Planning Commission Meeting
Regular MeetingWest Valley City, UT · August 10, 2016
Minutes
WEST VALLEY CITY
PLANNING COMMISSION
MINUTES
August 10, 2016
The meeting was called to order at 4:01 p.m. by Chair Meaders at 3600 Constitution Blvd., West Valley
City, Utah.
WEST VALLEY CITY PLANNING COMMISSION MEMBERS
David McEwen, Brent Fuller, Jack Matheson, Matthew Lovato, Clover Meaders, Latai
Tupou, and Harold Woodruff
ABSENT
Martell Winters
WEST VALLEY CITY PLANNING DIVISION STAFF
Ryan Harris, Jody Knapp, Steve Pastorik, and Brenda Turnblom
WEST VALLEY CITY LEGAL DEPARTMENT
Brandon Hill
WEST VALLEY CITY COMMUNITY AND ECONOMIC DEVELOPMENT
Freyja Johnson
AUDIENCE
There were 27 people present in the audience.
3600 Constitution Blvd. West Valley City, UT 84119-3720 Phone (801) 966-3600 Fax (801) 963-3559
West Valley City Planning Commission
August 10, 2016
Page 2
GPZ-2-2016
Russ Platt
3579 and 3605 S Redwood Road
General Plan change from medium density residential to high density residential
Zone Change from M to RM
7.1 acres
Russ Platt has submitted a General Plan/zone change application for two parcels totaling 7.1 acres
located at 3579 and 3605 S Redwood Road. The parcels are currently zoned C-2 (general commercial)
for approximately the west 1/3 and M (manufacturing) for the east 2/3rds with a General Plan
designation of mixed use (general commercial and high density residential) and medium density
residential (7 to 12 units/acre). The proposed zone is RM (residential, multi-family) and the proposed
General Plan designation is high density residential (12 to 20 units/acre). The proposed change only
applies to the portion of the parcels currently zoned M.
Surrounding zones include M to the north, C-2 to the west, R-1-7 (single family residential, minimum
lot size 7,000 square feet) to the south and R-1-6 (single family residential, minimum lot size 6,000
square feet) to the east. Surrounding land uses include a shopping center and a few homes to the north,
single family homes to the east and south and commercial to the west.
The applicant is planning to develop the property into a mix of uses including a restaurant, retail, office
and warehouse on the C-2 portion and townhomes on the proposed RM portion. The original concept
plan, which is attached, had a proposed density for the residential portion of the project at 13.1
units/acre with 93 townhomes. However, after considering input from staff and the Planning
Commission, the applicant has revised the concept plan to provide more driveways that are deep enough
to park in. The attached latest concept plan includes 84 townhomes, yielding a density of 12 units/acre.
Also included are elevations and renderings for the commercial and residential buildings along with
floor plans of the residential buildings. The existing buildings would be demolished. More details about
the proposal are covered below under the development agreement discussion.
While the commercial portion of the proposed project is already zoned C-2, the applicant included
information on this portion of the project to show how the two portions would relate to each other. A
conditional use application will be required for this commercial portion of the project.
As the Commission evaluates this application, there are essentially the following three questions to
consider:
• Should the zoning be changed to RM to allow for townhomes on this property?
• Should the General Plan be changed to allow the density to exceed 12 unit/acre?
• Is the proposed quality of the development sufficient to meet the goals of the City?
Each of these questions is addressed below.
Should the property be rezoned to RM?
By ordinance, zone changes to the RM Zone can only be considered by the City if the following three
conditions are met:
1. For properties without existing structures which are proposed to be developed, the property must
be a minimum of two acres and the density must not exceed twelve units per acre. For properties
with existing structures proposed to be redeveloped, there is no minimum acreage requirement,
but the density must not exceed twenty units per acre.
West Valley City Planning Commission
August 10, 2016
Page 3
2. The property shall either i) have access and frontage on a street with a planned right-of-way
width of at least 80’ (for properties under two acres) or 100’ (for properties two acres or larger)
as indicated on the Major Street Plan or ii) be adjacent to existing multi-family residential
development on two sides.
3. A development agreement must be proposed with the zone change application that addresses
dwelling unit sizes, exterior materials, architecture, landscaping and project amenities.
