Planning Commission Regular Meeting
Regular MeetingWest Valley City, UT · July 12, 2023
Minutes
WEST VALLEY CITY
PLANNING COMMISSION PUBLIC HEARING MINUTES
JULY 12, 2023
The meeting was called to order at 4:00 p.m. by Chairperson Fuller in the City Council
Chambers at West Valley City Hall 3600 Constitution Boulevard, West Valley City, UT 84119,
and using Zoom at https://us06web.zoom.us/j/88955119737.
WEST VALLEY CITY PLANNING COMMISSION MEMBERS
David McEwen, Brent Fuller, Mathew Lovato, Darrick Porter, Martell Winters, Cindy
Wood, and Harold Woodruff
ABSENT
David McEwen and Darrick Porter
WEST VALLEY CITY PLANNING DIVISION STAFF
Steve Pastorik, Jody Knapp, Brock Anderson, Steve Lehman, and Kirsten Hunt
WEST VALLEY CITY LEGAL DEPARTMENT
Brandon Hill, Deputy City Attorney
AUDIENCE
There were 50 people in the audience
GPZ-5-2023
Connor Sheppard
2736 and 2856 S Corporate Park Dr and
5035 W Lake Park Blvd
General Plan change from Medium Density Residential and Large Lot Residential
to Mixed Use and a zone change from R-1-8 and A-2 to MXD
40.4 acres
This application was continued at the applicant’s request during the Planning Commission
meeting on June 28th. The applicant is having a neighborhood meeting with the residents of the
adjoining Highbury neighborhood on July 10th. The applicant is again asking that this application
be continued until the July 26th Planning Commission meeting to allow additional time to
respond to resident comments.
Connor Sheppard with Wasatch Acquisitions & Capital, Inc. has submitted a General Plan/zone
change application for three parcels totaling 40.4 acres that are located at 2736 and 2856 S
Corporate Park Dr and 5035 W Lake Park Blvd. The property is currently zoned R-1-8 (Single
Unit Dwelling Residential, minimum lot size 8,000 square feet) and A-2 (Agriculture, minimum
lot size 2 acres) with a General Plan designation of Medium Density Residential (7 to 12
units/acre) and Large Lot Residential (2 to 3 units/acre). The proposed zone is MXD (Mixed
Use) and the proposed General Plan designation is Mixed Use.
Surrounding zones include A-2 (Agriculture, minimum lot size 2 acres) to the north, BRP
(Business/Research Park) to the east, R-1-8 to the south, and M (Manufacturing) and R-1-8 to
the west. Surrounding land uses include vacant land to the north, Lake Park Corporate Center
and Monticello Academy to the east vacant land, single family homes to the south; and Neil
Armstrong Academy and single family homes to the west. The property is currently vacant.
Development Proposal
The applicant is proposing a mixed use development that would include:
a deep-water wave generating pool or surf pool with associated amenities open to the
public for a fee;
32 single family detached homes;
a 6-story, 55-unit for-sale condo/hotel building to accommodate overnight stays for
customers at the surf pool;
approximately 40,000 square feet of commercial space within the hotel building to
accommodate surf pool customers;
32 for-sale townhomes in a gated community;
56 for-rent townhomes;
280 stacked flat apartments;
a community clubhouse and community pool for those living on-site; and
competition style pickle ball courts, a dog park, and playground available to the public.
The proposed density of the 14-acre single family detached area is 2.3 units/acre. The density of
the remaining 26.4 acres is 13.9 units/acre without the condo/hotel building and 16 units/acre
with the condo/hotel building included.
Property History
A development agreement was approved with Ivory Development on the north 26.4 acres of this
property as well as other properties back in 2008. The development agreement, which is included
for reference, called for 69 townhomes and 89 parkside homes on the subject property. The
parkside homes were intended to be alley-loaded homes on small lots. The approved density in
the development agreement was 6 units/acre. Ivory Development pursued development on all of
the properties addressed in the development agreement except the subject property.
Issues to Consider
In reviewing this application, staff suggests that there are two primary questions to answer:
1. Is this the right location for this type of a mixed use development?
2. Assuming the location is appropriate, does the quality of the project further City goals?
These two questions are explored below.
Is this the right location for a mixed use development?
