Conservation Commission
Regular MeetingWaltham, MA · August 7, 2025
Minutes
Waltham Conservation Commission
August 7, 2025
Meeting Minutes
Meeting took place via public Zoom call with participation information posted at City Hall, Government
Center, and on the Commission’s page of the city web site. Zoom information was circulated directly
to all applicants and others on the public agenda.
Meeting called to order at 7:02 PM.
Attendees: Chair Alexander Sbordone, Vice Chair Bill Doyle, Gerard Dufromont, Michael Donovan
Lisa Limonciello.
Absent:
Development Prospectus
• 220 Moody Street. An Order of Conditions was issued for this project in December 2024 (DEP
file 316-0831). Mr. Doyle moved to authorize the chair to sign off, seconded by Mr. Dufromont.
Ms. Limonciello initiated a brief discussion to explain the purpose of a development prospectus
and the sign off process. This is part of the city council’s special permit process, independent
of ConCom permitting. Paul Finger was present for the applicant and confirmed that no
changes have been made to the plans since the OOC was issued. In favor: Sbordone, Doyle,
Donovan, Limonciello, Dufromont. Motion passed.
Public Hearing
Request for Amendment to Order of Conditions (DEP File # 316-0816)(continued from 7/24/25)
Applicant: Bubchull Kim
Property Location: 171 Copeland Street
Project Description: Construction of 80 sq.ft. and 598 sq.ft. additions to the rear of the dwelling and
construction of a rain garden.
Amendments: Expansion of impervious driveway and expansion of rain garden to compensate for
increase to impervious area. Applicant requests a continuance.
Mr. Daly from the commission office noted that information had been received that morning indicating
that this will likely move ahead at the next meeting. Motion to continue by Mr. Doyle, seconded by Mr.
Donovan. In favor: Sbordone, Doyle, Donovan, Limonciello, Dufromont. Motion passed.
Public Hearing
Notice of Intent (DEP File # 316-0842)
Applicant: Robert Winn – City of Waltham Engineering Department
Property Location: 200 Trapelo Road
Project Description: Replacement of utility infrastructure and roadway reconstruction.
Mr. Winn and John Martino of the Engineering Department were present. Mr. Winn gave a brief
overview of the project, then Mr. Martino presented plans and provided more details. The work
involves storm water infrastructure, reconstruction of roadway and sidewalks, and the demolition of
Approved 8-21-2025
one building (the chapel). He highlighted the jurisdictional area, a stream that runs parallel to the
roadway. The proposed work would improve infiltration and recharge and reduce runoff into the
stream. Water quality would be improved. There will be no new outfalls, but flow will be diverted and
existing outfalls would be limited to emergency use. Mr. Donovan asked for clarification on this
location relative to the previous stream restoration [DEP 316-0748], which was highlighted. Current
flow diversion from the stream under the chapel was shown, although it was explained that the exact
location of the pipe is not known, as existing plans disagree; the inlet and outflow are known. They
will inspect the line before the proposed work but will not touch it. Specifics of the erosion and
sedimentation controls were discussed. Mr. Martino noted that all the catch basins will be replaced.
The footprint of the demolished building will be filled then loamed and reseeded. Brief discussion of
the flow from this area to Beaver Brook and of the functioning of catch basins. Mr. Doyle noted that if
not for the drainage improvements and the work nearest the chapel, this could qualify as a limited
project, and all of the work is improvement. He asked that additional sedimentation controls be put at
the outfalls when work is being done upstream, which the applicant agreed to. He asked about the
schedule. They are hoping to get bids this fall, so if things move quickly they might be able to do
some work this winter, but most work would be expected in 2026. Public comment was solicited, but
none offered. Mr. Donovan moved to close the public hearing, seconded by Mr. Dufromont. Mr. Doyle
asked it DEP had issued any comments; they had not at the time. Most of the commission is familiar
with the site, and they did not feel an extra site visit was necessary. Ms. Limonciello will look into
making a visit. In favor: Sbordone, Doyle, Donovan, Limonciello, Dufromont. Motion passed.
Mr. Doyle moved to issue a positive order of conditions with the standard special conditions. Mr.
Donovan seconded. In favor: Sbordone, Doyle, Donvan, Limonciello, Dufromont. Motion passed. Mr.
Doyle asked that the commission be kept informed of the project timeline. He also said he would be
interested in attending, if a site visit is scheduled.
