Muyni
← Back to Waupun

Board of Public Works

Regular Meeting

Waupun, WI · September 10, 2024

AgendaMinutes

Minutes

Minutes - City of Waupun Board of Public Works Tuesday, September 10, 2024 – City Council Chambers CALL TO ORDER Chairperson Mike Matoushek calls the meeting to order at 4:30pm ROLL CALL: Alderpersons: Peter Kaczmarki, Kambria Ledesma (online), Mike Matoushek Citizens: Dale Heeringa, Andrew Sullivan, Dave Rens, Gregg Zonnefeld Ex-Officio: DPW Director Jeff Daane, City Administer Kathy Schlieve Others Present: Kris Dressler, Cedar Corporation (online) Discussion on future meetings and gatherings involving the Board of Public Works. The next regularly scheduled meeting is October 8, 2024, 4:30 pm, City Council Chambers. Motion Zonnefeld, second Sullivan to approve minutes from August 19, 2024 Board of Public Works meeting as presented. Carried unanimously. Motion Sullivan, second Heeringa to approve fall yard waste pickup dates for October 7 to November 11, 2024, weather permitting. Carried unanimously. Motion Zonnefeld, second Rens to approve the museum tuckpointing bid for B and B Quality Building Restoration, the lowest qualified bidder, in an amount of $102,792. Daane notes that the Historical Society is not interested in the alternate which was to construct a sign base. Sullivan questions difference between this contractor and next lowest bid (~$50,000). Kris Dressler confirms that B and B Quality Building Restoration is a WI contractor where others are out of state and notes that the other contractors are union contractors. Motion carries unanimously. Motion Heeringa, second Sullivan to approve the low bid for asphalt paving S West Street (W. Lincoln to Visser Avenue) in the amount of $42,866.25 from Kartechner Brothers LLC as presented. Work is offset by a Local Road Improvement Program grant, which will provide a 50% reimbursement. Carried unanimously. Discuss ordinance amendment of Ch. 7.03(3)(4)(5) Sidewalk Construction and Repair. Daane notes that the current ordinance needs to be updated to reflect current ADA standards. Draft ordinance is presented. Daane explains that we are working with a new contractor for our sidewalk program that provides grinding services vs. full replacement and that will stretch our dollars further. Ordinance changes are needed to specify materials to be used during a repair and to reduce the standard from 1 inch to ½ inch gap to meet ADA standards. Motion Rens, second Sullivan to recommend draft ordinance to the Common Council to City of Waupun Ordinance Chapter 7 Section 7.03 Sidewalk Construction and Repair to meet current ADA and maintenance standards. Motion Sullivan, second Rens to adjourn meeting at 4:52 pm. Carried unanimously.

