Mayor & Common Council Meetings
Regular MeetingWestminster, MD · December 23, 2024
Agenda
AGENDA
CITY OF WESTMINSTER
Special Mayor and Common Council Meeting
Monday, December 23, 2024, at 3:00 p.m.
City Administration Building, 45 West Main Street, Westminster, MD 21157
1. CALL TO ORDER
2. BID
A) Award of Bid to Conewago Enterprises, Inc., for Construction of the PUREWater Westminster
Water Reuse Facility in the amount of $25,492,599.00. – City Administrator Imhulse
3. ADJOURNMENT
PUREWater Westminster Project
and
To: Mayor and Common Council
From: Sara Imhulse, City Administrator
Date: December 20,2024
Re: Award of Bid – Construction of PUREWater Westminster Water Reuse Facility
Background
Westminster, like other cities across the United States, is experiencing increased, recurring drought conditions.
In response, the city has been proactive in its water supply planning to ensure local water reliability now and for
the future. One forward-thinking way the City is planning for the future is by launching PUREWater Westminster,
which will use proven technology to construct an indirect potable water reuse facility to provide a safe,
sustainable, and drought-resistant water source.
The project was advertised on EMMA with a pre-bid meeting and bid due dates of November 7, 2024, and
December 18, 2024, respectively. A total of five bids were received.
Name Total Bid Amount
Conewago Enterprises, Inc. $25,492,599.00
M2 Construction LLC $26,462,942.00
American Contracting and $27,495,000.00
Environmental Services
W.M. Schlosser Company, Inc. $27,933,000.00
CPP Construction Company, Inc. $31,534,000.00
Conewago Contractors, Inc. was the lowest bidder. The City has an extensive and successful history of partnering
with Conewago to complete Public Works projects. Examples include the original construction of the Water
Reclamation Facility at its current location in the early 1970’s, the upgrade and expansion of the facility in the
late 1980’s, the Biological Nutrient Removal (BNR) upgrade in the mid 2000’s, and the Water Treatment facility
and Gesell well in the mid 2010’s.
Recommendation
City staff has reviewed and evaluated references and the proposal from Conewago Enterprises, Inc. in the total
amount of $25,492,599.00 and finds it to be acceptable with regard to the City’s needs.
Staff recommends that the Mayor and Common Council award the bid to Conewago Contractors, Inc. in total
amount of $25,492,599.00, for construction of the PUREWater Westminster Water Reuse Facility.
Attachments
• Review of Bids by Watek Engineering
• Conewago Contractors, Inc. reference letter
• Bid Proposal from Conewago Contractors, Inc.
____________________________ The Water Technology Engineers
Sara Imhulse December 19, 2024
City Administrator
City of Westminster
45 West Main Street
Westminster, MD 21157
REF: PUREWater Westminster Facility
Project No. A-24-03
RFB #25-13 Bid Evaluation
Dear Sara,
We have reviewed the bids submitted by the five (5) bidders and offer the following comments:
Attached is the bid summary along with the Engineer’s Estimate including Contingency.
A) Bid Forms
Bid Forms for all five bidders were evaluated.
No math errors were found in the Bid Forms. However, there were written typos for the
following:
• M2 Construction, LLC Bid Item 5 was written as $2,500,00 instead of $2,500,000
• WM Schlosser Company, Inc. Contingent Item 14 was written as $8,000 instead of
$8,600.
Neither of these typos affect the overall total bid prices listed by each bidder.
All five bidders have listed manufacturers that were specified for the Reverse Osmosis (RO),
Granular Activated Carbon (GAC), and Ultraviolet (UV) systems. The apparent low bidder,
Conewago Enterprises, Inc. has specified Biwater for the RO System, New Terra for the
GAC System, and DeNora for the UV System.
B) Addenda
All bidders have acknowledged receiving Addenda Numbers 1 through 3 on their Bid Forms.
C) Bid Price Evaluation
The apparent low bidder is Conewago Enterprises, Inc. with a Total Base Bid Price of
$24,140,379.00, which is approximately 27% above the Engineer’s Estimate.
Total Bid Prices including Contingent and Cash Allowance Items for all bidders are
summarized in the table below.
604 South Frederick Avenue Suite 309 Gaithersburg, MD 20877 Phone: 240-780-7676 www.watek.com
Contractor Total Bid Price
Conewago Enterprises, Inc. $25,492,599.00
M2 Construction LLC $26,462,942.00
American Contracting & Environmental Services, Inc. $27,495,000.00
WM Schlosser Company, Inc. $27,933,000.00
CPP Construction Company, Inc. $31,534,000.00
Bid prices were generally in the range of the Engineer’s Estimate, although several
categories were higher including mechanical/plumbing/fire protection, electrical work, and
installation of process equipment. This can be attributed to the reduced labor force, delays
in the supply chain as a result of the COVID-19 pandemic, and availability of materials.
