generators
available to the Drainage District within its legal authority to assess fees.
A month following the meeting with Mr. Jackmond and after denial of the
request to provide the funds from the City’s stormwater budget and without
evidence to support the claim that the Preserve development was the source of
additional stormwater and undue pressure on the Drainage District, Mr.
Jackmond contacted Thurston County and the State Legislature to address
some issues. In each instance, there was no approval and Mr. Jackmond
received no funds from those sources for the Drainage District.
Director Smith explained that he has been in contact with Thurston County’s
water resources manager to determine the timeline and nature of the requests
by the Drainage District. He has not received all the information at this time.
However, the Drainage District has been experiencing issues for a number of
years. Part of the concern is whether the maintenance expectations or claims
by the Drainage District are historical in nature rather than related to
unprecedented events in January 2022.
In early April following the meeting with staff, the City received a letter from
Britton Law Office, PLLC representing the Drainage District. The letter
referred to a series of emergency resolutions adopted by the Drainage District
on February 19, 2022, declaring the District would increase its roll of rates and
charges. The District did not provide any evidence to the City to evaluate the
claims. The letter notified the City the Drainage District would move forward
with its resolution to increase the size of the District and add 414 homes and
20 businesses comprised of various developments located south of the airport,
comprised of the Preserve and other commercial developments located at
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 9
Tumwater Center and Tumwater Corporate Place. The letter is the last
correspondence the City received from Britton Law Office.
On April 28, 2022, the City, in response filed a public records request to obtain
information the City had previously requested to include all maintenance
records, flow analysis, copies of the Ditch District’s roll of rates and charges
over the last 15 years, and any drainage development or drainage reports for
new developments within the District. Staff plans to evaluate the claims
asserted by the Drainage District Commissioners to determine the impact and
whether there could be appropriate participation by the affected parties or the
City and to determine the extent of the service and benefit provided by the
District to the residents and other businesses. The information would provide
the City with the ability to communicate with the neighborhoods as questions
are asked. Additionally, because of the City’s ownership of two parcels in the
Preserve subdivision, the City is now a party to the process and would be
assessed the fees as proposed by the Drainage District.
The Drainage District responded that it would provide copies of materials
within 30 days for materials located on-site and a later time if materials are
located off-site. The previous day, Director Smith advised that he received
information indicating the City might be receiving some documents in the next
week. The City is interested in receiving any evidentiary documents that can
provide information as to the operations of the Drainage District and
information that might be contrary to the information the City has with respect
to the Preserve’s development documents, modeling, and engineering reports
prepared as part of any new development. The City is in a holding pattern
pending receipt of the information from the District.
On June 2, 2022, the Drainage District mailed a notification to all parties of a
public hearing on July 9, 2022. The City plans to object to the public hearing
and the City’s inclusion within the Drainage District based on the City’s
understanding of each development’s stormwater analysis, modeling, and
documentation reflecting that none of the developments contributed to an
increase in the impact to downstream facilities. At this time, the City is unsure
of the roll of rates and charges and which properties are included or excluded.
The notification from the Drainage District does not communicate the
assessment amount for each property. Initial information reflected a one-time
assessment of $750 for each residential property and $2,500 for commercial
properties, with 10% of those amounts assessed annually. The City’s
concerns are how the estimates were calculated, what projects would be
accomplished, and how the projects connect to the increased flows claimed to
be generated from the Preserve.
Director Smith said he is drafting an objection letter in the event the City
testifies against the City’s inclusion in the Drainage District. He has also
contacted a number of residents within the Preserve and has spoken with the
homeowners association president from the Preserve.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 10
Councilmember Althauser said he is not aware of the political structure of the
Drainage District and the analogy of the jurisdiction the District has and its
ability and basis for expanding its revenue rolls. For example, the Barnes
Lake Management District formed its taxing authority and elected to provide
services with residents agreeing to contribute funds to pay for those services.
When the cost of service increase, members are assessed a higher rate to derive
the benefits of the lake. It appears the Ditch District is attempting to levy a
similar revenue mechanism on a wide swath of residential homes and
businesses. The City’s position as one of those entities is that it could be
subject to the authority but not necessarily receive any benefits. He asked
whether the District has the authority to arbitrarily expand because it appears
nonsensical that the District could decide to expand because of the proximity
of residents and businesses that it feels would benefit from the Drainage
District.