This application meets the first two conditions in that the property has existing structures (a warehouse
and a home converted to commercial use) and has access and frontage on Redwood Road, which has a
planned right-of-way width of 115’. On the third condition, the following was proposed by the
applicant:
• Dwelling unit sizes: The minimum townhome size will be between 1,800. The two story units
will also have basements.
• Exterior materials: Exterior materials will be fiber cement siding, stone and stucco.
• Architecture: The proposed architecture is portrayed in the attached elevations and renderings.
Both the commercial and residential buildings are very modern.
• Landscaping: Open space represents 51% of the site.
• Project amenities: Project amenities include 2 car garages for each unit, 9’ ceilings, solid surface
countertops, courtyards, decks, ground level patios, balconies, private garden spaces, rooftop
patio areas, a BBQ area, a pavilion, a tot lot, a sports court, an entry feature and vinyl perimeter
fencing.
After reviewing the architecture, there are some areas of concern that staff has raised with the applicant.
At the time this report was written, staff was awaiting revisions from the applicant.
Given that the property is eligible to be rezoned to RM, staff believes RM zoning is appropriate at this
location for the following reasons:
• The General Plan currently anticipates multi-family at this location.
• There are no stub streets to the single family neighborhood to the east.
• This property is similar to other properties along the east side of Redwood Road between 3500 S
and 4100 S where the City has rezoned the property to allow for a mix of residential
developments situated between commercial along Redwood Road to the west and single family
detached homes to the east. Each of these projects has been well maintained. These projects are
listed below:
o Millburn Manor – This small lot single family PUD with 56 homes is behind AA
Callisters and has a density of 6.9 units/acre.
o Compass Renaissance Townhomes – This development of 96 townhomes at 3715 S has a
density of 11.8 units/acre.
o Gates at Kingspointe – The project includes 3 story condos and 2 story townhomes and
has 84 total units with a density of 15.1 units/acre.
o Truong Townhomes – This project, also submitted by Russ Platt, has 77 townhomes with
a density of 12 units/acre.
• The Salt Lake County Assessor shows home values in the $170,000 to $245,000 range for the
Kingspointe subdivision to the east and $200,000 to $230,000 for the Millburn Manor
subdivision to the south. According to the applicant, the proposed townhomes would sell
between $235,000 to $299,000.
• Redwood Road is a 106’ right-of-way, seven lane arterial street that is serviced by UTA bus
West Valley City Planning Commission
August 10, 2016
Page 4
route 217.
• Average annual daily traffic (AADT) in 2014 for this section of Redwood Road was 30,590. A
seven lane arterial can handle a traffic volume of 40,000 at a level of service (LOS) C and
46,000 at an LOS D. According to the Institute of Transportation Engineers, townhomes
generate 5.81 trips per day.
Should the General Plan be changed to allow the density to exceed 12 unit/acre?
As indicated above, the density of the original proposal was just over 13 units/acre which required a
General Plan change. However, after working with staff, the latest concept is now at 12 units/acre.
Therefore, the General Plan change is no longer needed.
Is the proposed quality of the development sufficient to meet the goals of the City?
Dwelling Unit Sizes
The proposed sizes are comparable to or larger than other recently approved townhome
developments. The proposed sizes exceed the minimums the Planning Commission recently
recommended to the City Council.
Exterior Materials
Exterior materials will be fiber cement siding, stone and stucco. In the revised multi-family
design standards recently approved by the Planning Commission, a requirement of 20% brick or
stone was added for projects that utilize fiber cement siding or stucco. Staff has raised this issue
with the applicant and is awaiting revisions.
Architecture
The architecture will be subject to the City’s multi-family residential design standards.
Assuming this application is approved, a comprehensive review of the building plans will verify
compliance with the design standards. Based on a preliminary review of the elevations, staff
relayed several comments to the applicant. Staff anticipates receiving updated elevations before
the public hearing.
Landscaping/Open Space
The condominium ordinance includes the following language: “Open space shall be provided
and shall not be less than 50 percent of the site area in residential condominiums which contain
multiple unit structures having three or more units per structure. Reduction may be made to this
percentage of required open space by the Planning Commission and upon a showing that the
open space in the site area will provide amenities; which will substantially meet the needs of
future residents.” The proposed amount of open space is 51%. More detailed landscape plans
will be required as part of the subdivision review process.
