Public Works Committee
Regular MeetingWaterford, WI · November 20, 2017
Minutes
Public Works & Utilities Committee
November 20, 2017
4:00 P.M.
The Public Works & Utilities Committee will meet on Monday, November 20, 2017 in the Seidel Building at Whitford Park,
625 N. River ST, Waterford, WI.
Members Present: Koeller, Baker, Goldammer, Houston and Nash.
Also Present: Jim Bergles, Doug Snyder and Angie Sterling
Call to Order by Koeller - 4:02pm
Public Appearances & Permits - None
Approval of Minutes: Review and act on October 16, 2017 meeting minutes. Minutes approved. Houston motioned,
Baker seconded.
Unfinished Business
Motion made to move Item #3 up to #1 to do a walk- thru of the park as a committee. Houston motioned, Nash
seconded. All in favor.
Whitford Park Playground update, measurements and plans and parking needs. Doug from Baxter & Woodman will put
together a concept plan of design and layout of ideas which will include an asphalt walk, possible location for a new
concession stand and a ¼ turn rotation of the baseball diamond. Parking would be approximately 40 asphalt paved
spaces as it lays now. Discussion of space for the new playground would be an estimated 100’x100’. Conversations did
include the flood plain elevations and proper grade guidelines.
SCADA update- purchase of software and equipment is complete. It is up and running with one final test that is needed
to make sure we are in compliance with DNR reporting. After confirmation of reporting, the old system will be
disconnected.
Giant chairs, they are still in place at this time, they will be moved to the High School around the last week in November.
Impact fees- No updates at this time.
Geese feeding enforcement – a camera was placed to aid in documenting the feeding. Grape juice was discontinued at
this time for the season and conversation of the addition for a string grid to be added. Motion was made to enforce the
ordinance of no feeding. Nash motioned, Baker seconded. All in favor.
Village Board approved the John’s Disposal special pick-up day at the DPW Office. Tentatively Sat. April 7th, with a second
date to be determined later in the spring.
Island clean up- Tree removal quotes and brush burning has been approved and work should start around the first week
of December.
New Business
Racine St. Parking Complaints- Parking signs & enforcement. There will no change to the current ordinance. This will stay
status quo, no recommendation to the Village Board. Goldammer motioned, Nash seconded.
Ice Skating Rink: Help with maintaining it, possibly the H.S. Honor Society, in which they can raise additional money by
selling hot chocolate & coffee. DPW will have a port-a-potty placed there. It will be approximately $675.00 for this
project. Plans are to have it split for hockey and regular skating. Possible concessions to be sold out of the Seidel side
window. Bergles will check into the cost of banners and signage. We may be able to provide the high school with fliers to
promote the rink. Project is not to exceed the cost of $875.00. Houston motioned, Goldammer seconed. All in favor.
Holiday Lights up prior to Christmas in the Village in future years. No change, will stay as is. Decorations will go up the
week prior to the Winter Wonderland Village parade.
Director’s Report- possible leaf pick-up was brought up for discussion.
Correspondence
Engineer monthly report.
Adjournment- 6:02PM
Agenda
Public Works & Utilities Committee
November 20, 2017
4:00 P.M.
The Public Works & Utilities Committee will meet on Monday, November 20, 2017 in the Seidel Building at Whitford Park,
625 N. River ST, Waterford, WI.
Call to Order
Public Appearances & Permits
Approval of Minutes
1. Review and act on October 16, 2017 meeting minutes.
Unfinished Business
2. Rain garden sidewalk in Village Hall Park. DPW has requested quotes from contractors and are getting no
luck or notice that it’s too late due to weather. This may need to be put on an agenda for spring. On 10/16
the committee tabled a decision until three quotes were obtained. Will be taken off the agenda.