D) Required Forms
All bidders submitted the required attachments with their bids as listed in the Instructions to
Bidders.
M2 Construction LLC did not sign the revised Equal Opportunity Employer Form or revised
Affidavit of Public Contracting Eligibility Form included in Addendum No. 3. However, the
original forms were included and signed.
We assume City will check and confirm bond, insurance, and other requirements for all
bidders.
E) Bidders’ Qualifications
All bidders completed and submitted their Experience Record and References forms by the
December 4, 2024 due date. The City and WATEK have checked the experience and
qualifications of the apparent low bidder and consider them qualified for successful
completion of this project. In fact, Conewago Enterprises, Inc. was the contractor on two
previous City projects where WATEK was the Engineer: Cranberry Water Treatment Plant
and Addition of Membrane Filtration System at Gesell Well No. 12.
Therefore, based on the above, we recommend awarding the contract to the apparent low
bidder, Conewago Enterprises, Inc., who is considered well qualified to perform the work
required under this contract.
During your review, if you need additional information or have any questions, please do not
hesitate to contact me.
Sincerely,
Ben Movahed, P.E., BCEE
President
WATEK Engineering
604 South Frederick Avenue Suite 309 Gaithersburg, MD 20877 Phone: 240-780-7676 www.watek.com
American Contracting & CPP Construction Company, Engineer's Estimate With
Conewago Enterprises, Inc. M2 Construction LLC WM Schlosser Company, Inc.
Environmental Services, Inc. Inc. Contingency
Unit of Estimated
Item Description Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total
Measure Quantitiy
1 Mobilization/Demobilization, engineer’s trailer, and other general costs Lump Sum 1 - $1,088,300.00 - $1,255,480.62 - $1,374,750.00 - $2,100,000.00 - $1,620,000.00 - $559,132.80
Site work, excavation, backfill, grading, yard piping, fire hydrants, manholes, ROC pump
2 station wet well and vault, new pavements, sidewalks, sediment/erosion control, stormwater Lump Sum 1 - $1,580,300.00 - $1,000,000.00 - $3,954,629.00 - $2,500,000.00 - $1,970,000.00 - $1,515,113.04
management, landscaping, site utilities, and site restoration
Demolition and removal of all existing structures, footings, slabs, underground septic and
leachate tanks, utilities (water, sewer, electrical), utility pole(s), stockpile, culvert pipes, HVAC
3 Lump Sum 1 - $163,200.00 - $275,000.00 - $478,404.00 - $400,000.00 - $775,000.00 - $110,400.00
system, electrical panels, kitchen appliances, furniture, lab cabinets, driveways in accordance
with Specification Section 02050 and Appendix D
Building structures including footings, slabs, ADA ramp, exterior landing platforms, interior
and exterior walls, concrete tanks, pipe gallery, all architectural features, doors, windows,
4 overhead doors, trench drains, casework, control room console, handrails, hatches, Lump Sum 1 - $6,408,513.28 - $6,500,000.00 - $7,626,199.00 - $7,249,309.00 - $12,209,000.00 - $7,383,276.00
platforms, stairs, ladders, grating, equipment pads, mezzanines, bridge crane, painting and
coating, and all building and structural related items
Building mechanical, plumbing, fire protection and alarm systems, sinks, faucets, plumbing
fixtures, water fountains, water heaters, fire sprinkler system, fire extinguishers, hose bibs and
5 Lump Sum 1 - $2,257,400.00 - $2,500,000.00 - $1,689,993.00 - $1,800,000.00 - $2,300,000.00 - $510,019.02
hose reels, valves, exhaust fans, louvers, dampers, geothermal, ductwork, unit heaters,