Agenda

AGENDA CITY OF WAUPUN BOARD OF PUBLIC WORKS MEETING Waupun City Hall – 201 E. Main Street, Waupun WI Tuesday, September 10, 2024 at 4:30 PM The City of Waupun Board of Public Works and Facilities Committee will meet in-person, virtually and teleconference. Instructions to join the meeting are provided below: Virtual: https://us02web.zoom.us/j/81987138114 Meeting ID: 819 8713 8114 Phone: 312 626 6799 US (Chicago) CALL TO ORDER ROLL CALL PERSONS WISHING TO ADDRESS THE BOARD OF PUBLIC WORKS--State name, address, and subject of comments. (2 Minutes) No Public Participation after this point. FUTURE MEETINGS AND GATHERING INVOLVING THE BOARD OF PUBLIC WORKS CONSIDERATION - ACTION 1. Approve Minutes from August 19, 2024 Board of Public Works Meeting 2. Approve Fall Yard Waste Pickup Dates 3. Approve Heritage Museum Restoration REBID 4. Approve Asphalt Paving Contract for S West Street (W. Lincoln St to Visser Ave) 5. Amend Ch. 7.03(3)(4)(5) Sidewalk Construction and Repair ADJOURNMENT Upon reasonable notice, efforts will be made to accommodate disabled individuals through appropriate aids and services. For additional information, contact the City Clerk at 920-324-7915. Minutes - City of Waupun Board of Public Works Monday, August 11, 2024 – City Council Chambers CALL TO ORDER Vice Chairman Peter Kaczmarki calls the meeting to order at 4:30pm ROLL CALL: Alderpersons: Peter Kaczmarki, Kambria Ledesma Citizens: Dale Heeringa, Andrew Sullivan, Dave Rens Ex-Officio: DPW Director Jeff Daane, Mayor Rohn Bishop, City Administer Kathy Schlieve Citizens: Eric Homan, Dan Holtz Excused Absences: Mike Matoushek, Gregg Zonnefeld FUTURE MEETINGS AND GATHERING INVOLVING THE BOARD OF PUBLIC WORKS 1. Next Regularly Scheduled Meeting is September 10, 2024, 4:30 pm CONSIDERATION - ACTION 2. Approve Minutes from July 9, 2024 Board of Public Works Meeting – Rens motion to approve as presented, Sullivan seconded. Motion passes unanimously. 3. Authorize Replacement of Damaged Flatbed 39-06 with New Vehicle – Mayor Bishop makes a statement regarding his strong opinion that the truck should be purchased from Homan. Rens brought up the insurance pay out and Schlieve answered regarding. Heeringa makes a motion to accept the bid of $54,128.44 from Homan, seconded by Rens. Motion passes unanimously. 4. Approve Rebid for City Hall Reroof of Existing Ballasted Roofs with EPDM Adhered Roof System (Roof Areas: East, West and North, 201 E Main Street) – Daane presents, there is a $10,000 savings in this rebid with an opportunity for more savings if the insulation is in good condition. Ledesma moves to approve the low bid, seconded by Sullivan. Motion passes unanimously. 5. Emergency Declaration City Garage - Daane presents, the roof is in bad shape following the May hail storm. Rens moved to approve the resolution for a Public Emergency Declaration for the City Garage Roof Damaged during the May 2024 Hailstorm as presented. Heeringa seconded. Motion passes unanimously. 6. Recommend Public Works Garage Emergency Roof Replacement Bid to Council for Approval – Daane and Schlieve present. Rens moves to recommend to the Council approval of the Emergency Roof Repair and Gutter Replacement Bid for the Waupun Public Works Garage as presented. Ledesma seconded. Motion passes unanimously. Sullivan moves to adjourn, Heeringa seconded. Motion passes unanimously. ADJOURNMENT Respectfully submitted, Kambria Ledesma, Interim Secretary City of Waupun AGENDA SUMMARY SHEET MEETING DATE: 9/10/24 TITLE: Approve Fall Yard Waste Pickup Dates AGENDA SECTION: CONSIDERATION-ACTION PRESENTER: Jeff Daane, Public Works Director DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT Public Infrastructure N/A ISSUE SUMMARY: We need to confirm fall yard waste pickup dates for 2024. We are looking at October 7 through November 11, weather permitting. All yard waste must be at the curb by 7am on November 11. STAFF RECOMMENDATION: Approve dates as outlined ATTACHMENTS: RECOMMENDED MOTION: Motion to approve fall yard waste pickup dates October 7 through November 11, weather permitting AGENDA SUMMARY SHEET MEETING DATE: 9/10/24 TITLE: Approve Heritage Museum Restoration REBID AGENDA SECTION: CONSIDERATION-ACTION PRESENTER: Jeff Daane, Public Works Director DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT Public Infrastructure Base bid $102,792.00 plus alternate $106,592.00 ISSUE SUMMARY: The Museum has water infiltrating the building in different areas. This is due to the mortar joints deteriorating. The project was bid earlier this summer with a low bid at that time coming in just over $194,000. The bid spec was changed to repair some of the old stone versus just replacing all of them, this