3. Whitford Park Playground update- Measurements and plans. Parking needs.
4. SCADA update.
This is informational only. No action required
5. Giant chairs- moving them for the winter.
This is informational only. No action required
6. Impact fees- This hasn’t been updated yet. This will be a project after the tax roll is complete by the
Treasurer.
This is informational only. No action required
7. Geese feeding enforcement – next steps
The Committee is requested to provide a recommendation to the Village Board.
8. VB approved the John’s Disposal special pick-up day at the DPW Office. Tentatively Sat. April 7th. (The week
before Clean Sweep)
This is informational only. No action required
9. Island clean up- Tree removal quotes and brush burning has been approved.
This is informational only. No action required
New Business
10. Racine St Parking Complaints- Parking signs & enforcement
The Committee is requested to provide a recommendation to the Village Board.
11. Ice Skating Rink: Help with Maintaining it, possibly the H.S. Honor Society, in which they can raise additional
money by selling hot chocolate & coffee. DPW will have a port-a-potty placed there. It will be approximately
$675.00 for this project.
The Committee is requested to provide a recommendation to the Village Board.
12. Holiday Lights up prior to Christmas in the Village in future years.
This is informational only. No action required
Director’s Report
Included in packet
Correspondence
13. Engineer monthly report.
14. Plan Commission Minutes
Adjournment
Karen Koeller, Chairperson
Please note that, upon reasonable notice, accommodations can be made for the needs of disabled individuals through
appropriate aids and service. For additional information or to request this service contact the Clerk’s Office at 534-3980.
2
Public Works & Utilities Committee
October 16, 2017
4:00 P.M.
The Public Works & Utilities Committee met at Village Hall, 123 N. River Street, Waterford, WI.
Members Present: Chairperson Koeller, Baker, Goldammer, Houston
Members Excused: Nash
Also Present: Jim Bergles, Barbara Messick, Howard Bryant, Patrick Goldammer
Call to Order by Chairperson Karen Koeller at 4:07 pm
Public Appearances & Permits
Recommendation on Special Event Permit – Winter Wonderland Parade. Bryant noted that the parade route had
been modified as recommended by Bergles to utilized DOT-approved route used for annual 4th of July parade. Staging
will take place on 5th St., with parade stepping off at 5th and Milwaukee St. Houston moved; Baker seconded. Motion
carried.
Approval of Minutes
Review and act on September 18, 2017 meeting minutes. Baker moved, Goldammer seconded to approve minutes with
two corrections – use Flight Control Plus approved rather than grape juice repellent which was eventually used; and
addition of photos in revised yard waste and brush collection language. Baker motioned Goldammer 2nd. Motion carried.
Unfinished Business
Committee discussed completion of sidewalk at the rain garden. Bergles sought three vendors to provide quotes
and as of meeting only had one response. Wanasek reviewed the site and noted that a railing would be required
and will include that in their quote. Bergles will check records to match product used in earlier canoe/kayak
launch project. This item was tabled until the next meeting when three quotes can be provided.
Discussion was also held regarding impact fees. Information provided in packet appeared to be missing data and
it is believed that the amount of impact fee money may be larger than shown. Cannot move forward when
complete information is not available to determine moneys available, when it needs to be spent. Houston will
check into it.
Review of recycling survey that was included in utility bills. Over 460 responded to the paper survey, almost 2 ½
times time number responded to the online survey monkey. The results were more than 2:1 opposed to weekly
recycling pickup. Houston motioned to not move forward with Johns proposal, second by Baker. Motioned
carried. Bergles will inform Johns of survey results and committee’s decision.
Patrick Goldammer, president of Waterford High School National Honor Society provided an update to the
committee on the all-abilities playground fundraising efforts. The society has new leadership and is getting up to
speed on the project. He asked the committee for suggestions on fundraising and grants which were provided. He
said that they are just over halfway to their $60,000 goal, having raised $31,000. Bergles shared the steps DPW
has taken to prepare the site and that it is all cleared and down to just the blacktop which can be easily and
quickly removed when the project is ready. Koeller asked Patrick to provide dimensions of the proposed
structures, and whether they could be modular and separated into units to help the committee with planning for
the park. She also invited him to come whenever he’d like to provide update and shared the committee’s regular
meeting time.
