City Council Worksession
Regular MeetingWatertown, MN · February 13, 2018
Minutes
MINUTES OF THE Steve Washburn
WATERTOWN CITY COUNCIL Deborah Everson
Workshop Meeting Tuesday, February 13, 2018 Lindsay Guetzkow
Adam Pawellk
Michael Walters
1. Call to Order and Roll Call
Mayor Steve Washburn called the Watertown City Council Workshop to order at 5:30 p.m. Tuesday, February
13, 2018 in the Council Chambers of City Hall. Council Members present: Washburn, Michael Walters,
Deborah Everson, Lindsay Guetzkow, and Adam Pawelk. City Staff present: City Administrator Shane
Fineran, City Engineer Andrew Budde, Utilities Superintendent Doug Kammerer, Public Services
Superintendent Mike Dressel and Clerk-Treasurer Lynn Tschudi.
2. New Business
A. Hwy 25 Improvement Update
Fineran stated that during the capital improvement process for 2018, the urbanization of Highway 25
was originally removed from the plan due to investment needs by the City reaching upwards of $1.6
million dollars to complete the project. MNDOT officials have approached staff with an opportunity
for a unique funding program that may support completion of the urbanization and pedestrian
facilities with the majority of expense being absorbed by MNDOT. This program is offered by
MNDOT through their Mainstreets Program to assist in completing areas in small towns that include
state highways. Fineran spoke with a representative from MNDOT who is estimating around $2.5
million dollars to be committed to this project set for completion in 2020. Fineran asked Council if
the City should explore this opportunity presented by MNDOT.
Mayor Washburn asked about the roadway documents included in the packet. Budde answered that
these are original drawings and very high level to visualize how the lanes would lay out. He pointed
out the turn lanes added for better flow and keep people off of the through lanes.
Guetzkow asked about limited access to the Subway and gas station location. She wants to make
sure none of the businesses along Highway 25 are limited access to their locations. Budde said the
City will provide feedback on this to MNDOT. Guetzkow is asking for the rational in having the
sidewalk on the residential side of the highway vs the commercial side. Budde said this is consistent
with the property to the North as well as utilizing the Highland Park. He said there is possibility for a
5 foot sidewalk on the other side of the street. Budde stated crossing concerns would be addressed at
logical intersections.
Guetzkow asked about City costs associated with this in regards to utilities. Budde estimated it at
around $55K to move utilities - he stresses this is only construction costs. Washburn added that it is
hard at this point to put a number on what aesthetic upgrades we would be doing.
Walters said he would like to see the project extended to Hutchinson or Reo Road rather than to have
sidewalks on both sides. He thinks if the state will pay for it, we should pursue it.
Washburn asked about design costs and staff support for the project. Fineran answered that MNDOT
would take the lead on the project. Budde added staff would assist MNDOT in evaluating City
preferences so they know what direction to take. Washburn asked for clarification on billable hours
for Bolton & Menk. Budde answered that it depends on the scope of the project. Fineran clarified
that the discussion for tonight is if we would like MNDOT to consider Watertown as a project
location. He also said that this project would feel a lot different than past projects because MNDOT
would be taking the lead.
Everson asked about the preliminary estimate included in the packet. Budde said these figures are
Page 1 of 2
based on the original idea included in the packet. The figures include a storm water option as well as
an additional trail to Highland Park. Washburn asked if this includes soft costs. Budde stated no,
since MNDOT would be the lead in the construction so they would cover the soft costs. Washburn
asked if Bolton & Menk has worked on projects where MNDOT has been the lead. Budde estimates
soft costs for the City at 5% rather than the typical 20%.
Walters asked if MNDOT would cover lighting. Budde replied only lighting that they deem
necessary.
Everson asked about a timeframe for the project. Fineran said MNDOT would like to hear back
after tonight's meeting. Everson expressed that it would be a missed opportunity if we didn't explore
this, however she is disappointed that a representative from MNDOT did not attend in order to
answer Council questions.
Pawelk asked if Budde's estimate included any lighting. Budde said no lighting is included.
Washburn stated that MNDOT construction costs tend to be higher. He asked Budde if the prices
included reflect that. Budde answered that the numbers included are for the area of Watertown and
feels they are comparable.
