Park and Recreation Committee
Regular MeetingWeston, WI · March 25, 2024
Minutes
Village of Weston, Wisconsin
MEETING MINUTES OF THE PARK & RECREATION COMMITTEE MEETING
Monday, March 25th, 2024, 5:00 p.m.
AGENDA ITEMS
1. Meeting called to order by Chair Weiland @ 5:00 P.M.
2. Pledge Allegiance to the Flag
3. Roll Call by Recording Secretary: Jessica Falkowski
Member Present
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb (VC) YES
Esker, Roger YES
Weiland, Jamie (C) YES
Village Staff in attendance: Falkowski (Clerk), Administrator Gebert, and Osterbrink
4. Approval of minutes from previous meeting: February 26th, 2024.
*M/S/P Esker/Ermeling: to approve the February 26th, 2024, minutes.
Yes Vote: 5 No Vote: 0 Abstain: 0 Not Voting: 0 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb YES
Esker, Roger YES
Weiland, Jamie YES
5. Public Comments.
NONE.
Village of Weston Parks and Recreation Committee Meeting March 25, 2024
EDUCATIONAL PRESENTATIONS & REPORTS
NONE
POLICY ISSUES – DISCUSSIONS/RECOMMENDATIONS
6. Discussion and possible action Arbor Day Proclamation.
Osterbrink stated the Arbor Day Proclamation is one of the requirements on the application to
achieve Tree City USA status. The Village has been part of Tree City USA for the past 13
years. Besides the proclamation the Village also needs to celebrate Arbor Day by planting
trees. National Arbor Day is April 26th, but the Village is choosing Friday, May 24th, 2024 as
our Arbor Day observance. Osterbrink also stated that the Park & Recreation Committee also
serves as the Tree Board.
.
*M/S/P Ermeling/Esker: to recommend approval of Proclamation P-24-001 designating
May 24, 2024 as Arbor Day in the Village of Weston.
Yes Vote: 5 No Vote: 0 Abstain: 0 Not Voting: 0 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb YES
Esker, Roger YES
Weiland, Jamie YES
7. Discussion and possible action Authorizing Resolution.
Osterbrink stated at the February meeting, the Committee discussed the proposed
improvements at Yellowbanks Park and to move forward with applying for a state and federal
grant. An Authorizing Resolution is a requirement of the Village in order to apply for a grant.
The resolution shows the commitment from the Village and authorizes a Village staff member
to sign all the necessary documents needed. Falkowski offered to be the designated staff
member authorized to submit a grant application and complete all necessary paperwork
required for a grant.
The grant application is due May 1, 2024, and is awarded August/September if approved. If
approved the Village would have 2 years to complete the project once the signed agreement is
completed.
Village of Weston Parks and Recreation Committee Meeting March 25, 2024
Weiland stated that the Village is responsible for 50% of the cost if awarded a grant.
Osterbrink confirmed and stated that the 50% matching could be cash, labor, equipment, and
materials. Osterbrink said there is an estimated $33,000 in the budget for the project that
could be applied towards the 50% matching.
Corvino asked what the current grant amount is. Osterbrink responded, $96,000.
Weiland asked what fund the money would come from. Osterbrink stated the Village Board
decided the CIP fund. Administrator Gebert asked if there is a cash commitment. Osterbrink
responded there is no cash commitment. The Village’s portion could be met through labor,
equipment, and materials.
*M/S/P Corvino/Clark: to recommend approval of Resolution 2024-008.
Yes Vote: 5 No Vote: 0 Abstain: 0 Not Voting: 0 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb YES
Esker, Roger YES
Weiland, Jamie YES
8. Discussion and possible action Development Plan for Kennedy Park.
Osterbrink assembled a draft development master plan with suggestions from Gebert. The
plan includes a timeline of tasks that have already been completed and a check list of steps
to keep the project moving forward in a timely manner. The Kennedy Park Phasing Plan is a
multi-year project so the development plan will also be used for documentation.
Currently, Village staff is preparing a request for proposals for marketing plan and distribute to
qualified consultants and a request for proposals for construction documents. The Village
Board approved moving forward with the request for proposals and sending them out as
quickly as possible. Once completed then the next step is to set goals for fundraising.
Corvino asked for clarification of when the ARPA funds need to be spent by. Osterbrink
stated that we need to have signed contracts by the end of 2024 and the funds spent by the
end of 2026. Osterbrink stated the urgency of completing the RFP’s, contracting with a
marketing firm, having completed construction documents, bidding phase 1 and award a
company before the end of the year. Then the designated ARPA funds would be fully
invested by the end of 2024. The Village Board approved $766,166.01 to be used towards
the development of Kennedy Park. Estimated costs for construction documents are
$100,000, $25,000 for marketing firm, and $600,000 to $700,000 for construction of phase 1.
