Public Works, Sewer and Water
Regular MeetingVerona, WI · November 15, 2021
Minutes
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, NOVEMBER 15, 2021
1. The meeting was called to order by Mr. Touchett at 5:11pm.
2. Roll Call: Present: Evan Touchett, Chad Kemp, Mara Helmke. Also present: Theran Jacobson, Director of Public
Works; Carla Fischer, City Engineer, AECOM; Adam Sayre, City Administrator; Zach Larson, AECOM; Tyler
Tkachuk, AECOM.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the September 27, 2021 meeting of the
Public Works/Sewer and Water Committee. Motion carried 3-0.
4. MOVED by Touchett, seconded by Kemp, to recommend approval of project closeout and change order no. 1
for Project 2021-101, Verona Asphaltic Street Rehabilitation Project, in the amount not to exceed $212,376.11.
Motion carried 3-0.
5. MOVED by Touchett, seconded by Helmke, to recommend approval of project closeout and change order no. 1
for Project 2021-102, Pavement Surface Treatment Project, in the amount not to exceed $186,508.20. Motion
carried 3-0.
6. MOVED by Touchett, seconded by Kemp, to recommend project closeout and change order no. 1 for Project
2021-10, Verona Pavement Marking Project, in the amount not to exceed $37,052.53. Motion carried 3-0.
7. MOVED by Touchett, seconded by Helmke, to recommend approval of amendment no. 1 with AECOM for
professional services agreement for Project 2020-116.2 CTH M/CTH PB intersection expansion design. Motion
carried 3-0.
8. MOVED by Touchett, seconded by Kemp, to recommend approval of professional services agreement with
AECOM for Project 2021-108 USH18/151 southbound auxiliary lane design, in the amount not to exceed
$698,742.00. Motion carried 3-0.
9. MOVED by Touchett, seconded by Helmke, to recommend approval of professional services agreement with
AECOM for Project 2021-109 Westside transportation impact analysis study, in the amount not to exceed
$754,373.00. Motion carried 3-0.
10. MOVED by Touchett, seconded by Helmke, to recommend approval of Public Works Policy PW-002, Toilet
Rebate. Motion carried 3-0.
11. DISCUSSION regarding Project 2018-108 Eastside Interceptor Gravity Sanitary Sewer. Jacobson noted the
project is complete with only minor punch-list items remaining. There will be a spring walk-through as well.
Ice Age Trail will remain detoured until 2022, this is being led by Ice Age Trail staff. Jacobson noted there have
been signs placed along the path regarding winter maintenance. Committee would like to revisit the plowing
request by the Parks Board. Sayre will speak to David Walker, Director of Parks and Urban Forestry.
12. MOVED by Touchett, seconded by Hemlke adjourn at 5:34pm. Motion carried 3-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based
on the notes of the recorder and are subject to change at a subsequent meeting.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA
MONDAY, NOVEMBER 15, 2021
5:30 P.M.
VERONA CITY CENTER, ROOM D110
111 LINCOLN STREET
VERONA, WI 53593
Agenda Items
1. Call to order.
2. Roll call.
3. Approval of the minutes of the September 27, 2021 meeting of the Public Works/Sewer and Water
Committee.
4. Discussion and action regarding project closeout and change order no. 1 for Project 2021-101, Verona
Asphaltic Street Rehabilitation Project.
5. Discussion and action regarding project closeout and change order no. 1 for Project 2021-102,
Pavement Surface Treatment Project.
6. Discussion and action regarding project closeout and change order no. 1 for Project 2021-104, Verona
Pavement Marking Project.
7. Discussion and action regarding amendment no. 1 with AECOM for professional services agreement for
Project 2020-116.2 CTH M / CTH PB intersection expansion design.
8. Discussion and action regarding professional services agreement with AECOM for Project ID 2021-108
USH 18/151 southbound auxiliary lane design.
9. Discussion and action regarding professional services agreement with AECOM for Project ID 2021-109
Westside transportation impact analysis study.
10. Discussion and action regarding Public Works Policy PW-002, Toilet Rebate.
11. Discussion and action regarding Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer
Replacement.
12. Adjourn.
Evan Touchett
Chairperson
Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works/Sewer &
Water Committee to gather information about a subject over which they have decision-making responsibility.