Washburn pointed out that the current design is likely what could be funded with the MNDOT grant,
but when we start adding in all the extras, the City's portion of the cost share will increase. He said
we need to decide what we want to do and how much staff time we sink into it. Washburn would
like to see the current plan submitted to MNDOT, and no out of City expenses to exceed $10,000-
$20,000.
Council discussed the possibility of connecting a trail to the Luce Line in the future.
Washburn asked Council if they agree on the concept included in packet. Council members agree.
He asked Council if they want staff to explore other funding opportunities such as Safe Route to
School or connection to Luce Line. Council members agree. Pawelk wants to make sure the Council
Members aren't forgetting about other trail connections previously discussed, such as Newton Ave.
Walters agreed with Pawelk as well but would still like to pursue the grant money.
Washburn summarized that they are interested in the grant money, but do not want to spend a lot
doing it and would like to explore other funding options as well.
3. Adjournment
Workshop meeting was adjourned at 6:24 p.m.
Page 2 of 2
Agenda
1. Agenda
Documents:
2-13-18 AGENDA.PDF
2. Supporting Documents
Documents:
WORK SESSION MEMO.PDF
WORKSHOP CITY COUNCIL MEETING Steve Washburn
Deborah Everson
309 Lewis Avenue S., Watertown Lindsay Guetzkow
Tuesday, February 13, 2018 Adam Pawellk
5:30 PM Michael Walters
1. Call to Order and Roll Call
2. New Business
A. Hwy 25 Improvement Update
3. Adjournment
Page 1 of 1
To: Honorable Mayor and City Council
From: Shane Fineran, City Administrator
Date: February 13th, 2018
Re: Hwy 25 Improvement Update
During the capital improvement planning process during the 2018 budget preparation activity the City Council
reviewed various transportation improvements along the Highway 25 corridor in Watertown. The projects
included roadway and pedestrian route enhancements that included urbanization of the corridor to include curb,
gutter, turn lanes, and pedestrian facilities through the corridor. Review of a potential project in this area was
motivated by a desire to see enhanced pedestrian through ways, better connection to downtown, and an
enhanced transportation network serving this vital commercial corridor in the community. Additionally, MNDOT
is planning a mill and overlay in the corridor with small ADA improvements to intersections in 2020. Carver
County also recently adopted a sales tax and increase to the wheelage tax for transportation improvements in
the County. With a potential for outside funding these concepts were reviewed by the City Council as part of the
capital investment plan preparation.
Ultimately the roadway project idea was abandoned by the City Council due to investment needs by the City
that reached upwards of $1.6 million dollars to complete the project. A smaller scale pedestrian improvement
was contemplated at an estimated cost of $345,000 and was ultimately added to the capital investment plan in
the year 2028.
MNDOT officials have approached staff with an opportunity for a unique funding program through MNDOT that
may support completion of the urbanization and pedestrian facilities with the majority of expense being absorbed
by MNDOT.
MNDOT staff will be on hand to review this potential funding source and discuss with the Council the interest the
City may have in exploring this opportunity further.