Since the MXD zone has only been used once in the City, staff believes a brief explanation of the
MXD zone is warranted here. Unlike other zones, the MXD zone has very few standards spelled
out in our ordinance. For example, there are no setbacks, height restrictions, or maximum
building coverages. The lack of standards was intentional to allow for design flexibility for
applicants who could essentially propose their own standards through a development agreement.
Another unique aspect of the MXD zone is that all allowed uses within the zone, except for
public utility installations, are reviewed as permitted uses and not conditional uses. That means
that the site plan approval process will be handled only by staff. These unique aspects of the
MXD zone make detailed development agreements for developments within the MXD zone
essential in staff’s view.
The points below may help the Commission answer the first question.
The proposed use for the 14-acre parcel on the south end that wraps around Monticello
Academy is in line with the current General Plan designation of Large Lot Residential.
In 2018, the State designated the area between SR-201 and 3100 South and from 5600
West and 3600 West as an Opportunity Zone. The Opportunity Zone Program is a federal
program designed to incentivize capital investment through tax incentives offered to
investors that hold their investments with the greatest benefit going to those investors
who hold their investment for 10 or more years. Hence, developers have an added
incentive within this area to build and hold commercial development including rental
housing as opposed to for-sale homes that are developed and sold.
With the increase in remote work resulting from the pandemic, vacancy within Lake Park
Corporate Center has increased significantly.
The subject property is part of the larger Lake Park and Highbury developments. As
Zions Securities and later Suburban Land Reserve developed the Lake Park and Highbury
areas they became a mixed use development including the following mix of uses:
Land use Acres # of Housing Units
Golf Course 346.4
Health Care 3.4
Hotels 6.5
Industrial 53.9
Office 178.1
Residential 87.0
Apartments 24.2 196
Single Family Detached 39.2 256
Townhomes 23.6 499
Retail 64.0
Schools 17.8
Utilities 0.7
Vacant 179.3
Waterways/Open Space 28.8
Totals 965.9 951
The property is served by UTA bus route 513 with limited service between the West
Valley Central Station and the Salt Lake Central Station.
At the time this report was prepared, staff had received emails from 20 of the residents of
the adjoining neighborhood who oppose this application. These emails are included with
this report. In summary, the neighbors that sent emails prefer single family detached
homes and expressed concerns about how the proposed project would impact parking,
traffic, noise, property values, privacy, neighborhood turnover, views, neighborhood
character, City services, crime, and infrastructure.
During the Commission’s study session on 6/21, several questions or concerns were
raised. The applicant provided preliminary responses to these questions/concerns and
these responses were provided in the previous staff report. The applicant offered the
following updated responses on 7/3.
o Question: Will the for-rent townhomes be short or long-term rentals? Applicant
Response: Our For-Rent Townhomes are created to be long-term rentals for
maximum benefit to the community and project. These long-term rentals will be
professionally managed by an industry leader in the Utah market, Wasatch
Property Management.
o Question: How will this project impact traffic? Applicant Response: An
independent third-party traffic study conducted by a licensed traffic engineer
states no additional mitigation efforts are required due to the proposed
o development. The traffic study states specifically studied traffic patterns with the
proposed development now in 2023, 2028, and 2050 and concluded no additional
infrastructure requirements other than what has been recommended by the city and
what is currently in place.
o We will continue to proactively work with the city to better understand the traffic
concerns and addressed them through creating solutions for traffic flow in our
planning.
o Question: Does the project meet parking requirements and how will event parking
be handled. Applicant Response: Our parking requirements for the project are
accommodated at 2.58 stalls per unit. We are proactively working with nearby
property owners to address parking needs required for events, if any. The current
parking count for residential and commercial uses adequately addresses parking
needs for the proposed development.
o Question: Is the surf pool viable in the long-term? Applicant Response: Surf Pools
have been around for over a decade with increased locations opening throughout
the world. The need and desire for viable surf parks has only increased in the past
10 years with more interest in the surf community and sport as a whole due to the
inclusion of surfing as an official Olympic event. These more premium attractions
bring visitors from around the world who enjoy active lifestyle and outdoor
activities. Prior to executing on the proposed development, we conducted a third-
party feasibility study to gauge immediate and long-term interest in the project.
