Public Works, Sewer and Water
Regular MeetingVerona, WI · June 10, 2019
Minutes
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, JUNE 10, 2019
1. The meeting was called to order by Mr. Touchett at 5:15pm.
2. Roll Call: Present: Evan Touchett, Chad Kemp, and Sarah Gaskell. Also present: Theran Jacobson, Public Works
Director; Adam Sayre, Planning Director / Interim City Administrator; Jim Ferolie, Verona Press.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the May 28, 2019 meeting of the Public
Works/Sewer and Water Committee. Motion carried 3-0.
4. Mr. Jacobson provided an overview of curb side services that are contractual or provided by staff.
Sayre entered at 5:28pm
• Waste Management contracted curb side pick-up regarding Refuse and Recycling. Jacobson
presented the following:
o Contract terminates end of 2021.
o All information is readily available on the website.
o Refuse is weekly and includes bulk item pickup curb side.
o Recycling is bi-weekly and does not include any additional pickup; all items shall be
placed in the cart.
o Of the approximately 3,900 stops only 16 stops have an additional refuse or recycling cart
that is contracted through waste management on a one year contract for $5 a month.
o Staff requested an estimate from Waste Management in late 2018 to modify the
recycling from bi-weekly to weekly and that cost was an additional $25 per stop annual.
This would be a pass through cost to the refuse and recycling budget of just under a
$100,000.
o Staff noted the challenges are cardboard and that is the primary inquiry received. Staff
always directs residents to breakdown and bundle their cardboard.
o Alternative option is to coordinate a cardboard dumpster to be located at public works
facility for use by residence and shall breakdown cardboard. Jacobson noted he had
coordinated this request with Waste Management and is awaiting a price.
o Gaskell noted she would like to see a full recycling drop off location at the new public
works facility that requires a permit fee for use. This would help users that have excess
recycling and not have an adverse cost to other not in need of additional recycling
services. Jacobson noted they would evaluate and include as part of the design and
provide future information as the design progress in 2019 – 2020.
o Committee mutually discussed that no changes to curb side pick provided by Waste
Management should be considered.
Touchett noted the cardboard dumpster would help as this is the largest item(s) that
accumulates the recycling cart. Breaking down the cardboard and bundling great
increases the efficiency of any resident’s cart. Touchett request any additional
information that can be placed on the website would be helpful.
• Jacobson noted that staff has been working with waste management as of last
week to get additional recycling information.
Kemp noted the lack of numbers with residents with second carts does not support any
change for all residents due to the costs.
Gaskell noted she would like to see a full recycling drop off location at the new public
works facility that requires a permit fee for use. This would help users that have excess
recycling and not have an adverse cost to other not in need of additional recycling
services.
• Jacobson noted they would evaluate and include as part of the design and
provide future information as the design progress in 2019 – 2020
Ferolie left at 5:33 pm
• Public works staff curb side pick-up regarding brush, leaf, and yard waste. Jacobson presented the
following:
o Comparison of multiple communities curbs side services for brush, leaf, and yard waste.
o Verona Brush collection is 2nd and 4th week of the month, all brush and tree debris from
residents are collected. No size limitation on diameter and pile size. No commercial
contractors waste is collected. Two full crews and take two days to pass through City on
typical week. Brush can be transferred and disposed of at public works facility during
operating hours.
• Other communities are:
• Monthly with size limitation on diameter and pile
• Varies if have alternative drop off site similar to Verona
o Verona leaf collection is fall only, from early / middle October to end of November or first
snow fall. No pile size limitation. Pickup is weekly. No commercial contractor’s leaf is
collected. Primary public works activity, full forces dedicated to service with street
sweeping occurring immediately after pickup. Leaves can be transferred and disposed of
at public works facility during operating hours.
• Other communities are:
• Leaf collection in fall
• Equipment varied from trailer mounted vacuum or Vacall units
• 5 of the 11 communities surveyed picked up leaves in spring
3 of the 5 were contracted and was a pickup in April and
May only
• Material to be placed in open bags or storage
containers to be emptied
2 remaining communities had multiple Vacall leaf
collection equipment
• One community did not include grass clippings
• Varies if have alternative drop off site similar to Verona
o Verona yard waste collection is fall only, from early / middle October to end of November
or first snow fall with leaf collection. No pile size limitation. Pickup is weekly. Yard
waste, leaf, and brush piles are to be segregated for pickup. Yard waste can be
transferred and disposed of at public works facility during operating hours. Yard waste
bunk at the public works facility is being utilized. For instance, the bin was emptied Friday
June 7 in the afternoon and again after Saturday drop off hours (with compaction of the
bin and site management), and Monday am the bin was emptied again.
• Other communities are:
• 5 of the 11 communities do not pickup yard waste.
