Public Works, Sewer and Water
Regular MeetingVerona, WI · February 26, 2024
Minutes
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE MINUTES
MONDAY, February 26, 2023
5:30 P.M.
VERONA CITY CENTER, ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
Agenda Items
1. Call to order: Meeting called to order by E. Touchett at 5:33pm.
2. Roll call: Evan Touchett, Beth Tucker Long. Also present: Adam Waszak, Interim Director of Public
Works, Zach Larson, AECOM.
3. Public Comment: None.
4. Approval of the minutes: January 22, 2024:
Moved by E. Touchett and seconded by B. Tucker Long. Motion carried 2-0.
5. Discussion and Possible Action: Practical Alternatives Analysis (West Road Crossing)
Staff presented the alternatives identified as part of the practical alternative analysis for the future
West Road crossing. Staff identified that alternative 3.2 was the preferred route as it limits disturbance
of non-ruderal wetlands and creates an additional access point to US18/151.
Motion of support for Alternative 3.2 by B. Tucker Long and seconded by E. Touchett. Motion carried
2-0.
6. Staff Report:
a. Well #6 Packer Test Update
Staff provided a brief update on the status of the packer testing at Well #6. Pump removal and
televising has been completed. The contractor is expected to re-mobilize and begin the installation of
the packer during the first part of March.
7. Adjourn:
Motion to adjourn at 5:55pm by E. Touchett and seconded by B. Tucker Long. Motion carried 2-0.
Evan Touchett
Chairperson
Notice is hereby given that a quorum of the members of the City Council or other standing committees of the City
Council may be present at the meeting of the Public Works, Sewer & Water Committee to gather information about a
subject over which they have decision-making responsibility. The City Council and any other standing committees will
not take formal action at this meeting.
POSTED: Verona City Hall
Verona Library
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
Agenda
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE AGENDA
MONDAY, February 26, 2023
5:30 P.M.
VERONA CITY CENTER, ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
Agenda Items
1. Call to order.
2. Roll call.
3. Public Comment.
4. Approval of the minutes: January 22, 2024.
5. Discussion and Possible Action: Practical Alternatives Analysis (West Road Crossing)
6. Staff Report:
a. Well #6 Packer Test Update
7. Adjourn.
Evan Touchett
Chairperson
Notice is hereby given that a quorum of the members of the City Council or other standing committees of the City
Council may be present at the meeting of the Public Works, Sewer & Water Committee to gather information about a
subject over which they have decision-making responsibility. The City Council and any other standing committees will
not take formal action at this meeting.
POSTED: Verona City Hall
Verona Library
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
CITY OF VERONA
PUBLIC WORKS/SEWER & WATER COMMITTEE
MINUTES MONDAY, JANUARY 22, 2023
6:00 P.M.
VERONA CITY CENTER, ROOM D122
111 LINCOLN STREET
VERONA, WI 53593
Agenda Items
1. Call to order: Meeting called to order by E. Touchett at 6:05pm.
2. Roll call: Evan Touchett, Mara Helmke, Beth Tucker Long. Also present: Adam Waszak, Interim Director
of Public Works, Carla Fischer, AECOM.
3.
4.
Public Comment: None.
T
5.
AF
Approval of the minutes: December 11, 2023.
Moved by B. Tucker Long and seconded by M. Helmke. Motion carried 3-0.
Discussion and Possible Action: Stormwater Services Agreement (AECOM).
Renewal of annual agreement with AECOM for a variety of SW Services. E. Touchett questioned if the
D
scope and estimated coast was similar to years past. A. Waszak confirmed. C. Fischer talked about the
R
success of private BMP inspection in 2023.
Moved by E. Touchet and seconded by B. Tucker Long to recommend to Common Council the
authorization of the 2024 Stormwater Services Agreement with AECOM, for a cost not to exceed
$80,595. Motion carried 3-0.
6. Staff Report:
None.
7. Adjourn:
Motion to adjourn at 6:20pm by E. Touchett and seconded by B. Tucker Long. Motion carried 3-0.