The conclusion of the study was that this need is underserved both regionally and
nationally, thus lending to the long-term viability of the project. Not only does the
surf park address a national and international interest, it also addresses a local
need that is currently being served by out-of-state locations. The technology we
have acquired for this project allows us to bring leading innovation which is
highly sought after to this space.
o Question: Is this the right location for this type of development given the
neighboring single family homes? Applicant Response: This location not only
supports the use of adjacent retail and businesses, but also maximizes the use of
traffic main traffic arteries through the Mountain View corridor, Bangerter
Highway and Interstate 15. These established traffic corridors allow for the
maintenance of private access and lifestyle needs of the local residents. The
proximity to the Salt Lake International Airport and other local attractions also
lends to the viability of this location. The project also creates a much needed
“buffer zone” between the transition of residential to industrial in the area.
o Concern: Racing occurs on Highbury Parkway. This project has the potential to
make this problem worse. Applicant Response: The current plans support more
active use of Lake Park Blvd which will naturally reduce the racing that is
currently seen today. With the low traffic flow in the area currently it is conducive
to promoting the use of racing. We feel strongly that regular use and traffic will
greatly reduce the draw to race in this area.
During the Commission’s public hearing on 6/28, the Commission requested information
on the zoning of remaining vacant land within the City. This information is provided in
the table below.
Remaining Remaining
Vacant Vacant
Land Land
Zone (Acres) % of Total Zone (Acres) % of Total
A 237.8 12.9% R-1-7 9.9 0.5%
A-1 104.8 5.7% R-1-8 60.8 3.3%
A-2 228.3 12.4% R-1-10 61.2 3.3%
BRP 49.4 2.7% R-1-12 1.7 0.1%
C-1 1.7 0.1% R-2-8 0.8 0.0%
C-2 91.7 5.0% R-4 0.3 0.0%
CC 2.9 0.2% RB 1.4 0.1%
LI 19.4 1.1% RE 11.2 0.6%
M 907 49.4% RM 45.1 2.5%
R-1-6 2 0.1% Total 1837.4
The applicant submitted a traffic impact study, which is included with this report, on 7/3.
This traffic impact study was forwarded to Public Works for their review. In summary,
the study evaluates, among other things, the performance of 7 existing intersections for
2023, 2028, and 2050 traffic conditions with and without the proposed project and
provides recommended mitigation measures. According to the study, in both 2023 and
2028, all 7 intersections would operate at acceptable levels of service with and without
the proposed project. By 2050, 6 of the 7 intersections would operate at acceptable levels
of service with and without the proposed project. The one intersection that fails without
the proposed project is 4800 West (Corporate Park Drive)/Lake Park Blvd. However, if
the recommended mitigations of improved signal timing at 3100 South/4800 West and a
new traffic signal at 4800 West (Corporate Park Drive)/Lake Park Blvd. are
implemented, this intersection would operate at a level of service B, which is acceptable.
Does the quality of the project further City goals?
The applicant submitted a development agreement proposal, project narrative, and elevations of
the different building types. After reviewing the applicant’s application materials, staff provided
a list of comments to the applicant. The applicant has been working to address these comments;
however, at the time this report was prepared, not all of the staff comments had been addressed.
Specific items that are still being addressed or refined include: parking, amenities, events,
commercial uses, building renderings, development agreement provisions, public use of the
linear park, unit sizes, project phasing, and fencing.
On the issue of parking, the latest information provided by the applicant shows that the
residential components would meet the City’s parking requirements. The remaining parking
unknowns are the person capacity of the surf pool, the commercial use mix within the
condo/hotel building, and the size and frequency of events.
Staff Alternatives:
1. Continuance. As requested by the applicant, this application should be continued until the
Planning Commission meeting on July 26th.
2. Denial. The General Plan and zoning should remain as they are.
Discussion: Steve Pastorik presented the application. He mentioned receiving twenty-one
emails, a form letter with forty signatures, and a petition with forty-two signatures
opposing this proposal. Steve compiled the issues and concerns he received from
the residents and summarized them for the Commission.
Steve mentioned that, as staff, they have found issues with this proposal that
would need to be addressed by the applicant. After reviewing these comments
with the applicant, Steve noted that they requested to continue this application to
the public hearing on July 26, 2023, giving them time to rework their proposal.