Project Amenities
The City’s multi-family residential design standards require projects with 76 to 99 units to
include at least four amenities from a list included in the ordinance. The following amenities are
ones proposed by the applicant that count toward the four required: courtyards, garages, private
patio or balcony for each unit, tot lot, sport court and pavilion. Other amenities are also proposed
as described in the previous section.
Staff Alternatives:
1. Approval of the zone change only. The General Plan should remain medium density residential.
This approval is subject to a development agreement that includes:
West Valley City Planning Commission
August 10, 2016
Page 5
a. All of the commitments made by the applicant and
b. The following additions recommended by staff:
i. The density shall be capped at 12 units/acre.
ii. No fence shall be required between the commercial and residential portions of the
development.
2. Continuance, for reasons determined during the public hearing.
3. Denial.
Applicant:
Russell Platt
1759 East 4620 South Millcreek
Discussion: Russell Platt said a few blocks to the south is another very successful townhome
development. Sales started at $179,000 two years ago. The townhomes are now selling for
$235,000. These townhomes are almost sold out and Russell Platt is eager to begin another
development.
Russell Platt said the modern look of the townhomes will extend to the interiors as well.
Features include metal horizontal or glass railings, large windows that come to within 18” of the
floor, and 9’ ceilings. It doesn’t cost much more to do these things. Some of the views from the
2nd and 3rd floors are spectacular.
Merilee Hawthorne, 1512 Kenlock Way, asked how much space will be between her fence on
the South side and where the townhomes begin? Steve Pastorik said it varies between 15 and 20
feet.
Maryanne Callister, AA Callister Corp, is concerned with not having some type of wall or fence
between AA Callister and the townhomes. AA Callister stores products such as hay and wood
shavings outside, and a fence would help to keep these from being stolen. Steve Pastorik
answered that the development agreement specifies that the residential portion of the property be
fenced on the south, east, and north sides. There is no requirement for fencing between the two
commercial uses. Steve Pastorik said generally the requirement to put in a masonry wall falls on
a commercial property coming in next to residential. Commissioner Meaders stated when there
are two commercial properties next to each other, it is up to the property owners to figure out
fencing.
Motion: Commissioner Matheson moved to approve the zone change only for GPZ-2-2016
subject to the development agreement and all of the commitments made by the applicant. The
General Plan for this area will remain medium density. Density shall be capped at 12 units per
acre. No fence is required between the commercial portions of the development.
Commissioner Lovato seconded the motion.
Roll call vote:
Commissioner Fuller Yes
Commissioner Lovato Yes
Commissioner Matheson Yes
Commissioner McEwen Yes
Chair Meaders Yes
West Valley City Planning Commission
August 10, 2016
Page 6
Commissioner Tupou Yes
Commissioner Woodruff Yes
Unanimous – GPZ-2-2016 – Approved
C-27-2016
Boart Longyear
2455 South 3600 West
M Zone (20.09 Acres)
The applicant, AE Urbia Architects, representing Boart Longyear, is requesting conditional use approval
for a drilling, manufacturing and storage facility at 2455 S. 3600 W. The zoning for this area is M,
manufacturing. The West Valley City General Plan designates this area as light manufacturing. The
surrounding zone is manufacturing to the west, north and northeast with R-1-6 and R-1-7, single family
residential, to the south and southeast. The surrounding uses include office/warehouse and other light
industrial uses as well as single family residential.
The property was originally developed in 1985 as a distribution center for Mervyn’s (C-40-85). They
occupied the site until approximately 2007. The next tenant that occupied the building was CCAM
(Classic Cabinets) and they occupied the site until about 2014. Currently, a large portion of the building
is vacant and a variety of trucking companies utilize the loading docks on a limited basis.
At this time, Boart Longyear is proposing to occupy the site for office, manufacturing, and storage of
specialized mining and drilling equipment. The hours of operation will be from 7:00 a.m. – 7:00 p.m.
There is an existing building on site that will be consist of 32,410 sqft of office space, a 200,061 sqft
warehouse and a 41, 672 sqft manufacturing/shop area. This use mixture requires 274 parking spaces
and 280 spaces have been provided on site for parking. The only exterior modifications that are
proposed for the building is to add a small wash bay (81’x 40’) and overhead doors along the north side
of the building.