Enc: Hwy 25 Urbanization Layout Concept, Hwy 25 Pedestrian Facilities Layout Concept
TH 25 (JEFFERSON AVE)
FREMONT STREET KIEFFER STREET STEVENS STREET
HIGH STREET
TH 25 (JEFFERSON AVE)
STEVENS STREET MADISON STREET WHITE STREET
CITY OF WATERTOWN, MINNESOTA FIGURE
MANKATO, MN FAIRMONT, MN SLEEPY EYE, MN BURNSVILLE, MN WILLMAR, MN
TH 25 URBANIZATION
1
© Bolton & Menk, Inc. 2016 , All Rights Reserved
H:\Watt\C12109506\TH 25 URBANIZE ROAD\CAD\URBANIZATION FIGURE.dwg 2/3/16 9:42 am
CHASKA, MN RAMSEY, MN MAPLEWOOD, MN BAXTER, MN ROCHESTER, MN
AMES, IA SPENCER, IA DES MOINES, IA FARGO, ND HIGH STREET TO WHITE STREET
TH 25 (JEFFERSON AVE)
FREMONT STREET KIEFFER STREET STEVENS STREET
HIGH STREET
TH 25 (JEFFERSON AVE)
STEVENS STREET MADISON STREET WHITE STREET
CITY OF WATERTOWN, MINNESOTA FIGURE
MANKATO, MN FAIRMONT, MN SLEEPY EYE, MN BURNSVILLE, MN WILLMAR, MN
TH 25 URBANIZATION
1
© Bolton & Menk, Inc. 2016 , All Rights Reserved
H:\Watt\C12109506\TH 25 URBANIZE ROAD\CAD\URBANIZATION FIGURE.dwg 2/3/16 9:42 am
CHASKA, MN RAMSEY, MN MAPLEWOOD, MN BAXTER, MN ROCHESTER, MN
AMES, IA SPENCER, IA DES MOINES, IA FARGO, ND HIGH STREET TO WHITE STREET
PRELIMINARY ESTIMATE
TH 25 URBANIZATION (HIGH ST. TO WHITE ST.)
WATERTOWN, MINNESOTA
BMI PROJECT NO. C16.115460
February 2, 2018
BASE BID - TH 25 Urbanization Section (White St. to High St.)
ITEM NO. ITEM QTY UNIT UNIT PRICE TOTAL
1 2021.501 MOBILIZATION 1 LUMP SUM $75,000.00 $75,000.00
2 2101.524 CLEARING 15 TREE $400.00 $6,000.00
3 2101.524 GRUBBING 15 TREE $400.00 $6,000.00
4 2102.503 PAVEMENT MARKING REMOVAL 1060 LIN FT $0.75 $795.00
5 2104.503 REMOVE PIPE CULVERTS 780 LIN FT $16.50 $12,870.00
6 2104.503 REMOVE CURB & GUTTER 530 LIN FT $5.00 $2,650.00
7 2104.503 REMOVE FENCE 250 LIN FT $7.50 $1,875.00
8 2104.503 REMOVE CONCRETE FLUME 30 LIN FT $8.00 $240.00
9 2104.504 REMOVE BITUMINOUS PAVEMENT 8600 SQ YD $4.00 $34,400.00
10 2104.502 REMOVE SIGN (ALL TYPES) 25 EACH $60.00 $1,500.00
11 2104.502 REMOVE DRAINAGE STRUCTURE 6 EACH $300.00 $1,800.00
12 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) 25 LIN FT $5.00 $125.00
13 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 1030 LIN FT $3.00 $3,090.00
14 2104.518 REMOVE BITUMINOUS DRIVEWAY PAVEMENT 9900 SQ FT $2.50 $24,750.00
15 2104.518 REMOVE CONCRETE DRIVEWAY PAVEMENT 240 SQ FT $2.50 $600.00
16 2105.504 GEOTEXTILE FABRIC TYPE 5 1430 SQ YD $2.25 $3,217.50
17 2105.507 COMMON EXCAVATION 7370 CU YD $14.00 $103,180.00
18 2105.507 SUBGRADE EXCAVATION 4980 CU YD $11.00 $54,780.00
19 2105.507 SELECT GRANULAR BORROW 4780 CU YD $18.50 $88,430.00
20 2105.609 HAUL & DISPOSE OF CONTAMINATED MATERIAL 300 TON $60.00 $18,000.00
21 2106.507 STABILIZING AGGREGATE (CV) 100 CU YD $40.00 $4,000.00
22 2211.509 AGGREGATE BASE CLASS 6 9127 TON $17.00 $155,159.00
23 2357.506 BITUMINOUS MATERIAL FOR TACK COAT 1180 GALLON $4.00 $4,720.00
24 2360.509 TYPE SP 12.5 WEARING COURSE MIX (3,C) 2700 TON $80.00 $216,000.00
