Muyni
← Back to Uvalde

Airport Advisory Board

Regular Meeting

Uvalde, TX · February 1, 2024

Agenda

Agenda

AIRPORT ADVISORY BOARD AGENDA REGULAR MEETING Thursday February 1, 2024 4:00PM BOARD MEMBERS: William Kessler-Board Chair Craig Garnett Don McLaughlin, Jr. Jared Reading Charlie Waller Joe A. Cardenas-Assistant City Manager Page 1 of 28 NOTICE OF A REGULAR MEETING OF THE AIRPORT ADVISORY BOARD OF UVALDE, TEXAS Notice is hereby given of the regular meeting of the Airport Advisory Board of the City of Uvalde, Texas, to be held Thursday February 1, 2024 at 4:00 P.M., in the City Council Chambers 2nd floor of City Hall, 101 East Main St., Uvalde, Texas for the following purpose: Page 1 CALL MEETING TO ORDER 2 APPROVAL OF MINUTES 4-6 2A. Consider approving the Airport Advisory Board meeting minutes of the November 30, 2023 meeting. Airport Advisory Board - Nov 30 2023 - Minutes - Pdf 3 FINANCIAL REPORT 7 - 11 3A. Financial Report by Joe A. Cardenas. Financial Report 4 NEW BUSINESS 12 - 19 4A. Consider and act on a request from Archie McFadin to add another 50 feet to his existing hangar and to amend his existing lease to reflect said terms. This expansion will accommodate the Air Evac EMS team at Garner Field. Air EVAC 5 DISCUSSION 20 5A. Discussion regarding a request from SWTJC to renew their existing hangar lease that expires on September 30, 2024. SWTJC 21 - 28 5B. Discussion regarding a request to build a Law Enforcement Training Facility (shoot house) on Garner Field Airport property. Law Enforcement Training Facility 5C. Discussion regarding the upcoming April 8, 2024 total solar eclipse. 6 OLD BUSINESS 6A. 2023 CIP pavement rehab at Garner Field estimated at $5M and effective changes to the 2023-24 ramp program. 6B. Request from the Texas Department of Public Safety for hangar and office at Garner Field. 7 REPORT 7A. Report regarding:  Status/condition of Hangar 1 - Aviation Museum Hangar  T-hangars, cost estimate  Electronic copy of the master plan  Garner Field general liability coverage  The need to add an automatic gate open/closer on last gate  AWOS system and letter of intent  Clearing of land between firemen's practice field and gun range Page 2 of 28 8 OTHER AIRPORT RELATED BUSINESS 8A. Other items desired by board members. 9 ADJOURNMENT Certificate: I certify that the above and foregoing notice was posted in compliance with Section 553.043, Texas Government Code at 3:00pm, January 29, 2024. _____________________________________ Sorayda A. Sanchez, City Secretary City Hall Municipal Building is wheelchair accessible with accessed and special parking available on the west side of the building. The Council Chamber is accessible by elevator to the second floor. Requests for special services must be received forty-eight (48) hours prior to meeting time by calling City Hall (830) 278-3315 ext. 142. Page 3 of 28 MINUTES Airport Advisory Board Meeting 4:00PM - Thursday November 30, 2023 City Hall-Council Chambers 101 E. Main St. Uvalde, TX 78801 The Airport Advisory Board meeting of the City of Uvalde was called to order on Thursday November 30, 2024, at 4:00PM, in the City Hall, Council Chambers, with the following members present: BOARD William Kessler-Board Chair MEMBERS Craig Garnett PRESENT: Don McLaughlin, Jr. Jared Reading Charlie Waller BOARD MEMBERS ABSENT: STAFF Joe A. Cardenas-Assistant City Manager PRESENT: Sorayda A. Sanchez-City Secretary 1 CALL MEETING TO ORDER 2 APPROVAL OF MINUTES 2A. Consider and act on the approval of the Airport Advisory Board meeting minutes of the July 13, 2023 meeting. Motion to approve the minutes of the July 13, 2023 Airport Advisory Board meeting made by Board Member Don McLaughlin, Jr. Motion seconded by Board Member Charlie Waller. Motion carried 5-0. 