Mineral Mining Review Board - 18 Feb 2021 - PM Session
Regular MeetingWalker, MI · February 18, 2021
Agenda
Mineral Mining Review Board
via Zoom
4243 Remembrance Rd NW
Thursday, February 18, 2021
1:00 PM
Join Zoom Meeting via Web:
https://us02web.zoom.us/j/82596758779?pwd=VDhvQlZoUndsVjN3VVd2Yi9icFlqUT09
Join Zoom Meeting via Phone:
+1 646 558 8656 US
Meeting ID: 825 9675 8779
Passcode: 737416
1. Call the meeting to order
2. General Public Comment
This provision is made to encourage the expression of questions and concerns regarding
non-public hearing items and issues not on the agenda. Speakers are asked to identify
themselves by name and address. A maximum time of 6 minutes per person is required.
3. Goodale Sand Pit - 2610 O’Brien St SW & 2851 Butterworth Dr SW - PPN: 41-13-33-200-
014 and 41-13-33-326-010
Engineer Brandon Simon of Nederveld Inc on behalf of applicant Goodale Sand Pit, LLC
and owner JA Devland LLC. is seeking renewal of their Mineral Mining License for the 2021
calendar year.
3.1.
4. Stanley Orchards Mine - 2605 Bristol Ave NW & 1784 3 Mile Rd NW - PPN: 41-13-10-201-
003, 009
Engineer Brad Meyers with Meyers, Bueche & Nies, Inc. on behalf of applicant Cordes
Trenching I Inc. and owner Stanley Orchards LLC is seeking renewal of their Mineral Mining
License for the 2021 calendar year.
4.1.
Page 1 of 46
5. The Mines Golf Club LLC - 2301 & 2311 O’Brien Rd SW - PPN: 41-13-27-300-002, 025
Applicant/owner Dan Schimmel of the Mines Golf Club LLC is scheduled for a Mineral
Mining Review Board (MMRB) meeting to consider the formal close-out of mining activities
pursuant to Section 34-308 of the Walker City Code.
5.1.
6. Mineral Mining Review Board Member/Staff Comments
7. Adjournment
Page 2 of 46
APPLICATION FOR MINERAL MINING LICENSE
(Article VII Chapter 34)
MINERAL MINING REVIEW BOARD
CITY OF WALKER
This application form shall be completed in full and all required attachments shall
be provided by the applicant, as applicable to the mineral mining operation for which a
license is being sought. A response must be provided for all items. For items which the
applicant believes do not apply to the operation in question, the applicant should respond
by indicating “not applicable.” Additional sheets should be attached by the applicant as
necessary to provide the requested information. All materials which are attached to the
application must be clearly identi?ed and must indicate the portion of the application to
which they pertain.
Following submission of the application, the Building Official shall review the
application and attachments to determine if the application is complete based on the
application requirements provided by the current Mineral Mining Control Ordinance If
the application is determined to be complete (including payment of all applicable fees),
the Building Official shall transmit the application to the Mineral Mining Review Board
for review by the Board as provided by the Ordinance. If the application is determined to
be incomplete, the applicant shall be notified as to what additional information or
materials are required and no further action shall be taken by the City on the application
until such information or materials have been received by the Building Of?cial.
_jj
1. SITE DESCRIPTION:
Provide the location, size, and legal description of the site and the area of the
site from which the materials will be mined or upon which the mining
operations will take place.
a_ Address; 2851 Butterworth Drive
c. Dimensions of Lot: Varies '
See Pla”
d. Dimensions of Area to be mined: Varies '
599 Plan
e. Total acres of disturbance: "2-1 acres
Page 3 of 46
OWNER OF SITE:
Provide the name, address and telephone number of the owner (or owners) of
the site from which the materials will be mined or upon which the mining
operations will take place.
J A Devland, LLC
a. Name:
2000 Ch'‘Cage Dr. SW Wyoming ,MI 49519
'
b. Address:
616-453-7690
c. Telephone:
APPLICANT:
Provide the name, address and telephone number of the applicant for the
license.