Director Smith reported the Drainage District was formed in 1901. State
regulations go back in time and essentially satisfy rural agricultural needs to
address stormwater drainage and prepare agricultural lands. The District has
the independent assessing authority to expand. Provisions in the RCW allow
the expansion based on properties that receive service and benefit; however, it
is unclear as to the evidentiary requirements for determining which properties
receive service and benefit from the District beyond the downstream
connection. Theoretically, in 1901 when the district was formed, the entity
would have evaluated the drainage basin properties to include. The Preserve
properties were obviously not included as they did not exist when the District
was formed. The District is asserting that because of the Preserve
development, the development is sending an increased amount of stormwater
discharge through its system and that the District has to maintain the system to
some higher standard to provide benefit to ensure the flows continue
downstream and not flood properties. That element lacks documentation or
evidence to support the District’s claims. Based on the lack of information,
the City is objecting to its inclusion of the City’s parcels. It is unclear how the
District can make the determination without any supporting documentation or
studies to document that the properties are receiving benefit and at what level.
Director Smith said the District generates $2,500 each year to manage the
entire ditch network, which is insufficient to manage any type of project. The
District also lacks any staff resources. The District is comprised of three
elected officials. The City has requested documentation as to how the District
maintains the ditch and whether ongoing deferred maintenance has created
obstructions throughout the ditch network that exacerbates flooding.
Chair Swarthout inquired about the source of the $2,500. Director Smith said
the information is unknown until the City receives documentation on rolls and
rates. The City has requested the information from the District. The amount is
insufficient to manage a stormwater network the size of the District’s network.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 11
Councilmember Schneider said his uncertainty pertains to the flooding, which
apparently floods because of the wetlands, which is owned by the City and the
reason for the District to assess fees to the City, residents, and businesses.
However, when each property owner purchased their homes, they understood
that all design and regulations had been satisfied. He has considered options
of considering the issue as a reoccurring event because of climate change or
because there may have been a design flaw, which is the concern by
homeowners as they are being penalized on an issue that they did not control.
He does not understand how three individuals from the District can enforce a
levy on homeowners in the Preserve with no vote. He acknowledged that the
City does have stormwater funds and if the City is found at fault, at some point
those costs would likely need to be covered. He asked whether the situation
has been ongoing since January and whether the City and City Attorney have
considered bringing the issue to the Council.
Director Smith advised that the issue has been an ongoing conversation with
members from the Drainage District during a meeting with Mr. Jackmond in
April. At that time, the City requested more information to address the issue
with the Council. However, the District elected to move forward with its
action to conduct a public hearing without the benefit of the City receiving
information from the District. Notification of the public hearing was mailed
the same time Preserve property owners received notice. There was no
opportunity for staff to brief the Council beyond the public testimony
demanding the funds because of the lack of sufficient information to evaluate
the request.
City Attorney Kirkpatrick responded to the question and advised that she has
been involved and has been working with staff since the initial testimony by
Mr. Jackmond. She and staff have been seeking information from the District
to develop a response to Mr. Jackmond. She is not sure as to what other
information is desired other than the information included in the briefing
provided by staff. The City received the notice of the public hearing at the
same time as other property owners. At this time, she is not aware of any
legal questions. The City wants to receive the District’s documentation to
evaluate the issues.