3 FINANCIAL REPORT 3A. Financial Report by Joe A. Cardenas. Joe A. Cardenas, Assistant City Manager reviewed the Financial Report with the board members present. Mr. Cardenas stated that the Fiscal Year runs from October 1 through September 30. The revenue proposed for this year is $394,933, and expenses are projected at $372,783 with a surplus of $22,150. We have received $27,847.08 in revenue, and expenditures of $516,273.99, the big one is the $515,460, which is the 10% for the asphalt rehab project. The balance sheet reflects $956,239. Motion to approve agenda item 3A, financial report made by Board Member Craig Garnett. Motion seconded by Board Member Don McLaughlin, Jr. Motion carried 5-0. Page Page41ofof28 3 4 NEW BUSINESS 4A. Consider and act on request from Archie McFadin to add another 50 feet to his existing hangar and modify the extended apron (striping) in order to accomodate the Air Evac EMS team at Garner Field. Joe A. Cardenas, Assistant City Manager explained to the Airport Advisory Board that this is a request from Archie McFadin. Air Evac EMS has contacted Mr. McFadin regarding a housing request. To accommodate Air Evac, he would need to add to his hangar. He currently has 2 planes housed at his hangar, and if allowed to expand, he would have his 2 planes on one side and Air Evac on the other. Motion to approve item 4A, the concept of Mr. McFadin's plans, made by Board Member Don McLaughlin, Jr. Motion seconded by Board Member Craig Garnett. Motion carried 5-0. 4B. Consider and act on the removal of brush (over grown area) between the firemen's practice field and gun range in an effort mitigate the deer seeking shelter at Garner Field. Joe A. Cardenas, Assistant City Manager explained to Board Members that there have been a large number of deer that have entered the airport property. They enter the Airport via the gate entrances. Mr. Cardenas is proposing 2 options. One is to close the gates and control the entrance to the airport. The second is to clear the area out and flush out the deer. Mr. Cardenas has spoken to 2 different contractors for assistance in clearing the area. Motion to approve agenda item 4B and proceed with both options made by Board Member Jared Reading. Motion seconded by Board Member Charlie Waller. Motion carried 5-0. 5 OLD BUSINESS 5A. 2023 CIP pavement rehab at Garner Field estimated at $5M and effective changes to the 2023-24 ramp program. Joe A. Cardenas, Assistant City Manager reported that we have paid our share for the asphalt rehab project. The contractor is aware that the project should be completed before July 2024, due to Glider Competition. 