Goodale Sand Pit, LLC
a. Name:
0-21 Fennessy SW, Grand Rapids MI 46534
b. Address:
616-453-7690
c. Telephone:
OPERATOR {Mining Contractor):
Provide the name, contact person, address and telephone number of the ?rm
or corporation who will be conducting the actual mining operations.
same as applicant
a. Name:
b. Contact Person:
c. Address:
d. Telephone:
ENGINEER
Brandon Simon, PE
a. Name:
Nederveld Inc
b. Firm:
616-575-5190
c. Telephone:
Page 4 of 46
d. E_Mai1:bsimon@nederveld.com
6. MATERIALS TO BE MINED
Sand Provide a detailed statement of the types of materials or
resources to be mined, stockpiled and/or processed on the
site or hauled away from the site.
7. MINING METHODS
front end loaders
fillingdump trucks Provide a detailed statement of the proposed method of
mining, stockpiling, processing and/or hauling.
8. OF F-SITE ROUTES
Identify off-site route(s) over which materials will be hauled to or from the
site and truck routes in the area that will be used.
Westerly on Butterworth Drive to the intersection of Buttenivorth Drive & Maynard
Ave., during regular hours of operation.
9. ON- SITE ROADS AND DRIVES
Describe the location, width and proposed surface treatment (gravel, paved,
etc.) of all on-site roads and drives, including driveway approaches.
There is a bituminous drive for access to the site off Butterworth, approximately
300' in length and 30' wide. See attached site plan.
10. TYPE AND LOCATION OF MACHINERY, EQUIPMENTAND
FACILITIES
Describe the types of machinery, equipment and facilities to be used at site
and where the machinery, equipment and facilities will be located on the site.
Include the decibel level emitted by the equipment, measured at a distance of
50 ft. from the equipment.
Sand will be loaded into trucks with loaders. Equipment such as
dozers and excavators will be used in the reclamation activities
Page 5 of 46
11. TIME OF COMPLETION AND PHASES
Provide an estimate of the number of years to complete mining and
reclamation at the site and the number of phases involved.
Mining to be completed by the year 2035, depending on market demand.
Reclamation will be under continuous practice and should be completed within one
year after mining has concluded.
12. PLAN OF OPERATION
Provide an overall plan of operation sealed by a professional engineer which
meets all applicable requirements under Sections 34-263 and 34-266 of the
Mineral Mining Control Ordinance, including a topographic survey map of
the site drawn on a scale not less than 1 inch = 200 feet, showing on a 4 foot
contour interval existing grades of the land prior to any removal and grades of
the proposed excavations subsequent to removal. The plan shall clearly show
the area(s) to be mined, including existing areas and roads within 100 feet of
all property lines, areas for stockpiling, maintenance areas, berms, fencing,
and similar use areas. The plan of operation shall be accompanied by a
projected schedule of mining operations as required by Section 34-263 of the
Mineral Mining Control Ordinance. (Place a check in the space provided if
item attached or shown as required.)
Current topographic survey attached
Areas to be mined shown, including present application and
future cells
Existing areas mined shown
Roads within 100 ft. of all property lines shown
Areas for stockpiling shown
NA
Maintenanceareas shown
NA Berms shown, along with existing vegetation and new
landscaping
Fl“i'l't Fl‘ Page 6 of 46
Fencing shown
[]NA Other use areas shown (specify)
Projected schedule of mining operations provided
Continuous until 2035 Dates provided for commencement/completion of mining
operations
Continuous until 2035 Dates provided for commencement/completion of erosion
and drainage control measures
Dates provided for commencement/completion of:
In place and moved w/ operation Fencing
In place see site plan Roads
none Ummm
HOT} e Other structures/improvements (specify)
Operation plan and maps meet reguirements of Section 34-263 of
Mineral Mining Control Ordinance, including:
X Existing conditions shown
X Mining underway shown
Mining completed shown
Mining proposed shown
Stockpiles shown
Roadways and drives shown
Fill areas subject to the requirements of Sec. 34-305 of the
Mineral Mining ordinance.
Permanent benchmarks identi?ed and located
Page 7 of 46
Plans and maps prepared and sealed by a registered civil
engineer
Compaction test results reported by a certi?ed density
technician.