Evan Touchett
Chairperson
Notice is hereby given that a quorum of the members of the City Council or other standing committees of the City
Council may be present at the meeting of the Public Works, Sewer & Water Committee to gather information about a
subject over which they have decision-making responsibility. The City Council and any other standing committees will
not take formal action at this meeting.
POSTED: Verona City Hall
Verona Library
Miller’s Market
ALL AGENDAS ARE POSTED ON THE CITY’S WEBSITE AT www.ci.verona.wi.us
IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMMODATION TO
ACCESS THE MEETINGS, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE
MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST.
T
AF
DR
Meeting Date: February 26, 2024
PW/S&W Committee Memo
Public Works/Sewer & Water Committee
Listed below is an explanation of the items on the Public Works/Sewer & Water Committee
agenda.
Item (5) Practical Alternatives Analysis (West Road Crossing)
As part of continued roadway design efforts to combat growing capacity concerns for key
thoroughfares and connections on the City’s West side, a Practical Alternatives Analysis has
been completed for a western crossing of the Sugar River. The Analysis explored a wide range
of alternatives to address traffic related concerns. These alternatives are further discussed in the
included West Road Crossing Alternatives Summary. Staff are seeking affirmation of support
for the preferred alternative 3.2.
Item (6.a.) Well #6 Packer Test Update
Initial stages of the packer test have been completed. Staff will provide an update on initial
findings and next steps in the process.
Page 1 / 1
City of Verona Public Works Mee ng February 26, 2024
West Road Crossing Alterna ve Summary
(Public Works Mee ng February 26, 2024)
Project Background
The purpose of the proposed West Road project is to address traffic growth, safety, and emerging and
forecasted operational deficiencies on both US 18/151, between the W. Verona Avenue/Epic Lane and
the County Trunk Highway (CTH) G/Dairy Ridge Road interchanges, and along CTH PD in the City and
Town of Verona. Traffic has increased primarily due to the growth of Epic Systems Corporation (Epic), a
large employer in Dane County with a campus located in the City of Verona, and, to a lesser extent,
single and multi-family residential growth in the City of Verona. Verona is one of Wisconsin’s fastest
growing communities (per US Census data, the population grew by over 30% between 2010 and 2020).
With the forecasted growth at Epic and in the City of Verona, significant traffic congestion and safety
concerns will occur if no changes are made to the transportation network. Therefore, there is a need for
a robust solution that addresses both near-term and long-term growth in the area. As part of alternatives
development process, the following criteria were developed to meet the purpose and need of the project:
1. Meets operational and safety requirements to handle near-term and long-term forecasted
traffic (e.g. secondary access points)
2. Minimizes net environmental impacts (wetland, floodplain, Military Ridge State Trail (MRST))
while providing improved Sugar River access to the public (bike, pedestrians, kayak, trout
fishing, etc.)
3. Consistent with the near-term and long-term growth plans in the region
a. Based on Epic’s growth history, one important criterion to the City of Verona and Epic
is that any new facility be publicly owned and be located to accommodate future
growth without having to relocate a facility. Northern Lights Road was moved two
times between 2005 and 2017, with additional expansion work occurring every
couple of years, which causes disruption to City residents and Epic employees and is
costly.
4. Minimize relocation of existing infrastructure (buildings, underground utilities, geothermal,
solar fields, etc.)
If no project occurs the existing two main Epic campus access points and Northern Lights Road will not
have the capacity to handle the additional traffic resulting from near-term and long-term planned campus
growth. Traffic analysis shows multiple failures at these locations:
1. US 18/151 & W Verona Ave/Epic Lane Interchange
2. CTH PD & Northern Lights Road intersection
Page 1 of 4
City of Verona Public Works Mee ng February 26, 2024
Alternative Analysis
A wide range of alternatives were developed to address the traffic problems of the area. Here is the list of
alternatives and associated exhibits:
Alternative 0 – No Build
Alternative 1 – West Verona Ave Interchange (Exhibit 1)
Alternative 2 – (Exhibit 2-1)
Alternative 3.1 – (Exhibits 3.1-1)
Alternative 3.2 – (Exhibits 3.2-1 through 3.2-5)
Alternative 3.3 – (Exhibits 3.3-1)
Alternative 4 – (Exhibit 4)
Alternative 5 – (Exhibit 5)
Alternative Discussion
Alternative 0 is a “no build” alternative, which does not fulfill the purpose and need of the project. In a no
build scenario, the number of Epic employees will continue to grow, and traffic volumes and safety issues
will continue to worsen. The existing access points (US 18/151 and CTH PD) and Northern Lights Road
cannot handle the additional traffic to Campuses 6 and 7 and potential future campuses.