There are currently two very large landscaped areas located along the south and north sides of the site.
The proposal is to convert a portion of these areas to outside storage yards. The areas will be surfaced
with gravel and used for storage of materials and equipment and shall not be used for standard vehicular
parking.
The yard on the south side requires a 20’ landscaped setback from all residential uses with evergreen
trees planted at a ratio of 1 for every 300 sqft of area (1 every 15’). The residential uses to the east were
constructed after this facility was originally built, therefore the landscaping setback is currently not in
place. The applicant has indicated that the full 20’ setback in this area would make access and
maneuvering difficult along the back of the building and has proposed to add tree diamonds every 30’
along the paved portions of the lot. Lighting in these areas shall be installed so it does not negatively
affect adjacent residential uses.
The existing landscaping along the west side of the site will remain and the yard to the north is required
to be setback 20’ from the right-of-way. These areas will be landscaped with lawn and trees spaced
every 30’.
There is currently a 6’ masonry fence along the south side of the site and an 8’ wall along the residential
portion on the east side. An additional 6’ masonry wall will be constructed along the entire perimeter of
the site to screen the outside storage areas and equipment from public view. Any dumpsters located on
site would also need to be located within a masonry enclosure and screened.
West Valley City Planning Commission
August 10, 2016
Page 7
The applicant indicated that they would like to install a monument sign on the property. This sign would
be a single tenant sign and need to conform to the standards in §11-5-103. All wall signage would also
be required to meet all the standards set forth in Title 11.
Staff Alternatives:
Approval, subject to the resolution of any concerns raised at the public hearing as well as the following
conditions:
1. The hours of operation for the business shall be from 7:00 a.m. – 7:00 p.m.
2. All minimum required vehicular parking stalls shall be located on hard surfacing.
3. The outside storage areas shall be used for material and equipment storage only and may be
located on gravel.
4. A minimum 20’ landscape strip shall be installed along all areas adjacent to residential uses
with 1 tree planted for every 300 sqft of area except for the area outlined in condition 5
below.
5. Tree diamonds may be installed every 30’ along the east side of the site, in the paved area
adjacent to the residential uses.
6. A lighting plan must be submitted and all lighting shall be installed so it does not negatively
affect adjacent residential uses.
7. A 20’ setback must be maintained along 3600 West and 2400 South with trees planted at a
ratio of 1 for every 30’ of frontage.
8. A 6’ masonry wall is required adjacent to residential uses.
9. All outside storage areas shall be screened from public view with a combination of a 6’
screen wall and landscaping.
10. Dumpsters must be located within a 6’ masonry enclosure.
11. All signage shall conform to the standards set forth in Title 11 of the West Valley City
Municipal Code.
12. All requirements of affected departments and agencies must be met.
13. This use is subject to review upon a valid complaint.
Continuance, to allow for the resolutions of any issues raised at the public hearing and to allow time for
the applicant to submit more detailed information on the project.
Applicants:
Andrew Bollschweiler, AE Urbia Architects Nate Barnes, Boart Longyear
West Valley City Planning Commission
August 10, 2016
Page 8
2875 South Decker Lake Drive 1775 South 5350 West
West Valley City Salt Lake City
Discussion: Andrew Bollschweiler said Boart Longyear has several operations in the Salt Lake
valley that they are considering consolidating to this new site. Commissioner Woodruff asked
for a summary of Boart Longyear’s operations. Kent Hoots, Senior V.P. of Boart Longyear, said
Boart Longyear manufactures diamond drill bits that are used in minerals drilling applications
around the world. They produce about 1,000 drill bits per week. They currently run a one shift
operation. Boart Longyear has a distribution center based in Salt Lake where products are
supplied in and out of Canada, Mexico, and the U.S. Maintenance activities for the drilling
services group primarily supports the Kennecott operation. 215 employees will be relocating to
this property. Boart Longyear has been in operation for 126 years, in this valley since at least
1960.
Commissioner Meaders asked how noisy this process is. Kent Hoots said there is very little
noise at all associated with manufacturing and distribution. The only noise occurs when drill
rigs are fired up, which is very rare, and will happen on the north side of the building.
Commissioner Fuller asked for a description of the Boart Longyear transit operation. Kent
Hoots said third party providers pick up materials. 12 to 36 semi-trucks come in to the property
per day. The semis and trailers are not stored on site, they come and go.