13. RECLAMATION PLAN
Provide a plan of reclamation sealed by a professional engineer for the site
which meets the requirements under Sections 34-263(5) (m) of the Mineral
mining Control Ordinance. The reclamation plan shall be submitted in three
parts, consisting of a recent aerial photograph of the site with a general plan of
reclamation as an overlay or as a separate drawing; a reclamation contour plan;
and a description of reclamation methods and declarationof ?ll materials
proposed for grade restoration and topsoil. The general plan of reclamation
shall be presented at the same scale as the plan of operations and shall provide
the information required by Sections 34-263(5) (m) of the Ordinance. (Place a
check in the space as required.)
X
Aerial photograph attached
General plan of reclamation attached
X
Areas of land already completely reclaimed shown
X
Areas of reclamation underway shown
X
Areas currently used for storage of topsoil and/or
overburden shown
X
Areas proposed to be used for storage of topsoil and/or
overburden shown
X
Areas proposed for reclamation during the one year
license period shown
va?es
Acreage for each area above shown
overburden from Site
Declaration of ?ll material
X . . .
Reclamation contour plan with contour intervals not to exceed 2 ft.
indicating the general grade and slopes to which excavated areas
will be reclaimed attached
Page 8 of 46
Compaction tests reported by a certi?ed density technician
4" topsoil seeded
-
(grass legume mix) Description of methods and materials proposed for restoration of
topsoil to required fertility and amount and type of planting shown
Projected schedule of reclamation operations provided
X Dates provided for commencement/completion of
reclamation operations
X . .
Dates provided for commencement/completion of
erosion and drainage control measures
Dates provided for commencement/completionof:
X . .
Final grading
Topsoil replacement
Replanting or landscaping
Other (specify)
14. OTHER INFORMATION
Provide any other information necessary to evaluate the character and nature
of the proposed mining operations
15. PERMANENT CLOSE OUT OF MINING OPERATIONS
(a) Notwithstanding the activities permitted under Section 34-307, all mining
operations are required to undergo a ?nal review by the Mineral Mining
review board to close out all onsite activities and active licenses and
before any performance guarantee is discharged or released.
(b) The application and public hearing process for the final close out of all
onsite activities will follow that for an armual mineral mining permit.
(c) The following must be supplied on site plans, sealed by a professional
engineer, by the applicant to the Mineral Mining review board:
a. Sealed, surveyed as-built plans, showing reclaimed contours at 2 ft.
contour intervals.
Page 9 of 46
A sealed, engineered soil erosion and permanent soil stabilization plan.
A list of, and locations for, vegetative site restoration methods.
The location of, and future plans for, all onsite driveways, catch
basins, culverts, drains and other appurtenances.
The location of, and removal plan for, all onsite signage.
The location of, and removal plan for, all onsite buildings, equipment,
and other related items.
The location of, and grading plan for, all future public roads.
Compaction tests reporting a minimum 90% compaction rate for
planned undeveloped areas and a minimum 95% compaction rate for
planned development areas. Compaction test results shall be reported
by a certi?ed density technician. The planned undeveloped and
development areas must match those shown on the reclamation plan.
i. Documentation that all onsite oil wells have been cut to the
reclamation topography.
(d) Prior to the public hearing, the City Engineer and DPW director will
conduct an onsite inspection to determine compliance with the as-builts
and reclamation plans.
(e) Compliance with any conditions of approval attached to the close out
review is required before any performance guarantee is discharged or
released.
Owner’ s signature
(This page for of?ce use only)
F ."°
“
Q
°
Page 10 of 46
Date Received
Received by
( ) Fee Paid Receipt No.
( ) New ( ) Renewal
( ) Application Complete
( ) Hearing Set: Date
Page 11 of 46
NEIJERVELD
January 05, 2020
Mrs. Laura Lundy
Planning Assistant
City of Walker Community
4243 Remembrance Rd. NW
Walker, MI 49544
RE: Goodale Sand Mine 2021 Applicationfor Mineral Mining License
-
City of Walker, Kent County, MI
Dear Mrs. Lundy:
Enclosed, along with this cover letter, please ?nd ten (10) copies of the grading and
reclamation plan for the request of a mineral mining license for the Goodale Sand Mine located
in the City of Walker, Kent County, MI.
Please note, the required signed mineral mining license application, a check in the amount of
$500 to serve as the renewal fee, and bond renewal will be submitted under separate cover by
the owner.