5B. Request from the Texas Department of Public Safety for hangar and office at Garner Field. Joe A. Cardenas, Assistant City Manager explained that DPS is still interested in coming to Uvalde. Mr. Cardenas stated that the location we are looking to house them is the Junior College Hangar. There is less than a year remaining on that lease. Jared Reading, Board Member stated there are other individuals interested in that hangar. Mr. Reading asked if there could be a bidding process or if this would automatically go to DPS because they serve Uvalde. Mr. Cardenas stated that it would be the latter. We would get other uses from them as well and therefore he believes it should go to DPS. 5C. The emergency operation center (EOC) tentative schedule to vacate Hangar 1. Joe A. Cardenas, Assistant City Manager explained that the Emergency Operation Center has relocated. There are a few items remaining. Page Page52ofof28 3 6 REPORT 6A. Report regarding:  Status/condition of Hangar 1 - Aviation Museum Hangar  Update on the Jr. College hangar  Working with Game Warden on a deer removal plan  The need to close the gates along Airport Blvd  The need to add an automatic gate opener/closer on last gate Joe A. Cardenas, Assistant City Manager reviewed all items with board members. 8 months are remaining on the Junior College lease. Working with Game Warden on deer removal plan. Look into the gates for the airport. 7 OTHER AIRPORT RELATED BUSINESS 7A. Other items desired by board members. William Kessler, Board Chair stated that the board had previously discussed potentially building T-Hangars. Mr. Kessler would like for staff to start that process and asked for an update on the next agenda. 8 ADJOURNMENT Motion to adjourn made by Board Member Charlie Waller. Motion seconded by Board Member Don McLaughlin, Jr. Motion carried 5-0. Meeting adjourned at 4:58PM. Board Chair City Secretary Page Page63ofof28 3 Budget Report City of Uvalde, TX Account Summary For Fiscal: 2023-2024 Period Ending: 12/31/2023 Variance Original Current Pe?od Fiscal Favorable Percent Total Budget Total Budget Activity Activity (Unfavorable) Remaining Fund: 733 - AIRPORT FUND Revenue 733«00—00>S S 14 GROSS RECEIPTS AIRPORT ~ 26,500.00 26,500.00 0.00 2,578.60 -23,921.40 90.27 % 733-00-00-5611 INTERESTREVENUE 30,000.00 30,000.00 3,484.59 10,195.25 ~19,804.75 66.02 % 733~00—00—5624 AIRPORT RENTALFEES ~ 302,433 .00 302,433.00 25,670.91 75,051.19 —227,381.81 75.18 % 733—0O—0O—5774 MISCELLANEOUSREVENUE 0.00 0.00 20,330.04 20,830.04 20,830.04 0.00 % 733-01-00-5624 LANCAIRTDA 36,000.00 36,000.00 3,000.00 9,000.00 -27,000.00 75.00 % Revenue Total: 394,933.00 394,933.00 52,985.54 117,655.08 -277,277.92 70.21% Expense PROFESSIONALSERVICES 6,000.00 6,000.00 0.00 0.00 6,000.00 100.00 % 733—OO—0O—6 311 OPERATINGSUPPLIES 7,000.00 7,000.00 0.00 87.77 6,912.23 98.75 % 733~0O~O0—6313 BUILDINGSUPPLIES 500.00 500.00 0.00 0.00 500.00 100.00 % 733vO0—00—6321 WATER 82GAS 6,500.00 6,500.00 1,406.83 1,970.82 4,529.18 69.68 % 733-00—00»6323 ELECTRICITY 10,000.00 10,000.00 786.61 1,623.46 8,376.54 83.77 % 733~00—00-6402 OTHERSERVICES& CHARGES 1,000.00 1,000.00 0.00 0.00 1,000.00 100.00 % 733—00—O0—6414 EQUIPMENTREP. & MAINT. 10,000.00 10,000.00 275.00 525.00 9,475.00 94.75 % 733-00-00-6417 BUILDINGREP. & MAINT. 7,500.00 7,500.00 347.75 57.75 7,442.25 99.23 % 733»0O-00-6421 Infrastructure Repair & Maint. 2,500.00 2,500.00 0.00 670.00 1,830.00 73.20 % 733-0O—00~6478 TRAINING/TRAVEL 1,500.00 1,500.00 0.00 0.00 1,500.00 100.00 % 733-00-00-6479 DUES & SUBSCRIPTIONS 250.00 250.00 0.00 0.00 250.00 100.00 % 733—00—00~6706 IMPROVEMENTS 150,000.00 150,000.00 0.00 515,460.00 365,460.00 -243.64 % 73 300-00693 1 SERIES2022 PRINCIPAL 90,000.00 90,000.00 0.00 0.00 90,000.00 100.00 % 733-O0—00—6932 SERIES2022-INTEREST 30,033.00 30,033.00 0.00 0.00 30,033.00 100.00 % 733—00—01»6706 IMPROVEMENTS 50,000.00 50,000.00 0.00 _ 0.00 50,000.00 100.00 % Expense Total: 372,783.00 372,733.00 