MEETING MINUTES
URBANA DESIGN REVIEW BOARD
DATE: April 13, 2017 APPROVED
TIME: 5:30 p.m.
PLACE: Urbana City Building – City Council Chambers
400 South Vine Street
Urbana, IL 61801
_______________________________________________________________________________
MEMBERS PRESENT: Scott Kunkel, Nancy Ouedraogo, Jeffery Poss, Kim Smith,
Maryalice Wu
MEMBERS EXCUSED: Dannie Otto
STAFF PRESENT: Lorrie Pearson, Planning Manager; Marcus Ricci, Planner II; Teri
Andel, Administrative Assistant II; Justin Swinford, Civil Engineer I
OTHERS PRESENT: Josh Daly, Andrew Fell, Jo Kibbee, Mary Pat McGuire, Alice
Novak, Mario Vailati Riboni, Dennis Roberts, Ruth Ross, Steve
Ross, Adam Rusch, Chris Saunders, Lisa Treul, Jacob Unzicker,
Karl Weingartner
1. CALL TO ORDER, ROLL CALL, AND DECLARATION OF QUORUM
Chair Poss called the meeting to order at 5:33 p.m. Roll call was taken and a quorum was
declared present.
2. CHANGES TO THE AGENDA
There were none.
3. APPROVAL OF THE MINTUES
The minutes from the January 12, 2017 Design Review Board meeting and from the January 12,
2017 Joint Review Board meeting of the Design Review Board and the MOR Development
Review Board were presented for approval. Mr. Kunkel moved to approve both sets of minutes
as presented. Ms. Smith seconded the motion. Both sets of minutes were then approved by
unanimous voice vote.
1
April 13, 2017
4. COMMUNICATIONS
Revised Exhibit C – Site Plans and Architectural Renderings – Updated April 13, 2017
Email from Deborah Katz-Downie
Email from Sarah McEvoy and Huseyin Sehitoglu
Email from Mary Pat McGuire
Email from Pierre Moulin
Email from Peggy Patton
5. AUDIENCE PARTICIPATION
There was none.
6. CONTINUED PUBLIC HEARINGS
There were none.
7. OLD BUSINESS
There was none.
8. NEW PUBLIC HEARINGS
Case No. 2017-LBDRB-01 – A request by Chris Saunders, Vision Housing, LLC, for design
review of a residential development at 802, 804, and 806 South Lincoln Avenue and 809 West
Nevada Street.
CHAIRPERSON OPENS THE PUBLIC HEARING
Chair Poss opened this item on the agenda. Lorrie Pearson, Planning Manager, announced the case
and noted the communications received for the proposed development, which are listed under
Communications above.
STAFF PRESENTS SUMMARY OF THE CASE
Marcus Ricci, Planner II, presented the staff report. He began by summarizing the changes that
were made and submitted in the updated Site Plan and Architectural Renderings and by describing
the proposed development. He stated the Design Review Board’s responsibility for review of the
proposed application. He reviewed the intent of the Lincoln-Busey Design Guidelines as they
pertain to Zone 1 along Lincoln Avenue (higher intensity area) and Zone 2 along Busey Avenue
(lower intensity area). He reviewed how the proposed development met those guidelines with
regards to the following: 1) Façade Zone, 2) Massing & Scale, 3) Building Orientation, 4) Patterns
& Rhythms, 5) Roof Lines, 6) Windows & Door Openings, 7) Outdoor Living Space, 8) Materials,
9) Landscaping, 10) Parking Areas and 11) Sustainability. He noted that no single guideline is
mandatory, so a project does not have to meet every guideline perfectly.
2
April 13, 2017
Mr. Ricci noted a correction to the height to width ratio in the memo regarding massing and scale.
The height to width ratio on Lincoln Avenue is 1:4 overall and 1:3/4 when viewed as individual
buildings and on Nevada Street, it is 1:2.5 overall.