Please feel free to contact me in our Grand Rapids of?ce at (616) 575-5190 or via email at
bsimon@nederveld.com if you have any questions or require additional information.
Sincerely,
Brandon Simon, P.E.
Project Engineer
cc: Mr. Todd Grasman —
Goodale Enterprises (w/ plans and application)
K:\2020\204\20401093\OUTGOING\2021
Mining Renewal Submitta|\a. Goodale Sand Mine Cover Letter.doc
217 Grandville Ave. SW I STE. 302 l Grand Rapids, Ml 49503
P: 616.575.5190 l www . .
n e d e rv e l d c o In I F: 616.575.6644
Page 12 of 46
§8<(-sv—;:87e:
i 3
IRREVOCABLESTANDBY LETTER OF CREDIT
“
V.
U. y
amx
rssuan:MACATAWA '
1o7s3£sAcmwADRIVE
*"P.O.BOX3119
MI49422-3119
HOLLAND,
Date of lssue:IJ7-25-2005 Letter of Credit Number: 506
Amount: U.S. $ z§,0O0.00
( TWENTY FIVE AND
THOUSAND NOTOO U.S. DOLLARS)
For Bene?t Of: For Account Of:
Bene?ciary Name and Address Applicant Name and Address
CITYOFWAU(ER JACKGOODALE
I.I.C,O-21FENNESY
ENTERPRISES
OFGOODALE
FORBENEFIT HOSW
Ml49504
RDNW,WALKER,
4243FIEMEMBRANCE
GRAND MI49504
RAPIDS,
of Credit (Letter of Credit) in favor of Bene?ciary in the
LETTEROF CREDIT. Issuer establishesthis irrevocable Standby Letter
with a Draft (or Drafts. if the maximumnumberof drawings is
amount indicated above. Bene?ciary may draw on this Letter of Credit
greater than one) together with the documents described below. Each
Draft shall be signed on behalf of Bene?ciary and be marked
Credit No. [Letter of Credit number] dated [Letter of Credit datej." Drafts must be presented at
"Drawn under [Issuer name] Letter of
presentation of any Draft shall reduce the Amount availableunder
Issuer's address shown above on or before the Expiration Date. The
this Letter of Credit by the amount of the Draft.
Beneficiary. This obligation cannot be modi?ed by any
This Letter of Credit sets forth in full theterms of Issuer's obligation to
this Letter of Credit may be related.
reference in this Letter of Credit, or any document to which
This Letter of Credit expires on the Expiration Date.
DRAWINGS.
[3 Partial drawings shall not be permittedunder this Letter of Credit.
that may be made is
III Partial drawings are permitted. The maximum number of drawings
two copies except as stated:
Each Draft must be accompaniedby the following. in original and
DOCUMENTS.
[XI The original Letter of Credit, together with any amendments.
[XI A sight draft drawn by Bene?ciary on Issuer.
LLC INTHE
ITSOBLIGATIONS
HASNOTCOMPLETED
ENTERPRISES
[X] A signed statent by Bene?ciary including the following statement: GDDDALE
OFALL
OFCOMPLETION
60 DAYS
PITWITHIN
ITSMINING
_OF
RESTORATION
.
ACTIVITIES.
MINING
CI Other documents:
Beneficiary withoutany obligation or duty on the part of Issuer to
any person purporting to be an authorized officer or representativeof
verify the identify or authority of the personpresentingthe draft and such documentation.
SPECIALINSTRUCTIONS:
at Issuer's address at 5m_EM_____________ (Time)
EXPIRATIONDATE. This Letter of Credit expires at the close of business (Date). Issuer agrees to honor all Drafts presentedin
on mmzgm
on or before the ExpirationDate.
strict compliance with the provisions of this Letter of Credit
[XI If Bene?ciary has not drawn the full amount of this Letter of Credit prior to the ExpirationDate, the ExpirationDate shall be
extendedfor a period of 365 days from the Expiration Date, unless Issuer noti?es Bemz?ciary in writing at least
this Letter of Credit. in any event, this Letter
30 days prior to the ExpirationDate that Issuer elects not to extend
without any notice from Issuer to Bene?ciary.
of cream expire on
511311
(pays 1 of 2)
mstzcoz
5%‘ 02001 Banlteu symms. Ine.. St. cloud, MN FormLC-STANDBY
Page 13 of 46
TRANSFERABILITY.This Letter of Credit is D transferable IX!non-transferable.