Public Meeting
Informal Discussion
Representative: Brian Maroney – Piety Corner Club
Property Location: 2 Worcester Lane
Description: Request to remove dead oak tree.
Mr. Maroney was present. He is concerned about a dead tree, which has the potential to fall on
powerlines or into Bacon Street. They had hoped to save it during previous work, but could not.
[Referenced work took place under an RDA and enforcement order dating to 2023.] Their insurance
company is also concerned. He presented photos. Discussion. Mr. Donovan has recently taken a look
and agrees that it is a hazard. Mr. Maroney asked if they could grind the stump. Mr. Doyle
recommended that the commission allow stump grinding to 6″ below grade, and that the hole be filled
with soil. Mr. Doyle recommended this decision be properly documented. Ms. Limonciello asked if
they had a schedule for removal; they do not, but Mr. Maroney hopes to have it done within the next
month. Mr. Doyle moved to issue the letter documenting this discussion and conditions. Mr. Donovan
seconded. In favor: Sbordone, Doyle, Donovan, Limonciello, Dufromont. Motion passed. Mr. Daly
noted the commission tree policy, drafted several months ago but not yet discussed or approved. The
commission asked that this be recirculated for review.
Commission Business
• Approval of meeting minutes from 7-24-2025. Mr. Donovan motioned to approve, seconded by
Mr. Dufromont. Motion passed. Ms. Limonciello abstained, as she was not present at this
meeting.
Correspondence
Approved 8-21-2025
• NOTED: SOLitude planned an observation visit to Hardy Pond on August 12. If conditions warrant,
they will apply treatment during the visit. (316-0837)
• NOTED: 104 Hibiscus Ave (NDA issued in April). Notified that work was planned to begin on or
after 8/5 and requested erosion control inspection.
• NOTED: National Grid gas main replacement in the vicinity of Newton Street, from Yetten Terrace
to Whitcomb Street (south of the Charles River). A portion of the work will be in WPA jurisdiction,
but is exempt utility maintenance within existing roadway.
• NOTED: MWRA plans to begin test borings at 209 Lexington Street during the week of August
11. Work was approved by the commission as part of an RDA July 12, 2024.
Old Business
• Status of commission vacancies. It has been confirmed that the city recirculated notice of the
openings on social media.
• Status of conservation agent position. The opening was posted by the city last week, and has
been sent to MACC and MSMCP for additional distribution. Ms. Limonciello asked for specifics
on which social media outlets the city uses. Mr. Daly will investigate and report back.
Site Visit Reports
• 245-265 Winter Street. Ms. Limonciello reported favorably on their preparations and the
anticipated impact. Mr. Dufromont noted that the sidewalk might have to be moved to the
opposite side of the drive to meet ADA requirements, due to steepness.
• 404 Wyman Street & 303 Wyman Street. Three projects are involved in this area. Mr. Donovan
recently visited. The breezeway glass replacement and sewer line repair were completed
satisfactorily. These will be on the next agenda for RCOCs. The current patio project has not yet
started. They will be doing work in 3 locations, only 1 is in jurisdiction. He noted a tree that the
commission had approved for removal, which the site supervisor now believes can be kept in
place. Erosion controls will be going up in the next week, and he will visit again soon.
• 455 Totten Pond Road. Mr. Dufromont noted that MWRA’s contractor appears to have left, but
has left a mess and this could potentially wash into the brook. Mr. Donovan spoke with the
contractor sometime back and they were to leave the erosion controls and jersey barriers in
place. He noted that the contractor has cleaned up and reseeded the old branch library site on
Lexington Street, which was also being used for storage.
Mr. Daly noted several site visits needing scheduling or follow up.
• 43 Chesterbrook Road. For RCOC. Proposed for 8/13 9:30 AM. No one was available. He will
contact the applicant for alternate times and dates.
• Brandeis Chapels Pond. For RDA. This is accessible, and Ms. Limonciello will try to take a look
before the next meeting. Brief discussion of the reason for this RDA, related to confirming the
pond’s man-made status and exemptions.
• 105 Riverview Ave. For RDA. Mr. Dufromont suggested 8/13 2:30 PM, and Ms. Limonciello will
also go. Will confirm with the applicant.
Committee Reports
• CPC: Special meeting was held July 28. Next meeting scheduled for September 16. Mr. Doyle
reported that the commission recommended around $270,000 for repairs at 88 Lexington Street
/ St. Mary’s Apartments. This moved on to city council.