He read the options of the Design Review Board. He presented City staff’s recommendation for
approval with the following two conditions:
1. Construction of the proposed building and parking area shall be in general compliance with
the updated Site Plan, elevations and architectural renderings dated April 13, 2017. Any
significant deviation from these plans and renderings shall require consideration by the
Design Review Board.
2. A landscape plan shall be submitted providing a list of number and general location of trees,
shrubs, and other plants, subject to approval of the Zoning Administrator. This landscape
plan shall include the methods for tree protection during construction for the northwest
corner pin oak, determined in consultation with the City Arborist.
Chair Poss asked if the Board members had any questions for City staff.
Ms. Smith asked if there was a historical approach to analyze the height to width ratio based on the
articulation. Mr. Ricci stated that it was the decision of the board. He explained that the purpose of
the articulation is to break up a large mass. The other option is providing multiple buildings with
voids in between, which would not be feasible for a development such as this one being proposed.
Ms. Wu asked to retain the ability to ask questions later in the hearing.
With no further questions, Chair Poss opened the hearing for public input. He reviewed the
procedure for public hearings.
PETITIONER OUTLINES REQUEST AND PRESENTS EVIDENCE
Josh Daly and Jacob Unzicker, President and Vice-President (respectively) of Mode 3
Architecture, approached the Design Review Board to speak on behalf of the petitioner, Vision
Housing, LLC. They added a few more details to City staff’s report, specifically the constraints
of the requirements for the height and floor area ratio (FAR) of the proposed building. They
mentioned that they tried to break up the volume of the proposed building with deep recesses and
different earth tone colored bricks and limestone. Having larger setbacks requirements along
Lincoln Avenue also helped to make it appear to be smaller individual buildings rather than one
large building. They talked about the materials they planned to use and about the ornate cornice
on the roof.
Mr. Unzicker stated that the doors to the outside balconies would be along the side and would
not be visible from the street. The purpose of the balconies is to capture some space for the
tenants with apartments that face the street. The balconies would be more like covered porches
and set back really far to give that separation between the two sides.
There would be a lot of green space. The existing structures on the properties have 30.1% green
space and the proposed development would have 29.9%. He presented ratios of green space for
3
April 13, 2017
other properties in the nearby area. He added that there would be an outdoor community space
in the middle of the front façade along Lincoln Avenue for people to congregate and enjoy the
outdoor space. They plan to preserve the large Oak tree on the corner of Lincoln Avenue and
Nevada Street.
With regards to landscaping, they have begun preparing a Landscape Plan. It will be prepared in
conformance of the City’s specifications for proper types of trees and spacing, etc.
Mr. Daly stated that there would be shadow lines between each volume of the building. So, it
will appear to be three or four buildings. They showed pictures of other buildings in the world
with the same design techniques as they planned to use in the proposed development.
Mr. Unzicker talked about the east side of the proposed development. The parking area would
be screened with a wood fence along with some tall vegetation. They decided to use a fiber
cement material with a horizontal lap pattern along the east side or back of the building. Mr.
Daly added that there would be parking under the backside of the building, so the purpose to use
the fiber cement material would be to lighten the weight of the building over these parking
spaces.
Mr. Kunkel asked if the north and south ends of the east side would be in brick and limestone.
Mr. Unzicker answered yes. The fiber cement material would only be used where parking would
be located under the building.
Ms. Wu wondered about the dimension of the recesses. Mr. Unzicker explained that the recessed
areas on the ends would be about 6 feet and the one in the middle where the community space
would be located would be about 12 feet. The recessed area above the vehicular entrance along
Nevada Street would be about 20 feet.
Ms. Wu asked about brick pillars on the front façade. Mr. Unzicker replied that it would be to
give some interest to the front façade. It would be another focal element to help break up the
massing of the front façade.
Ms. Smith questioned how high the cornices would extend above the roof. Mr. Unzicker replied
that the cornices would be 4 feet tall from the roof deck. The condensing units would be located
on the roof and would be 30 inches tall and would not be visible from the street.