I
APPLICABLEMILAW.
ThisLetter of Credit shall be governed by:
III the Unifonu Customs and Practice for Documentary Credits.1993 Revision, InternationalChamber of Commerce Publication
No. 500 (UCP), or any later version or amendment.
D the IntemationalStandby Practice:1998 (ISP98).
This Letter of Credit shall also be governed by the laws of MIQHJQAN .the United States of
America.so long as such laws are not inconsistentwith the UCP or ISP, as applicable.
.
MA$2AIAi¥A.EAl£iJS__._____________________..___________
(Issuer Name)
(Signature) (Date)
PESIDENT
PEARSON.
LINDA VICE
(Signer Nameand Title)
cam.MN FormLC-STANDBYlIl5I2002 Inns 2 of 2!
Ex?mg‘ Q2001B|nhr| Syetumn. Int:., 51.
Page 14 of 46
MaI_'y
Alighire
From: _
L Patty Riemersma <Priemersma@MacatawaBank.com> on behalf of LettersOfCredit
~" <LettersOfCredit@MacatawaBank.com>
Sent: Monday, September 14, 2020 9:16 AM
To: 'pgooda|e@goodaleent.com'; Mary Alighire
Cc: Andy Schmidt
Subject: Jack Goodale FBO Goodale Enterprises LLCLetter of Credit renewal
Pat and Mary,
Please be advised that we have marked this Letter of Credit #506 to automatically extend to October 14, 2021. If you
have any questions, please let me know.
Thanks,
Patty
Patty Riemersma
Commercial Loan Document Specialist ll
10.753 Macatawa Drive. Holland, MI 49424
P: (616) 820-1445
M MACATAWABANK
This email and any attachments are solely for the person or entity to which it is addressed and may contain
con?dential and/or privileged information. Any review, dissemination,copying, printing or other use of this
email or attachment is prohibited. If you have received this email in error, please contact the sender
immediately by return email and promptly delete the material from any computer. We do not guarantee that the
integrity of this email has been maintained or that this email is free of Viruses,interception or interference and
do not accept any liability for any damage caused by any Virus transmitted by this email.
Page 15 of 46
‘V’ A e
i
/it . g;
.; f
Q {IllPlR¢OvDU6ERS
0-.. canesy I-’..ci.,
S.W. = GrazzdRapids. MI 493. 4
March l0, 2015
LakesideAggregate, LLC and Goodale Sandpit, LLC operate mineral mining operations located
in the City of Walker, Michigan at 2471 Butterworth and 2851 Butterworth,respectively.Two of
the properties included in the mineral mining permit, 4|-13-33-200-O3 (2468 O'Brien St SW)
and 4]-13-33-200-14 (2610 O'Brien ST SW) have a common property boundary line. The
owners and operators agree to remove the materials along the common property boundary line to
a common elevation as shown on the Nederveld, lnc mineral mining permit grading and
reclamation plan C-300 (project number l440l27l) last revised on January I5, 2015 and
submitted to the City of Walker Mineral Mining Board on February 18, 2015.
/ .
I\"‘-?("/ILL ’ /,2 ~il
I /
Doug Meekhof, Lakeside Aggregate, LLC Date
/
Pat Goodale, Goodale Sandpit, LLC Date
Page 16 of 46
Page 17 of 46
Page 18 of 46
Page 19 of 46
Page 20 of 46
Page 21 of 46
Page 22 of 46
Page 23 of 46
Page 24 of 46
Page 25 of 46
Page 26 of 46
Page 27 of 46
Page 28 of 46
Page 29 of 46
Page 30 of 46
Page 31 of 46
From: Rachell Nagorsen
To: Scott Conners; Frank Wash; Tricia Anderson; Laura Lundy
Subject: MMRB Public Comment-Stanley Orchards
Date: Wednesday, February 3, 2021 2:17:43 PM
Attachments: image001.png
image002.png
All:
I received a call from a concerned resident on 3 Mile about a new stockpile at Stanley Orchards. I
explained the MMRB process and that she could add public comments to the record on our
upcoming meeting on the 18th, and she opted to send an email. In the past, Frank has read letters
out loud during the public comment period-can we do the same with this email?