Steve pointed out that he provided a document with the zoning of vacant property
within the City and a traffic study in the Commission's packet.
Commissioner Winters asked which vacant properties could be rezoned as mixed-
use areas. Steve said he would need to find out how many acres, but there is
property fitting that description. He noted that the biggest challenge when looking
to rezone a property to MXD is it would need to be at least five acres in size.
Commissioner Woodruff asked Steve what the density is for the R-1-8 zone.
Steve said it is typically 4-5 units/acre. He explained that, in this case, the
northern part of the subject property had been rezoned before this application was
submitted for a planned unit development (PUD) with a density of 6 units/acre.
Commissioner Lovato asked if residents could park anywhere on site or if there
would be designated parking for each structure. Steve stated that the hotel/condo
building has parking underneath, but the applicant is still working on the parking
structure.
Michael Dye said he resides directly adjacent to the subject property. He said he
is concerned for the safety of the children crossing the road to the elementary
school with increased egress traffic on Redbridge. Mr. Dye said the developer had
explained where there would be on-street parking for this development. He
explained that the neighborhood had experienced parking issues with the addition
of a previous development, and as a result, the residents do not park on the street,
so that is a big concern. Mr. Dye said the developer also mentioned draining the
wave pool into irrigation water to assist with waterway filling issues. He said this
would introduce chemicals into the same water containing fish and other wildlife.
He also mentioned that a pickleball game is boisterous, the pickleball court would
be next to the existing homes, and there needs to be a sufficient noise barrier.
Mike said he lives at 5101 W Sandwell Dr., and his major concern is the increase
in Armstrong Academy students. He stated that his children attend that school,
and there would be too many students in a classroom to provide an adequate
learning environment.
Nicole McCrea, a neighboring resident, said Wasatch mentioned wanting to be
part of keeping the neighborhood beautiful. She explained that the residents pay a
fee to the HOA for maintaining the Highbury community areas. Mrs. McCrea
explained that Wasatch has excluded themselves from the HOA, and she is
wondering how they plan to contribute to those areas. She is also concerned about
people purchasing hotel/condo units to rent out for a profit, which would increase
tenant turnover and decrease owner-occupied homes.
Vance Evans, a neighboring resident, pointed out that he could not locate the lake
and canal adjacent to Armstrong Academy in the plans. Mr. Adams asked Steve if
they were planning to fill in that area. Steve explained that the lake and canal are
not part of the subject property and would remain as is.
Commissioner Woodruff asked if there is a limit to the number of continuances
the applicant can request. Steve said he does not believe so. Brandon Hill, Deputy
City Attorney, confirmed that there is no limit.
Steve mentioned that the State precludes the City from factoring in school
capacity with a zoning issue.
Commissioner Wood suggested that the applicant be in attendance for the meeting
on July 26th.
Motion: Commissioner Woodruff motioned to continue GPZ-5-2023 as requested
by the applicant, this application should be continued until the Planning
Commission meeting on July 26th.
Commissioner Winters seconded the motion.
Vote: Commissioner Lovato Yes
Commissioner Winters Yes
Commissioner Woodruff Yes
Commissioner Wood Yes
Chairperson Fuller Yes
Unanimously – GPZ-5-2023 – Continued
ZT-5-2023
West Valley City
A zone text change to the Zoning (Title 7) and Condominium (Title 9) Ordinances to
comply with State code changes from HB 406 and SB 174.
City staff is proposing an ordinance change to amend the Zoning (Title 7) and Condominium
(Title 9) Ordinances to comply with State code changes from HB 406 and SB 174. Both HB 406
and SB 174 were passed by the Utah Legislature in the 2023 General Session of the Utah
Legislature and later signed by the governor. Copies of these bills are included with this report.
Among other changes, the bills prohibit cities from requiring an applicant to post an
improvement completion bond for landscaping on private property (HB 406) and prohibit the
legislative body of a municipality from reviewing subdivision applications for single-family
dwellings, two-family dwellings, or townhomes (SB 174).
Instead of having a separate subdivision process for subdivision applications for single-family
dwellings, two-family dwellings, or townhomes, staff is proposing that the subdivision review
process be amended to not require the approval of the City Council for any subdivision,
especially since these decisions are administrative.