Ms. Smith asked if they had considered continuing the cornices around the back of the proposed
building. Mr. Unzicker noted that they would still provide a cap on the roof on the east side;
however, it would not be quite as elaborate.
Mr. Poss noticed that on the south end of the east side, there was no cornice shown on the plans.
Mr. Unzicker explained that it would be lap siding. Mr. Poss asked if they would consider
extending the brick siding to the south end of the east side to make the design more consistent.
4
April 13, 2017
Mr. Poss wondered if the railings between the piers were balconies or just decorative. Mr.
Unzicker replied that they are just decorative. Mr. Poss suggested rather than building piers to
have the limestone go up to the window sills on the second floor.
Mr. Poss inquired if the cornice would be constructed from limestone. Mr. Unzicker explained
that the cornice would be fabricated from either fiber cement material or be a faux stone that
would be fabricated from a high density foam with a stucco coating. Mr. Poss recommended that
they be cautious with what materials they use. They do not need so much depth to create the
effect they are after. They should let the sun and the shadow create the effect for them.
PROPONENTS PRESENT EVIDENCE
Adam Rusch approached the Design Review Board to speak in favor of the proposed
development. He believed it would be an improvement over the existing structures. The stone
and brick façade would be a nice face to Lincoln Avenue and would be compatible with the
neighborhood. He recalled that during the recent election how all of the running candidates
talked about Urbana being open for business. They all stated that they want to attract
development and making improvements to attract more people. The proposed development is a
proposal with private money of someone wanting to make Urbana a better place. He encouraged
the Design Review Board to approve the proposed development with the City staff’s
recommendations along with some design critique.
OPPONENTS PRESENT EVIDENCE AND ASK QUESTIONS
Mary Pat McGuire approached the Design Review Board to express some concerns about the
proposed development. She stated that the nearby residents have not had much time to review
the material or to meet with the architects or the applicant. She felt it would have been beneficial
to be able to exchange some concerns and to prioritize some things that they felt would be
important to keep the proposed development in quality with the surrounding neighborhood.
She highlighted some of the comments she expressed in her letter submitted and handed out as
part of the written communications. These comments pertained to Comparable in Zone 1,
Building Massing and Scale, Materials of the Building, Imperviousness, Tree Planting and
Vegetation, Tree Preservation and Building Setbacks. She requested that the Design Review
Board make no decision at this meeting.
Pierre Moulin approached the Design Review Board to express his concerns. He concurred with
what Ms. McGuire said. He felt that the proposed development was a good start to making the
development compatible with the neighborhood, but it still had a long way to go. He expressed
similar concerns with the proposed materials and greenery. He did not see the proposed
development plans preserving the existing greenery. Therefore, they need much improvement in
the landscaping plan.
With regards to the length of the proposed building, he commented that it would be a gigantic
“L”. It was not in the style of the entire neighborhood.
The property owner and architects’ goal was to pack as many tenants in as the space provides.
However, he expressed concern for an increase in noise. The proposed development would triple
5
April 13, 2017
the density of residents on the subject properties. This would increase the amount of water
usage, and he did not see the existing sewer system being addressed.
In conclusion, he did not feel that the Design Review Board could make a decision at this time.
Steve Ross approached the Design Review Board to voice his concerns about the quality of the
materials that was being proposed on the east side of the proposed development. The Lincoln-
Busey Design Guidelines discouraged the use of fiber-cement material. He would like to see
brick material used and felt it could be done in a way that would not affect the engineering
quality of the building. He stated that he appreciated the property owner’s efforts to reduce the
size of the proposed building.
Chair Poss clarified the interpretation of the use of fiber-cement. The Design Guidelines state
that “the use of wood or fiber cement was encouraged as an alternative to vinyl siding”.