As far as the stockpile goes, I plan to get better photos and make sure it has reasonable soil erosion
controls installed. I think it’s also a good idea to make sure the plan isn’t to slowly sell it off, but we
can discuss that at the meeting.
Thank you.
Rachell Nagorsen
Engineering Programs Coordinator
City of Walker | 4243 Remembrance Road NW
Phone: 616-791-6327
The Engineering Department is staffed Monday-Friday from 7:00 AM to 3:30 PM
From: Jan <pixpix300@gmail.com>
Sent: Wednesday, February 3, 2021 12:14 PM
To: Rachell Nagorsen <rnagorsen@walker.city>
Subject: Fwd: Development
---------- Forwarded message ---------
From: Jan <pixpix300@gmail.com>
Date: Wed, Feb 3, 2021, 12:05 PM
Subject: Development
To: <rnagorsen.walker.city@gmail.com>
Dear board members
As the city develops and grows, many of the long time residents ( some for over 40 yrs ) hope that
you are working in conjunction with us as well as new businesses to maintain a respectful standard
of living with regards to zoning boundries, visual screens, noise and air pollution, water run off and
Page 32 of 46
traffic control.
Thank you all for your time and energy thus far
Janet ford
On 3 mile rd
Page 33 of 46
Page 34 of 46
Page 35 of 46
From: Rachell Nagorsen
To: Scott Conners; Frank Wash; Tricia Anderson; Laura Lundy
Subject: MMRB Public Comment-Stanley Orchards
Date: Wednesday, February 3, 2021 2:17:43 PM
Attachments: image001.png
image002.png
All:
I received a call from a concerned resident on 3 Mile about a new stockpile at Stanley Orchards. I
explained the MMRB process and that she could add public comments to the record on our
upcoming meeting on the 18th, and she opted to send an email. In the past, Frank has read letters
out loud during the public comment period-can we do the same with this email?
As far as the stockpile goes, I plan to get better photos and make sure it has reasonable soil erosion
controls installed. I think it’s also a good idea to make sure the plan isn’t to slowly sell it off, but we
can discuss that at the meeting.
Thank you.
Rachell Nagorsen
Engineering Programs Coordinator
City of Walker | 4243 Remembrance Road NW
Phone: 616-791-6327
The Engineering Department is staffed Monday-Friday from 7:00 AM to 3:30 PM
From: Jan <pixpix300@gmail.com>
Sent: Wednesday, February 3, 2021 12:14 PM
To: Rachell Nagorsen <rnagorsen@walker.city>
Subject: Fwd: Development
---------- Forwarded message ---------
From: Jan <pixpix300@gmail.com>
Date: Wed, Feb 3, 2021, 12:05 PM
Subject: Development
To: <rnagorsen.walker.city@gmail.com>
Dear board members
As the city develops and grows, many of the long time residents ( some for over 40 yrs ) hope that
you are working in conjunction with us as well as new businesses to maintain a respectful standard
of living with regards to zoning boundries, visual screens, noise and air pollution, water run off and
Page 36 of 46
traffic control.
Thank you all for your time and energy thus far
Janet ford
On 3 mile rd
Page 37 of 46
APPLICATION FOR MINERAL MINING LICENSE
(Article VII Chapter 34)
MINERAL MINING REVIEW BOARD
CITY OF WALKER
This applicationform shall be completed in ?1lland all required attachmentsshall
be provided by the applicant, as applicable to the mineral mining operation for which a
license is being sought. A response must be provided for all items. For items which the
applicantbelieves do not apply to the operation in question, the applicant should respond
by indicating “not applicable.” Additional sheets should be attached by the applicant as
necessary to provide the requested information. All materialswhich are attached to the
application must be clearly identi?ed and must indicate the portion of the application to
which they pertain.
Following submission of the application, the Building Of?cial shall review the
application and attachments to determine if the applicationis completebased on the
application requirements provided by the current Mineral Mining Control Ordinance If
the application is determined to be complete (including payment of all applicable fees),
the Building Official shall transmitthe applicationto the Mineral Mining Review Board
for review by the Board as provided by the Ordinance. If the applicationis determined to
be incomplete,the applicant shall be noti?ed as to what additional information or
materials are required and no further action shall be taken by the City on the application
until such information or materialshave been received by the Building O?cial.