2,816.19 520,394.80 -147,611.80 -39.60% 22,150.00 22,150.00 50,169.35 0 H Fund: 733 - AIRPORT FUND Surplus (Deficit): 402,739.72 -424,889.72 1,918.Z4% 22,150.00 22,150.00 '—42'4,'si;9.72" ‘II‘50,‘16§.2§5 I4t02,7‘39.’7"2 A I 1,9V1é.247A W I ' Report Surplus (Deficit): Page 7 of 28 BudgetRepon For Fiscal: 2023-2024 Period Ending: 12/31/2023 Group Summary Variance Original Current Pe?od Fiscal Favorable Percent Account Typ... Total Budget Total Budget Activity Activity (Unfavorable) Remaining Fund: 733 AIRPORT FUND - Revenue 394,933.00 394,933.00 52,985.54 117,655.08 —277,277.92 70.21% Expense 372,783.00 372,783.00 2,816.19 520,394.80 —147,611.80 -39.60% Fund: 733 - AIRPORT FUND Surplus (Deficit): 22,150.00 22,150.00 50,169.35 -402,739.72 -424,889.72 1,918.24% Report Surplus (Deficit): 22,150.00 22,150.00 50,169.35 402,739.72 -424,889.72 1,918.24% Page 8 of 28 Budget Report For Fiscal: 2023-2024 Period Ending: 12/31/2023 Fund Summary Variance Original Current Pe?od Fiscal Favorable Fund Total Budget Total Budget Activity Activity (Unfavorable) 733 AIRPORTFUND « 22,150.00 22,150.00 50,169.35 -402,739.72 424,889.72 Report Surplus (Deficit): 22,150.00 22,150.00 50,169.35 -402,739.72 -424,889.72 Page 9 of 28 Balance Sheet City of Uvalde, TX Account Summary As Of 12/31/2023 ACCOUHI Name Balance Fund: 733 AIRPORT FUND - Assets 73}-OQ-QQ«110O POOLEDCHECKINGAirport Fund - 1,035,842.68 733—0O—00~112O INVESTMENTS 0.00 733«00~00«1202 ACCTRECIEVABLE FORARAPP 7§§—0Q—0Q—1260 DUE TO/DUE FROM 0.00 733~O0-0Q-1290 ACCTS.RECEIVABLE-OTHER 31,473.91 733~0Q»O0-1418 Deferred Expenditures/Expenses 0.00 7;;-Qgm-1430 Prepald Expenses CI.0O 733—00- -1510 LAND 96,152.00 7 - ~1 0 - BUILDINGS 3,441,37q.oo 733—00—OO—1§2§ IMPROVEMENTS 0.00 733-QQ;QQ—;§§§ MACHINERY& EQUIPMENT 591,24:II.41 733-00-00-1571 ACCUM. DEPR.-BUILDINGS —1,714,078.17 73 ~ 0- -1 7 ACCUM.DEPR-VEHICLES 0.00 733-00-00-1575 ACCUM. DEPR. «MACH.& EQUIPMENT -591,241.41 7 ~ 4 77 ACCUM.DEPR.-IMPROVEMENTS -3,166,134.95 733-00-00-1580 CONST. IN PROGRESS-IMPROVEMENT 0.00 733700-Q-1597 INFRASTUCTURE ASSETS AIRPORT - 5,359,263.54 733-O0-85-1580 CIP Border Patrol Hanger Improvements - 0.00 733—0Q~§7-1§§§) CIP- Southstar SOQ#05-15-11 0.00 733-0O- -1294 A.R. SIerra(TCF)729012 — 311,602.27 7 - — -15 CIP Sierra Industries/TCF — Project £1.90 Total Assets: 5395:49913 5,39 5,499.28 Liability 7g;-oom-;;;g ACCOUNTSPAYABLE d.oo 733-oo-oo-2111 Accounts Payable Additional for year-em - 0.00 73§—Q_Q;QQ-2240 SHORTTERM LOANPAYABLE- TDA#72901 35,511I.60 733-00-oo-2251 SHORTTERM BONDSPAYABLE 90,000.00 73 -0 -2274 - ACCRUEDINTEREST 7,853.50 DEFERREDREVENUE—NonProperty Tax 0.00 733-09-oo-g314 Unapplied Credits - Deferred Revenue 30q.00 733-00-00-2420 BOND ISSUANCECOSTS-Series 2012 0.00 73 - - -2 11 BONDSPAYABLE-Series 2022 985,000.00 733-0Q-Q0-2552 LOANPAYABLE—TDA #729012 (SIERRA) 276,090.67 7 3- -29 9 - DUETO POOL(AP PENDING) 0.00 733—O0—87—2S8O LOANFROM GENERALFUND 000 733-oo-§7-2531 LOANFROMUTILITYFUND 0.00 733-0 —87—2582 LOANFROM SANITATIONFUND 000 733-00 -2550 LOANPAYABLE _________________________ Total Liability: 1.394.750-77 Equity 7 - 7 - PRIORPERIODADJUSTMENT 47,104.60 733-00-00-3701 Prior Period 0.37 7 - -7 2 - CYPrior Period Adjustment 0.00 733-00-00-3703 Prior Period Adjustment 0.00 73§—QO~QQ~_%_§QQ Invested in Capital Assets Net of Related E 3,179,710.00 7 3- -0 -3810 Restricted for Debt Service 0.00 733-00-00-3900 UNRESTRICT ED NETASSETS 3,775,191.46 733-00-00-3902 CONTRIBUTEDCAPITAL -2,534,319.00 Total Beginning Equity: 4-4037473-23 Page 10 of 28 Balance Sheet A5 of 12/31/2023 Account Name Balance Total Revenue 117,655.08 Total Expense 520,394.80 Revenues Over/UnderExpenses 402,739-72 Total Equity and Current Surplus (Deficit): 4.000.738-51 Total Liabilities, Equity and Current Surplus (Deficit): 5,395,499.28 Page 11 of 28 Joe A. Cardenas From: Joe A. Cardenas Sent: Tuesday, December 5, 2023 10:46 AM To: ‘Paul J. Tarski (paul@tarski|aw.com)'; Alexandra T. Wegrzyn Cc: Vince DiPiazza Subject: doc0O231020231205102032.pdf Attachments: doc00231020231205102032.pdf Paul Re: Garner Field Attached please find a copy of Archie McFadin’s hangar lease with the city of Uvalde. Archie is requesting permission to expand his hangar by another 50 feet, in order to accommodate Air EVAC (a second air ambulance) very similar to what he did with PHI. Our Airport Advisory Board has tentatively approved the expansion (concept), pending the details/termsof revised lease agreement. I will be providing you in a subsequent email a sketch by TXDOT Aviation, showing the proposed hangar location. If approved, Archie's plan is to house Air EVAC in the same area of the hangar that PHI once occupied and house his airplanes in the balance of the hangar including the area being expanded. We haven't gone over the terms of the new or revised lease, but unofficially, I would propose that we keep this within the current terms of the lease and add another $150 to $200 ground lease to the existing. Archie would in turn, cover the cost of construction and be responsible for the cost involved in moving the taxi lane. Your thoughts. Current lease 20 years (Oct 2015 September 2035, with two 5 years options) — Base rent (ground lease) $150 a month Please call should you have any questions. . Page 12 of 28 Ijvrildra /-\<rpmt was :‘~.‘u:>z 1) Cut (3) openings for window installation 3ftx5ft in the interior where drywall is installed. 2) Cut (3) 3ftx5ft openings for window installation on ex- terior side where existing corrugated panels. 3) Frame (3) 3ftx5ft openings for window installation. 4) Install window seal moisture tape around seals. 5) Install metal flashing around windows and flashing. 6) Waterproof all window seals. iar»;«»r: UvaldeAirport Mm» 11/15/2023,1:54pm Crmvru; TJ’s Remodeling And Construction 8) Install drywall where window cut out took place(3) tape float texture and paint to match existing. 9) Cut out opening for exterior door 36inx80in in living room area. 10) Frame entry door with egress 36x80in. 11) Install moisture tape around openiAng. 12) Install exterior door. 12) Install metal flashing and trim around door. 13) Caulk and paint. i’u_:,r~..: Uvalde Airport Um» 11/13/2023, 10:25am in »..r:n TJ’s Remodeling And Construction Pic for reference where window cutout will take place. C’n<.y-r: Uvalde Airport i).—::e,= 11/13/2023,10:25am C:r—u11n:TJ’s Remodeling And Construction Page 13 of 28 Uveilrie Airport ll"|5m’2’()23 Pic for reference where window cut out will take place. Prr;-newI Uvalde Airport Dale 11/13/2023,10:26am Lreatov TJ’s Remodeling And Construction 8) Cut out 36inx54in attic access door with ladder for access above. 9) Frame for installation of attic ladder and attic access. 10) Install fasten drywall repair needed where ceiling was cut for frame. 11) Install trim around access door caulk and paint. Prr:u}e(;i Uvalde Airport Dare 11/13/2023,10:25am (‘,.r».