Lisa Treul approached the Design Review Board to speak in opposition of the proposed
development. While there are many concerns about development in the West Urbana
Neighborhood area (WUNA), the residents welcome it. She encouraged developers reach out to
the neighbors before bringing forth development projects to the City. She asked that the Board
to continue the case to allow the neighbors an opportunity to discuss the issues about the quality
of the construction materials, issues with drainage, and issues with noise, traffic and safety.
Also, she believed it would allow the architects more time to reconsider the idea of having one
and two-bedroom apartments rather than three and four-bedrooms. The bottom line is to have
the developers and the neighbors in the area coming together to work out the remaining issues.
Chair Poss inquired about the sewer capacity. Justin Swinford, from Public Works, addressed
the storm sewer and sanitary sewer capacity. Public Works will review the site plans for storm
sewer and drainage for the proposed project when they are submitted.
With regards to the Berns, Clancy and Associates report that had previously been mentioned, the
report references the 1981 Greely & Hanson report on the sanitary sewer system that was done
for the City of Urbana. The report outlines some concerns with the Coler Avenue sanitary sewer
for both the capacity and the condition of the sewer system. In 1991, an additional sewer was
built down Coler Avenue to address any capacity issues. Since that time, the pre-existing system
has been improved with cured in place lining annually. Therefore, the issues that are mentioned
in the report do not reflect the existing condition of the sanitary sewer system. Public Works
believed that the capacity would be there for the proposed development. In addition, the City has
requirements for drainage for new developments and any additional impervious area would need
to be accounted for.
Ms. Wu asked about the process with regards to review of the storm sewer and sanitary plans. If
the Design Review Board approves the proposed development, but the plans do not meet the
requirements of the City, then what happens? Mr. Swinford explained that the Engineering
Division of Public Works would review the site plans and would have to sign off that the plans
meet the City’s requirements before any construction permits would be issued.
6
April 13, 2017
Ms. Wu questioned if for some reason the developer would need to redesign the building to meet
the requirements for drainage and sanitary systems, then what would happen? Ms. Pearson
explained that if the changes substantially altered the design of the building, then the case would
need to be reviewed by the Design Review Board again. However, most changes to storm sewer
and sanitary systems are handled underground do not necessarily have an effect on the design of
the building. Chair Poss added that City staff consults with him on whether changes would be
considered major or minor.
Mr. Kunkel wondered what the correct way would be to compare the proposed development in
comparison with other properties along Lincoln Avenue and along Nevada Street in Zone 1
(referring to page 14 of the Lincoln-Busey Corridor Design Guidelines. Mr. Ricci stated that
three of the properties totaling 80% of the proposed development would be along Lincoln
Avenue, and one property totally 20% of the proposed development would be along Nevada
Street. City staff felt the proposed development should be reviewed in context with other
properties as a property facing Lincoln Avenue and being on a corner lot.
Ms. Smith expressed concern about the massing. She asked if they would be setting a precedent.
Ms. Pearson referred to Page 19 regarding Massing & Scale in the Lincoln-Busey Corridor
Design Guidelines. She referred to the example in the first bullet under Encouraged which reads
as such, “For example, if existing structures have a ratio of 2:1, then a ratio of 1:3 for a new
development may not be appropriate”. She stated this example may help to put context on what
might be considered compatible height to width ratio. She noted that the proposed development
was not as severe as the example given in the design guidelines. She pointed out that one of the
few developments that the Board reviewed was the Nabor House, which was approved to be 90
feet along Iowa Street. Ms. Treul commented saying that it was designed to look like a house
and a front door was added to break up the 90 feet.
Ruth Ross approached the Design Review Board to ask a question. She mentioned that her
property abuts to the proposed properties on the east side. Referring to Exhibit D of the
Application, she wondered why the property line was extended into her backyard. She has a
fence on her property line separating her property from the subject parcels. Ms. Pearson stated
the Site Plans show the properties in line with one another, but asked that the architects clarify
the numbers. Mr. Daly stated that Exhibit D does not really show property lines. The lines
represented where the parking lots are. Whereas, Exhibit E shows property lines and that the
parcels line up.
