Public Works, Sewer and Water
Regular MeetingVerona, WI · February 11, 2019
Minutes
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, FEBRUARY 11, 2019
1. The meeting was called to order by Mr. Touchett at 5:15pm.
2. Roll Call: Present: Evan Touchett, Chad Kemp, and Sarah Gaskell. Also present: Theran Jacobson, Public Works
Director; Adam Sayre, City Planner; Katherine Holt, Assistant City Planner; Jess Billmeyer, AECOM. Also present:
Fred DeVillers, FDG; Bill Dunlop, JSD; Tomas Torro, JSD.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the January 28, 2019 meeting of the Public
Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Kemp, to recommend awarding contract for Project 2019-101, Verona Street
Asphaltic Rehabilitation Project to Raymond P. Cattell in the amount not to exceed $430,840.00. Motion
carried 3-0.
5. MOVED by Touchett, seconded by Gaskell, to recommend awarding contract for Project 2019-102, Bituminous
Seal Coat Project to Fahrner’s Asphalt Sealers of Waunakee, WI in the amount not to exceed $237,870.00.
Motion carried 3-0.
6. MOVED by Touchett, seconded by Kemp, to recommend approval of the Memorandum of Understanding for
Joint Design and Construction of MMSD Pumping Station 17 Force Main Relief – Phase 1 and City of Verona
East Side Interceptor Replacement. Motion carried 3-0.
7. MOVED by Touchett, seconded by Gaskell, to recommend approval of the release of the temporary
construction easement under document number 4297834 located at 2159 Range Trail. Motion carried 3-0.
8. Discussion about Whispering Coves subdivision including pedestrian traffic and safety, pond maintenance
requirements, design of terraces and cul-de-sacs, lack of VASD feedback. Informal notes are documented
below during discussion.
a) Dunlop noted that the 50-foot ROW is now a 60-foot ROW with a 6’ terrace as a minimum around the cul-
de-sac. Street widths would like to see 28’ foot edge to edge and 30’ face to face if allowed with one-side
on-street parking. There are a number of studies regarding slower speed and narrow street width.
b) Jacobson presented what Verona streets sections currently are and why. Typical section is 18’ from the
centerline to the face of the curb with a full 9’ terrace measure from back of curb to edge of sidewalk for
residential street. Jacobson showed an example in Cathedral Point and other locations throughout the City
after 13 inches of snow. The intersection configurations do not follow engineering standards and create a
hazard for the right turn movements, for speed, vision, and stop control. The details are identified below.
c) Dunlop – Cross section have been modified per the drawings shows. Will provide to staff.
d) Billmeyer - It is important for pedestrians and visibility for cars sight distance depending on the type of
design at an intersection.
e) Touchett - Is there any parking in front of those properties near the primary intersection near Street R?
f) Jacobson - No on-street parking in those residents south of intersection near Street R. Jacobson presented
the preferred design of the intersection on the white board that has been used in other locations of the City.
g) Gaskell - Why do we need pass through right lanes? 4-way stop or through-right turn lane instead of single
right turn lane with median? There would be less places for drivers to look. Where the trail is crossing this is
the only control for the crossing?
h) Jacobson - They have used this design to place boulevards on collector streets. These would be an issue for
mowing or river stone with plantings could be placed similar to Locust and S. Main intersection.
i) Jacobson – Options are to square the intersections and closing off the boulevards so they are end to end.
j) DeVillers - More landscaping in the corridor with HOA landscaping maintenance, which are a higher level
landscaping.
k) Sayre - Cathedral Point has a condo association in Verona but the fee is minor.
l) Jacobson - Trail would be maintained year round by the City staff.
m) Jacobson - Discussed temporary access point and what is being discussed in the TIA as an update to the
committee.
n) Dunlop - The TIA had two alternatives. 1st phase of the development, determined how much it could handle
and the breaking point for the single family. Number of trips in the eastern forty is being determined the
tipping point. The analysis was done solely on single-family on single access point.
o) Billmeyer - TIA had full build out and took out half the multi-family and still failed at the intersection. The
delays were 65 to 70 with half the multifamily. 55 seconds is failing. The TIA is not approved at this point.
p) Jacobson - Pointed out the number of storm water management facilities. The more facilities means the
more risk for the site and maintenance in the future. There is a dry pond used for infiltration. Dark green is
to take water in as shown on the exhibit. Make sure the buildings meet all of the requirements.
q) Dunlop - Described what was analyzed and the checks for the development. The second 100-year storm is
not a requirement but is a disaster analysis. The lots are all 2’ above the back to back 100-year event. The
infiltration meets the standards.
r) Gaskell - People are very concerned about storm water events and how can you design for the larger event
even though you don’t have to build for it. WDNR controls these standards.