The committee had information on the SKADA upgrade from B&B Consulting and were to see Bergles with any
questions. He feels it should be in place by January 2018.
3
Bergles gave an update on geese management. The committee and board approved use of Flight Control Plus on
Village Hall and Safety Building parks. In discussions with Pendleton Turf, Bergles learned of success with
unflavored grape Kool-Aid. He purchased it and applied a half Village Hall Park and observed the geese moving to
the area that had not received treatment. He then applied spray to both parks for cost of about $25. It appears to
have been a success, but with recent rain will need to be reapplied.
Discussion on bulk pick up site was held and Bergles suggested that the recommendation be updated to provide
pickup at DPW garage inside the fence for three hours on Saturday prior to the annual Clean Sweep. This way,
residents who bring unacceptable items can be advised to hold on to it for a week and bring to the Clean Sweep.
Baker motioned, Goldammer seconded to make the recommendation. Motion carried.
New Business
The committee reviewed floodplain map of Whitford Park for future planning and determined several changes:
All abilities playground to be in the gravel area near river; rotate Diamond #2 clockwise ¼ turn; small concession
stand/gazebo at Field 2 at 1st base outside of flood plain (covered in flood plain); parking area between Ray
Seidel building and all abilities playground; Seidel doors to open to the west; freezer to be placed next to Seidel
on east side. Whitford Park review will be added to next month’s agenda.
Director’s Report
Hydrant flushing is moving quickly and removing iron. Valves for upgrade to iron plant are delayed because of
Hurricane Harvey. They are coming from Houston.
Plans to keep the squad car. It is working well and will just drive it till it drops, but Chief Johnson said the police
plate must be removed.
DNR issue regarding disinfection byproduct testing. Samples were taken from normal location, but letter received
after sent in stated that it is not complete because samples need to be taken from another site.
Plans to burn brush on island. Awaiting word from T&T to remove dead fall from other side of island, but
company has been very busy with removal of dead ash from several municipalities. New employee is working
very well.
Koeller reminded members of the October 13, 2017 Engineer’s Report and September 20, 2017 Plan Commission
Minutes.
Adjournment- 5:52pm Motion to adjourn by Houston, 2nd by Goldammer. Motion Carried
Respectfully submitted,
Barbara Messick, Administrative Analyst
Please note that, upon reasonable notice, accommodations can be made for the needs of disabled individuals through
appropriate aids and service. For additional information or to request this service contact the Clerk’s Office at 534-3980.
4
LAST UPDATED 6-12-17
VILLAGE OF WATERFORD
STREET AND PARKING REGULATION SCHEDULE
Pursuant to the sections of the Code of the Village of Waterford indicated, and the taking of the
appropriate action by the Village Board, the following streets are designated as through or
one-way streets, and the following parking regulations shall be enforced in the Village of
Waterford upon the erection of the appropriate signs:
207-3. Through streets.
“Through street” means every highway or portion thereof which has been declared by the state, the
county or the Village to be a through highway and at the entrances to which vehicular traffic from
intersecting highways is required by traffic control signals or stop signs to stop. In the interest of
public safety and pursuant to Wis. Stat. s. 349.07, the following streets or portions thereof are
declared to be through streets:
Name of Street Except at Intersection of
Field Drive Washington Street and South Jefferson Street
First Street Main Street
Jefferson Street Main Street
Main Street Buena Park Road, First Street, Jefferson Street, North Milwaukee
Street at the eastern approach thereof
North Milwaukee Main Street
Street
North Third Street Division Street
207-4. One-way streets.