Commissioner Meaders asked why a 20’ landscaped buffer cannot be installed on the east side of
the property, next to residential. Kent Hoots said the area is needed to place equipment and
safely move employees and third parties around the site from a traffic management standpoint.
He noted that Boart Longyear plans to park things that are low next to the residential area, not
semi-trucks.
Commissioner Lovato asked if any forging or casting will be done on the property. Kent Hoots
answered no, Boart Longyear only does light machining on purchased blanks. Bryan Cragun,
2547 South 3425 West, asked if explosives are stored on the property. Commissioner Meaders
answered no. Bryan Cragun feels that removing the existing greenspace will lower the values of
surrounding homes and a 20’ landscaped buffer is not enough. He is also concerned about dust
that may be stirred up on the property.
David Thorpe, 2528 South 3460 West, said he purchased his home specifically because of the
green space behind it. He says replacing the grass with gravel and having trucks drive through
the area will stir up dust that will cause problems for his child with asthma. He is concerned that
trucks driving right next to the wall will create noise pollution. David Thorpe said the reason the
buffer zone was created was to prevent noise pollution when Mervyn’s was there in 1985. He
feels the buffer zone should be grandfathered in. David Thorpe said he looked on Google maps
and feels the other Boart Longyear locations are eyesores. He asked Planning Commissioners if
they would want a gravel pit with tons of broken machinery in their backyards.
Larry Thorpe, 1966 Wilson Ave. SLC, is the executor of his parents’ estate. He feels allowing a
gravel area behind an estate will ruin it. He does not want the buffer zone removed just because
a new tenant moves in. He feels the existing Boart Longyear locations look like junk yards from
the rear. He would like Boart Longyear to move elsewhere. Larry Thorpe would like to see a
park on the area, perhaps asking surrounding homeowners to pay HOA fees to water it. He
doesn’t want to look over his fence to see a gravel pit.
West Valley City Planning Commission
August 10, 2016
Page 9
Marcella Sparks owns a home on 3540 Vespa Drive that her children live in. She wants to keep
the greenspace. She says there are already trucks driving through the property, making noise,
moving things in surrounding homes, and knocking things off of the walls. She said there are
also weird smells. Jody Knapp said Boart Longyear is not occupying the site at this time.
Marcella Sparks asked what the reason is for installing gravel. Commissioner Meaders said
heavy equipment will be stored on gravel because it would break up an asphalt surface. Instead
of removing greenspace, Marcella Sparks would like to see areas of the parking lot used for
equipment storage.
Jody Knapp showed the originally approved landscape plan. The original 1985 conditions of
approval state that landscaping should be done in accordance with the approved plan. There was
no discussion about why the buffer was there or a definitive number per the conditions of
approval. Commissioner Meaders asked if the original plans indicate an easement or dedicated
park. Jody Knapp said it has always been private property, nothing saying that it needs to
remain open space in perpetuity has been recorded.
Jody Knapp noted the original stamped site plan shows a 70’ wide landscaped buffer that
narrows to 32’ along the south side of the property. This condition of approval can be modified
by the Planning Commission. The applicant is asking to reduce the original landscaping
requirement down to the current ordinance, which is a 20’ buffer. The applicant is not asking for
a change in access. The pavement will remain the same. There should not be much vehicular
traffic in the gravel areas. Traffic will be on hard surfacing. The gravel is for storage of mining
equipment and large trucks.
Jody Knapp indicated there will be an enclosed wash bay on the north side of the building which
will follow all drainage requirements. Boart Longyear is not proposing any changes to the
existing fence. They are adding a 6’ masonry wall to screen the outside storage areas. A 20’
landscaped buffer is required along the street side and tree diamonds along the east side. The
entire site will be surrounded by a masonry wall.
Larry Thorpe, 3586 West Vespa Dr., noted that the landscaped buffer behind his house extends
165 feet. The buffer extends 145 feet behind his son’s house. Jody Knapp said the improved
area is significantly wider than the original plans showing 70 and 32 feet for landscaping as well
as areas for future expansion. Mervyn’s widened the buffer and put up a cement fence.
David Thorpe said, when he was building his home, they were looking at making the property
behind his home into a park area. He was told in 2006 that this area would be a permanent
buffer. He asked what has changed since then.