Staff Alternatives:
1. Approval. The ordinance should be approved as proposed by staff to comply with State
law.
2. Continuance.
Discussion: Steve Pastorik presented the application. While reviewing this proposal and
speaking with the City Manager, he said staff has decided to continue this
application for four weeks.
Commissioner Winters asked Steve to review the reasons behind this request.
Steve presented the background of this application for the Commission.
Commissioner Winters said he would assume the issue with the landscaping bond
would be being unable to open a business because the weather prevents them
from installing it. Steve said that the bills passed by the Utah Legislature prohibit
the City from posting a bond on finishing the required landscaping. Therefore, the
landscaping would be code enforcement issue.
Commissioner Winters asked Steve what the benefit would be for subdivisions
not needing to be approved by the City Council. Steve explained that currently,
there is a need for more affordable housing, and the longer it takes to go through
the approval process, the higher the cost. He stated that this would eliminate any
pressure the Council feels to deny a subdivision from those who speak in
opposition during the meetings because it is an administrative decision. Therefore,
the City can’t deny it if it meets the minimum requirements.
Motion: Commissioner Winters motioned to continue ZT-5-2023 to the August 9th
public hearing.
Commissioner Lovato seconded the motion.
Vote: Commissioner Lovato Yes
Commissioner Winters Yes
Commissioner Woodruff Yes
Commissioner Wood Yes
Chairperson Fuller Yes
Unanimously – ZT-5-2023 – Continued
SA-4-2023
The Shoppes at Lake Park Phase 2 Lot 4A Amended
2893 South 5600 West
C-2 Zone
BACKGROUND
Trevor Gasser, is requesting a plat amendment for lot 4A of the Shoppes at Lake Park Phase 2
Subdivision. The purpose for the amendment is to create an additional building lot from the last
remaining vacant lot in the subdivision.
STAFF/AGENCY CONCERNS:
There are no staff or agency concerns with this application.
ISSUES:
The Shoppes at Lake Park Phase 2 was recorded with the Salt Lake County Recorder’s Office in
June 2007. Lots 4 and 5 were platted as part of that subdivision. In 2016, a boundary adjustment
was approved between said lots to increase the size of lot 5. The adjustment allowed for the
Burlington clothing store to be constructed. The result of that adjustment left lot 4A with an area
of approximately 4.3 acres.
Mr. Gasser is now proposing to add an additional building lot and is seeking a plat amendment of
lot 4A. The proposed plat amendment will consist of 2 lots on 4.3 acres. Lot 4B will comprise
3.5 acres while lot 4C will consist of .84 acres. The property is zoned C-2 which requires a
minimum lot size of 20,000 square feet.
There are no major staff or agency concerns with this application as they have been addressed as
part of the original subdivision application. Furthermore, the existing building lot and site
improvements have been reviewed and approved by the Planning Commission in conjunction with
the 5600 West Overlay Zone. The proposed plat amendment will allow for construction of the last
remaining property in the Shoppes at Lake Park Subdivision.
There is one item that will need to be addressed as a result of the amended plat. The property
owner will need to prepare cross access and parking agreements that will need to be recorded along
with the amended subdivision plat – if not already done. In addition, storm water agreements may
also need to be amended as the existing drainage system will impact both lots.
STAFF ALTERNATIVES:
A. Approval of the amendment to lot 4A of the Shoppes at Lake Park Phase 2 Subdivision.
B. Continuance to allow for more discussion regarding the application.
Discussion: Steve Lehman presented the application. Trevor Gasser, the applicant, said Steve
did a great job explaining the application. He asked if the Commission had any
questions for him. There was no further discussion.
Motion: Commissioner Lovato motioned to approve SA-4-2023.
Commissioner Winters seconded the motion.
Vote: Commissioner Lovato Yes
Commissioner Winters Yes
Commissioner Woodruff Yes
Commissioner Wood Yes
Chairperson Fuller Yes
Unanimously – SA-4-2023 – Approved
C-8-2023
Comcast – J5 Infrastructure Partners
3362 S 4000 W
RB Zone (0.27 Acres)
The applicant, J5 Infrastructure Partners, representing Comcast, is requesting conditional use
approval for a public utility installation. This property is zoned RB (Residential Business) and
the West Valley City General Plan designates this area as General Commercial. The property to
the south is zoned RB (Residential Business), the properties to the east and west are zoned C-2
and to the north it is zoned R-2-8 (two unit residential). Adjacent land uses include a single unit
dwelling to the south, duplexes owned by the Housing Authority of Salt Lake County to the
north and Jordan Valley Hospital to the west.