• Yard waste is pickup up with leaf collection
• 4 communities pick up with spring leaf collection
2 of the 4 were contracted and was a pickup in April and
May only
• Material to be placed in open bags or storage
containers to be emptied
1 of 4 remaining communities had material to be placed in
open bags or storage containers
1 of 4 remaining communities used a trailer mounted
vacuum
o Jacobson noted any changes to public works staff curb side collection would require
additional equipment and staff. Additional equipment alone would represent capital
costs of $125,000 to over $200,000 depending on the type of equipment and process
necessary to modify collection.
o Residents still place yard waste curb side even when not collected and it is tagged with a
flyer. Any spring collection unfortunately would be non-compliant.
o Jacobson noted that he has stated previously that we would provide an isolated 24 / 7
brush, leaf, and yard waste bin at the new public works facility policed by video
surveillance for compliance.
o Committee mutually discussed that no changes to curb side pick-up provided by public works
staff should be considered.
Touchett noted the service provided is above what other communities provide, the
drop off site is readily available, and that other services would be impacted also from
an operations standpoint.
Kemp noted he lived in a community where leaf and other curb side collection required
bagging the process was inefficient as compared to unlimited pile sizes available for
Verona currently.
Gaskell noted she support the drop-off expansion at the new facility but not additional
curb side services. Ultimately, this contradicts sustainability and impacts operations
from a street sweeping and storm water management perspective.
Committee thanked staff for the detailed comparison between communities.
MOVED Kemp, seconded by Gaskell, to maintain current level of services for curb side pickup. Motion carried
3-0.
5. Mr. Jacobson provided an update on Gateway Pond as staff is waiting on permit requirements from Wisconsin
Department of Natural Resources.
6. MOVED by Touchett, seconded by Kemp, to adjourn at 6:00pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based
on the notes of the recorder and are subject to change at a subsequent meeting.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, JUNE 10, 2019 – 5:15 P.M.
VERONA CITY CENTER
111 LINCOLN STREET
VERONA, WI 53593
AGENDA
1. Call to order.
2. Roll call.
3. Approval of the minutes of the May 28, 2019 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion and action regarding curbside pickup services.
5. Discussion regarding on-going public works and utility projects.
6. Adjourn.
Evan Touchett
Chairperson
POSTED: Verona City Hall, Verona Public Library, Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, MAY 28, 2019
1. The meeting was called to order by Mr. Touchett at 5:19pm.
2. Roll Call: Present: Evan Touchett, Chad Kemp, and Sarah Gaskell. Also present: Theran Jacobson, Public Works
Director; Jeff Montpas, City Engineer, AECOM.
3. MOVED by Touchett, seconded by Gaskell, to approve the minutes of the April 22, 2019 meeting of the Public
Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Kemp, to recommend approval of contract with Payne and Dolan for Project
2016-123 CTH PD expansion from Woods Road to CTH M, not to exceed $1,479,552.75. Motion carried 3-0.
5. MOVED by Touchett, seconded by Gaskell, to recommend approval of Amendment No. 2 with MSA
Professional Services for Land Acquisition in regards to Project 2016-123 CTH PD expansion from Woods Road
to CTH M, not to exceed $15,000. Motion carried 3-0.
6. Mr. Jacobson provided an update to committee on Water Rate Case submitted in July of 2018. Public Service
Commission of Wisconsin – Water Division has completed the revenue requirement and is working on the rate
analysis currently, Mr. Jacobson noted we are nearing the end of the rate case and more details will follow in
the near future on rates.
7. Mr. Jacobson noted an analysis was completed by the Auditors on the revenue requirement for our fees from
the Madison Metropolitan Sewerage District. Jacobson noted the following:
• City approved ordinance no. 16-876 amending Title 9 Chapter 2 of the Code of Ordinances on June
27, 2016. The significant cost to the utility each year is from Madison Metropolitan Sewerage
District for the treatment of the City’s population raw wastewater. Language within the ordinance
allows the Director of Public Works to automatically adjust the sewer rate for the annual increases
from MMSD. The MMSD rate change is a complex calculation with multiple variables and inputs
therefore staff engages with our Auditors with the rate change.
• Our Auditors recommend a rate change of 3.4% to satisfy the MMSD increases from 2017 base rates
to 2019 new rates, therefore:
• Volume rate change from $3.54 to $3.71 per 1000 gallons
• ¾-inch residential quarterly meter charge from $40.11 to $40.35.
• Other meter sizes are identified below:
Mr. Jacobson noted the increase would be in effect for 2nd quarter billings in 2019 and be shown on bills
received dated June 30, 2019.
No action.
8. Mr. Jacobson provided an update on the schedule for Tower 1 maintenance on W. Verona Avenue. Jacobson
noted the following:
• Tower 1 is due for an interior and exterior overcoat of paint
• Tower 1 maintenance is scheduled to commence in the next week or two
• Discussion with committee to match Tower 1 and Tower 2 exterior painting scheme to save on
current and future maintenance costs
MOVED by Touchett, seconded by Kemp, to remove “HOMETOWN USA” from stem of Tower 1 along W.
Verona Avenue. Motion carried 3-0
9. Mr. Jacobson provided an update on ongoing public works projects.
10. MOVED by Touchett, seconded by Kemp, to adjourn at 5:58pm. Motion carried 3-0.
Public Works Committee
June 10, 2019
Item (4) Curb side pickup services.
Discussion in regards to curb side services such as:
• Brush
• Leaf – yard waste
• Refuse
• Recycling
Item (5) On-going public works and utility projects
Discussion and updates for ongoing public works and utility projects.