was the largest cost difference in the new low bid. B and B Quality Building Restoration was the low bid initially and is once again the lowest qualified bidder in this round of rebidding. STAFF RECOMMENDATION: Approve the low bid from B and B Quality Building Restoration ATTACHMENTS: Bid analysis/bid tab RECOMMENDED MOTION: Motion to approve the museum tuckpointing bid for B and B Quality Building Restoration, the lowest qualified bidder, in an amount that includes the base bid plus alternate for a total expenditure of $106,592. BID ANALYSIS Community Infrastructure • Architecture • Environmental Services Client City of Waupun Project No. W6218-012 Project Heritage Museum Restoration REBID Date 09.04.2024 Prepared By K. Dressler The City of Waupun (hereinafter referred to as the OWNER) has received bids on the third day of September 2024 for the Heritage Museum Restoration REBID, (hereinafter referred to as the Project); and Cedar Corporation (hereinafter referred to as ENGINEER) has been retained by the OWNER to prepare bid tabulations, analyze bid results and consult with the OWNER on the award of contracts. The ENGINEER hereby consults as follows: 1. Bids were received from three bidders. Base bids ranged from a low of $102,792.00 to a high of $172,113.00. A summary of the bid tabulation is attached. 2. Based upon ENGINEER's analysis of the bids received on the above PROJECT, the responsive low bidder is: B&B Quality Building Restoration of WI LLC 2456 Highway MM Fitchburg, WI 53575 Base Bid Amount: $102,792.00 Alternate Bid Amount: $ 3,800.00 Total Bid Amount: $106,592.00 3. It is understood that by this analysis, that the ENGINEER does not guarantee the Contractor's performance which is covered by the Contractor's bond, but it is a statement by the ENGINEER that the ENGINEER has no information which would lead the ENGINEER to believe that the Contractor does not have the necessary equipment and personnel to complete the PROJECT in compliance with the drawings and specifications within reasonable tolerances generally accepted in the trade. 4. It is further understood that this analysis is not a representation that the ENGINEER has reviewed the proposal for possible legal irregularities which should be a function of the OWNER'S legal counsel, and at the option of the OWNER. 5. It is further understood that in the event that OWNER feels that the Contract should be awarded on some basis other than price, the OWNER should defer further action on this PROJECT until a thorough legal review can be made by OWNER'S legal counsel. Page 1 of 1 Cedarburg • Green Bay • Madison • Menomonie Bid Tab Heritage Museum Restoration REBID City of Waupun Dodge County, WI September 3, 2024 B&B Quality Bldg Rest Berglund Construction Building Restoration Line Fitchburg, WI Chicago, IL Roseville, MN Item Item Description Unit Qty Unit Price Extension Unit Price Extension Unit Price Extension Base Bid 1 Re‐Pointing Masonry SF 1200 $36.00 $43,200.00 $25.00 $30,000.00 $41.00 $49,200.00 2 Cut Stone Replacement SF 20 $400.00 $8,000.00 $650.00 $13,000.00 $633.00 $12,660.00 3 Limestone Replacement SF 25 $400.00 $10,000.00 $560.00 $14,000.00 $838.00 $20,950.00 4 Fill Crack in Cut Stone LF 5 $165.00 $825.00 $300.00 $1,500.00 $872.00 $4,360.00 5 Fill Chipped Cut Stone SF 5 $125.00 $625.00 $700.00 $3,500.00 $977.00 $4,885.00 6 Masonry Cleaning SF 4500 $1.00 $4,500.00 $4.00 $18,000.00 $1.00 $4,500.00 7 Roof Flashing LF 90 $49.00 $4,410.00 $80.00 $7,200.00 $153.00 $13,770.00 8 Concrete Stair with Landing EA 1 $8,500.00 $8,500.00 $31,720.00 $31,720.00 $20,160.00 $20,160.00 9 Concrete Foundation LF 16 $700.00 $11,200.00 $580.00 $9,280.00 $1,198.00 $19,168.00 10 Railing LF 18 $550.00 $9,900.00 $1,400.00 $25,200.00 $718.00 $12,924.00 11 Sidewalk Replacement SF 32 $51.00 $1,632.00 $50.00 $1,600.00 $298.00 $9,536.00 Base Bid Total $102,792.00 $155,000.00 $172,113.00 Alternate 12 Concrete Slab SF 32 $25.00 $800.00 $75.00 $2,400.00 $120.00 $3,840.00 13 Concrete Foundation EA 2 $1,500.00 $3,000.00 $1,300.00 $2,600.00 $2,800.00 $5,600.00 Alternate Total $3,800.00 $5,000.00 $9,440.00 Base Bid + Alternate $106,592.00 $160,000.00 $181,553.00 Page 1 of 1 AGENDA SUMMARY SHEET MEETING DATE: 9/10/24 TITLE: Approve Asphalt Paving Contract for S West Street (W. Lincoln St to Visser Ave) AGENDA SECTION: CONSIDERATION-ACTION PRESENTER: Jeff Daane, Public Works Director DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT Total project $42,866.25 Wisconsin Local Roads and Public Infrastructure Improvement Program will offset 50% of the project costs ISSUE SUMMARY: On September 4th the City held a bid opening for mill and overlay of S. West St. We received and opened two