PETITIONER REBUTTAL
Mr. Daly addressed some of the concerns that were mentioned by the neighboring residents.
With regards to the storm and sanitary sewers, they have checked it out by hiring a civil engineer
who will submit a full set of drawings. These drawings will be submitted along with their
construction documents to the City to prove how they planned to drain the property. The City
will review the documents and approve them or not. This is all part of the Plan Review process
for obtaining a construction permit.
There are ways to provide drainage beneath the pavement. They can install large 3 to 4-foot
diameter pipes that will collect the water during a big storm event. Then, it will slowly release
7
April 13, 2017
the water into the sewer system. This method had been approved by the Illinois Department of
Transportation (IDOT) and by the City of Urbana.
He mentioned that they have confirmed that the existing sanitary sewer can handle the capacity
of the proposed development.
With regards to landscaping, they intend to plant trees in the front parkway. The front setback
would be 25 feet from the property line. The point of the presentation was to show the building
not a bunch of trees that would block the view of the front façade. They would need to submit a
Landscaping Plan to obtain a construction permit as well as the storm water and sanitary plans.
There are 15 Ameren power poles on the site. They did ask Ameren if the power lines could be
buried and Ameren said no, so they intend to work through this issue and landscape the proposed
site appropriately.
Mr. Unzicker address the concerns with massing. The size of the proposed building had been
driven by the City’s requirements for the Floor Area Ratio (FAR) and the height limits for the
building. The proposed building would be longer because it could not be taller.
Mr. Daly commented on the number of bedrooms per apartment. One week 1and 2-bedroom
apartments are hot and the next week 3 and 4-bedroom apartments are desired. It changes
continuously. They have decided to go with 3 and 4-bedroom apartments so that the tenants
could turn one of the bedrooms into a study room or common area if they want.
OPPONENTS REBUTTAL
Ms. McGuire re-approached the Board. The applicant had been trying to develop the proposed
site for about a year, and there has been a lot of pressure on the applicants regarding zoning
requirements. Zoning was intended for single parcels not joint parcels, so things have not been
fitting together very well. The design guidelines were intended to try to get some compatibility
between things that were not naturally scaled to fit together very well. When the guidelines talk
about massing and scale, it was meant to try to make a larger development look smaller so it
would fit in better with the surrounding properties. With the open space and parking
requirements, it makes designing a development such as the proposed building difficult. It is
very difficult to work within the building envelope to make the kinds of architectural demands
that would make it compatible with its context. Therefore, she was sympathetic to the design
challenge of the proposed development.
She expressed concern about City staff’s interpretation of how the Board should compare the
proposed development to the existing structures nearby. The middle street (Nevada) is more
important in terms of context than Busey Avenue and Lincoln Avenue on their own. 90 feet of
building would be facing Nevada Street and 150 feet would face Lincoln Avenue. This did not
seem like 20% and 80%. Size and scale matters.
The landscape and the performance of the site and the performance of the surfaces are not an
afterthought of the design review process. The building footprint and the parking would all be
impervious surface. It would not be compatible with the neighborhood to just wash rainwater
away. The entire neighborhood was really about the quality of vegetation and the quality of the
8
April 13, 2017
ground plane to operate as a thermal regulator for the neighborhood. These concerns are part of
the design guidelines. The purpose of this meeting was to review the design of the proposed
development and these things were not presented.
Ms. Pearson stated that this step in the public hearing was to hear rebuttal; it was not intended for
new evidence to be presented.
Mr. Moulin re-approached the Design Review Board to comment on the 80%-20% comparison.
He stated that the 20% would be 90-feet of building facing Nevada Street, which are all single-
family homes except the multi-family building on the opposite corner of Nevada Avenue and
Lincoln Avenue. This would change the character of the 800 Block of Nevada Street. The
proposed development does not conform to the intent of the Lincoln-Busey Corridor Design
Guidelines.