Terry Bishop, 3528 Vespa Dr., is concerned about the value of her property going down. She
said it is ridiculous that renters would destroy the beautiful landscaping. She said there are
residents who work nights and sleep during the day in the neighborhood. She doesn’t want
trucks rolling through the property all hours of the day. Cleta Cragun, 2181 South Vespa Dr.,
also does not want the grass eliminated.
Nathan Barnes said the gravel area will be used for storage, not truck traffic. Boart Longyear’s
intent is to maintain the current access point. Right now this is a cross dock facility. All
deliveries are local. Nathan Barnes said the current tenant produces more traffic than Boart
Longyear ever will. Some of Boart Longyear’s equipment may sit for a year and not move until
there is a need for it. Boart Longyear needs the area to become more efficient and to help
maintain jobs.
West Valley City Planning Commission
August 10, 2016
Page 10
Daniel Palacios, 4077 W 4040 South, said residents have a right to have their properties
respected. He feels the gravel equipment storage area will be ugly, creating industrial blight. He
said surrounding residents purchased their properties with the expectation that the easement and
buffer zone would make their property desirable. They want to get the maximum value out of
their properties when they sell. The landscaped buffer is the only thing that keeps these residents
content where they are.
Commissioner Meaders said, generally speaking, an owner in a Manufacturing area can do just
about anything they want. Most often we don’t get to decide what our neighbors do with their
properties. It is her understanding that there was no permanent easement. Conditions on
conditional uses are not permanent.
Brandon Hill confirmed that each conditional use application is based on the merits of that
application. A permitted use with conditions does not include private assurances or agreements
between property owners that may have existed. Those concerns are for the private property
owners to work out amongst themselves and not for the Commission.
Commissioner Matheson said gravel does create dust, which is a valid complaint. The suggested
site plan says existing grass and trees will be removed for the proposed gravel yard. Not only
are we losing grass, we are losing trees. The site plan of the existing facility on 1700 South has
three rows of storage, approximately 100’ x 150’ of solid storage. Commissioner Matheson
asked why equipment cannot be stored on a paved or concrete surface. He is in favor of having
our City Engineer look at the turning movements of trucks going around the buildings before a
decision is made.
Commissioner Woodruff feels the original landscaped buffer of 70 and 32 feet should be
maintained. Brent Fuller agrees. Commissioner Woodruff feels the equipment storage area on
the south should be on a hard surface. The storage area on the north could remain gravel. He
would also like a 20’ landscaped buffer on the east side along the residential area.
Commissioners Matheson, McEwen, and Lovato voiced their agreement.
Commissioner Tupou asked if any restrictions were recorded with the deed when the property
was developed. Jody Knapp will look again at the title report.
Commissioner Fuller noted it is easier to tear out grass than asphalt. Perhaps an unused area of
asphalt could be removed and replaced with gravel in order to preserve more grass area.
Commissioner Matheson is not opposed to having gravel on the north side, but does not think
there is a need for gravel on the south side.
Motion: Commissioner Matheson moved to continue C-27-2016 to the September 14, 2016
Public Hearing to give City Engineering time to review the plan for traffic movements. A plan
needs to be submitted to Engineering along with a proposed drainage plan. Boart Longyear will
probably be required to pave part of the south side of the property.
Commissioner Lovato seconded the motion.
Roll call vote:
Commissioner Fuller Yes
Commissioner Lovato Yes
Commissioner Matheson Yes
West Valley City Planning Commission
August 10, 2016
Page 11
Commissioner McEwen Yes
Chair Meaders Yes
Commissioner Tupou Yes
Commissioner Woodruff Yes
Unanimous – C-27-2016 – Continued
C-28-2016
Western Garden Center - Receptions
4050 W. 4100 S.
C-1 Zone (2.37 Acres)
Western Garden Center is requesting a conditional use amendment for a reception center. This property
is zoned neighborhood commercial (C-1) and the West Valley City General Plan designates this area as
Neighborhood Commercial. The surrounding zone is R-1-8 to the north and west and C-1 on all other
sides. There are single family homes to the north and west, and retail strip centers to the east and south,
across 4100 South.