POSTED: Verona City Hall
Verona Library
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
MINUTES
PUBLIC WORKS/SEWER & WATER COMMITTEE
MONDAY, SEPTEMBER 27, 2021
1. The meeting was called to order by Mr. Touchett at 5:25pm.
2. Roll Call: Present: Evan Touchett, Chad Kemp. Also present: Theran Jacobson, Director of Public Works; Carla
Fischer, City Engineer, AECOM.
3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the August 30, 2021 meeting of the Public
Works/Sewer and Water Committee. Motion carried 2-0.
4. MOVED by Touchett, seconded by Kemp, to recommend approval of Ordinance No. 21-988 Fire Hydrants.
Notice to the public will be included on 4th quarter 2021 utility bills. Motion carried 2-0.
5. MOVED by Touchett, seconded by Kemp, to recommend approval of professional services agreement with JT
Engineering for construction engineering / inspection services at the Woods at Cathedral Point Phase 3 project
in an amount not-to-exceed $64,471.00. Motion carried 2-0.
6. DISCUSSION regarding 5-year Capital Improvement Program for 2022 budget. Jacobson presented the budget
as attached to these minutes.
7. DISCUSSION regarding Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement. Jacobson
provided a schedule update as highlighted in the Engineer’s Report to the Common Council on September 27,
2021. No motion taken.
8. MOVED by Touchett, seconded by Kemp adjourn at 6:11pm. Motion carried 2-0.
Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based
on the notes of the recorder and are subject to change at a subsequent meeting.
Public Works / Utility / Equipment
2022 Budget Presentation
1
Operating Budgets
• Water Utility – No major changes
• Sewer Utility
– MMSD pass through increase (2022 7% +/‐, next five years 8%‐10% per MMSD staff)
– MMSD is approximately 60% of operating expenses
– Rate study this fall
• Storm Utility
– Professional Services / permit compliance due to retirement in 2022
– Rate study this fall
• Refuse & Recycling
– Pellitteri service provider recommended by PWC.
– Removed levy cost from budget. Hold $182/ annual cost.
– Re‐allocated one staff pay distribution from 0.50 to 0.75. (reduce from 0.50 to 0.25 in PW)
• Public Works
– Add LTE for winter season / offset with OT reduction.
– Accounted for fuel increases
– Material $ increases
2
Staffing
• No additional staff requested for 2022.
• Re‐call within the 2021 budget cycle an
additional maintenance staff was proposed
and this is still a need.
3
Transportation
4
Pedestrian / Bike Projects
Bridge
to MRST
2022 Design
2023 Construction
5
2023 Design
2024 Construction
6
2023 Design
2025 Construction
7
2026 Design
2027 Construction
8
• Construction to be completed with
Public Works Facility
2024 Design
2025 Construction
9
Pavement Rehabilitation ‐ Streets
• Asphalt, Concrete, & Chip Seal.
– Asphalt:
• 2022 Military Ridge / Harmony
• 2023 – 2026 Arterial Streets
– Concrete: E. Verona Avenue
– Chip Seal: Neighborhoods vary each year
10
Pavement Rehabilitation ‐ Paths
• Replace pavement along multi‐use paths adjacent
to Roadways & within Pedestrian Corridors
– 2022 Cross Country Road (Hemlock to N. Main Street)
– 2023 N. Main Street (Cross Country to 1300‐ft south)
11
Sidewalk Rehabilitation
• Maintain sidewalk throughout City
• Locations to be neighborhood specific
– We have a list of areas throughout City to refine and organize.
