Muyni
← Back to Verona

Public Works, Sewer and Water

Regular Meeting

Verona, WI · November 15, 2021

AgendaMinutes

Minutes

CITY OF VERONA MINUTES PUBLIC WORKS/SEWER & WATER COMMITTEE MONDAY, NOVEMBER 15, 2021 1. The meeting was called to order by Mr. Touchett at 5:11pm. 2. Roll Call: Present: Evan Touchett, Chad Kemp, Mara Helmke. Also present: Theran Jacobson, Director of Public Works; Carla Fischer, City Engineer, AECOM; Adam Sayre, City Administrator; Zach Larson, AECOM; Tyler Tkachuk, AECOM. 3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the September 27, 2021 meeting of the Public Works/Sewer and Water Committee. Motion carried 3-0. 4. MOVED by Touchett, seconded by Kemp, to recommend approval of project closeout and change order no. 1 for Project 2021-101, Verona Asphaltic Street Rehabilitation Project, in the amount not to exceed $212,376.11. Motion carried 3-0. 5. MOVED by Touchett, seconded by Helmke, to recommend approval of project closeout and change order no. 1 for Project 2021-102, Pavement Surface Treatment Project, in the amount not to exceed $186,508.20. Motion carried 3-0. 6. MOVED by Touchett, seconded by Kemp, to recommend project closeout and change order no. 1 for Project 2021-10, Verona Pavement Marking Project, in the amount not to exceed $37,052.53. Motion carried 3-0. 7. MOVED by Touchett, seconded by Helmke, to recommend approval of amendment no. 1 with AECOM for professional services agreement for Project 2020-116.2 CTH M/CTH PB intersection expansion design. Motion carried 3-0. 8. MOVED by Touchett, seconded by Kemp, to recommend approval of professional services agreement with AECOM for Project 2021-108 USH18/151 southbound auxiliary lane design, in the amount not to exceed $698,742.00. Motion carried 3-0. 9. MOVED by Touchett, seconded by Helmke, to recommend approval of professional services agreement with AECOM for Project 2021-109 Westside transportation impact analysis study, in the amount not to exceed $754,373.00. Motion carried 3-0. 10. MOVED by Touchett, seconded by Helmke, to recommend approval of Public Works Policy PW-002, Toilet Rebate. Motion carried 3-0. 11. DISCUSSION regarding Project 2018-108 Eastside Interceptor Gravity Sanitary Sewer. Jacobson noted the project is complete with only minor punch-list items remaining. There will be a spring walk-through as well. Ice Age Trail will remain detoured until 2022, this is being led by Ice Age Trail staff. Jacobson noted there have been signs placed along the path regarding winter maintenance. Committee would like to revisit the plowing request by the Parks Board. Sayre will speak to David Walker, Director of Parks and Urban Forestry. 12. MOVED by Touchett, seconded by Hemlke adjourn at 5:34pm. Motion carried 3-0. Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based on the notes of the recorder and are subject to change at a subsequent meeting.