s) Jacobson - 100 year storm is the regulatory is the code at state, county and local level. CARPC has a 100 year
back to back because of the closed kettle requirement, which is met based upon current layouts.
t) Jacobson - Showed photos of the latest snow storm with measurements. Gang mailbox locations are a
different topic of discussion. Alternate side parking and typical street geometrics is very important to help
with snow removal, public works operations, etc. throughout the winter. Safety improvements we have
used in the city are vision triangles, pork chop islands, medians, bump-outs, and beacon crossings.
u) Gaskell - We could do parking on one-side and in a certain timeframe is alternate side parking. Balancing
narrower streets against a handful of snow events. It is easy to have parking restrictions with a new
development to establish the rules.
v) Kemp - Would you have to change the structure of the trucks? What about other streets with smaller
widths?
w) Jacobson – No, the routes are set. It may require an additional pass for the plow due to the lack of utilizing
the plow full potential and offsetting the centerline.
x) Jacobson - Unsure how many miles are being added to the system. Two staff members would need to be
hired to handle this area and Kettle Creek North plus equipment. Hometown Grove is 36 feet except 32 feet
for Goldenrod. It will create more staff time for clearing the street. We don’t haul snow from subdivisions
except at a certain height in cul-de-sacs. We plow snow to the center of the cul-de-sacs.
y) Jacobson - Described the cross-sections using the Applicant’s exhibits. 32’ face to face is a concern. Narrow
terraces do not provide ample snow storage and create vision concerns. Terraces are used for snow
storage, street sign placement, trees, private utility companies to serve the development, brush collection,
etc.
z) Touchett - It is cleaner to do parking on alternate side all year around if the streets are narrower.
aa) Gaskell - Every cul-de-sac is a pocket park. We are pushing snow to the center of the cul-de-sac with the salt
towards the equipment and killing the grass.
bb) Gaskell - Ok with narrower streets with alternate side parking year round. Concern with the school street
width. We need to adjust or account for school traffic. We need to see what the changes are that the
Applicant has done. 32’ wide road with 8’ terrace.
cc) Jacobson - Suggests that there shall be a terrace with no obstructions to help with snow storage in the
islands.
dd) Gaskell - Year round alternate parking with 32 feet and 8 foot terrace.
ee) Torro - Design completed for removing the retaining walls except for one wall.
ff) Touchett - Prefers bump out for pedestrians. How many crashes are recorded for pedestrian and bicyclists in
the City? Forcing cars alternating side is good.
gg) Gaskell – Developer to provide graphic to illustrate speed and hit for pedestrian.
hh) Sayre - 8.5’ minimum terrace width/alternate parking/32’ width back of curb to sidewalk.
ii) Dunlop - Clarification for terrace for cul-de-sacs?
jj) Jacobson - Still wants minimum of 8.5’ terrace width throughout. Why not keep the right of way at 66’
minimum as required? Space could be used for a wider terrace.
kk) Gaskell - VASD feedback on school site?
ll) Dunlop - No response, but did move the school south. 60’ right of way with 7.5’ terrace going into the cul-
de-sac.
mm) Sayre - Update the exhibits and present the updates. JSD to send to City staff.
nn) Touchett - He has maintenance concerns about the ponds and hopes to reduce the number of ponds. This
puts an extra burden on the City.
oo) Gaskell - Visually flip it to see the topography with the design would be helpful.
pp) Jacobson - Dunlop shall submit the current drawings to Jacobson ahead of the formal submittal to continue
discussions at next committee meeting.
qq) No action taken.
9. MOVED by Touchett, seconded by Gaskell, to adjourn at 6:43pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works and Katherine Holt,
Planning. These minutes are based on the notes of the recorder and are subject to change at a subsequent
meeting.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, FEBRUARY 11, 2019 – 5:15 P.M.
VERONA CITY CENTER
111 LINCOLN STREET
VERONA, WI 53593
AGENDA
1. Call to order.
2. Roll call.
3. Approval of the minutes of the January 28, 2019 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion and action regarding Awarding Contract for Project 2019-101, Verona Street Asphaltic
Rehabilitation Project.
5. Discussion and action regarding Awarding Contract for Project 2019-102, Bituminous Seal Coat Project.
6. Discussion and action regarding Memorandum of Understanding for Joint Design and Construction of
MMSD Pumping Station 17 Force Main Relief – Phase 1 and City of Verona East Side Interceptor
Replacement.
7. Discussion and action regarding release of temporary construction easement under document number
4297834 located at 2159 Range Trail.
8. Discussion and action regarding Whispering Coves subdivision.
9. Adjourn.
Evan Touchett
Chairperson
POSTED: Verona City Hall, Verona Public Library, Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.