This property was originally approved for a AT&T fiber optic cable switching facility in 2000
(C-5-2000). This was under the original R-1-8 zoning with the original home in a 20’ x 20’
fenced area. Since that time the home was destroyed by fire (2005) and the property was rezoned
in 2006. The home was rebuilt however never finaled or occupied. Comcast purchased the
property in 2012 and at this time would like to demolish the structure and expand the utility
facility on the lot with additional equipment including a backup generator.
The RB zone requires a 25’ front yard setback and that area will be landscaped in a similar
manner to the existing site with lawn, trees and shrubs. The access points and spacing is
currently being reviewed by Public Works for the change of use. Also, sometime in the last year
a gravel access lane was added to the south side of the property. Since this will no longer be
assessable through the gate staff recommends that this be removed and replaced with
landscaping as part of the access re-design. The parcel is also adjacent to residential uses on the
north and south sides so there must be a 10’ landscaped setback, including one tree, spaced every
30 ft. along those property lines. The required shrubs/50% live plant material adjacent to the
trees may be relocated outside of the fenced in area to spaces that are more visible. Screening is
also required adjacent to the residential uses. Since those areas are also designated as General
Commercial in the General Plan the application is requesting to do a solid Trex composite fence
in lieu of a masonry wall.
A backup generator is also proposed for this facility. That equipment can not be located in the
10’ setback adjacent to residential and staff also recommends that this equipment be spaced as
far away as possible to the adjacent residential uses and should be located more central to the
facility.
Lastly, all lighting throughout the facility and must be designed to meet section 7-9-113 of the
City Code and not disturb the adjacent residential uses.
Staff Alternatives:
Approval, subject to the resolution of any concerns raised at the public hearing, as well as the
following conditions:
1. The site shall be repaired, improved and landscaped per the approved plans including the
following:
a) There shall be a 25’ front setback that is landscaped.
b) There shall only be one paved access and the existing gravel access shall be
removed and replaced with landscaping.
c) There shall be a 10’ setback adjacent to residential uses that includes 1 tree every
30’.
d) The required shrubs/50% live plant material in the 10’ setback behind the screen
fence may be relocated to the front setback area.
2. Fencing adjacent to residential may be a solid Trex Composite material as submitted and
is not required to be masonry based off the general plan designation of those adjacent
lots.
3. The generator on site must maintain a minimum 10’ setback to residential and shall be
centered/setback as far as possible from the adjacent residential uses.
4. Lighting on site shall comply with section 7-9-113 of the West Valley City Municipal
Code and not negatively impact adjacent residential uses.
5. Subject to review upon valid complaint.
Continuance, to allow for the resolutions of any issues raised at the public hearing or to allow
for a revised site/landscape plans to be submitted.
Discussion: Jody Knapp presented the application. Commissioner Winters asked if the home
to the south was occupied and if it was a business. Jody, it is just one house, and it
looks to be owner-occupied. Commissioner Winters asked if Jody had said north
of the subject property is the Granger Development. Jody said yes, and it contains
three and fourplexes.
Commissioner Winters asked if the lighting would need to be directional, so it
doesn’t cast light everywhere. Jody said the code is quite specific and states there
can be zero light spillover at the property line.
Motion: Commissioner Wood motioned to approve C-8-2023 subject to the five
staff alternatives outlined in the staff report.
Commissioner Winters seconded the motion.
Vote: Commissioner Lovato Yes
Commissioner Winters Yes
Commissioner Woodruff Yes
Commissioner Wood Yes
Chairperson Fuller Yes
Unanimously – C-8-2023 – Approved
C-15-2023
Peak Industrial Inc. - JCB
4527 West SR-201 S. Frontage Rd.
M Zone (3.0 Acres)
The applicant, Peak Industrial Inc. representing Peak JCB, is requesting conditional use approval
for outside storage and display of heavy construction equipment in conjunction with a sales,
rental and service facility located at 4527 West SR-201 S. Frontage Rd. The zoning for this area
is M, manufacturing. The West Valley City General Plan designates this area as light
manufacturing. The surrounding zone is manufacturing on all sides. The surrounding uses
include similar freight/trucking uses with CR England and Asahi Refining is located to the west.