Alternative 1 is a concept to expand the West Verona Avenue interchange, which would avoid the wetland
impacts west of the Epic campus. Even with the significant improvements shown in Alternative 1, this
alternative would not have the traffic capacity to address the volumes associated with the current and
projected campus growth.
Alternative 2 does not meet the project purpose and need as previously described. This alternative has
access or transportation concerns related to separating future campus developments from the existing
campus. It doesn’t accommodate future traffic goals and doesn’t create the separation between public
roads and lower speed private roads. Having a public street split the Epic site would cause inefficiencies
and safety issues for staff moving between campuses and unsafe conditions for staff walking or biking
between campuses across the busy public street. There is significant pedestrian traffic on campus with
over 11,000 employees on site each day. Alternative 1 does provide a more direct connection to campus
6 and 7. without significantly re-routing. However, a four-lane publicly owned arterial splitting the campus
would not align with the Epic Campus master planning. This alternative would not allow Epic to maximize
their property for future growth and would create a public roadway within a private campus.
Alternative 3.1 meets the purpose and need of the project by accommodating both current and future
traffic and is consistent with future plans. Alternatives 3.2 and 3.3 are slight variations and were
developed after the wetland delineation survey was completed to help further minimize/reduce wetland
impacts. Alternative 3.2 has the least amount of wetland impacts between 3.1, 3.2, and 3.3. Alternative
3.2 is discussed in further detail under the recommended alternative section.
Alternatives 4 and 5 were other alternatives considered but were found to not meet the purpose and need
of the project. Alternative 4 does not require a new crossing location across the MRST or the Sugar
River. The concept uses an improved existing roadway network (e.g., Dairy Ridge, White Crossing Road,
CTH PD) including a new White Crossing structure over the Sugar River. This alternative would introduce
approximately 4 miles of additional travel distance for traffic trying to access the Epic site. Alternative 5
would split the existing campuses from future campuses thus creating concerns with mixing higher speed
public roads with private roads and heavy pedestrian movements. Most importantly both Alternative 4 and
Alternative 5 would require additional travel distance to access Campuses 6 and 7. This additional travel
Page 2 of 4
City of Verona Public Works Mee ng February 26, 2024
time would not attract enough users to address the traffic operations and safety issues created by
expected traffic growth.
A summary of the wetland impacts and purpose and need criteria for each Alternative is provided in Table
1 below.
Table 1 - Roadway Crossing Impacts
Wetland Impacts (Acres)
Purpose and Need Criteria
Temporary Permanent
Meet
Criteria 1 Criteria 2 Criteria
Alter. Non- Non- Criteria 3 Purpose
Ruderal Total Ruderal Total (Access) (Environmental 4
# Ruderal Ruderal (Growth) and
Impacts) (Relocation)
Need
0 No Wetland Impacts No Yes No Yes No
1 No Wetland Impacts No Yes No Yes No
2 0.02 2.16 2.18 0.07 10.64 10.71 Yes No No Yes No
3.1 1.19 0.81 2.00 4.02 6.30 10.32 Yes Yes Yes Yes Yes
3.2 0.24 2.06 2.30 1.59 8.19 9.78 Yes Yes Yes Yes Yes
3.3 0.46 2.13 2.59 1.80 8.13 9.93 Yes Yes Yes Yes Yes
4 Does not meet purpose and need. Alternative 2 provides a more direct route.
5 Does not meet purpose and need. Alternative 2 provides a more direct route.
Cost
Overall costs, including construction and maintenance, were developed for Alternatives 2, 3.2, and 3.3. An
alternative cost comparison was completed for a pre-cast arch crossing option for each remaining
alternative. The City of Verona, the eventual owner of this roadway and structure, prefers options that
lower the long-term maintenance costs of the structure.