Village of Weston Parks and Recreation Committee Meeting March 25, 2024
NO ACTION TAKEN.
9. Discussion and possible action Phasing Plan for Kennedy Park.
Osterbrink stated that DPW Director Wodalski drafted the phasing plan. Village staff have
taken into consideration all the input that was mentioned at all the meetings over the past
year and implementing those ideas into a plan that will not interrupt play for the 500+ kids
currently in the DCEYB program. Also, how the support facilities work with the phasing.
Phase 1 is the development of ball field #5 and the support facilities in the northwest corner of
the park, which also hosts the hockey and ice rinks. Youth hockey is moving forward with
their part and having construction documents drafted by a construction company. Hockey
may be ready to start construction by this fall.
Weiland asked if Phase 1 has restrooms included in the plans. Osterbrink stated that
restrooms are part of Phase 2 and 3. Phase 2 is construction of the restrooms and parking
lot on the east side of the park.
Sarah Olafson asked if the Village could include the upgrade to the restrooms on the east
side of the park in Phase 1 and possibly use APRA funds for that and donor money towards
the construction of ball field #5. Olafson asked if staff could provide estimates for the
restrooms.
Olafson stated that the phasing plan is extremely helpful and provided all the information to
the Community Foundation so user groups can move forward with applying for grants and
also provides information to possible donors that want to donate to the Friends of Kennedy
Park Upgrades.
Gebert asked which restroom facility will be constructed in Phase 3. Osterbrink responded #
28 on the plan. It would be upgrading the existing restroom on the west side. Numbers 28
and 29 are existing restrooms that will be upgraded, # 6 is a newly constructed restroom with
concessions in the middle of the park and their will be a restroom in the multipurpose building
near the hockey rink.
Phase 3 would be improvements to the skate park, construction of ball fields #2 and #4, and
batting cages.
Ermeling asked about artificial turf that is proposed to be installed on ball fields #1, #4, and
#5. Ermeling is concerned that the Village will be removing it after a few years. Corvino
responded that Wausau Parks added turf to Athletic Park field because softball would not
play there without it. Gebert and Osterbrink responded that Goerke Park in Stevens Point
and Stiehm Stadium both have had artificial turf for at least 15 years and is holding up well.
Phase 4 is the construction of field #4 which would eliminate the current big field, construction
of the central restrooms and concession, and utility lines.
Village of Weston Parks and Recreation Committee Meeting March 25, 2024
Phase 5 is construction of field #1 which eliminates both Jones #1 and Jones #2 fields,
construction of the west side parking lot, and adding an additional playground in that area.
Currently, if the school district uses our fields for games their staff comes to Kennedy Park
and chalk the lines.
Corvino asked when the RFP will be sent to marketing firms. Osterbrink responded that the
RFP will go out this week and a deadline in 2 weeks. Corvino would like the marketing firms
to present to the Park and Recreation Committee and not just staff. Osterbrink stated that
RFP for construction documents will go out possibly next week.
Osterbrink mentioned naming rights for fields. Currently Jones #1 and Jones #2 are named
after Ervin Jones who was a coach in the league for a long time and contributed money to the
Village. Olafson stated that the Village is going to have to decide on the legacy of the Jones
name once the 2 little league fields are eliminated. Osterbrink stated that the current
Memorial Policy states that the Village will not maintain it in perpetuity. Ermeling would like
staff to look into the history of the naming of Jones #1 and Jones #2.
Corvino stated that once a marketing firm is selected and working on the fundraising is where
naming rights will fall into place.
Gebert stated that a naming rights policy should be drawn up and presented to the Park and
Recreation Committee and then Village Board. Osterbrink thinks the policy will be close to
what the current Memorial Policy states. Olafson commented that a Naming Rights Policy
should be separate from the Memorial Policy because there could possibly be live donors that
contribute to the Kennedy Park improvements. The Committee advised staff to draft a
naming rights policy for the April meeting.
NO ACTION TAKEN.
FUTURE ITEMS
10. Next meeting date: April 22, 2024 at 5:00 pm.
11. Topics for future meetings.
a. Playground border proposals
b. Kennedy Park marketing proposals
c. Kennedy Park construction document proposals
d. Naming Rights Policy draft
12. Remarks from Staff
Osterbrink stated that the playground company contacted him, and the Kennedy playground
equipment is ready. The company’s timeline has moved up a couple of months and they would
Village of Weston Parks and Recreation Committee Meeting March 25, 2024
like to install six structures by the end of May. Osterbrink stated that the timeline will not work
because the Village will not have enough time to remove old playgrounds and prep the sites
for the installation of the new playgrounds. Osterbrink needs to coordinate with Gametime,
Minnesota-Wisconsin Playgrounds, and the installation company to setup installation times of
6 of the 7 playgrounds that will be ready. Osterbrink has a conference call scheduled with
them in the coming weeks. The plan is to concentrate on the community parks before the
neighborhood parks.