PETITIONER SUMMARIZATION
Mr. Unzicker thanked the Design Review Board for listening to their presentation.
Chair Poss closed the public input portion of the hearing. He, then, opened the hearing for
Design Review Board discussion and/or motion(s).
PLAN COMMISSION DISCUSSION AND MOTION(S)
Ms. Smith stated that she serves on the Historic Preservation Commission and had voted in favor
of designating the Trelease Home as a local historic landmark back in August of 2016. She
expressed concern with the size of the proposed building setting a precedent and making it easier
for future developments to be constructed even bigger.
She also commented that she would like to see the east side of the proposed building addressed
more. Perhaps the developer could use cornices to help screen the air conditioning units up on
the roof. Also, if they brought the brick siding around to the south end of the east side, it would
break the mass down of the lap siding. She encouraged them to consider using different patterns
of windows as well.
Ms. Wu mentioned that she lived at 805 West Nevada Street. She agreed with Ms. Smith’s
comments. The east side of the proposed building would be facing her backyard. She felt that
the materials used on the east side should be reflective of the building structure and character of
the neighborhood. Also, the building on the northeast corner of Lincoln Avenue and Nevada
Street was big. The proposed building would be even larger.
There could be an opportunity to develop the sites. The neighborhood was quite motivated to
work with the developer and the architects to come up with something that can work. She felt
that a lot of work had been done and was pleased with the proposed plans. Her concerns were
how to minimize the scale of the building, how to ensure that it would be a decent looking
building from all aspects, and how to ensure the preservation of the tree on the corner.
Ms. Ouedraogo commented that Zone 1 is a higher density residential area. There is a need for
new development to be compatible with regards to comparisons along Lincoln Avenue.
9
April 13, 2017
However, she shared the same concern with massing and the materials being proposed along the
east side. The proposed building would be big, so taking these into consideration would be
helpful.
Mr. Kunkel stated that he was less concerned about the use of fibercement on the east side
especially if the brick and stone would be brought around the south end. Elevations can be
misleading sometimes because you cannot read the plane difference in an actual structure.
It may help the massing to have a change in the materials. The uniformity of the line of the stone
base may be counterproductive because it reintroduces the uniformity to the building versus the
effort to create more modulation of the façade. Also, the uniformity of the windows work
contrary to the desire to articulate the massing. There are some fundamental changes that could
be made without changing the scale or massing of the proposed development.
Chair Poss commented that the whole intention of a design corridor is to develop sensibly. The
architects are making great progress. He learned to appreciate the project to a greater extent
when listening to the applicants talk about it. This told him that the images were not
communicating some of the best things they were actually proposing.
Density and scale were a mixed thing. They are talking about the Lincoln Avenue Corridor,
which is a gateway. It was also a combination of densities. There was a need to consider higher
densities in appropriate places. He interpreted the design review and the corridor to increase the
density along the corridor in a specialized way and in a sensitive way. Design guidelines are not
perfect, but as soon as they would be perfect, a new project would come along that they would
no longer fit. It is evolution.
He was not concerned with the scale or the length of the proposed building. In order to make the
building appear to not be so big, the architects should not have made the bricks so dark and the
renderings should reflect shadow lines. Also, he recommended that the windows be taller in
proportion to play the vertical against the horizontal. Although he felt that the coloration or
change in tone of the brick color was a nice touch, he believed it could be done in a way to pull
the masses apart. In addition, he believed that there needed to be a sensitivity to the neighbors,
who have made it clear what their concerns were about…It was not about development, but
about discussion. As the Design Review Board, they need to encourage discussion outside the
board room as well as inside. Sensitivity toward the landscaping was important in this project to
break down the massing of the proposed building. The right landscape can reduce the scale of the
pedestrian or neighboring experience. He was not concerned with the proposed development
setting a precedent because that was what the Design Review Board was for.