Table 2 - Alternative Roadway Crossing Cost Comparison
Roadway Structure Meets
Maintenance
Alternative # Construction Construction Overall Cost* Purpose /
Cost (75-year)
Cost Cost Need?
2 $66M $20M $6M $92M No
3.2 $88M $23M $6M $117M Yes
3.3 $94M $26M $6M $126M Yes
*Costs do not include stream realignment or utility cost
The overall cost of Alternative 3.2 is less than Alternative 3.3 and both meet the purpose and need.
An additional cost analysis for Alternative 3.2 was completed to compare the cost between the pre-cast
arch versus a bridge option as seen in Table 3. Please see Figure 1 for graphic view of the precast arch
layout.
Page 3 of 4
City of Verona Public Works Mee ng February 26, 2024
Table 3 – Precast Arch versus Bridge Cost for Alternative 3.2
Roadway Structure
Maintenance
Type Construction Construction Overall Cost
Cost (75-year)
Cost Cost
Precast Arch $88M $23M $6M $117M
Bridge $88M $15M $31M $134M
Figure 1 - Precast Arch Graphic
The construction cost of the bridge is lower than the precast arch option. However, the long-term
maintenance cost of the bridge option is much more significant than the precast, arch resulting in the
precast arch being the more economical option overall.
Preferred Alternative
The preferred Alternative 3.2 meets the purpose and need of the project. It minimizes non-ruderal wetland
impacts to the extent practicable, provides the secondary access point via US 18/151 and CTH PD
required to meet the near and long-term growth in the area, creates a safe transportation network for all
modes of traffic, while also preserving Epic’s ability to safely grow without public thoroughfare splitting
campuses.
Alternative 3.2 crossing of the Sugar River and MRST was chosen after an iterative process to reduce the
quantity and quality of wetland impacts.
Other items included for the preferred alternative:
Alternative 3.2 provides the opportunity for further enhancements to the Sugar River such as a stream
alignment to improve the character and quality of the Sugar River. Enhancements also include improved
public access will be provided to both the Sugar River and the MRST.
Accommodations for planned and future utilities will be included in this project. This will minimize the need
for future crossings of the Sugar River, minimizing impacts to wetlands and floodplain.
The City of Verona will be the owner of the new road and structure. The City considered both the cost of
the improvements and the cost of future maintenance when selecting the precast arch option as the
preferred type of structure. While being functional to convey large flooding events, the arch bridge will
provide a visually appealing profile to adjacent landowners and users of the Sugar River and MRST.
Page 4 of 4
ALTERNATIVE 1
WEST VERONA AVE INTERCHANGE
ERN
EXHIBIT 1 RTH
NO
LIG
HT S
RD
MILI
ES SB/EB BRIDGE
RIDG
RY
TA NB TUNNEL
TA
TE E PIC LN
CITY OF VERONA
AI SB/EB TUNNEL
TR L W VERONA AVE
USH 18/151
R
IVE
AR
R
SU
G
SB/EB BRIDGE
AIL
ATE TR
DG E ST
Y RI
ITAR
MIL
US
H1
8/1
51
EPIC FACILITIES
ALTERNATIVE 2 CURRENTLY IN USE
EXHIBIT 2-1
EPIC OWNED PARCELS (TYP.)
ZONE A FEMA 100-YR
FLOODPLAIN (TYP.)