Councilmember Schneider commented that his concerns surround the surprise
element of the issue as it has been an ongoing process since January 2022 and
has escalated. He asked at what point the issue would be moved to the Council
to receive public comments. Director Smith recommended waiting until the
City receives information requested from the Drainage District to determine if
the information supports the validity of the District’s claims. At this time, the
City does not believe the Drainage District has a credible claim based on all
the developments’ plans, modeling, and engineering reports. Staff believes the
development of the property was appropriate based on best available science
as the Preserve development and other developments have not increased
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 12
stormwater beyond natural conditions or pre-existing conditions to cause
impacts to downstream facilities. Staff does not agree with the District’s
position that the properties have increased downstream maintenance needs for
the ditch network. More information is required and the City intends to object
to its inclusion within the Drainage District. The Drainage District is its own
independently elected authority is authorized under the RCW and does not
need the City’s or the county’s permission. Based on his understanding,
should the City pursue legal action, the City must defer any action until the
City is included within the Drainage District. Should the City oppose its
inclusion and the District continues to move forward and incorporate the
properties, the City could file an appeal or take another action that would be
determined at a later date. Today, the City can object to its inclusion and
provide information to the Preserve homeowners association (HOA). City
staff has been in contact with the HOA President and provided copies of the
City’s correspondence to keep the HOA advised of the City’s position and
actions undertaken to seek information from the District to validate the
District’s claims. He also understands the HOA is seeking legal counsel to
represent the Preserve’s interest as the City is unable to represent private
interests.
Councilmember Althauser remarked that the situation is a transparency issue
and if he was a resident of the Preserve, he would be upset with the Drainage
District. The action is inappropriate by the District to increase its normal $25
assessment to $750. Director Smith noted the $750 assessment is a one-time
special assessment with ongoing fees equating to 10% of the one-time special
assessment. The District has not defined any ongoing expectations.
Councilmember Swarthout pointed out that the District has attempted to seek
funding by contacting the Legislature. It appears they started at the top and
worked down to homeowners and business owners.
Director Smith noted that if maintenance of the drainage network has been an
issue for any length of time (information the City is seeking), the request for
$360,000 for maintenance needs is questionable unless some type of erosive
event occurred. Staff is seeking information to determine how the $360,000
estimate was established and for what purpose. The issue is why the District
has not acted over the last several years to increase assessments to increase
revenue stream within the network from properties that are benefitting. It is
important for staff to have the information to evaluate the issue rather than
making assumptions.
Director Smith responded to a question about the affects of climate change and
the possibility of more flooding incidents. The affects of climate change,
should it become an issue moving forward, would likely entail an evaluation
by staff.
Councilmember Schneider advocated for briefing the Council to afford an
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
June 9, 2022 Page 13
opportunity for public comments. Chair Swarthout and Councilmember
Althauser disagreed and offered opinions as to the process and the options for
the public to offer comments. Councilmember Althauser noted that the issue
is at a point where no action is possible by the City until the District acts and
the City has the information. The lack of response by the District to provide
records to the City is concerning as the Public Records Act has strict timelines
to respond to public records requests. He encouraged staff to aggressively
pursue the requests and consider informing the District of their noncompliance
with the law by not responding to the City’s request for records.
Director Smith offered to serve as a point of contact for homeowners from the
Preserve to share information on the status of the issue to date.
ADJOURNMENT: With there being no further business, Chair Swarthout adjourned the
meeting at 9:25 a.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PUBLIC WORKS COMMITTEE
**AMENDED AGENDA**
Online via Zoom and In Person at
Tumwater City Hall, Council Conference
Room, 555 Israel Rd. SW, Tumwater, WA
98501
Thursday, June 09, 2022
8:00 AM
1. Call to Order
2. Roll Call
3. Approval of Minutes - May 5, 2022
4. Percival Creek Sewer Overflow Update – SmartCover Level Monitor (Steve Craig)
5. Drainage Design and Erosion Control Manual Revisions (Dave Kangiser)
6. PSE Schedule 74 Project Plan (Bill Lindauer)
7. Interlocal Agreement Between the City of Tumwater and Tumwater School District for the Barnes
Boulevard and Ridgeview Loop Crossing Improvements (Mary Heather Ames)
8. Pioneer Park Riparian Restoration Service Provider Agreement (Meridith Greer)
9. Hopkins Drainage District #2 Update (Dan Smith)
10. Additional Items
11. Adjourn
Meeting Information
All committee members will be attending remotely. The public are welcome to attend in person, by
telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/82178697211?pwd=enY4MHFVVVFveWlQcFpJRjFJTjBidz09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 821 7869 7211 and Passcode
267260.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
5:00 p.m. the day before the meeting. Comments are submitted directly to the Committee members
and will not be read individually into the record of the meeting.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.