Ms. Wu moved that the Design Review Board continue Case No. 2017-LBDRB-01 to a future
date to allow the applicants to revise the plans given the recommendations on ways to improve
the design of the proposal and achieve conformity with the Design Review Ordinance. Mr.
Kunkel asked if Mr. Daly and Mr. Unzicker could re-approach the Board to ask about their
timeframe. Ms. Pearson said yes. Discussion ensued between the applicants, City staff and the
Board about the possibility of the motion.
10
April 13, 2017
Chair Poss asked the board members which option they felt most comfortable with. Ms. Wu said
Option C.
Ms. Ouedraogo felt that Option C would imply that the proposed development did not comply
with the guidelines. She did not believe that this was the case. So, she opted towards Option B.
Mr. Kunkel was torn between Option B and Option C. He did not know if the Board could
adequately describe the conditions to make Option B viable.
Chair Poss said Option B. He felt that they could articulate the changes necessary.
Ms. Smith chose Option C; however, that would require more time.
Mr. Kunkel inquired about what the conditions would be. Chair Poss replied that approval could
be subject to the following conditions:
1. More rigorous Landscape development with sensitivity to under store tree, permeability,
shade, and things like that.
2. Investigation of the façade material on the east side.
3. Resubmitted Elevations that look at the window proportions, the fenestration of stone to
brick.
4. Screening for the east side.
Ms. Pearson mentioned that they could add that the improvements be reviewed in consultation
with the Chairperson. Chair Poss agreed.
Chair Poss stated that the original motion failed due to lack of a second.
Mr. Kunkel moved that the Design Review Board approve the proposed development subject to
approval by the Chair that a Site Plan be resubmitted with the following changes:
1. Additional efforts to enhance the façade facing Lincoln Avenue including the
reconfiguration and proportions of the windows, the limestone detailing along the base
additional opportunities for articulation of that base, the engaged brick pediment details
and the development of the site landscaping to work in concert with these items.
Ms. Wu asked for a friendly amendment to add the condition that the City Arborist be consulted
in preservation of the tree on the corner. Mr. Kunkel agreed to the amendment. Ms. Smith
seconded the motion. Roll call was as follows:
Mr. Kunkel - Yes Ms. Ouedraogo - Yes
Mr. Poss - Yes Ms. Smith - Yes
Ms. Wu - Yes
The motion passed by unanimous vote.
11
April 13, 2017
9. NEW BUSINESS
There was none.
10. STAFF REPORT
There was none.
11. STUDY SESSION
There was none.
12. ADJOURNMENT
Ms. Ouedraogo moved to adjourn the meeting. Mr. Kunkel seconded the motion. The meeting
was adjourned at 8:11 p.m.
Respectfully submitted,
Lorrie Pearson, Planning Manager
12
Agenda
MEETING NOTICE
URBANA DESIGN REVIEW BOARD
DATE: Thursday, April 13, 2017
TIME: 5:30 P. M.
PLACE: City Council Chambers
Urbana City Building
400 South Vine Street
Urbana, Illinois 61801
AGENDA
1. CALL TO ORDER, ROLL CALL, AND DECLARATION OF QUORUM
2. CHANGES TO THE AGENDA
3. APPROVAL OF MINUTES OF PREVIOUS MEETING
January 12, 2017 Meeting Minutes
January 12, 2017 Joint Meeting Minutes
4. COMMUNICATIONS
5. AUDIENCE PARTICIPATION
6. CONTINUED PUBLIC HEARINGS
7. OLD BUSINESS
8. NEW PUBLIC HEARINGS
Case No. 2017-LBDRB-01 – A request by Chris Saunders, Vision Housing, LLC, for
design review of a residential development at 802, 804, and 806 South Lincoln Avenue and
809 West Nevada Street.
9. NEW BUSINESS
10. STAFF REPORT
11. STUDY SESSION
12. ADJOURNMENT