SU
R
GA
RI
SUGAR RIVER CROSSING VE
(BRIDGE OR PRECAST ARCH) R
WETLAND IMPACT AREA
DAIRY RIDGE RD
M
ILI
TA
RY
RI
E
DG
ST
AT
ET
RA
IL
NOTE: RUDERAL AREAS ARE CROSS HATCHED SUGAR RIVER WILDLIFE AREA
WETLAND IMPACTS - ROADWAY CROSSING
QUALITY PERMANENT TEMP IMPACT PERM PERM TEMP TEMP
COLOR
IMPACT TOTAL TOTAL RUDERAL NON-RUDERAL RUDERAL NON-RUDERAL
WET PRAIRIE 0.07 ACRES 0.01 ACRES -- 0.07 ACRES -- 0.01 ACRES
SEDGE MEADOW -- 0.01 ACRES -- -- -- 0.01 ACRES
WET MEADOW 4.93 ACRES 1.98 ACRES 4.93 ACRES -- 1.98 ACRES -- EPIC LN
SHALLOW MARSH 0.05 ACRES -- 0.05 ACRES -- -- --
SHRUB CARR 0.34 ACRES 0.13 ACRES 0.34 ACRES -- 0.13 ACRES --
HARDWOOD -- -- -- -- -- --
SWAMP USH 18/151
FARMED WET 5.32 ACRES 0.05 ACRES 5.32 ACRES -- 0.05 ACRES --
MEADOW
TOTAL 10.71 ACRES 2.18 ACRES 10.64 ACRES 0.07 ACRES 2.16 ACRES 0.02 ACRES
EPIC FACILITIES
ALTERNATIVE 3.1 CURRENTLY IN USE
EXHIBIT 3.1-1
STREAM ACCESS
PARKING AND
WALKING PATH
WETLAND IMPACT AREA
EPIC OWNED PARCELS (TYP.)
SUGAR RIVER CROSSING ZONE A FEMA 100-YR
(BRIDGE OR PRECAST ARCH) FLOODPLAIN (TYP.)
SU
GA R
RIVE
R
DAIRY RIDGE RD
M
ILI
TA
RY
RI
E
DG
ST
AT
ET
RA
IL
NOTE: RUDERAL AREAS ARE CROSS HATCHED SUGAR RIVER WILDLIFE AREA
WETLAND IMPACTS - ROADWAY CROSSING
QUALITY PERMANENT TEMP IMPACT PERM PERM TEMP TEMP
COLOR
IMPACT TOTAL TOTAL RUDERAL NON-RUDERAL RUDERAL NON-RUDERAL
WET PRAIRIE -- 0.01 ACRES -- -- -- 0.01 ACRES
SEDGE MEADOW 2.38 ACRES 0.65 ACRES -- 2.38 ACRES -- 0.65 ACRES
WET MEADOW 4.58 ACRES 0.81 ACRES 4.58 ACRES -- 0.80 ACRES 0.01 ACRES EPIC LN
SHALLOW MARSH 1.49 ACRES 0.06 ACRES 0.31 ACRES 1.18 ACRES -- 0.06 ACRES
SHRUB CARR 0.51 ACRES 0.47 ACRES 0.05 ACRES 0.46 ACRES 0.01 ACRES 0.46 ACRES
HARDWOOD -- -- -- -- -- --
SWAMP USH 18/151
FARMED WET 1.36 ACRES -- 1.36 ACRES -- -- --
MEADOW
TOTAL 10.32 ACRES 2.00 ACRES 6.30 ACRES 4.02 ACRES 0.81 ACRES 1.19 ACRES
EPIC FACILITIES
ALTERNATIVE 3.2 CURRENTLY IN USE
EXHIBIT 3.2-1
SUGAR RIVER CROSSING
(BRIDGE OR PRECAST ARCH)
STREAM ACCESS
PARKING AND
WALKING PATH STORMWATER
EPIC OWNED PARCELS (TYP.) POND (TYP.)
W
PED / BICYCLE ACCESS
W
PATH TO MILITARY
W RIDGE STATE TRAIL
WETLAND IMPACT AREA ZONE A FEMA 100-YR
ROADWAY CROSSING FLOODPLAIN (TYP.)