~;.m: TJ's Remodeling And Construction 12) Reconfigure plumbing for water heater relocation at bottom of structure. 13) Build enclosure for water heater with acces door. 14) Configure/install all sprinklers throughout structure per fire code with shut off valve (23’x53') 15) Remove corrugated metal panels from exterior of structure (53'L) (23L) for structure 10'4" metal building height Plum '. Uvalde Airport Date 11/13/2023,10:27am CH-’E)i()f TJ's Remodeling And Construction Srarfmn 1 5 llwulzln import Page 14 of 28 Uvalde Allpult ‘Ill’,I 5 '}’(,J2":)’ 16) Frame walls from foundation up to roof gable 23x53'x24’H 17) Install/fasten double layered sheathing fireproofing 5/8 drywall fire retardant on outside wall. 18) Install/fasten R-13 batted insulation throughout inte- - rior of framed wall 23'x53’x14'H. ~ 19) Install/fasten single layer of fire retardant drywall in interior wall 20) Tape ,float and sand level 1 finish. v Uvalde Airport F’r<-1e< inn-:4 11/15/2023,1:55pm C:r=.;~.ror TJ’s Remodeling And Construction 21.) Primer all interior walls, doors and trim 1,300sq ft. 22.) Paint all interior walls, doors and trim 2 coats 1,300 sq 5 ft. $4,387.99 PI-upeI‘;[ Uvalde Airport mm» 11/13/2023,10:25am (ire,-am: TJ's Remodeling And Construction TOTAL$131,875.99 INTERIOR PAINTING$4,387.99 GRANDTOTAL $136,263.99 ALL MATERIALSTOOLS AND LABOR INCLUDED P!-::)r:( 2 Uvalde Airport Dam 11/15/2023.1:59pm (..:re>mm TJ's Remodeling And Construction 3 .j.,(1l(h_= fw ;_T.'Tl1 Ew: ilonl Page 15 of 28 W ESTIMATE circle H Construction circ|ehconstruction20@gmai|.com 559 sage Ln +1 (830) 279-8185 Uvalde, TX 78801 CIRCLE H CEINSTRUCTIEIN Arci3ie‘McFadin Bill to Ship to Archie McFadin Archie Mcpadin Estimate details Estimate no.2 1040 Estimate date: 12/21/2023 Product or service Amount Materials $40,838.99 Build 55'x75'x20' airplane hangar, joining existing hangar. Concrete Work $64,181.25 Materials $40,000.00 50'widex17‘ tall hydraulic door Labor $27,843.75 Electrical Senrlce $15,675.00 Equipment $3,500.00 Insulation $11,914.85 T018‘ $203,953.84 Page 16 of 28 Page 17 of 28 Page 18 of 28 1 Page @ 19 of 28 C SOUTHWESTTEXASJUNIOR COLLEGE 2401 Garner Field Road l Uvalde, TX 78801-6221 Phone: (830) 278-4401 I Fax: (830) 591-7354 www.swtj(;.edu cnlleu Sullmslixasllnlur January 24,2024 City of Uvalde City Attorney Paul Tarski PO Box 799 Uvalde, TX 78802-0799 Dear Mr. Tarski, Southwest Texas College is requesting that the City of Uvalde renew the Aviation Hangar lease set to September 30, 2024. The original 20-year lease began in November 1994 and subsequently the college built the hanger for the operation of a flight school. During the early 2000's the college approach City Council for approval to make modifications to the hangar for the operation of our Radiology program and other academic classrooms, permission was granted. The hangar was also home to our Wildlife Program until the summer of 2022 when our Aviation Maintenance Program was begun. Our plan is to complete our aviation airframe and powerplant (A&P) program. We are currently licensed by the FAA for the airframe portion on our Del Rio Campus (since 2015) and we planned to expand the Powerplant portion in Uvalde. This program will require an approximate $500,000 investment in equipment alone. We are requesting a 10-year lease with two 5-year options to extend. The college would like to expand the current hanger by approximately 8,400 square feet potentially 11,250 square feet. We are not opposed