25 2360.509 TYPE SP 12.5 NON-WEARING COURSE MIX (3,B) 1350 TON $65.00 $87,750.00
26 2360.509 TYPE SP 12.5 WEARING COURSE MIX (3,C) (FOR DRIVEWAYS) 120 TON $100.00 $12,000.00
27 2501.502 18" RC PIPE APRON (AVG. SIZE) 6 EACH $800.00 $4,800.00
28 2501.602 SAFETY GRATE FOR 18" APRON (AVG. SIZE) 6 EACH $800.00 $4,800.00
29 2502.503 4" PERF TP PIPE DRAIN 600 LIN FT $8.50 $5,100.00
30 2502.602 4" TP PIPE DRAIN CLEANOUT 15 EACH $130.00 $1,950.00
31 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS III (AVG. SIZE) 2625 LIN FT $50.00 $131,250.00
35 2506.502 CASTING ASSEMBLY 48 EACH $850.00 $40,800.00
32 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN F, G, OR H 100 LIN FT $390.00 $39,000.00
33 2506.503 CONSTRUCT DRAINAGE STRUCTURE DES 48-4020 65 LIN FT $375.00 $24,375.00
34 2506.503 CONSTRUCT DRAINAGE STRUCTURE DES 60-4020 35 LIN FT $525.00 $18,375.00
36 2511.507 RANDOM RIPRAP CLASS IV 45 CU YD $110.00 $4,950.00
37 2521.518 4" CONCRETE WALK 12375 SQ FT $5.50 $68,062.50
38 2521.518 6" CONCRETE WALK 530 SQ FT $7.25 $3,842.50
39 2521.518 4" CONCRETE WALK SPECIAL (COLORED & STAMPED) 1920 SQ FT $11.00 $21,120.00
40 2531.503 CONCRETE CURB & GUTTER DESIGN B624 4530 LIN FT $26.50 $120,045.00
41 2531.503 CONCRETE CURB & GUTTER DESIGN B618 120 LIN FT $29.00 $3,480.00
Preliminary Estimate
Bolton & Menk, Inc. Page 1 of 3
PRELIMINARY ESTIMATE
TH 25 URBANIZATION (HIGH ST. TO WHITE ST.)
WATERTOWN, MINNESOTA
BMI PROJECT NO. C16.115460
February 2, 2018
42 2531.504 6" CONCRETE DRIVEWAY PAVEMENT 135 SQ YD $67.00 $9,045.00
43 2531.618 TRUNCATED DOMES 165 SQ FT $56.00 $9,240.00
44 2540.602 MAILBOX SUPPORT 2 EACH $175.00 $350.00
45 2563.601 TRAFFIC CONTROL 1 LUMP SUM $15,000.00 $15,000.00
46 2564.518 SIGN PANELS (ALL TYPES) 300 SQ FT $38.00 $11,400.00
47 2571.524 DECIDUOUS TREE 4" CAL B&B 15 TREE $600.00 $9,000.00
48 2571.525 DECIDUOUS SHRUB NO. 5 CONT 15 SHRUB $60.00 $900.00
50 2573.502 STORM DRAIN INLET PROTECTION 38 EACH $250.00 $9,500.00
49 2573.503 SILT FENCE, TYPE MS 5000 LIN FT $2.25 $11,250.00
51 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE 2 EACH $1,600.00 $3,200.00
52 2574.507 TOPSOIL BORROW (ALL TYPES) 780 CU YD $52.00 $40,560.00
53 2575.604 SITE RESTORATION (ALL TYPES) 4700 SQ YD $6.00 $28,200.00
55 2582.503 4" SOLID LINE EPOXY (WHITE) 3600 LIN FT $1.00 $3,600.00
56 2582.503 4" SOLID LINE EPOXY (YELLOW) 3170 LIN FT $1.00 $3,170.00
57 2582.503 4' BROKEN LINE EPOXY (YELLOW) 700 LIN FT $2.00 $1,400.00
58 2582.503 4" DOUBLE SOLID EPOXY (YELLOW) 680 LIN FT $2.00 $1,360.00
59 2582.503 12" SOLID LINE EPOXY (YELLOW) 120 LIN FT $10.50 $1,260.00
54 2582.518 PAVEMENT MESSAGE EPOXY 300 SQ FT $18.00 $5,400.00
60 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND IN 810 SQ FT $19.00 $15,390.00
SUBTOTAL: $1,590,106.50
10% CONTINGENCY: $159,010.65
TOTAL CONSTRUCTION COST (BASE BID): $1,749,117.15
ADD ALTERNATE A - Construct Stormwater Detention Pond at TH 25 & Hutchinson Rd
ITEM NO. ITEM QTY UNIT UNIT PRICE TOTAL