• This is a program that will need to grow
• Program is in the developing stages and will take
time
12
RRFB
13
Mark Drive
• Replacement of
– Pavement section
– Water Main (P1, P2)
– Sanitary sewer (P1)
– Storm sewer addition (P3)
14
East View / East View
Court
• Replacement of
– Pavement section
– Sanitary Sewer
– Water Main
– Storm sewer additions
15
Public Works Facility
• Design 2021‐2022/2023
• Planning submittals 2021/2022
• Bid Documents completed 2023
• Construction borrowing 2025 and 2026
• Commence construction in 2025/2026
• Occupancy September 2026/2027
16
Public Works Facility
• Budget split between
– PW
– Water
– Sewer
– Storm
– Parks
17
Public Works Facility
18
Combined Projects PW/ Water / Sewer
• Facility
• Mark Drive
• East View / East View Court
• Military Ridge Drive
19
Water Utility
20
• Proposed improvement in Water Master Plan
Cleary Connection •
•
Back loop to Southwest of City
Redundancy for VASD & Cleary
• Coordinated with WDNR & Cleary Contacts
21
North Pump
Station
Expansion
Reliable Supply (largest pump out of service)= 250 gpm Existing (above)
Proposed (below)
2015 Max Day Demand = 174 gpm
Reliable pumping capacity for fire = 76 gpm
Short fall in
storage:
• 0.11 MG as of 2015
• 0.24 MG by 2040 22
Sanitary Utility
23
East Side Interceptor
(rehab / lining)
Project Details
• Reconstruct manholes within floodway
– Excavation only at manholes
• CIPP pipes, trenchless
• Inflow / Infiltration reduction project
Construction 3 Phases
• 2022, Siphon to MRST // Manhole rehab
• 2023, Siphon to MRST // CIPP lining
• 2024, MRST to Badger Prairie // CIPP
lining
24
Stormwater Utility
25
Military Ridge Drive – Storm
Drainage Improvements
• Eliminate surface drainage over sidewalk
• Sump pump connections to inlets
• Reduces safety hazards
• Prolong pavement life
26
City Wide Analysis – Storm
• Example of a storm water master plan study on a watershed size scale, 2D Model
(City of Oshkosh, Westhaven Circle storm water facility)
27
Meeting Date: November 15, 2021
PW/S&W Committee Memo
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (4) Project closeout and change order no. 1 for Project 2021-101, Verona Asphaltic
Street Rehabilitation Project.
Payne and Dolan has substantially completed the Verona asphaltic street rehabilitation project.
All project documentation has been provided by the contractor.
Change order No. 2 is to rectify as-built quantities for the work required to complete the
project:
• The reductions of certain items including but not limited to:
o Base aggregate dense
o Excavation common
o Asphalt pavement milling
The contract notes are as follows:
• Contract award value = $182,172.50
• Previous change orders = $51,537.50 (add)
• Change order No. 2 = ($21,333.89) (deduct)
• Contract value after incorporating this change order = $212,376.11
Item (5) Project closeout and change order no. 1 for Project 2021-102, Pavement Surface
Treatment Project.
Fahrner Asphalt Sealers has substantially completed the pavement surface treatment project.
All project documentation has been provided by the contractor.
Change order No. 1 is to rectify as-built quantities for the work required to complete the
project:
• The reductions of certain items including but not limited to:
o Measured quantities vs planned quantities
The contract notes are as follows:
• Contract award value = $189,660.00
• Change order No. 1 = ($3,151.80) (deduct)
• Contract value after incorporating this change order = $186,508.20
Page 1 / 3
Meeting Date: November 15, 2021
PW/S&W Committee Memo
Item (6) Project closeout and change order no. 1 for Project 2021-104, Verona Pavement
Marking Project.
Brickline has substantially completed the pavement marking project. All project documentation
has been provided by the contractor.
Change order No. 1 is to rectify as-built quantities for the work required to complete the
project:
• The addition of certain items including but not limited to:
o Measure quantities vs planned quantities
The contract notes are as follows:
• Contract award value = $36,217.50
• Change order No. 1 = $875.03 (add)
• Contract value after incorporating this change order = $37,092.53
Item (7) Amendment no. 1 with AECOM for professional services agreement for Project 2020-
116.2 CTH M / CTH PB intersection expansion design.
Amendment No. 1 for the contract at the CTH M / PB intersection is for additional design
services required due to WisDOT project on USH 18/151 being delayed. The delay of the
WisDOT required the City project to take on more design elements to ensure construction is
completed in 2022 for all necessary transportation improvements at the intersection of CTH M
/ PB and the northbound off ramp of USH 18/151 to CTH PB.
Added design work is as follows:
• Additional traffic control staging and detours
• Adding turn lanes to northbound off ramp of USH 18/151 to CTH PB
• Additional traffic signal design work and reports to satisfy WisDOT requirements at the
off ramp
The contract notes are as follows:
• Initial contract value = $158,595
• Amendment No. 1 = $25,527 (add)
• Contract value after incorporating this amendment = $184,122
Item (8) Professional services agreement with AECOM for Project ID 2021-108 USH 18/151
southbound auxiliary lane design.
This agreement is for professional services including but not limited to: coordination, design
reports, design and permitting for the future construction of an auxiliary lane on USH 18/151.
The auxiliary lane will be on the southbound direction between the STH 69 (Paoli Street) and W.
Verona Avenue interchange.
Page 2 / 3
Meeting Date: November 15, 2021
PW/S&W Committee Memo
The auxiliary lane is necessary to increase traffic flow from the mainline lanes of USH 18/151 to
the off-ramp at W. Verona Avenue. The auxiliary lane will create a dedicated exit lane and a
shared thru/exit lane.