Tito removed the infield material this past week from Jones #1 and staff abandoned the
necessary irrigation zones. The next steps are to install sand, ball diamond mix, anchors for
bases and pitching rubber.
Staff will take pictures of the playgrounds so they can be placed on Wisconsin Surplus Auction.
13. Remarks from Committee Members
Esker will be absent for the April meeting.
Corvino would like pictures taken before, during, and after the process of the park projects to
tell our story.
14. Announcements.
None
15. Adjournment.
*M/S/P Esker/Clark: motion to adjourn the meeting at 6:11p.m.
Yes Vote: 5 No Vote: 0 Abstain: 0 Not Voting: 0 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb YES
Esker, Roger YES
Weiland, Jamie YES
Jessica Falkowski, Recording Secretary
Village of Weston Parks and Recreation Committee Meeting March 25, 2024
Agenda
OFFICIAL MEETING PACKET OF THE
PARKS AND RECREATION COMMITTEE
CHAIRPERSON/TRUSTEE JAMIE WEILAND PRESIDING
DIRECTOR OF PARKS AND RECREATION SHAWN OSTERBRINK; STAFF
ADVISOR
A meeting of the Parks and Recreation Committee, composed of five (5) appointed
members, will convene at Weston Municipal Center, which is located at 4747
Camp Phillips Road, Weston, on MONDAY, MARCH 25, 2024, at 5:00 p.m.
Village of Weston, Wisconsin
ATTENTION – NOTICE OF PUBLIC MEETING
Meeting: PARK AND RECREATION COMMITTEE
Members: Clark, Corvino, Ermeling (VC), Esker, Weiland (C)
Ex-Officio: Maloney
Staff: Osterbrink, Falkowski
Date/Time: Monday, March 25th, 2024, at 5:00 p.m.
Location: Weston Municipal Center, 4747 Camp Phillips Road, Weston, WI
54476
Agenda: The Agenda Packet will be sent out Wednesday or Thursday of this
week.
Attendance: Parks and Recreation Committee Members please indicate if you will
or will not be attending so we may determine in advance if there will
be a quorum.
Questions: Shawn Osterbrink Jessica Falkowski
sosterbrink@westonwi.gov jfalkowski@westonwi.gov
(715) 359-6114 (715) 359-6114
PLEASE NOTE THE FOLLOWING INFORMATION:
This notice was posted at the Municipal Center, and on the Village’s website at www.westonwi.gov, and was emailed
to local media outlets (Print, TV, and Radio) on 3/19/2024 @ 1:30 p.m. Any posted agenda is subject to change up until
24 hours prior to the date and time of the meeting.
A quorum of members from other Village governmental bodies (boards, commissions, and committees) may attend the
above-noticed meeting to gather information. Should a quorum be other government bodies are present, this would
constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993).
Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in final form,
24 hours prior to the meeting.
Any person who has a qualifying disability, as defined by the Americans with Disabilities Act, requiring that meeting or
material to be in an accessible location or format, must contact the Weston Municipal Center at 715-359-6114, so any
necessary arrangements can be made to accommodate each request.
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE PARKS AND RECREATION COMMITTEE
`
TO THE HONORABLE TRUSTEE WEILAND AND FOUR (4) APPOINTED MEMBERS OF
THE COMMITTEE: The following items were listed on the agenda in the Village Clerk’s
Office, in accordance with Chapter 2 of the Village’s Municipal Code and will be ready for
your consideration at the regular meeting of the Parks and Recreation Committee on
Monday, March 25, 2024 @ 5:00 p.m., in the Village Board Room at the Weston Municipal
Center, 4747 Camp Phillips Road, Weston, WI. 54476.
A quorum of members from other Village governmental bodies (boards, commissions, and committees)
may/might attend the above-noticed meeting to gather information. Should a quorum of other government bodies
be present, this would constitute a meeting pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d
553,494 N.W.2d 408 (1993). No official actions other than those of the Parks and Recreation Committee shall take
place. Wisconsin State Statutes require all agendas for Committee, Commission, or Board meetings be posted in
final form, 24 hours prior to the meeting. Any posted agenda is subject to change up until 24 hours prior to the
date and time of the meeting. All items listed on this agenda may be acted upon by the Park Committee.