The following streets are designated as one-way streets:
Direction of
Name of Street Travel Location
Municipal Parking Lot North From its southern common boundary with
located in the 200 Block of North River Street to its northerly boundary
North River Street with North River Street
North River Street North From Main Street to Racine Street
North River Street South From North Street to Racine Street
Rockrohr Court West From Edmund Street to North Milwaukee
Street
1
J:/Fee, Deposit, Parking and Traffic Schedule/
5
207-7. Parking Restrictions, Parking Signs and Pavement Markings.
A. Fifteen-minute parking.
The operator of a vehicle shall not park for longer than 15 minutes at a time from 7:00 a.m. to 6:00
p.m. of any day, except Sundays and holidays, within the area designated as the post office
entrance on North Milwaukee Street.
B. Thirty-minute parking.
The operator of a vehicle shall not park for longer than 30 minutes at a time on the following
streets or portions thereof:
Name of
Street Side Hours/Days Location
Barnes South 7:00 a.m. to 4:00 p.m./Any day From Field Drive westerly to a point
Drive on which school is in session which is 380 feet west of Field Drive
C. One-hour parking.
The operator of a vehicle shall not park for longer than one hour at a time from 8:00 a.m. to 4:00
p.m. during days in which public schools are in session on:
Name of Street Side Location
Braewood Both From Water Street to the westerly terminus of Braewood Drive
Drive
Center Street Both From Washington Street northerly to the High School property
Field Drive Both Between Barnes Drive and Washington Street
Foxhorn Drive Both From Racine Street to Danielson Street
Franklin Street Both From Barnes Drive to Rohda Drive
Harmont Street Both From Washington Street to Braewood Drive
Oak Street Both From Field Drive to Franklin Street
Racine Street Both From Main Street to Jefferson Street
Rohda Drive Both From Field Drive to Franklin Street
South East From 180 feet south of West Main Street to Riverview Drive
Jefferson
Street
2
J:/Fee, Deposit, Parking and Traffic Schedule/
6
Name of Street Side Location
South West From West Main Street to Field Drive
Jefferson
Street
South Water Both From Washington Street to Braewood Drive
Street
Washington Both From Harmont Street to Franklin Street
Circle
Washington Both Entire length, except where otherwise prohibited. See ss. E and H.
Street
Water Street East Between Main Street and Washington Street, and except as more
restrictive parking regulations may affect portions of said roadway
as controlled by other ordinances of the Village
D. Two-hour parking.
The operator of a vehicle shall not park for longer than two hours at a time on the following streets
or portions thereof:
Name of
Street Side Hours/Days Location
Club Lane South 8:00 a.m. to 6:00 p.m. From Rivermoor Drive westerly to its
terminus
Main Both 6:00 a.m. to 6:00 p.m./All, From Jefferson Street to Milwaukee
Street except Sundays and Street
holidays
North East 6:00 a.m. to 6:00 p.m./All, From Main Street north to Racine Street
River Side except Sundays and
Street holidays
River Both 24 hours/All Parallel to Whitford Park
Road
Second Both 6:00 a.m. to 6:00 p.m./All, From Division Street to Elizabeth Street
Street except Sundays and
holidays
Second Both 6:00 a.m. to 6:00 p.m./All From Main Street to a point 165 feet
Street north of the intersection of Second
Street and Main Street
Second East 8:00 a.m. to 8:00 p.m./All, From Elizabeth Street to Main Street,
3
J:/Fee, Deposit, Parking and Traffic Schedule/
7
Name of
Street Side Hours/Days Location
Street except Sundays and angled stalls only
holidays
South Both 6:00 a.m. to 6:00 p.m./All, From Main Street to a point 170 feet
River except Sundays and south of Main Street
Street holidays
Third Both 6:00 a.m. to 6:00 p.m./All, From Division Street to Fox Isle Bridge
Street except Sundays and
holidays
E. No parking at any time.
Name of Street Side Location
Barnes Drive North From Field Drive westerly to a point which is 380 feet west of
Field Drive
Division Street North Between North Milwaukee and North Third Streets where
posted
East Main South Beginning at a point which is 670 feet south of the center line of
Street Fifth Street at its intersection with North Milwaukee Street and
continuing for a distance on the east side of North Milwaukee
Street southerly a distance of 400 feet.