bids. One from Kartechner Brothers LLC and the other from Northeast Asphalt. STAFF RECOMMENDATION: Approve the low bid from Kartchener Brothers LLC ATTACHMENTS: Bid Tab RECOMMENDED MOTION: Motion to approve the low bid in the amount of $42,866.25 from Kartechner Brothers LLC as presented. CITY OF WAUPUN BID TAB Asphalt Paving Contract S. West St. (W. Lincoln St. to Visser Ave.) Wednesday, September 4, 2024 Kartechner Brothers LLC N11829 County Rd I Waupun WI 53963 Item No Item Description Approx S.Y. Mill Price Surface Price Total Price 2" Profile Mill 2" Blacktop Sufrace (4LT 58‐28s) 1 S. West St. (W. Lincoln St. to Visser Ave) 4899 $ 0.95 $ 7.80 $ 42,866.25 Total Item #1 $ 42,866.25 Northeast Asphalt 20 Camelot Dr. Fond Du Lac WI 54935 Item No Item Description Approx S.Y. Mill Price Surface Price Total Price 1 2" Profile Mill 2" Blacktop Sufrace (4LT 58‐28s) S. West St. (W. Lincoln St. to Visser Ave) 4899 $ 1.40 $ 9.00 $ 50,949.60 Total Item #1 $ 50,949.60 AGENDA SUMMARY SHEET MEETING DATE: 9/24/2024 TITLE: Amend Ch. 7.03(3)(4)(5) Sidewalk Construction and Repair AGENDA SECTION: CONSIDERATION-ACTION PRESENTER: Jeff Daane, Director Public Works DEPARTMENT GOAL(S) SUPPORTED (if applicable) FISCAL IMPACT SUMMARY: Attached is the City’s current ordinance 7.03 Sidewalk Construction and Repair. ADA and maintenance standards have changed and the ordinance is recommended for updates. STAFF RECOMMENDATION: Discussion ATTACHMENTS: Preliminary Ordinance 7.03 Sidewalk Construction and Repair with Proposed Revisions RECOMMENDED MOTION: Motion to recommend updates to the Common Council to City of Waupun Ordinance Chapter 7 Section 7.03 Sidewalk Construction and Repair to meet current ADA and maintenance standards. 7.03 SIDEWALK CONSTRUCTION AND REPAIR. Formatted: Heading 1 (1) DEFINITIONS. The following terms have the meanings indicated: Crack. A fissure within a sidewalk square. Defective Sidewalk or Square. A sidewalk square meeting the criteria for replacement in subsection (4) below. Joint. A cleavage created for expansion purposes which separates 2 or more sidewalk squares. Sidewalk. A public sidewalk within the street right-of-way. Sidewalk Square. That portion of a sidewalk bordered by joints and the sidewalk edge. Spalling. A chipped or splintered condition of a sidewalk square. (2) WISCONSIN STATUTES. Section 66.615, Wis. Stats., is incorporated herein by reference. (3) DELEGATION OF AUTHORITY; SIDEWALK INSPECTORS. The City Engineer shall have the authority of the Board of Public Works as provided for in §66.615, Wis. Stats., and he they shall designate one or more subordinates as sidewalk inspectors who shall have the duty of inspecting the sidewalks within the City and ordering or arranging for the replacement and or repair of defective sidewalks. (4) CRITERIA FOR DETERMINING NECESSITY OF REPLACEMENT OR REPAIR when applicable. Sidewalk squares which meet the following criteria shall be considered defective, unsafe and insufficient and in need of replacement or repair: (a) There is a difference in height equal to or greater than one-half inch in the elevation of adjacent sidewalk squares. (b) There is a crack equal to or greater than one-half inch in width. (c) There is a difference in height equal to or greater than one-half inch in the elevation of adjacent sections of a crack or a crack with width greater than one-half inch for 3 inches or longer (d) There is depression greater than one-half inch within a sidewalk square. (e) There is spalling which has resulted in a depression greater than one-half inch. (f) There is a noticeable change or distortion in the constant grade resulting from the heaving or settlement of 2 or more sidewalk squares, where this creates a difference in height of one inch or more. (g) There has been a temporary sidewalk repair. (5) TEMPORARY SIDEWALK REPAIR. No sidewalk square shall be ordered or arranged to be repaired by way of crack fillers, asphalt wedges, surface treatments or the like by a sidewalk inspector, except as a temporary measure pending replacement and or repair. Sidewalk squares which, upon inspection, are noted to have been temporarily repaired shall be ordered or arranged to be replaced. However, wherever the only defect is a difference in elevation due to settlement or having, it shall be permissible to remedy the defect by adjusting the square. (a) Crack filling will be allowed only using High Performance, self-leveling one-part Polyurethane sealant as preventive maintenance. . (6) PROCEDURE; SIDEWALK REPLACEMENT AND PAYMENT OF COSTS. The procedure for sidewalk replacement and for the payment of the cost shall be governed by §66.615, Wis. Stats. Created: 2024-04-24 15:47:57 [EST] (Supp. No. 