New Business
• The ZBA has received a comprehensive permit (“40B”) application for 379-395 Totten Pond
Road and requested comment by August 19 from ConCom and other involved boards and
Approved 8-21-2025
commissions. An OOC was issued to this location in August 2023 (316-0819). Recommended
response to the ZBA:
“All projects proposing work within Wetlands Protection Act (M.G.L. c. 131 § 40) jurisdictional
areas must follow the appropriate permitting process established by Mass DEP. An Order of
Conditions was issued to 379-395 Totten Pond Road in August 2023 and remains in effect (MA
DEP file #316-0819). The applicant will be expected to file to amend the existing Order with the
Waltham Conservation Commission, or close the existing Order and file a new Notice of Intent.
An approved Order of Conditions must be in place prior to the start of work.”
Mr. Daly noted that this text is similar to that previously sent to the ZBA for 40B projects, but this
is a slightly different case because there is already an OOC in place. Clarification of this site and
other nearby 40B projects (455 Totten Pond Road, 245-265 Winter Street). The commission is
familiar with these sites from previous and current activity. Discussion of whether an amendment
would be allowed or if a new filing would be required. The commission has not seen the new
proposed plans, only those previously approved. Ms. Limonciello had a question about water
and sewer at the site, which Mr. Doyle clarified is handled by Engineering and CPW.
Mr. Doyle moved to accept the proposed text with the modification (strike-through) shown.
Seconded by Ms. Limonciello. In favor: Sbordone, Doyle, Donovan, Limonciello, Dufromont.
Motion passed.
Motion to adjourn by Mr. Doyle, seconded by Mr. Dufromont. All present in favor. Motion passed.
Meeting adjourned at 8:11 PM.
Approved 8-21-2025
Agenda
Waltham Conservation Commission
August 7, 2025
7:00 p.m.
Meeting Agenda
Pursuant to the relevant legislation, including Mass. Acts 2025 c.2, this meeting will take place
remotely. All Open Meeting Law requirements will be met and public access will be available by Zoom
call. Residents who need a device to connect are invited to use a public desktop or borrow a
laptop at the Waltham public library (valid library card required).
For this meeting, members of the public may participate by joining at:
https://us02web.zoom.us/j/82457402580?pwd=7qiSW1jWuTOa01Tt8KAdbycQYMkRsf.1
Passcode: Waltham
We will post a link to the video recording at http://www.wcac.org/government/meetings/conservation-
commission as soon as possible after the meeting.
Development Prospectus
• 220 Moody Street. An Order of Conditions was issued for this project in December 2024 (DEP
file 316-0831).
Public Hearing
Request for Amendment to Order of Conditions (DEP File # 316-0816)(continued from 7/24/25)
Applicant: Bubchull Kim
Property Location: 171 Copeland Street
Project Description: Construction of 80 sq.ft. and 598 sq.ft. additions to the rear of the dwelling and
construction of a rain garden.
Amendments: Expansion of impervious driveway and expansion of rain garden to compensate for
increase to impervious area.
Public Hearing
Notice of Intent (DEP File # 316-0tba)
Applicant: Robert Winn – City of Waltham Engineering Department
Property Location: 200 Trapelo Road
Project Description: Replacement of utility infrastructure and roadway reconstruction.
Commission Business
• Approval of meeting minutes from 7-24-2025.
Correspondence
• INFORMATIONAL: SOLitude plans to make an observation visit to Hardy Pond on August 12. If
observed conditions warrant, they will make a treatment during the visit. (316-0837)
• INFORMATIONAL: 104 Hibiscus Ave (NDA issued in April). Notified that work is planned to begin
on or after 8/5 and requested erosion control inspection.
• INFORMATIONAL: National Grid has notified of planned gas main replacement in the vicinity of
Newton Street, from Yetten Terrace to Whitcomb Street (south of the Charles River). A small
portion of the work will be in WPA jurisdiction, but is exempt utility maintenance within existing
roadway.
• INFORMATIONAL: MWRA has notified that they plan to begin test borings at 209 Lexington Street
during the week of August 11. Work was approved by the commission as part of an RDA July
12, 2024.
Old Business
• Status of commission vacancies.
• Status of conservation agent position.
Site Visit Reports
• Recent visits and visits in need of scheduling.
Committee Reports
• CPC: Special meeting was held July 28. Next meeting scheduled for September 16.