The applicant proposes to lease a 3 acre area from CR England and improved it for the requested
use. The building on site will be 80’ x 154’ (12,320 sqft) and includes 4 service bays, a wash
bay, showroom, parts storage and offices. The building will be constructed of metal with a glass
façade portion for the office/showroom and metal canopy accents. The building is not required to
meet the Commercial Design Standards.
Landscaping is required along the frontage of the property in compliance with the standards for
High Image Arterials (7-10) and the site is required to have a minimum of 5% landscaping. The
applicant is requesting display of merchandise within that 20’ setback. Concrete pads will be
incorporated in to the frontage landscape design and would maintain a 10’ setback from the
right-of-way per 7-7-118.
All required parking and maneuvering areas for vehicles will be located on hard surfacing with
the proper lighting and landscaping per 7-9 of the WVC Municipal Code. There will be right-of-
way improvements required which will be part of the Public Works review of this application
including curb, gutter, sidewalk and street lights.
There will be outside storage on the south end of the lot as well as on the west side of the
building. The south area will be surfaced with gravel and used for storage of new, used, rental
and service equipment. There are also pre-cast concrete material/dirt bins provided in this area
for customer training on the equipment. There will be no storage of junk or salvage uses. This
area is behind the building and is not visible from public view. The racking on the west side will
be no greater than 5’ in height and is for storage of machine implements like buckets, pallet forks
and hydraulic attachments. This area will also be surfaced with gravel to provide access and
maneuvering area for the building service bays and will be screened with a 6’ tall chain link
fence with slats. No storage will be allowed in the parking areas in front of the building.
Staff Alternatives:
Approval, subject to the resolution of any concerns raised at the public hearing as well as the
following conditions:
1. The property shall be used to sell, rent and service new and used construction
equipment which includes a maintenance facility, wash bay, office and
storage/display yard. There shall be no junk storage or salvage uses at this site.
2. The outside storage areas may be surfaced with gravel and shall be maintained free of
weeds.
3. Outside storage is only permitted in areas on the south side of the building where it is
screened from public view and on the west side of the building with
fencing/screening.
4. All parking areas for vehicles must be located on hard surfacing with the appropriate
lighting and landscaping for the intended use.
5. The overall minimum required landscaping for the site is 5% and the frontage shall be
designed in accordance with the Landscaping Standards for High Image Arterials (7-
10).
6. Display of merchandise is allowed on concrete pads along the frontage and must
maintain a 10’ setback to the property line per 7-9-118.
7. All signage and dumpster locations shall comply with the standards set forth in the
West Valley City Municipal Code.
8. All requirements of affected departments and agencies must be met, including but not
limited to WVC Public Works.
9. This use is subject to review upon a valid complaint.
Continuance, to allow for the resolutions of any issues raised at the public hearing and to allow
time for the applicant to submit more detailed information on the project.
Discussion: Jody Knapp presented the application. Jim Pugh, the applicant, said they are
excited to expand in West Valley City. and the staff is excellent to work with.
Motion: Commissioner Lovato motioned to approve C-15-2023 subject to the nine
staff alternatives outlined in the staff report.
Commissioner Woodruff seconded the motion.
Vote: Commissioner Lovato Yes
Commissioner Winters Yes
Commissioner Woodruff Yes
Commissioner Wood Yes
Chairperson Fuller Yes
Unanimously – C-15-2023 – Approved
PLANNING COMMISSION BUSINESS
Vote for Chair and Vice Chair
Motion: Commissioner Woodruff motioned to keep Brent Fuller as Chair and Matthew
Lovato as Vice Chair.
Commissioner Winters seconded the motion.
Vote: Commissioner Lovato Yes
Commissioner Winters Yes
Commissioner Woodruff Yes
Commissioner Wood Yes
Chairperson Fuller Yes
Unanimously – Chair/Vice Chair– Approved
There being no further business, the meeting adjourned at 4:55 pm.