In 2010, Western Garden Center amended the City Code be to add “reception centers as an accessory
use to a garden center” as a conditional use in the C-1 zone. A conditional use application was then
approved in 2014 (C-69-14) for a reception center however the use was not conducted and that approval
has since expired. They are now ready to move forward with this portion of the business and have
submitted the following conditional use application for review.
The reception use is proposed within the existing 6,722 square foot garden center retail area. The space
that would be designated for receptions would be approximately 3,000 square feet within the south side
of the building. Permanent partitions will not be installed so the space will be delineated with kiosks and
plant walls. No other modifications to the exterior of the building or site are proposed as part of this
application.
The typical hours of operation for this use are 5:00 p.m. – 10:00 p.m. and there will be no alcohol served
at this facility. This use is located within 500’ of residential property so those hours are in compliance
with requirements set forth in section 7-6-1012 which is as follows:
7-6-1012. ADDITIONAL REGULATION OF RESTAURANTS, DANCE HALLS, CONCERT
HALLS, RECEPTION CENTERS AND CLUB LICENSEES.
(1) It is unlawful for the keeper, manager or person in charge of any restaurant, dance hall, concert hall
reception center or club licensee to permit any singing, dancing, Indoor or Outdoor Public Recreation,
playing of musical instruments or any other form of amusement or entertainment to be carried on the
premises when the closest point of the building is within 500 feet of any residential property line after ten
o’clock P.M. (10:00) P.M. and before six o'clock (6:00) A.M. This restriction should be extended to two
o’clock (2:00) a.m. on January 1 of year for New Year’s Day.
(2) Parking lots must be closed and vacated within thirty (30) minutes of closing by security personnel.
There are 131 parking spaces on site that are shared between the Garden Center and the attached retail
use. With the current mix of tenants, including 3,000 square feet of reception center, 123 spaces are
required.
West Valley City Planning Commission
August 10, 2016
Page 12
Signage is existing and will not be modified for this use. The landscaping is also existing on site and
will not be modified.
Staff Alternatives:
• Approval, subject to the resolution of any issues raised at the public hearing and the following
conditions:
1. The reception area shall be developed per the approved plans and shall not occupy more
than 3,000 square feet of the existing garden center building.
2. The property shall be kept properly maintained and in good condition.
3. Must comply with all relevant requirements set forth in the West Valley City Code
including but not limited to section 7-6-1012. ADDITIONAL REGULATION OF
RESTAURANTS, DANCE HALLS, CONCERT HALLS, RECEPTION CENTERS
AND CLUB LICENSEES.
4. Must comply with all other relevant requirements set forth from applicable department
and agencies including but not limited to the West Valley City Fire and Building
Inspection Department.
5. Subject to review upon valid complaint.
• Continuance, to allow for the resolution of any issues raised at the public hearing.
Applicant:
Michael Clayton
9201 South 1300 East
Discussion: Michael Clayton said Western Gardens does allow a party to serve alcohol
with a licensed and insured bartender. However, there is no open bar. Michael Clayton
reported he spoke to the Utah Department of Alcohol Beverage Control (DABC) and
they treat a reception like a private party when alcohol is served, as it would be in a
private home.
Daniel Palacios, 4077 West 4040 South, said he loves Western Gardens. He likes his
neighborhood quiet. His home will be the most directly impacted by a reception center.
His two bedrooms are above the 8’ wall next to the proposed reception center and
another bedroom is at ground level. Daniel Palacios said the intersection at 4100 South
and 4000 West is already a heavily congested traffic area. He feels adding a reception
center will make traffic worse. He does not believe that having 123 parking spaces is
enough to prevent overflow parking into the neighborhood.
Daniel Palacios does not want a bunch of drunken people hanging around his primarily
residential neighborhood, it invites trouble. He does not want bright lights shining into
his home. Just because a reception ends at 10:00, doesn’t mean people will leave the area
quietly. There is a potential for violence when alcohol is served.
Commissioner Meaders asked if Western Gardens plans any crowd control in the parking
lot. Michael Clayton said Western Gardens has been doing receptions at the Sandy
West Valley City Planning Commission
August 10, 2016
Page 13
location for nine years and at the Salt Lake location for six years. Based on experience,
most weddings end at about 9:00 p.m. 90% of receptions are open house receptions
where people come and go. Even when a reception ends at 10:00 p.m., there are usually
only about ten cars in the parking lot, usually the cleaning crew. There is a parking
attendant in the parking lot in case parking needs to be controlled and to direct people to
overflow. Commissioner Meaders asked if there have been any problems with alcohol at
their other locations. Michael Clayton said Western Gardens has not had a single noise
ordinance violation or alcohol consumption issue.