to include hangar space for a DPS helicopter with access to a dedicated office in the building. I ask that we be included on the agenda for the next Airport Advisory Meeting scheduled for February 1, 2024, to able to share our plans with the group. Please let me know how you wish to proceed. - Sincerely, //zéx/31/4» Hector Gonzales, Ph.D. President Crystal City | Del Rio | Eagle Pass I Hondo l Medina Valley | Pearsall | Uvalde Page 20 of 28 Law Enforcement Training Facility Project Proposal: Design and Construction of a law enforcement training facility, including a controlled ?ring area for short and medium ranges with 15 stalls each, shoot house for simulated indoor tactical training, classroom and of?ce building, and parking. Proposed Location: Southwest of the Uvalde County Justice Center, near the Uvalde County Fairplex. Phasing: This proposal is to perform the work in two phases. Phase I includes feasibility studies, design, and permitting, while Phase II includes physical construction. The phasing will allow for greater ?exibility in design requirements while controlling ?nal construction costs and minimizing potential change orders. A cost proposal will be provided for each phase, with the construction costs only ?nalized after phase I is completed. Phase I - Design Work performed under this phase will include: 0 Land Survey 0 Geotechnicallnvestigation 0 Engineering and design for civil, utilities, structural foundations, architectural, mechanical, electrical, and plumbing 0 Con?guration and features of the shoot house 0 Permitting and Approval Hangar6x (H6X) and JSR will manage all aspects of the design and permitting process, including contracting surveying, materials testing, architectural/engineering ?rm, and shoot house specialty contractor. A JSR design manager will meet regularly with the A/Emembers to ensure design schedule targets are met, and the agreed scope of work is implemented. Design will start with a design charrette, a collaborative meeting with key stakeholders, contractor, and A/E?rms to present conceptual plans and capture client needs. This meeting will help establish a mutual understanding of the project needs prior to major design efforts. Phase II Construction — 0 All work required to procure and construct the approved design in Phase I. Con?dential Do No Distribute Page 21 of 28 Law Enforcement Training Facility Key Construction Features Shoot House 0 60ft x 100ft Pre—EngineeredMetal Building 0 Multi-room, single story simulated ?re training rooms. Partitions to be recon?gurable to allow for multiple scenarios. 0 Cat walks for observation and instruction 0 Targetry AAR (After Action Review) system Controlled Firing Range 0 Short—RangeWeapons System Range, 50x55 yards (100m x 50m), 15 stalls 0 Longe-Range Weapons System Range, 109x55 yards (46m x 50m), 15 stalls 0 Range berm constructed of earth-filled Hesco barriers Classroom and Of?ce Buildings 0 One 64ft x 48ft modular building con?gured for classroom instruction and includes of?ce space and restrooms. 0 Space to accommodate training for thirty (30) individuals. Storage 0 Secured storage for equipment. Parking 0 Asphalt paved driveway and parking for (100) vehicles. Confidential Do No Distribute Page 22 of 28 Page 23 of 28 Page 24 of 28 Page 25 of 28 Page 26 of 28 Page 27 of 28 Page 28 of 28

Get email alerts for Uvalde

A daily email when new agendas and minutes are posted.

Report an issue with this meeting