Respectfully submitted,
Kirsten Hunt, Administrative Assistant
Agenda
WEST VALLEY CITY PLANNING COMMISSION AGENDA
7/12/2023 at 4:00 p.m.
The Public Hearing will be held in person in the City Council Chambers at West Valley City Hall 3600 Constitution
Boulevard, West Valley City, UT 84119, and electronically via Zoom at:
https://us06web.zoom.us/j/88955119737
A Study Session will be held a week prior to the Public Hearing on Wednesday at 3:30 p.m. and a Planning Commission Pre-
Meeting will be held the day of the Public Hearing at 3:30 p.m.
Preliminary application information will be available here by 6:00 pm on Tuesday, July 4, 2023. Staff analyses, as well as any
final application materials, will be available by 12:00 pm on Monday, July 10, 2023.
Testimonies for or against the proposed applications can be provided to the Planning Commission during the public hearing or
in writing prior to the hearing. If you wish to submit written comments, please be advised that this should be provided to the
Planning Staff member assigned to the application at least seven (7) days prior to the meeting to enable the Planning
Commission to properly consider the comments.
___Fuller ___Lovato ___McEwen ___Porter ___Winters ___Wood ___Woodruff
GENERAL PLAN/ZONE CHANGE APPLICATION
GPZ-5-2023 Petition by CONNOR SHEPPARD requesting a General Plan change from Medium Density Residential
(7 to 12 units/acre) and Large Lot Residential (2 to 3 units/acre) to Mixed Use and a zone change from R-1-
8 (Single Unit Dwelling Residential, minimum lot size 8,000 square feet) and A-2 (Agriculture, minimum
lot size 2 acres) to MXD (Mixed Use). The property is located at 2736 and 2856 S Corporate Park Dr and
5035 W Lake Park Blvd on 40.4 acres. (Staff – Steve Pastorik at 801-963-3545 or steve.pastorik@wvc-
ut.gov) Continued from the June 28, 2023 public hearing
ZONE TEXT CHANGE APPLICATIONS
ZT-5-2023 Petition by WEST VALLEY CITY requesting amendments to the Zoning (Title 7) and Condominium
(Title 9) Ordinances to comply with State code changes from HB 406 and SB 174. (Staff – Steve Pastorik
at 801-963-3545 or steve.pastorik@wvc-ut.gov)
SUBDIVISION APPLICATIONS
SA-4-2023 Petition by DEREK GASSER requesting preliminary approval for the Shoppes at Lake Park Phase II Lot
4A Amended subdivision. This application will amend lots 4 and 5 of the Shoppes at Lake Park Phase II.
The proposed plat will consist of 2 lots 4.3 acres. The subdivision is located at approximately 2893 South
5600 West and is zoned C-2 (General Commercial). (Staff – Steve Lehman at 801-963-3311 or
steve.lehman@wvc-ut.gov)
CONDITIONAL USE APPLICATIONS
C-8-2023 Petition by J5 INFRASTRUCTURE PARTNERS requesting conditional use approval for a utility
shelter and equipment expansion for Comcast. The property is located at 3362 South 4000 West on .27 acres
and is zoned RB (Residential Business). (Staff – Jody Knapp at 801-963-3497 or jody.knapp@wvc-
ut.gov)
C-15-2023 Petition by PEAK INDUSTRIAL INC. requesting conditional use approval for outside storage and
display for Peak JCB, heavy equipment service. The property is located at 4527 W. SR-201 S. Frontage Rd.
on 3.0 acres and is zoned M (Manufacturing). (Staff – Jody Knapp at 801-963-3497 or jody.knapp@wvc-
ut.gov)
PLANNING COMMISSION BUSINESS
Vote for Chair and Vice Chair
West Valley City does not discriminate on the basis of race, color, national origin, sex, religion, age, sexual orientation or disability in employment or the provision of services. If you are planning to
attend this public meeting and, due to a disability, need assistance in understanding or participating in the meeting, please notify the City eight or more hours in advance of the meeting. We will try
to provide whatever assistance may be required. The person to contact for assistance is Kirsten Hunt, 801-963-3282.
Get email alerts for West Valley City
A daily email when new agendas and minutes are posted.