The contract shall not exceed $698,742.
Item (9) Professional services agreement with AECOM for Project ID 2021-109 Westside
transportation impact analysis study.
This agreement is for professional services to complete a traffic study for the western border of
the City to determine future transportation improvements. The overall purpose of the study is
to determine the roadway configurations and operational improvements required to mitigate
future safety and capacity impacts as a result of the growing community.
The contract shall not exceed $754,373.
Item (10) Public Works Policy PW-002, Toilet Rebate.
City staff presented the proposed toilet rebate program on July 26, 2021 to request feedback
from the committee. The committee was supportive of the concept and draft policy language.
Staff has finalized the policy for a toilet rebate program and is included in the packet for
reference.
The proposal for the toilet rebate has the following details:
1. Program to start January 1, 2022
2. Annual program maximum cost of $10,000
3. Max rebate of $100 per toilet but with a varying maximum number of rebates per year
depending on meter size
4. Replacement toilets only, not new construction
5. Toilet to be a High Efficient Toilet (HET) of 1.28 gallons per flush per EPA Water Sense
website
City staff will post the policy and forms on the website and other media outlet platforms
including the Verona Press. The program would be funded by the sanitary sewer utility.
Staff is recommending approval of the policy. Action shall be subject on 2022 budget approval
with no amendment to the Sanitary Sewer Utility.
Item (11) Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement.
Staff will provide a construction update on the Eastside Interceptor Replacement Project.
Page 3 / 3
DocuSign Envelope ID: 3A7A889E-98BD-441E-A49F-1733F046C4C7
State of Wisconsin
Department of Workforce Development
Prime Contractor Affidavit of Compliance
Equal Rights Division With Prevailing Wage Rate Determination
Authorization for this form is provided under Sections 66.0903(9)(c), 66.0904(7)(c) and 103.49(4r)(c)
Wisconsin Statutes.
The use of this form is mandatory. The penalty for failing to complete this form is prescribed in Section
103.005(12), Wisconsin Statutes.
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m),
Wisconsin Statutes].
This form must ONLY be filed with the Awarding Agency indicated below.
Project Name
2021 City of Verona Asphalt Street Rehabilitation
DWD Determination Number Project Number (if applicable)
State Of ) Not Applicable 2021-101
Date Determination Issued Date of Contract
)SS Not Applicable March 9, 2021
Awarding Agency
County Of ) City of Verona
Date Work Completed
June 1, 2021
After being duly sworn, the person whose name and signature appears below hereby states under penalty of
perjury that
I am the duly authorized officer of the corporation, partnership, sole proprietorship or business indicated
below and have recently completed all of the work required under the terms and conditions of a contract
with the above-named awarding agency and make this affidavit in accordance with the requirements set
forth in Section 66.0903(9)(c), 66.0904(7)(c) or 103.49(4r)(c), Wisconsin Statutes and Chapter DWD 290 of
the Wisconsin Administrative Code in order to obtain FINAL PAYMENT from such awarding agency.
I have fully complied with all the wage and hour requirements applicable to this project, including all of the
requirements set forth in the prevailing wage rate determination indicated above which was issued for such
project by the Department of Workforce Development on the date indicated above.
I have received the required affidavit of compliance from each of my agents and subcontractors that
performed work on this project and have listed each of their names and addresses on page 2 of this
affidavit.
I have full and accurate records that clearly indicate the name and trade or occupation of every worker(s)
that I employed on this project, including an accurate record of the hours worked and actual wages paid to
such worker(s).
I will retain the records and affidavit(s) described above and make them available for inspection for a
period of at least three (3) years from the completion date indicated above at the address indicated below
and shall not remove such records or affidavit(s) without prior notification to the awarding agency indicated
above.
Name of Corporation, Partnership, Sole Proprietorship, Business, State Agency or Local Governmental Unit
Payne & Dolan, Inc.
Street Address City State Zip Code Telephone Number
6295 Lacy Road Fitchburg WI 53593 608-845-8900
Print Name of Authorized Officer Date Signed
Sam Bilhorn 9/30/2021
Signature of Authorized Officer
ERD-5724 (R. 11/2010)
DocuSign Envelope ID: 3A7A889E-98BD-441E-A49F-1733F046C4C7
CERTIFICATION BY CONTRACTOR
Project Name: 2021 City of Verona Asphalt Street Rehabilitation
Project Number: 2021-101
Project Location: Verona, WI
Owner: City of Verona, Wisconsin
We hereby certify that all persons, firms, or corporations who have done work or
furnished materials for this contract, for which the owner may become legally liable,
have been fully paid or satisfactory secured.