Jefferson East From Main Street south for a distance of 180 feet
Street
Jefferson West From Field Drive to Bakke Avenue
Street
Jefferson West No parking on the shoulder west of the intersection of North
Street Street to Danielson Street
Mohr Avenue Both Within 50 feet of any fire station driveway
North East Beginning at a point which is 385 feet south of the south line of
Milwaukee Fifth Street at its intersection with North Milwaukee Street and
Street continuing for a distance along the east side of North Milwaukee
Street southerly a distance of 650 feet
North River West From the intersection of North River Road and South First Street
Road to a point 200 feet south of that intersection
4
J:/Fee, Deposit, Parking and Traffic Schedule/
8
Name of Street Side Location
North River West From Main Street northerly to Racine Street
Street
Racine Street North Between Fox Horn Drive and Main Street
Rivermoor Both From West Main Street North for a distance of 150 feet
Drive
Superior Street Both Between Second and Third Streets
Washington Both From Field Drive east to Center Street
Street
West Main North From Water Street to Racine Street
Street
West Main South From Jefferson Street to Racine Street
Street
F. No trailer parking
Name of Street Side Location
Jefferson Street Both Between Main Street and Danielson Street
North Street Both Between River Street and Jefferson Street
Racine Street Both From River Street to Jefferson Street
River Street Both Between Main Street and the Fox River
G. Heavy Traffic. No vehicle defined as heavy traffic in s. 207-5B of the Code of the Village of
Waterford shall be parked in any designated municipal parking lot or area in the Village without a
special events or other applicable Village permit.
H. Parking prohibited certain hours.
The operator of a vehicle shall not park on the days and times specified on the following streets or
portions thereof:
Name of
Street Side Hours/Days Location
Barnes Drive North 7:00 a.m. to 4:00 Beginning at a point which is 350 feet
p.m./Any day on which east of Franklin Street and continuing
school is in session westerly to a point which is 625 feet west
of Franklin Street
5
J:/Fee, Deposit, Parking and Traffic Schedule/
9
Name of
Street Side Hours/Days Location
Center Street Both 8:00 a.m. to 4:00 From West Main Street northerly to
p.m./Any day on which Racine Street
school is in session
Washington North 2:30 p.m. to 3:00 p.m./ From Water Street westerly to Center
Street Any day on which Street
school is in session
Water Street West 6:00 a.m. to 6:00 Between Main Street and Washington
p.m./Monday through Street on weekdays, except as legally
Friday allowed in marked disabled spaces
I. Loading zones.
The Village Board may establish loading zones by Resolution, and are not required to be included
in this Schedule.
J. Angle parking.
Angle parking may be approved by Resolution and enforced by pavement marking.
Name of Street Side Location
Second Street East From Elizabeth Street to Main Street, angled
stalls only
St. Thomas Street South From First Street to Second Street
Municipal Parking Lot located Both From its southern common boundary with
in the 200 Block of North River North River Street to its northerly boundary
Street with North River Street
North River Street East Main Street to Racine Street
K. Temporary parking restrictions.
Temporary parking restrictions are not required to be included in this Schedule
L. Municipal Parking Lot Restrictions.
No person may park in a municipal parking lot for more than 24 continuous hours.
No person may park any vehicle classified as “heavy traffic” in a municipal parking lot unless
specifically allowed to do so under s. 207-5 of the Code of the Village of Waterford.
6
J:/Fee, Deposit, Parking and Traffic Schedule/
10
No person may park any trailer in a municipal parking lot unless authorized to do so by special
event permit or written authorization from the Village of Waterford, provided, however, that boat
trailer parking is allowed in the Village Hall Parking Lot when such parking is in compliance with
posted signs.