dehumidification system, and all other HVAC and plumbing related items
Electrical work, conduits and cables for power, fiber optics, instrumentation, and controls,
6 generator, ATS, VFDs, MCC/switchgear, electrical panels, disconnects, lighting, switches, Lump Sum 1 - $4,440,100.00 - $3,000,000.00 - $3,261,075.00 - $2,700,000.00 - $3,100,000.00 - $1,794,000.00
incoming power connection, and all other electrical related items
Furnish Reverse Osmosis (RO) System and all related instrumentation/controls, RO control
A panel, cartridge filters, RO Clean in Place (CIP) systems per Spec Sections 11400, 11410, Lump Sum 1 - $1,360,828.00 - $1,700,000.00 - $1,283,800.00 - $1,315,000.00 - $1,300,000.00 - $1,228,200.00
11415, and programming and services specified in RO specifications
Furnish Ultraviolet (UV) reactors, UVT analyzer, UV control panels, and programing and
B Lump Sum 1 - $318,000.00 - $385,000.00 - $278,000.00 - $380,000.00 - $300,000.00 - $324,000.00
services as specified in section 11390
C Furnish Granular Activated Carbon (GAC) System and valves per Spec Section 11395 Lump Sum 1 - $577,700.00 - $1,000,000.00 - $510,000.00 - $562,000.00 - $550,000.00 - $576,000.00
D Furnish Decarbonation System and blowers per Spec Section 13520 Lump Sum 1 - $90,100.00 - $120,000.00 - $167,000.00 - $91,000.00 - $90,000.00 - $108,000.00
E Furnish Vertical Turbine Pumps per Spec Sections 11214 and 11215 Lump Sum 1 - $699,335.00 - $915,000.00 - $659,750.00 - $1,187,000.00 - $850,000.00 - $840,000.00
7
Furnish lime feed system including lime hoper, dust collector, slurry tank, and control panel
F Lump Sum 1 - $172,292.40 - $70,000.00 - $35,084.00 - $79,000.00 - $50,000.00 - $72,000.00
per Spec Section 11238
Furnish chemical feed systems including anti-foulant, sodium hypochlorite, caustic soda, and
G Lump Sum 1 - $124,232.00 - $160,000.00 - $146,000.00 - $155,000.00 - $125,000.00 - $126,000.00
hydrogen peroxide feed systems per Spec Sections 11235 and 11237
H Furnish permeate flush tank and pumps, and related instruments per Spec Section 11291 Lump Sum 1 - $49,820.00 - $50,000.00 - $45,210.00 - $67,000.00 - $125,000.00 - $54,000.00
Furnish vertical turbine mixer per Spec Section 11224, static mixer per spec section 11226,
sample pumps per spec section 11295, ROC pumps and control cabinet per spec section
I Lump Sum 1 - $197,546.94 - $340,000.00 - $205,968.00 - $255,000.00 - $65,000.00 - $162,780.00
11380, laboratory equipment and supplies per spec section 12400, and all other process
equipment not listed above
Furnish preselected UF system including strainers, UF racks, modules, valve racks, UF CIP,
J UF air system, UF control panel, UF feed and filtrate turbidity panels, and programming and Lump Sum 1 - $1,504,611.38 - $1,504,611.38 - $1,504,611.38 - $1,504,611.38 - $1,504,611.38 - $1,440,000.00
services specified in spec section 13220
Instruments, controls, CSI programming services, PLC programming and HMI software, MCP
8 Lump Sum 1 - $678,500.00 - $900,000.00 - $513,519.00 - $900,000.00 - $500,388.62 - $514,800.00
per spec sections 17300, 17400, 17450, and 17500
Installation of all vendor supplied process equipment listed above in Items 7A thru 7J, and all
process piping, chemical tubing, vent pipes, valves, valve actuators, pipe supports, portable
9 Lump Sum 1 - $1,848,700.00 - $3,000,000.00 - $2,334,955.00 - $2,800,000.00 - $2,476,000.00 - $1,370,920.00
hoist, wall and tank sleeves, expansion couplings, painting and coating of process pipes, and
all other process related items not included in Item 7J.