Agenda

CITY OF VERONA PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA MONDAY, NOVEMBER 15, 2021 5:30 P.M. VERONA CITY CENTER, ROOM D110 111 LINCOLN STREET VERONA, WI 53593 Agenda Items 1. Call to order. 2. Roll call. 3. Approval of the minutes of the September 27, 2021 meeting of the Public Works/Sewer and Water Committee. 4. Discussion and action regarding project closeout and change order no. 1 for Project 2021-101, Verona Asphaltic Street Rehabilitation Project. 5. Discussion and action regarding project closeout and change order no. 1 for Project 2021-102, Pavement Surface Treatment Project. 6. Discussion and action regarding project closeout and change order no. 1 for Project 2021-104, Verona Pavement Marking Project. 7. Discussion and action regarding amendment no. 1 with AECOM for professional services agreement for Project 2020-116.2 CTH M / CTH PB intersection expansion design. 8. Discussion and action regarding professional services agreement with AECOM for Project ID 2021-108 USH 18/151 southbound auxiliary lane design. 9. Discussion and action regarding professional services agreement with AECOM for Project ID 2021-109 Westside transportation impact analysis study. 10. Discussion and action regarding Public Works Policy PW-002, Toilet Rebate. 11. Discussion and action regarding Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement. 12. Adjourn. Evan Touchett Chairperson Notice is hereby given that a majority of the City Council may be present at the meeting of the Public Works/Sewer & Water Committee to gather information about a subject over which they have decision-making responsibility. POSTED: Verona City Hall Verona Library Miller’s Market ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST. CITY OF VERONA MINUTES PUBLIC WORKS/SEWER & WATER COMMITTEE MONDAY, SEPTEMBER 27, 2021 1. The meeting was called to order by Mr. Touchett at 5:25pm. 2. Roll Call: Present: Evan Touchett, Chad Kemp. Also present: Theran Jacobson, Director of Public Works; Carla Fischer, City Engineer, AECOM. 3. MOVED by Touchett, seconded by Kemp, to approve the minutes of the August 30, 2021 meeting of the Public Works/Sewer and Water Committee. Motion carried 2-0. 4. MOVED by Touchett, seconded by Kemp, to recommend approval of Ordinance No. 21-988 Fire Hydrants. Notice to the public will be included on 4th quarter 2021 utility bills. Motion carried 2-0. 5. MOVED by Touchett, seconded by Kemp, to recommend approval of professional services agreement with JT Engineering for construction engineering / inspection services at the Woods at Cathedral Point Phase 3 project in an amount not-to-exceed $64,471.00. Motion carried 2-0. 6. DISCUSSION regarding 5-year Capital Improvement Program for 2022 budget. Jacobson presented the budget as attached to these minutes. 7. DISCUSSION regarding Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement. Jacobson provided a schedule update as highlighted in the Engineer’s Report to the Common Council on September 27, 2021. No motion taken. 8. MOVED by Touchett, seconded by Kemp adjourn at 6:11pm. Motion carried 2-0. Note: These minutes were prepared by Theran Jacobson, Director of Public Works. These minutes are based on the notes of the recorder and are subject to change at a subsequent meeting. Public Works / Utility / Equipment 2022 Budget Presentation 1 Operating Budgets • Water Utility – No major changes • Sewer Utility – MMSD pass through increase (2022 7% +/‐, next five years 8%‐10% per MMSD staff) – MMSD is approximately 60% of operating expenses – Rate study this fall • Storm Utility – Professional Services / permit compliance due to retirement in 2022 – Rate study this fall • Refuse & Recycling – Pellitteri service provider recommended by PWC. – Removed levy cost from budget. Hold $182/ annual cost. – Re‐allocated one staff pay distribution from 0.50 to 0.75. (reduce from 0.50 to 0.25 in PW) • Public Works – Add LTE for winter season / offset with OT reduction. – Accounted for fuel increases – Material $ increases 2 Staffing • No additional staff requested for 2022. • Re‐call within the 2021 budget cycle an additional maintenance staff was proposed and this is still a need. 3 Transportation 4 Pedestrian / Bike Projects Bridge to MRST 2022 Design 2023 Construction 5 2023 Design 2024 Construction 6 2023 Design 2025 Construction 7 2026 Design 2027 Construction 8 • Construction to be completed with Public Works Facility 2024 Design 2025 Construction 9 Pavement Rehabilitation ‐ Streets • Asphalt, Concrete, & Chip Seal. – Asphalt: • 2022 Military Ridge / Harmony • 2023 – 2026 Arterial Streets – Concrete: E. Verona Avenue – Chip Seal: Neighborhoods vary each year 10 Pavement Rehabilitation ‐ Paths • Replace pavement along multi‐use paths adjacent to Roadways & within Pedestrian Corridors – 2022 Cross Country Road (Hemlock to N. Main Street) – 2023 N. Main Street (Cross Country to 1300‐ft south) 11 Sidewalk Rehabilitation • Maintain sidewalk throughout City • Locations to be neighborhood specific – We have a list of areas throughout City to refine and organize. • This is a program that will need to grow • Program is in the developing stages and will take time 12 RRFB 13 Mark Drive • Replacement of – Pavement section – Water Main (P1, P2) – Sanitary sewer (P1) – Storm sewer addition (P3) 14 East View / East View Court • Replacement of – Pavement section – Sanitary Sewer – Water Main – Storm sewer additions 15 Public Works Facility • Design 2021‐2022/2023 • Planning submittals 2021/2022 • Bid Documents completed 2023 • Construction borrowing 2025 and 2026 • Commence construction in 2025/2026 • Occupancy September 2026/2027 16 Public Works Facility • Budget split between – PW – Water – Sewer – Storm – Parks 17 Public Works Facility 18 Combined Projects PW/ Water / Sewer • Facility • Mark Drive • East View / East View Court • Military Ridge Drive 19 Water Utility 20 • Proposed improvement in Water Master Plan Cleary Connection • • Back loop to Southwest of City Redundancy for VASD & Cleary • Coordinated with WDNR & Cleary Contacts 21 North Pump Station Expansion Reliable Supply (largest pump out of service)= 250 gpm Existing (above) Proposed (below) 2015 Max Day Demand = 174 gpm Reliable pumping capacity for fire = 76 gpm Short fall in storage: • 0.11 MG as of 2015 • 0.24 MG by 2040 22 Sanitary Utility 23 East Side Interceptor (rehab / lining) Project Details • Reconstruct manholes within floodway – Excavation only at manholes • CIPP pipes, trenchless • Inflow / Infiltration reduction project Construction 3 Phases • 2022, Siphon to MRST // Manhole rehab • 2023, Siphon to MRST // CIPP lining • 2024, MRST to Badger Prairie // CIPP lining 24 Stormwater Utility 25 Military Ridge Drive – Storm Drainage Improvements • Eliminate surface drainage over sidewalk • Sump pump connections to inlets • Reduces safety hazards • Prolong pavement life 26 City Wide Analysis – Storm • Example of a storm water master plan study on a watershed size scale, 2D Model (City of Oshkosh, Westhaven Circle storm water facility) 27 Meeting Date: November 15, 2021 PW/S&W Committee Memo Public Works/Sewer & Water Committee Listed below is an explanation of the items on the Public Works/Sewer & Water Committee agenda. Item (4) Project closeout and change order no. 1 for Project 2021-101, Verona Asphaltic Street Rehabilitation Project. Payne and Dolan has substantially completed the Verona asphaltic street rehabilitation project. All project documentation has been provided by the contractor. Change order No. 2 is to rectify as-built quantities for the work required to complete the project: • The reductions of certain items including but not limited to: o Base aggregate dense o Excavation common o Asphalt pavement milling The contract notes are as follows: • Contract award value = $182,172.50 • Previous change orders = $51,537.50 (add) • Change order No. 2 = ($21,333.89) (deduct) • Contract value after incorporating this change order = $212,376.11 Item (5) Project closeout and change order no. 1 for Project 2021-102, Pavement Surface Treatment Project. Fahrner Asphalt Sealers has substantially completed the pavement surface treatment project. All project documentation has been provided by the contractor. Change order No. 1 is to rectify as-built quantities for the work required to complete the project: • The reductions of certain items including but not limited to: o Measured quantities vs planned quantities The contract notes are as follows: • Contract award value = $189,660.00 • Change order No. 1 = ($3,151.80) (deduct) • Contract value after incorporating this change order = $186,508.20 Page 1 / 3 Meeting Date: November 15, 2021 PW/S&W Committee Memo Item (6) Project closeout and change order no. 1 for Project 2021-104, Verona Pavement Marking Project. Brickline has substantially completed the pavement marking project. All project documentation has been provided by the contractor. Change order No. 1 is to rectify as-built quantities for the work required to complete the project: • The addition of certain items including but not limited to: o Measure quantities vs planned quantities The contract notes are as follows: • Contract award value = $36,217.50 • Change order No. 1 = $875.03 (add) • Contract value after incorporating this change order = $37,092.53 Item (7) Amendment no. 1 with AECOM for professional services agreement for Project 2020- 116.2 CTH M / CTH PB intersection expansion design. Amendment No. 1 for the contract at the CTH M / PB intersection is for additional design services required due to WisDOT project on USH 18/151 being delayed. The delay of the WisDOT required the City project to take on more design elements to ensure construction is completed in 2022 for all necessary transportation improvements at the intersection of CTH M / PB and the northbound off ramp of USH 18/151 to CTH PB. Added design work is as follows: • Additional traffic control staging and detours • Adding turn lanes to northbound off ramp of USH 18/151 to CTH PB • Additional traffic signal design work and reports to satisfy WisDOT requirements at the off ramp The contract notes are as follows: • Initial contract value = $158,595 • Amendment No. 1 = $25,527 (add) • Contract value after incorporating