7
J:/Fee, Deposit, Parking and Traffic Schedule/
11
PW& U
Directors Report
11/17/2017
SCADA:
The purchase request form has been completed. The equipment should be in by the end of December
and installation of the system should in January.
Leaf Pickup:
The Village of Waterford will need to address leaf pickup in the near future. As you can see, the Village
has a lot of leaves and the volume will not be going down as more trees are planted and the ones we
have now grow bigger. Items to consider will be the equipment and time needed to perform leaf pickup.
Our dumpster cost will go up unless we have a place to store them. Once we start leaf pickup, the
Village can ban burning of leaves.
Chairs:
The Large lawn chairs will be moved to the High School this week. The chairs will be painted and then
moved back to the river.
Parking at Whitford:
I will be contacting the Lions Club to find out an estimation of required parking needed. DPW hopes to
be able to use the existing asphalt that was under the playground sand. The existing lot may have to be
expanded if the parking lot needs to be bigger.
VILLAGE OF WATERFORD
Engineer’s Report
November 17, 2017
STH 20/83 Utility Relocations -- Project No. 120491.40
Status:
• We are currently finalizing the design.
• Bidding: January of 2018.
• Construction Start: April of 2018
• Completion: November of 2018.
• Remaining Project Cost Summary:
Water System: $2.2M
Sanitary Sewer System: $2.0M
Other Items:
• WisDOT is requiring replacement of all sanitary laterals to the right-of-way line on West
Main Street and First Street. This will also occur on E. Main Street.
• Shared Laterals: Only with proper easement documentation.
• The Village will pay the cost of the additional sanitary lateral lengths for the five property
owners on the south side of W. Main Street, between River Street and Jefferson Street.
• Vacant Properties and Existing Buildings: The Village will verify sanitary sewer and water
services.
• Properties at the River Crossing: Lippman needs to reconnect to the sanitary in S. River
Street and the Nash water lateral must come from S. River Street.
• Staff will likely make a connection between the 16-inch and 6-inch water mains north of
the Village Hall; this will eliminate a dead end during the construction of the Main Street
Utilities Project.
• There are 4 property owners that will have 2-inch water services; these property owners
should be notified about the additional cost and reminded of the 10-year moratorium on
street pavement excavation.
South Milwaukee Street Reconstruction- Elizabeth to Main Street
• We have reviewed the RA Smith plan set and provided comments to the Village.
• The estimated remaining project cost (RA Smith) is $95,000.
• This is planned for 2019 construction with a portion funded by the LRIP program.
CMOM Assistance - Project No. 170188.30
• We will assist the public works staff with this WDNR required document.
• The staff has the document for review.
Water Treatment Plant Study - Project No. 140052.30
• We completed the study in January of 2017; at that time, Director Dolezal was completing
his employment; he reviewed the report and suggested a few changes.
• We will finalize the report based on the recommended changes and are available to present
it to the committee or board in December. The report recommends approximately $4.5M
of improvements before year 2021.
I:\Crystal Lake\WATRF\General\Monthly Reports\2017\November\11-17-17.docx Page 1 of 2
12
VILLAGE OF WATERFORD
Engineer’s Report
November 17, 2017
Needs Assessment for Water Impact Fee - Project No. 170860.30
• The attorney recommended that the projects listed in the needs assessment reflect the
recommended improvements from the Water Treatment Plant Study.
• We are currently preparing this study.
Well 4 Pump Repair - Project No. 171039.30
• We plan to assist the operation staff with the removal and repair or replacement of the well
pump, similar to Well 5, approximately a year ago.
• A work order is at the Village for consideration.
I:\Crystal Lake\WATRF\General\Monthly Reports\2017\November\11-17-17.docx Page 2 of 2
13
Get email alerts for Waterford