1 2021.501 MOBILIZATION 1 LUMP SUM $7,000.00 $7,000.00
2 2101.524 CLEARING 15 TREE $400.00 $6,000.00
3 2101.524 GRUBBING 15 TREE $400.00 $6,000.00
4 2105.507 COMMON EXCAVATION 4200 CU YD $14.00 $58,800.00
5 2501.502 18" RC PIPE APRON (AVG. SIZE) 3 EACH $800.00 $2,400.00
6 2501.602 SAFETY GRATE FOR 18" APRON (AVG. SIZE) 3 EACH $800.00 $2,400.00
7 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS III (AVG. SIZE) 625 LIN FT $40.00 $25,000.00
8 2511.507 RANDOM RIPRAP CLASS IV 30 CU YD $110.00 $3,300.00
9 2571.524 DECIDUOUS TREE 4" CAL B&B 10 EACH $600.00 $6,000.00
10 2573.503 SILT FENCE, TYPE MS 700 LIN FT $2.25 $1,575.00
11 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE 1 EACH $1,600.00 $1,600.00
12 2574.507 TOPSOIL BORROW (ALL TYPES) 370 CU YD $52.00 $19,240.00
13 2575.604 SITE RESTORATION (ALL TYPES) 2400 SQ YD $6.00 $14,400.00
SUBTOTAL: $153,715.00
10% CONTINGENCY: $15,371.50
TOTAL CONSTRUCTION COST (ADD ALT. A): $169,086.50
Preliminary Estimate
Bolton & Menk, Inc. Page 2 of 3
PRELIMINARY ESTIMATE
TH 25 URBANIZATION (HIGH ST. TO WHITE ST.)
WATERTOWN, MINNESOTA
BMI PROJECT NO. C16.115460
February 2, 2018
ADD ALTERNATE B - 8' Bituminous Path Extension (High St. to Hutchinson Rd.)
ITEM NO. ITEM QTY UNIT UNIT PRICE TOTAL
1 2021.501 MOBILIZATION 1 LUMP SUM $4,000.00 $4,000.00
2 2101.524 CLEARING 15 TREE $400.00 $6,000.00
3 2101.524 GRUBBING 15 TREE $400.00 $6,000.00
5 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 8 LIN FT $3.00 $24.00
4 2104.504 REMOVE BITUMINOUS PAVEMENT 20 SQ YD $4.00 $80.00
7 2105.504 GEOTEXTILE FABRIC TYPE 5 80 SQ YD $2.25 $180.00
6 2105.507 COMMON EXCAVATION 200 CU YD $14.00 $2,800.00
8 2211.509 AGGREGATE BASE CLASS 6 135 CU YD $32.50 $4,387.50
9 2501.502 12" RC PIPE APRON 2 EACH $550.00 $1,100.00
10 2501.602 SAFETY GRATE FOR 12" APRON 2 EACH $650.00 $1,300.00
11 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V 15 LIN FT $40.00 $600.00
12 2504.602 ADJUST HYDRANT 1 EACH $450.00 $450.00
13 2504.602 ADJUST VALVE BOX 1 EACH $300.00 $300.00
14 2511.507 RANDOM RIPRAP CLASS IV 8 CU YD $110.00 $880.00
15 2521.518 3" BITUMINOUS WALK 6240 SQ FT $5.50 $34,320.00
16 2571.524 DECIDUOUS TREE 4" CAL B&B 10 EACH $600.00 $6,000.00
17 2573.503 SILT FENCE, TYPE MS 1600 LIN FT $2.25 $3,600.00
18 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE 1 EACH $1,600.00 $1,600.00
19 2574.507 TOPSOIL BORROW (ALL TYPES) 60 CU YD $52.00 $3,120.00
20 2575.604 SITE RESTORATION (ALL TYPES) 700 SQ YD $6.00 $4,200.00
SUBTOTAL: $80,941.50
10% CONTINGENCY: $8,094.15
TOTAL CONSTRUCTION COST (ADD ALT. B): $89,035.65
Summary of Construction Costs
TOTAL CONSTRUCTION COST (BASE BID): $1,749,117.15
TOTAL CONSTRUCTION COST (ADD ALT. A): $169,086.50
TOTAL CONSTRUCTION COST (ADD ALT. B): $89,035.65
TOTAL CONSTRUCTION COST $2,007,239.30
Preliminary Estimate
Bolton & Menk, Inc. Page 3 of 3
TH 25 TRAIL CONCEPT
HUTCHINSON ROAD TO WHITE STREET
CHALLENGES AND OPPORTUNITIES HORZ.