this amendment = $184,122 Item (8) Professional services agreement with AECOM for Project ID 2021-108 USH 18/151 southbound auxiliary lane design. This agreement is for professional services including but not limited to: coordination, design reports, design and permitting for the future construction of an auxiliary lane on USH 18/151. The auxiliary lane will be on the southbound direction between the STH 69 (Paoli Street) and W. Verona Avenue interchange. Page 2 / 3 Meeting Date: November 15, 2021 PW/S&W Committee Memo The auxiliary lane is necessary to increase traffic flow from the mainline lanes of USH 18/151 to the off-ramp at W. Verona Avenue. The auxiliary lane will create a dedicated exit lane and a shared thru/exit lane. The contract shall not exceed $698,742. Item (9) Professional services agreement with AECOM for Project ID 2021-109 Westside transportation impact analysis study. This agreement is for professional services to complete a traffic study for the western border of the City to determine future transportation improvements. The overall purpose of the study is to determine the roadway configurations and operational improvements required to mitigate future safety and capacity impacts as a result of the growing community. The contract shall not exceed $754,373. Item (10) Public Works Policy PW-002, Toilet Rebate. City staff presented the proposed toilet rebate program on July 26, 2021 to request feedback from the committee. The committee was supportive of the concept and draft policy language. Staff has finalized the policy for a toilet rebate program and is included in the packet for reference. The proposal for the toilet rebate has the following details: 1. Program to start January 1, 2022 2. Annual program maximum cost of $10,000 3. Max rebate of $100 per toilet but with a varying maximum number of rebates per year depending on meter size 4. Replacement toilets only, not new construction 5. Toilet to be a High Efficient Toilet (HET) of 1.28 gallons per flush per EPA Water Sense website City staff will post the policy and forms on the website and other media outlet platforms including the Verona Press. The program would be funded by the sanitary sewer utility. Staff is recommending approval of the policy. Action shall be subject on 2022 budget approval with no amendment to the Sanitary Sewer Utility. Item (11) Project ID 2018-108 Eastside Interceptor Gravity Sanitary Sewer Replacement. Staff will provide a construction update on the Eastside Interceptor Replacement Project. Page 3 / 3 DocuSign Envelope ID: 3A7A889E-98BD-441E-A49F-1733F046C4C7 State of Wisconsin Department of Workforce Development Prime Contractor Affidavit of Compliance Equal Rights Division With Prevailing Wage Rate Determination Authorization for this form is provided under Sections 66.0903(9)(c), 66.0904(7)(c) and 103.49(4r)(c) Wisconsin Statutes. The use of this form is mandatory. The penalty for failing to complete this form is prescribed in Section 103.005(12), Wisconsin Statutes. Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m), Wisconsin Statutes]. This form must ONLY be filed with the Awarding Agency indicated below. Project Name 2021 City of Verona Asphalt Street Rehabilitation DWD Determination Number Project Number (if applicable) State Of ) Not Applicable 2021-101 Date Determination Issued Date of Contract )SS Not Applicable March 9, 2021 Awarding Agency County Of ) City of Verona Date Work Completed June 1, 2021 After being duly sworn, the person whose name and signature appears below hereby states under penalty of perjury that  I am the duly authorized officer of the corporation, partnership, sole proprietorship or business indicated below and have recently completed all of the work required under the terms and conditions of a contract with the above-named awarding agency and make this affidavit in accordance with the requirements set forth in Section 66.0903(9)(c), 66.0904(7)(c) or 103.49(4r)(c), Wisconsin Statutes and Chapter DWD 290 of the Wisconsin Administrative Code in order to obtain FINAL PAYMENT from such awarding agency.  I have fully complied with all the wage and hour requirements applicable to this project, including all of the requirements set forth in the prevailing wage rate determination indicated above which was issued for such project by the Department of Workforce Development on the date indicated above.  I have received the required affidavit of compliance from each of my agents and subcontractors that performed work on this project and have listed each of their names and addresses on page 2 of this affidavit.  I have full and accurate records that clearly indicate the name and trade or occupation of every worker(s) that I employed on this project, including an accurate record of the hours worked and actual wages paid to such worker(s).  