19) Page 1 of 3 (7) NONCOMPLIANCE. Sidewalks replaced by the City contractor or City forces shall be subject to an administrative fee as established annually by the Common Council on the Fee Schedule per tax parcel in addition to the replacement cost. (8) NEW SIDEWALKS. (a) Owners of business or commercial real estate abutting any public street in the City shall construct and perpetually maintain sidewalks prior to the time of opening for business. (b) Owners of residential real estate abutting any public street in the City shall construct and perpetually maintain sidewalks in the manner following: 1. Sidewalks shall be constructed at such time as directed by the Board of Public Work. Owners shall be prohibited from constructing sidewalks absent such direction from the Board. 2. Where the Board of Public Works has directed that residential sidewalks be constructed, the Board is authorized to grant temporary exemptions to owners where the Board determines that special or unusual situations make the construction of sidewalks impossible or impractical and an alternate means of sidewalk is available or unnecessary. All such exemptions shall be for a term of one year, unless the Board otherwise directs at the time of granting the exemption, however, in no event shall such exemption be granted on a permanent basis. (9) SIDEWALK CONSTRUCTION. These specifications shall apply to the construction and restoration of sidewalks installed for improvement of pedestrian facilities. All sidewalks installed on public property shall be constructed in accordance with the following provisions: (a) All sidewalks shall be constructed with Class A Concrete, unless other materials are approved by the City Engineer, the Director of Public Works, or Board of Public Works. (b) All sidewalks shall have a minimum width as outlined in the Table in §7.13, unless otherwise provided by the Board of Public Works. (c) The elevation of the sidewalk, as measured at the outside edge (edge nearest to the private property) shall be no less than 2% or no more than 5% above the top of the adjacent curb. The transverse slope of the sidewalk shall be not less than one-quarter inch per foot or more than one inch per foot, sloping toward the public street. (d) All sidewalks shall have a concrete thickness of 4 inches over a 4-inch gravel base, except at driveways where sidewalk shall be constructed of concrete 6 inches thick over a 4-inch gravel base. (e) Commercially prepared concrete (ready-mix) shall conform substantially to the Standard Specifications for Road and Bridge Construction as prepared by the Wisconsin Department of Transportation, Division of Highways, except that concrete shall contain not less than 6 bags of cement per cubic yard. (f) The foundation for the sidewalks shall be thoroughly tamped or otherwise compacted to prevent settlement and be moistened before placing the concrete. The concrete shall be consolidated and spaded sufficiently to bring the mortar to the surface and prevent honeycombing. Before the mortar has set, the surface shall be struck off and floated with a wooden or magnesium float, steel troweled and brushed. (g) Transverse joints shall be constructed at right angles to the centerline of the sidewalk, either by sawing or grooving, at approximately 4-foot intervals. One half-inch transverse expansion joint filler shall be installed at each property line. The edges of the sidewalk shall be rounded with an edger having a ¼- inch radius. Concrete shall not be placed on frozen ground and shall be protected against freezing for a period of 72 hours after placement. The concrete shall be cured for a minimum of three days using impervious plastic or paper, wet fabric or liquid impervious membrane. Created: 2024-04-24 15:47:57 [EST] (Supp. No. 19) Page 2 of 3 (h) All sidewalks shall generally be located as outlined in the Table in §7.13 unless it is necessary to be further from the property line to match the location of sidewalks on either or both sides of the property involved. (10) PENALTY. Any person who shall fail to replace or repair defective, sidewalks within 45 days after being so ordered as provided herein shall be subject to a penalty as provided in §18.04 of this Municipal Code. A separate offense shall be deemed committed on each day in which a violation of this section occurs or continues. This section shall not preclude the City from replacing or repairing defective sidewalks as provided in §66.615, Wis. Stats. (Ord. No. 23-09, § 4, 11-28-2023) Created: 2024-04-24 15:47:57 [EST] (Supp. No. 19) Page 3 of 3

Get email alerts for Waupun

A daily email when new agendas and minutes are posted.

Report an issue with this meeting