0
SCALE
60 120
FEET
GENERAL CHALLENGES:
1. SEVERAL IMPACTS TO EXISTING CULVERTS ALONG THE TRAIL CORRIDOR.
2. MAINTAIN STORMWATER CONVEYANCE ALONG TH 25 DITCH SYSTEM. THE ADDITION OF THE TRAIL ALTERS EXISTING DITCH ALIGNMENT IN MANY
LOCATIONS.
GENERAL OPPORTUNITIES:
1. COMPLETES A PLANNED TRAIL CONNECTION INCLUDED IN THE 2030 COMPREHENSIVE PLAN.
2. PROVIDES THE OPPORTUNITY TO COMPLETE OTHER SIDEWALK CONNECTIONS TO SAFELY ACCESS DOWNTOWN AS INCLUDED IN THE 2030
COMPREHENSIVE PLAN..
UNSIGNALIZED
CROSSING.
REVIEW TRAIL EXTENSION
TO LUCE LINE TRAIL.
TH 25 CULVERT
EXISTING 6'
POSSIBLE TREE IMPACT.
SIDEWALK.
IMPACTS INSIDE R/W. TH 25 CULVERT
IMPACT.
POTENTIAL FILL COMPLETES THE NORTH-SOUTH TRAIL SYSTEM
OVER TREE ALONG TH 25 WHICH CURRENTLY ENDS AT WHITE
RETAINING WALL STREET, COMPLETING THIS CONNECTION
CULVERT LIKELY ROOTS.
AND LANDSCAPING PROVIDES ACCESS TO TERRETORIAL STREET,
NEEDED UNDER TRAIL INPACTS INSIDE R/W.
UTILIZE CITY OWNED PARCEL DOWNTOWN, SCHOOLS, AND NUMEROUS LOCAL
TO CONVEY WATER
AS NEEDED TO CONSTRUCT BUSINESSES.
BACK TO CENTER
TRAIL WITHOUT IMPACTING DITCH.
TH 25 R/W.
DRAINAGE IS CURRENTLY
CONVEYED IN A DITCH ALONG R/W
LINE. ADDING FILL TO BUILD TRAIL
COULD IMPACT EXISTING TREES
ALONG R/W LINE. DRAINAGE
WOULD LIKELY NEED TO FLOW
ACROSS TRAIL AND ALONG R/W. A
DRAINAGE AND UTILITY EASEMENT
MAY BE REQUIRED.
PROVIDES A SAFE ROUTE TO HIGHLAND PARK.
COMPLETES A TRAIL
CONNECTION TO REO
ROAD.
REVIEW SIDEWALK
EXTENSION ALONG WHITE
STREET TO TH 25,
REVIEW SIDEWALK COMPLETING A SIDEWALK
EXTENSION ALONG MADISON REVIEW SIDEWALK OR TRAIL
LINK TO DOWNTOWN.
STREET TO TH 25, EXTENSION ALONG
COMPLETING A SIDEWALK TERRITORIAL STREET TO TH
LINK TO DOWNTOWN. 25, COMPLETING A SIDEWALK
LINK TO DOWNTOWN.
REVIEW FEASIBILITY OF
MAKING CONNECTION TO
LUCE LINE TRAIL.
H:\WATT\C12109506\TH 25 URBANIZE ROAD\CHALLENGES & OPPORTUNITIES\109506_MAP 6' WALK OPTION.DWG 09/13/2017 3:13 PM