Contractor: Payne & Dolan, Inc.
Signature By:
Print Name: Sam Bilhorn
Title: Area Manager/Agent
Date: 9/30/2021
Sworn and subscribed to before me this
30th day of September , 2021.
Notary Public
My commission expires: 2/19/2023
S:\PROJECTS\2021-101_STREET REHABILITATION ASPHALT\ADMINISTRATIVE (CONTRACTS)\CONSTRUCTION\CLOSE OUT\PAYMENT
CERTIFICATION BY CONTRACTOR.DOCX
Project Forms Page 1 / 1
23rd September
23rd September
2/19/2023
400-53100-54904-00001
PW-002
CITY OF VERONA
DEPARTMENTAL POLICY
Department Public Works & Utilities
Division Sewer Utility Author: Theran Jacobson
PW, Sewer & Water
Policy Number PW-002 11-15-2021
Committee Approval
Subject Toilet Rebate Revision # / Date No. 0 / 11-11-2021
1. Purpose
a. To conserve water by offering an incentive for residential and multi-family owners to replace
older, low-efficiency toilets with newer, high-efficiency models. New models also reduce the risk
of expensive bills due to malfunctioning, constantly-running toilets.
2. Eligibility
a. Residential and multi-family properties that replace less-efficient existing toilets with high-
efficiency toilets “HET”. High efficiency toilets are those with 1.28 gallons per flush or less. New
construction properties or properties that wish to replace an existing, properly-functioning HET
will not be eligible. We intend to use the EPA WaterSense website and point residents to that
website to determine eligible toilets. lookforwatersense.epa.gov
b. The rebate will be $100/toilet. There will be a limit for each eligible property per year as follows:
Meter Size Max Rebate/year Total Allowable Credit/year
5/8” 2 $200
1” 2 $200
1-1/2” 4 $400
2” 4 $400
3” 6 $600
Above 3” 6 $600
c. Program maximum per calendar year will be $10,000, funded by the Sewer Utility starting in
2022. Eligibility will be on a first-come, first-served basis, determined by the date City staff
receives a completed rebate application. If an application is determined to be incomplete by
staff, the required additional information will be requested by staff to the applicant. Once the
complete application is received, eligibility will be cataloged. If funds are expended for the year,
no further rebates will be granted for that calendar year.
d. Toilets shall be purchased within the same year as the rebate application requested.
Page 1 / 2
PW-002
3. Claims Process and Reimbursement
a. The Toilet Rebate form must be completed and submitted to the utility as stated on the form,
along with a copy of the receipt listing toilet model number.
b. Utility personnel will verify the replacement qualifies as a HET with 1.28 gpf or less using the
EPA WaterSense website.
c. If qualifying, and if the maximum has not been reached, either per property or annual limits for
the program, a responding credit will be placed on the sewer utility account of the service
address as per Section 2 line b.
Originally Drafted by:
Kimberly Marshall
Utility Clerk
Originally Reviewed by:
Jon Bublitz
Utility Superintendent
Page 2 / 2
City of Verona, Wisconsin
Toilet Rebate Form
Name
Address
Utility Account #:
Phone
E-mail
Qualifying toilets must be replacements for existing toilets (new construction not included) with less-
efficient flow rates. New toilets must be high-efficiency toilets with a flush rate of 1.28 gpf or less, and
be listed on the EPA Watersense website list of qualifying toilet models: lookforwatersense.epa.gov
The rebate will be $100/toilet. It will be given as a credit on the sewer utility bill of the eligible property.
There will be a limit for each eligible property per year as follows:
Meter Size Max Rebate/year Total Allowable Credit/year
5/8” 2 $200
1” 2 $200
1-1/2” 4 $400
2” 4 $400
3” 6 $600
Above 3” 6 $600
Program maximum of $10,000 total credit given annually across all recipients.
Number of rebates claiming: _____
Flow rate of toilet(s) being replaced (this info can usually be found inside tank): __________________
E-mail this form with attached copy of receipt showing model # of new toilet
to: meters@ci.verona.wi.us
Or mail to the address below:
City of Verona Public Works
Attn: Toilet Rebate
410 Investment Court
Verona, WI 53593
Submissions will not be returned
Page 1 / 1