Furnish and install dechlorination facility including site work, pavement, sidewalk, precast
building, incoming power, chemical system, sample pump, heater, fan, louver, eye wash,
10 Lump Sum 1 - $478,400.00 - $250,000.00 - $349,581.00 - $185,000.00 - $200,000.00 - $192,000.00
chlorine analyzer, flow switch, static mixer, valves, piping, and all other items shown on
dechlorination facility drawings
11 All other miscellaneous work not listed above Lump Sum 1 - $102,500.00 - $200,000.00 - $1,000.00 - $501,000.00 - $100,000.00 - $50,000.00
Total Base Bid Price $24,140,379.00 $25,125,092.00 $26,419,528.38 $26,730,920.38 $30,210,000.00 $19,000,000.00
12 Pressure Grouting - Injected Grout CY 600 $620.00 $372,000.00 $630.00 $378,000.00 $449.00 $269,400.00 $468.00 $280,800.00 $750.00 $450,000.00 $0.00
13 Pressure Grouting – Injection Pipe LF 1,350 $62.00 $83,700.00 $60.00 $81,000.00 $47.00 $63,450.00 $49.00 $66,150.00 $60.00 $81,000.00 $0.00
14 Sinkhole Remediation – Aggregate CY 40 $250.00 $10,000.00 $100.00 $4,000.00 $88.00 $3,520.00 $215.00 $8,600.00 $700.00 $28,000.00 $0.00
15 Sinkhole Remediation – Injected Grout CY 40 $745.00 $29,800.00 $700.00 $28,000.00 $554.00 $22,160.00 $582.00 $23,280.00 $700.00 $28,000.00 $0.00
16 Micropiles (final production pile) LF 2,000 $198.00 $396,000.00 $185.00 $370,000.00 $142.00 $284,000.00 $160.00 $320,000.00 $120.00 $240,000.00 $0.00
17 Micropile Load Test EA 2 $23,475.00 $46,950.00 $22,500.00 $45,000.00 $31,471.00 $62,942.00 $31,000.00 $62,000.00 $40,000.00 $80,000.00 $0.00
18 Overexcavation and Backfill CY 50 $100.00 $5,000.00 $25.00 $1,250.00 $120.00 $6,000.00 $125.00 $6,250.00 $200.00 $10,000.00 $0.00
19 Gravel Removal CY 500 $36.00 $18,000.00 $45.00 $22,500.00 $22.00 $11,000.00 $32.00 $16,000.00 $50.00 $25,000.00 $0.00
Cash Allowance for additional equipment, material or work if requested by the City in Writing,
20 N/A N/A - $100,000.00 - $100,000.00 - $100,000.00 - $100,000.00 - $100,000.00 $0.00
Billed as Time and Material
21 Cash Allowance for computers, computer software, and printers per Spec Section 17450 N/A N/A - $30,000.00 - $30,000.00 - $30,000.00 - $30,000.00 - $30,000.00 $0.00
22 Cash Allowance for additional soil borings by the Geotechnical Consultant per Appendix E N/A N/A - $27,000.00 - $27,000.00 - $27,000.00 - $27,000.00 - $27,000.00 $0.00
New Electrical and Gas Service – Allowance to cover actual cost charge by BGE to
23 N/A N/A - $150,000.00 - $150,000.00 - $150,000.00 - $150,000.00 - $150,000.00 $0.00
Contractor for new electrical and gas services identified in the Contract Documents.
24 Below Grade 2” Ductbank LF 100 $126.00 $12,600.00 $80.00 $8,000.00 $76.00 $7,600.00 $80.00 $8,000.00 $80.00 $8,000.00 $0.00
25 Below Grade 4” Ductbank LF 100 $168.00 $16,800.00 $86.00 $8,600.00 $79.00 $7,900.00 $85.00 $8,500.00 $150.00 $15,000.00 $0.00
26 ¾” Type A-1 Conduit LF 500 $26.00 $13,000.00 $60.00 $30,000.00 $14.00 $7,000.00 $60.00 $30,000.00 $30.00 $15,000.00 $0.00
27 ¾” Type E-1 Conduit LF 500 $51.00 $25,500.00 $80.00 $40,000.00 $21.00 $10,500.00 $75.00 $37,500.00 $40.00 $20,000.00 $0.00
28 No. 12 AWG, Type THWN Conductors LF 1000 $1.67 $1,670.00 $1.40 $1,400.00 $1.00 $1,000.00 $5.00 $5,000.00 $2.00 $2,000.00 $0.00
29 No. 14 AWG, Type THWN Conductors LF 1000 $1.35 $1,350.00 $1.10 $1,100.00 $1.00 $1,000.00 $5.00 $5,000.00 $2.00 $2,000.00 $0.00
30 No. 10 AWG, Type THWN Conductors LF 500 $2.00 $1,000.00 $2.00 $1,000.00 $1.00 $500.00 $6.00 $3,000.00 $3.00 $1,500.00 $0.00
31 No. 16 TSP Instrumentation Cable LF 500 $3.70 $1,850.00 $2.00 $1,000.00 $1.00 $500.00 $10.00 $5,000.00 $3.00 $1,500.00 $0.00
32 Exterior Building Signage Lump Sum 1 - $10,000.00 - $10,000.00 - $10,000.00 - $10,000.00 - $10,000.00 $0.00
Total Contingent and Cash Allowance Bid Price $1,352,220.00 $1,337,850.00 $1,075,472.00 $1,202,080.00 $1,324,000.00 $0.00
TOTAL BID PRICE $25,492,599.00 $26,462,942.00 $27,495,000.38 $27,933,000.38 $31,534,000.00 $19,000,000.00