Daniel Palacios said the Sandy Western Garden is in a commercial area with large lots
and easements. He indicated there is no easement between Western Gardens and his
home. The lights will be on late at night. His family will be seriously affected. He says
a bunch of drunks that want to carry on a party past 10:00 cannot be controlled.
Commissioner Meaders suggested adding, “Subject to review upon valid complaint” to
the staff conditions. Parking spaces number more than are required, so parking should
not spill out into the residential area. Commissioner Tupou asked if a lighting plan was
submitted. Commissioner McEwen noted that parties will be confined inside of the 300
sqft building.
Motion: Commissioner Tupou motioned to approve C-28-2016 subject to the four
conditions listed in the staff report and subject to review upon valid complaint. A
lighting plan must also be submitted.
Commissioner Lovato seconded the motion.
Roll call vote:
Commissioner Fuller Yes
Commissioner Lovato Yes
Commissioner Matheson Yes
Commissioner McEwen Yes
Chair Meaders Yes
Commissioner Tupou Yes
Commissioner Woodruff Yes
Unanimous – C-28-2016 – Approved
PLANNING COMMISSION BUSINESS
Approval of Minutes from July 20, 2016 (Study Session) Approved
Approval of Minutes from July 27, 2016 (Regular Meeting) Approved
Approval of Minutes from August 3, 2016 (Study Session) Approved
There being no further business, the meeting adjourned at 5:54 p.m.
West Valley City Planning Commission
August 10, 2016
Page 14
Respectfully submitted,
_____________________________________
Brenda Turnblom, Administrative Assistant
Agenda
WEST VALLEY CITY PLANNING COMMISSION AGENDA
Wednesday, August 10, 2016
Planning Commission Technical Committee ..............................................................August 02, 2016 @ 8:00 a.m.
Planning Commission Study Session ..........................................................................August 03, 2016 @ 3:30 p.m.
Planning Commission Pre-Meeting.............................................................................August 10, 2016 @ 3:30 p.m.
Planning Commission Meeting ...................................................................................August 10, 2016 @ 4:00 p.m.
The Public Hearing is held in the City Council Chambers at West Valley City Hall.
3600 Constitution Boulevard, West Valley City, UT 84119
Fuller Lovato Matheson McEwen __Meaders __Tupou __Winters __Woodruff
GENERAL PLAN/ZONE CHANGE APPLICATION
GPZ-2-2016 Petition by RUSSELL PLATT requesting a General Plan change from Medium Density
Residential to High Density Residential and a zone change from M (Manufacturing) to
RM (Residential, Multi-family). The property is located 3579 and 3605 South Redwood
Rd on 7.1 acres. (Staff – Steve Pastorik at 801-963-3545)
CONDITIONAL USE APPLICATIONS
C-27-2016 Petition by AE URBIA ARCHITECTS, representing Boart Longyear, requesting
conditional use for a warehouse, manufacture, and storage of mining and drilling
equipment. The property is located at 2455 South 3600 West on 20 acres and is zoned M
(Manufacturing). (Staff - Jody Knapp at 801-963-3497)
C-28-2016 Petition by WESTERN GARDENS requesting conditional use for receptions. The
property is located at 4050 West 4100 South on 2.45 acres and is zoned C-1 (General
Commercial). (Staff - Jody Knapp at 801-963-3497)
PLANNING COMMISSION BUSINESS
Approval of Minutes from July 20, 2016 (Study Session)
Approval of Minutes from July 27, 2016 (Regular Meeting)
Approval of Minutes from August 3, 2016 (Study Session)
West Valley City does not discriminate on the basis of race, color, national origin, sex, religion, age, sexual orientation or disability in employment or the provision of services. If you are planning to
attend this public meeting and, due to a disability, need assistance in understanding or participating in the meeting, please notify the City eight or more hours in advance of the meeting. We will try
to provide whatever assistance may be required. The person to contact for assistance is Brenda Turnblom, 963-3282.
Get email alerts for West Valley City
A daily email when new agendas and minutes are posted.