1. SITE DESCRIPTION:
Providethe location,size, and legal description of the site and the area of the
site from which the materials will be mined or upon which the mining
operations will take place.
a. Address: 350 Coulv“
b. Listing on Tax Rolls:
c. Dimensions of Lot:
d. Dimensions of Area to be mined:
e. Total acres of disturbance:
Page 38 of 46
OWNER OF SITE:
Provide the name, address and telephone number of the owner (or owners) of
the site from which the materials will be mined or upon which the mining
operations will take place.
a. Nme W‘1\/\e,§,@o Coors/Bra
b. Address: 2 $0 Coc)»Lll
c. Telephone: Lilli 7°7i’
APPLICANT:
Providethe name, address and telephone number of the applicant for the
license.
a. Nara WW I w\ W‘ -<’~
\
b. Address: 3 >0 C0U <—
c. Telephone: "
761 l— 7 g VA‘!
OPERATOR (Mining Contractor}:
Provide the name, contact person, address and telephonenumber of the ?rm
or corporation who will be conducting the actual mining operations.
a. Name:_:>CU/\ "V'~c_i
)
b. Contact 1>erson:\.l><1«4 V1/|«Q—
c. Address: 330 ’C:>«>< H
d. Telephone: (OW -"7‘7lr 73‘/"’/
ENGINEER
a. Name:
”
E??c \ K
W; A}
b. Firm: Tobw V\I\L\<_.
c. Telephone: 5’ :3 l’ -3(P93
Page 39 of 46
(1. E-Mail:
MATERIALS TO BE MINED
_2L Provide a detailed statement of the types of materials or
resources to be mined, stockpiled and/or processed on the
site or hauled away from the site.
MINING METHODS
X Provide a detailed statement of the proposed method of
mining, stockpiling,processing and/or hauling.
OFF-SITE ROUTES
Identify off-site route(s) over which materials will be hauled to or from the
site and truck routes in the area that will be used.
23
ON- SITE ROADS AND DRIVES
Describe the location, width and proposed surface treatment (gravel, paved,
etc.) of all on-site roads and drives, including driveway approaches.
__>£
10. TYPE AND LOCATION OF MACHINERY E UIPMENT AND
FACILITIES
Describe the types of machinery, equipment and facilities to be used at site
and where the machinery, equipment and facilities will be located on the site.
Includethe decibel level emittedby the equipment,measured at a distance of
50 ft. from the equipment.
>[
Page 40 of 46
11. TIME OF COMPLETION AND PHASES
Provide an estimate of the number of years to complete mining and
reclamationat the site and the number of phases involved.
12. PLAN OF OPERATION X
Provide an overall plan of operation sealed by a professional engineer which
meets all applicablerequirementsunder Sections 34-263 and 34-266 of the
Mineral Mining Control Ordinance, including a topographic survey map of
the site drawn on a scale not less than 1 inch = 200 feet, showing on a 4 foot
contour interval existing grades of the land prior to any removal and grades of
the proposed excavations subsequentto removal. The plan shall clearly show
the area(s) to be mined, including existing areas and roads within 100 feet of
all property lines, areas for stockpiling, maintenanceareas, berms, fencing,
and similar use areas. The plan of operation shall be accompanied by a
projected schedule of mining operations as required by Section 34-263 of the
Mineral Mining Control Ordinance. (Place a check in the space provided if
item attached or shown as required.)
Current topographic survey attached
Areas to be mined shown, including present application and
future cells
Existing areas mined shown
Roads within 100 ft. of all property lines shown
Areas for stockpiling shown
Maintenanceareas shown
Berrns shown, along with existing vegetation and new
landscaping
Fl”
FIEFFF Page 41 of 46
JZl_ Fencing shown
_Q__ Other use areas shown (specify)
on Projected schedule of mining operations provided
.12. Dates provided for commencement/completionof mining
operations
i. Dates provided for commencement/completionof erosion
and drainage control measures
A Dates provided for commencement/completionof:
Fencing
Roads
Utilities
Other structures/improvements (specify)
0 eration Ian and ma s meet re uirements of Section 34-263 of
Mineral Minin Control Ordinance includin :
Existing conditions shown
dmxé
Mining underway shown
Mining completed shown
Mining proposed shown
Stockpiles shown
Roadways and drives shown
Fill areas subject to the requirements of Sec. 34-305 of the
Mineral Mining ordinance.