SU
PUBLIC UTILITY GA
NORTHERN CROSSING R
''-''-WF
S
- STEEL PIPE CASING RIVE 1210
SEE EXHIBIT 3.2-5 R
PROPOSED STREAM ''-''-WF
S
1120
REALIGNMENT &
RESTORATION
S
''- -WF
1120''
S
''--WF
1120''
DAIRY RIDGE RD FS
''--W
1120''
PUBLIC UTILITY
SOUTHERN CROSSING
- STEEL PIPE CASING
M
STREAM ILI
REALIGNMENT / TA
PUBLIC UTILITY RY
IMPACT OVERLAP RI
E
DG
ST
AT
ET
RA
IL
NOTE: RUDERAL AREAS ARE CROSS HATCHED SUGAR RIVER WILDLIFE AREA
WETLAND IMPACTS - ROADWAY CROSSING
QUALITY PERMANENT TEMP IMPACT PERM PERM TEMP TEMP
COLOR
IMPACT TOTAL TOTAL RUDERAL NON-RUDERAL RUDERAL NON-RUDERAL
WET PRAIRIE -- -- -- -- -- --
SEDGE MEADOW 0.99 ACRES 0.24 ACRES -- 0.99 ACRES -- 0.24 ACRES
WET MEADOW 4.42 ACRES 1.67 ACRES 3.82 ACRES 0.60 ACRES 1.67 ACRES -- EPIC LN
SHALLOW MARSH 0.63 ACRES 0.07 ACRES 0.63 ACRES -- 0.07 ACRES --
SHRUB CARR 2.52 ACRES 0.32 ACRES 2.52 ACRES -- 0.32 ACRES --
HARDWOOD -- -- -- -- -- --
SWAMP USH 18/151
FARMED WET 1.22 ACRES -- 1.22 ACRES -- -- --
MEADOW
TOTAL 9.78 ACRES 2.30 ACRES 8.19 ACRES 1.59 ACRES 2.06 ACRES 0.24 ACRES
ALTERNATIVE 3.2 EPIC FACILITIES
CURRENTLY IN USE
EXHIBIT 3.2-2
ROADWAY CROSSING
SUGAR RIVER CROSSING
(BRIDGE OR PRECAST ARCH)
STREAM ACCESS
PARKING AND
WALKING PATH STORMWATER
EPIC OWNED PARCELS (TYP.) POND (TYP.)
W
PED / BICYCLE ACCESS
W
PATH TO MILITARY
W RIDGE STATE TRAIL
WETLAND IMPACT AREA ZONE A FEMA 100-YR
ROADWAY CROSSING FLOODPLAIN (TYP.)
SU
PUBLIC UTILITY GA
NORTHERN CROSSING R
''-''-WF
S
- STEEL PIPE CASING RIVE 1210
SEE EXHIBIT 3.2-5 R
S
''-''-WF
1120
S
''- -WF
1120''
S
''--WF
1120''
DAIRY RIDGE RD FS
''--W
1120''
M
ILI
TA
RY
RI
E
DG
ST
AT
ET
RA
IL
NOTE: RUDERAL AREAS ARE CROSS HATCHED SUGAR RIVER WILDLIFE AREA
WETLAND IMPACTS - ROADWAY CROSSING
QUALITY PERMANENT TEMP IMPACT PERM PERM TEMP TEMP
COLOR
IMPACT TOTAL TOTAL RUDERAL NON-RUDERAL RUDERAL NON-RUDERAL
WET PRAIRIE -- -- -- -- -- --
SEDGE MEADOW 0.99 ACRES 0.24 ACRES -- 0.99 ACRES -- 0.24 ACRES
WET MEADOW 4.42 ACRES 1.67 ACRES 3.82 ACRES 0.60 ACRES 1.67 ACRES -- EPIC LN
SHALLOW MARSH 0.63 ACRES 0.07 ACRES 0.63 ACRES -- 0.07 ACRES --
SHRUB CARR 2.52 ACRES 0.32 ACRES 2.52 ACRES -- 0.32 ACRES --
HARDWOOD -- -- -- -- -- --
SWAMP USH 18/151
FARMED WET 1.22 ACRES -- 1.22 ACRES -- -- --
MEADOW
TOTAL 9.78 ACRES 2.30 ACRES 8.19 ACRES 1.59 ACRES 2.06 ACRES 0.24 ACRES
ALTERNATIVE 3.2 EPIC FACILITIES
CURRENTLY IN USE
EXHIBIT 3.2-3
STREAM RESTORATION
STREAM ACCESS
PARKING AND
WALKING PATH STORMWATER
EPIC OWNED PARCELS (TYP.) POND (TYP.)