I will retain the records and affidavit(s) described above and make them available for inspection for a period of at least three (3) years from the completion date indicated above at the address indicated below and shall not remove such records or affidavit(s) without prior notification to the awarding agency indicated above. Name of Corporation, Partnership, Sole Proprietorship, Business, State Agency or Local Governmental Unit Payne & Dolan, Inc. Street Address City State Zip Code Telephone Number 6295 Lacy Road Fitchburg WI 53593 608-845-8900 Print Name of Authorized Officer Date Signed Sam Bilhorn 9/30/2021 Signature of Authorized Officer ERD-5724 (R. 11/2010) DocuSign Envelope ID: 3A7A889E-98BD-441E-A49F-1733F046C4C7 CERTIFICATION BY CONTRACTOR Project Name: 2021 City of Verona Asphalt Street Rehabilitation Project Number: 2021-101 Project Location: Verona, WI Owner: City of Verona, Wisconsin We hereby certify that all persons, firms, or corporations who have done work or furnished materials for this contract, for which the owner may become legally liable, have been fully paid or satisfactory secured. Contractor: Payne & Dolan, Inc. Signature By: Print Name: Sam Bilhorn Title: Area Manager/Agent Date: 9/30/2021 Sworn and subscribed to before me this 30th day of September , 2021. Notary Public My commission expires: 2/19/2023 S:\PROJECTS\2021-101_STREET REHABILITATION ASPHALT\ADMINISTRATIVE (CONTRACTS)\CONSTRUCTION\CLOSE OUT\PAYMENT CERTIFICATION BY CONTRACTOR.DOCX Project Forms Page 1 / 1 23rd September 23rd September 2/19/2023 400-53100-54904-00001 PW-002 CITY OF VERONA DEPARTMENTAL POLICY Department Public Works & Utilities Division Sewer Utility Author: Theran Jacobson PW, Sewer & Water Policy Number PW-002 11-15-2021 Committee Approval Subject Toilet Rebate Revision # / Date No. 0 / 11-11-2021 1. Purpose a. To conserve water by offering an incentive for residential and multi-family owners to replace older, low-efficiency toilets with newer, high-efficiency models. New models also reduce the risk of expensive bills due to malfunctioning, constantly-running toilets. 2. Eligibility a. Residential and multi-family properties that replace less-efficient existing toilets with high- efficiency toilets “HET”. High efficiency toilets are those with 1.28 gallons per flush or less. New construction properties or properties that wish to replace an existing, properly-functioning HET will not be eligible. We intend to use the EPA WaterSense website and point residents to that website to determine eligible toilets. lookforwatersense.epa.gov b. The rebate will be $100/toilet. There will be a limit for each eligible property per year as follows: Meter Size Max Rebate/year Total Allowable Credit/year 5/8” 2 $200 1” 2 $200 1-1/2” 4 $400 2” 4 $400 3” 6 $600 Above 3” 6 $600 c. Program maximum per calendar year will be $10,000, funded by the Sewer Utility starting in 2022. Eligibility will be on a first-come, first-served basis, determined by the date City staff receives a completed rebate application. If an application is determined to be incomplete by staff, the required additional information will be requested by staff to the applicant. Once the complete application is received, eligibility will be cataloged. If funds are expended for the year, no further rebates will be granted for that calendar year. d. Toilets shall be purchased within the same year as the rebate application requested. Page 1 / 2 PW-002 3. Claims Process and Reimbursement a. The Toilet Rebate form must be completed and submitted to the utility as stated on the form, along with a copy of the receipt listing toilet model number. b. Utility personnel will verify the replacement qualifies as a HET with 1.28 gpf or less using the EPA WaterSense website. c. If qualifying, and if the maximum has not been reached, either per property or annual limits for the program, a responding credit will be placed on the sewer utility account of the service address as per Section 2 line b. Originally Drafted by: Kimberly Marshall Utility Clerk Originally Reviewed by: Jon Bublitz Utility Superintendent Page 2 / 2 City of Verona, Wisconsin Toilet Rebate Form Name Address Utility Account #: Phone E-mail Qualifying toilets must be replacements for existing toilets (new construction not included) with less- efficient flow rates. New toilets must be high-efficiency toilets with a flush rate of 1.28 gpf or less, and be listed on the EPA Watersense website list of qualifying toilet models: lookforwatersense.epa.gov The rebate will be $100/toilet. It will be given as a credit on the sewer utility bill of the eligible property. There will be a limit for each eligible property per year as follows: Meter Size Max Rebate/year Total Allowable Credit/year 5/8” 2 $200 1” 2 $200 1-1/2” 4 $400 2” 4 $400 3” 6 $600 Above 3” 6 $600 Program maximum of $10,000 total credit given annually across all recipients. Number of rebates claiming: _____ Flow rate of toilet(s) being replaced (this info can usually be found inside tank): __________________ E-mail this form with attached copy of receipt showing model # of new toilet to: meters@ci.verona.wi.us Or mail to the address below: City of Verona Public Works Attn: Toilet Rebate 410 Investment Court Verona, WI 53593 Submissions will not be returned Page 1 / 1

Get email alerts for Verona

A daily email when new agendas and minutes are posted.

Report an issue with this meeting