Permanent benchmarksidenti?ed and located
I IIMW W Page 42 of 46
Plans and maps prepared and sealed by a registered civil
engineer
Compaction test results reported by a certi?ed density
technician.
13. RECLAMATION PLAN
Provide a plan of reclamationsealed by a professional engineer for the site
which meets the requirements under Sections 34-263(5) (m) of the Mineral
mining Control Ordinance. The reclamation plan shall be submitted in three
parts, consisting of a recent aerial photograph of the site with a general plan of
reclamation as an overlay or as a separate drawing; a reclamation contour plan;
and a description of reclamation methods and declaration of ?ll materials
proposed for grade restoration and topsoil. The general plan of reclamation
shall be presented at the same scale as the plan of operationsand shall provide
the information required by Sections 34-263 (5) (m) of the Ordinance. (Place a
check in the space as required.)
Aerial photograph attached
General plan of reclamationattached
‘K Areas of land already completely reclaimed shown
Areas of reclamation underway shown
Areas currently used for storage of topsoil and/or
overburden shown
Areas proposed to be used for storage of topsoil and/or
overburdenshown
Areas proposed for reclamation during the one year
license period shown
Acreage for each area above shown
Declaration of ?ll material
Reclamationcontour plan with contour intervals not to exceed 2 ft.
indicating the general grade and slopes to which excavated areas
will be reclaimedattached
Page 43 of 46
Compaction tests reported by a certi?ed density technician
Description of methods and materialsproposed for restoration of
topsoil to required fertility and amount and type of planting shown
Projected schedule of reclamation operations provided
Dates provided for commencement/completion of
reclamation operations
Dates provided for commencement/completionof
erosion and drainage control measures
Dates provided for commencement/completionof:
Final grading
Topsoil replacement
Replanting or landscaping
Other (specify)
14. OTHER INFORMATION
Provide any other information necessary to evaluate the characterand nature
of the proposed mining operations
15. PERMANENT CLOSE OUT OF MINING OPERATIONS
(a) Notwithstanding the activities permittedunder Section 34-307, all mining
operations are required to undergo a final review by the Mineral Mining
review board to close out all onsite activities and active licenses and
before any performance guarantee is discharged or released.
(b) The application and public hearing process for the ?nal close out of all
onsite activities will follow that for an annual mineral mining permit.
(c) The following must be supplied on site plans, sealed by a professional
engineer, by the applicant to the Mineral Mining review board:
a. Sealed, surveyed as-built plans, showing reclaimed contours at 2 ft.
contour intervals.
Page 44 of 46 I
b. A sealed, engineered soil erosionand permanent soil stabilizationplan.
c. A list of, and locationsfor, vegetative site restorationmethods.
(1. The location of, and future plans for, all onsite driveways, catch
basins,culverts, drains and other appurtenances.
The location of, and removal plan for, all onsite signage.
The location of, and removal plan for, all onsite buildings, equipment,
and other related items.
The location of and grading plan for, all future public roads.
Compaction tests reporting a minimum 90% compaction rate for
planned undeveloped areas and a minimum 95% compactionrate for
plarmed development areas. Compaction test results shall be reported
by a certi?ed density technician. The plarmed undeveloped and
developmentareas must match those shown on the reclamationplan.
i. Documentationthat all onsite oil wells have been cut to the
reclamationtopography.
(d) Prior to the public hearing, the City Engineer and DPW director will
conduct an onsite inspectionto determinecompliance with the as-builts
and reclamationplans.
(e) Compliance with any conditions of approval attached to the close out
review is required before any performance guarantee is discharged or
released.
Date: '2’ 3 /102" ’\_Wl‘.Vl€/-3CO‘-U”S'&'
Date:
.
} ”>'/r>’° Z’(
App1icmt
(.3 ‘
Owner’s signature
A?v?
(This page for office use only)
F"5*.“
"!
°
Page 45 of 46
Date Received
Received by
( ) Fee Paid Receipt No.
( ) New ( ) Renewal
() Application Complete
( ) Hearing Set: Date
Page 46 of 46