ZONE A FEMA 100-YR
FLOODPLAIN (TYP.)
STREAM
REALIGNMENT / SU
ROADWAY CROSSING GA
IMPACT OVERLAP R S
''-''-WF
RIVE 1210
R
PROPOSED STREAM ''-''-WF
S
1120
REALIGNMENT &
RESTORATION
S
''- -WF
1120''
S
''--WF
1120''
TEMPORARY IMPACT
DAIRY RIDGE RD AREAS DURING FS
''--W
1120''
RESTORATION
M
ILI
TA
CONNECT INTO RY
EXISTING SUGAR RIVER
RI
E
DG
ST
PROPOSED AT
ROADWAY ET
ALIGNMENT RA
IL
SUGAR RIVER WILDLIFE AREA
EPIC LN
STREAM RESTORATION TEMPORARY IMPACT
DURING RESTORATION USH 18/151
3.70 ACRES 14.52 ACRES
ALTERNATIVE 3.2 EPIC FACILITIES
CURRENTLY IN USE
EXHIBIT 3.2-4
SOUTHERN UTILITY CROSSING
STREAM ACCESS
PARKING AND
WALKING PATH STORMWATER
EPIC OWNED PARCELS (TYP.) POND (TYP.)
ZONE A FEMA 100-YR
FLOODPLAIN (TYP.)
SU
GA R S
''-''-WF
RIVE 1210
R
PROPOSED STREAM ''-''-WF
S
1120
REALIGNMENT &
RESTORATION
S
''- -WF
1120''
S
''--WF
1120''
DAIRY RIDGE RD FS
''--W
1120''
PUBLIC UTILITY
SOUTHERN CROSSING
- STEEL PIPE CASING
M
STREAM ILI
REALIGNMENT / TA
PUBLIC UTILITY RY
IMPACT OVERLAP RI
E
DG
ST
PROPOSED AT
ROADWAY ET
ALIGNMENT RA
IL
SUGAR RIVER WILDLIFE AREA
NOTE: RUDERAL AREAS ARE CROSS HATCHED
WETLAND IMPACTS - SOUTHERN UTILITY CROSSING
IMPACT TEMP TEMP EPIC LN
COLOR QUALITY
TOTAL RUDERAL NON-RUDERAL
WET PRAIRIE 0.01 ACRES -- 0.01 ACRES
WET MEADOW 1.06 ACRES 1.06 ACRES --
SHRUB CARR 0.02 ACRES 0.02 ACRES -- USH 18/151
FARMED WET 0.46 ACRES 0.46 ACRES --
MEADOW
TOTAL 1.55 ACRES 1.54 ACRES 0.01 ACRES
ALTERNATIVE 3.2
EXHIBIT 3.2-5
SUGAR RIVER
SUGAR RIVER CROSSING
(BRIDGE OR PRECAST ARCH)
STREAM ACCESS
PARKING AND
WALKING PATH W PED / BICYCLE ACCESS
W PATH TO MILITARY
W
RIDGE STATE TRAIL
W
W
W
WETLAND IMPACT AREA
W ROADWAY CROSSING
W
W
W
W
M
W ILI
RY
W TA
RI
W
DG
W ES
TA
TE
PUBLIC UTILITY TR
AI
NORTHERN CROSSING L
- STEEL PIPE CASING
STORMWATER
POND (TYP.) PROPOSED STREAM
NOTE: RUDERAL AREAS ARE CROSS HATCHED REALIGNMENT &
RESTORATION
WETLAND IMPACTS - ROADWAY CROSSING
QUALITY PERMANENT TEMP IMPACT PERM PERM TEMP TEMP
COLOR
IMPACT TOTAL TOTAL RUDERAL NON-RUDERAL RUDERAL NON-RUDERAL
WET PRAIRIE -- -- -- -- -- --
SEDGE MEADOW 0.99 ACRES 0.24 ACRES -- 0.99 ACRES -- 0.24 ACRES
WET MEADOW 4.42 ACRES 1.67 ACRES 3.82 ACRES 0.60 ACRES 1.67 ACRES --
SHALLOW MARSH 0.63 ACRES 0.07 ACRES 0.63 ACRES -- 0.07 ACRES --
SHRUB CARR 2.52 ACRES 0.32 ACRES 2.52 ACRES -- 0.32 ACRES --
HARDWOOD -- -- -- -- -- --
SWAMP
FARMED WET 1.22 ACRES -- 1.22 ACRES -- -- --
MEADOW
TOTAL 9.78 ACRES 2.30 ACRES 8.19 ACRES 1.59 ACRES 2.06 ACRES 0.24 ACRES
EPIC FACILITIES
ALTERNATIVE 3.3 CURRENTLY IN USE
EXHIBIT 3.3-1
SUGAR RIVER CROSSING
(BRIDGE OR PRECAST ARCH)
EPIC OWNED PARCELS (TYP.)
WETLAND IMPACT AREA
ZONE A FEMA 100-YR
FLOODPLAIN (TYP.)
SU
GA R
RIVE
R
DAIRY RIDGE RD
M
ILI
TA
RY
RI
E
DG
ST
AT
ET
RA
IL
NOTE: RUDERAL AREAS ARE CROSS HATCHED SUGAR RIVER WILDLIFE AREA
WETLAND IMPACTS - ROADWAY CROSSING
QUALITY PERMANENT TEMP IMPACT PERM PERM TEMP TEMP
COLOR
IMPACT TOTAL TOTAL RUDERAL NON-RUDERAL RUDERAL NON-RUDERAL
WET PRAIRIE -- -- -- -- -- --
SEDGE MEADOW 1.19 ACRES 0.44 ACRES -- 1.19 ACRES -- 0.44 ACRES
WET MEADOW 4.50 ACRES 1.99 ACRES 3.89 ACRES 0.61 ACRES 1.99 ACRES -- EPIC LN
SHALLOW MARSH 0.30 ACRES -- 0.30 ACRES -- -- --
SHRUB CARR 2.34 ACRES 0.16 ACRES 2.34 ACRES -- 0.14 ACRES 0.02 ACRES
HARDWOOD -- -- -- -- -- --
SWAMP USH 18/151
FARMED WET 1.60 ACRES -- 1.60 ACRES -- -- --
MEADOW
TOTAL 9.93 ACRES 2.59 ACRES 8.13 ACRES 1.80 ACRES 2.13 ACRES 0.46 ACRES
ONLY
ALTERNATIVE 4
ONLY
ONLY
ONLY ONLY
ONLY ONLY
EXHIBIT 4 ONLY ONLY
CTH PD
ZONE AE FEMA 100-YR
FLOODPLAIN (TYP.)
COUNTRY VIEW RD
SU
R
GA
D RI
OA VER
GR
SIN
OS
CR
TE
WHI
ZONE A FEMA 100-YR
FLOODPLAIN (TYP.)
M
ILITA
R
RY
ID G
ES
TA
TE
TR
AI L
DAIRY RIDGE RD
USH 18/151
ALTERNATIVE 5
EXHIBIT 5
ZONE A FEMA 100-YR
FLOODPLAIN (TYP.)
AY
M YW
D ILK
RI M
RY
TA
SUGAR RIVER WILDLIFE AREA ILI EPIC OWNED PARCELS (TYP.)
GE
ST
AT
BOBCAT LANE ET
RA
IL
GA
SUR
RIVE
R EP
IC
LN
SUGAR RIVER CROSSING MILITARY RIDGE
STATE TRAIL CROSSING
USH 18/151
CTH G
ZONE AE FEMA 100-YR
FLOODPLAIN (TYP.)
Get email alerts for Verona