If not able to attend in person interested persons may also attend via the zoom link or
by phone.
Join Zoom Meeting by Computer:
https://zoom.us/j/5445915099
Join Zoom Meeting by Phone:
+1 312 626 6799 US (Chicago)
Meeting ID: 5445915099
AGENDA ITEMS.
1. Meeting called to order by Chair Weiland.
2. Pledge of Allegiance to the Flag.
3. Roll Call by Recording Secretary.
a. Clark
b. Corvino
c. Ermeling (VC)
d. Esker
e. Weiland (C)
4. Approval of minutes from previous meeting: February 26, 2024.
5. Public Comments.
Parks and Recreation Committee Meeting – Agenda 3/25/24
Prepared by: Shawn Osterbrink, Director of Parks, Recreation and Forestry
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE PARKS AND RECREATION COMMITTEE
EDUCATIONAL PRESENTATIONS & REPORTS.
POLICY ISSUES – DISCUSSIONS/RECOMMENDATONS.
6. Discussion and possible action Arbor Day Proclamation.
7. Discussion and possible action Authorizing Resolution.
8. Discussion and possible action Development Plan for Kennedy Park.
9. Discussion and possible action Phasing Plan for Kennedy Park.
FUTURE ITEMS
10. Possible next meeting date: April 22, 2024.
11. Topics for future meetings: Playground border proposals, Kennedy Park marketing
proposals, Kennedy Park construction document proposals.
12. Remarks from Staff.
13. Remarks from Committee Members.
14. Announcements.
15. Adjourn.
Parks and Recreation Committee Meeting – Agenda 3/25/24
Prepared by: Shawn Osterbrink, Director of Parks, Recreation & Forestry
Village of Weston, Wisconsin
MEETING MINUTES OF THE PARK & RECREATION COMMITTEE MEETING
Monday, February 26th, 2024, 5:00 p.m.
AGENDA ITEMS
1. Meeting called to order by Chair Weiland @ 5:00 P.M.
2. Pledge Allegiance to the Flag
3. Roll Call by Recording Secretary: Jessica Falkowski
Member Present
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb (VC) ABSENT, EXCUSED
Esker, Roger YES
Weiland, Jamie (C) YES
Village Staff in attendance: Falkowski (Clerk), Administrator Gebert, Osterbrink, Wodalski, and
Trustee Zeyghami.
4. Approval of minutes from previous meeting: January 29th, 2024.
*M/S/P Esker/Corvino: to approve the January 29th, 2024, minutes.
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb -----
Esker, Roger YES
Weiland, Jamie YES
5. Public Comments.
NONE.
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
EDUCATIONAL PRESENTATIONS & REPORTS
6. Discussion and possible action improvements at Yellowbanks Park.
Osterbrink stated at the February Park and Recreation meeting, Dan Higginbotham presented
improvements for the canoe/kayak access along with adding a parking area closer in
proximity to the access at Yellowbanks. The committee stated that Higginbotham should
continue working on this project. Staff verified that current improvement plans for
Yellowbanks listed in the Comprehensive Outdoor Recreation Plan (CORP) are sufficient to
make the project eligible for federal and/or state grants.
Higginbotham contacted Bill Bertram from Wausau/Marathon County Parks and Recreation
Foundation because Yellowbanks is officially a part of the Great Pinery Heritage Waterway,
making the project eligible for funding. Funds are handled by the Community Foundation of
North Central Wisconsin. Osterbrink explained some bank improvements were made to
Yellowbanks in 2015-2016 for easier access but more improvements could be made. The
two existing parking lots at Yellowbanks are located on the east and west sides of the park
and the launch access is in the middle. Osterbrink stated this section of river is the most
accessible during all seasons. Users do not have to deal with the low water levels like other
sections of this river. The City of Schofield has taken care of the downed trees that blocked
the passageway further downstream.
Higginbotham also contacted the Wisconsin Department of Natural Resources (WDNR) and
sent them information on this project. The WDNR has various 50/50 matching grants that this
project could meet the requirements and the Village could apply for. Osterbrink stated grant
applications are due by May 1st, 2024. Higginbotham has prepared a site plan and partial
cost estimate for the project. The Village would be responsible for 50% of the full cost of the
grant. Village contribution could be labor, material, and equipment expense, not necessarily
direct money contribution. Labor, material, and equipment will have to be logged and monthly
reports sent in. Osterbrink emphasized by receiving federal and state monies the Village is
tied to this project in perpetuity meaning we cannot back out and/or not maintain it. It is a
lengthy and difficult process to change the use or exchange property with the WDNR
requirements.
Higginbotham added the Yellowbanks launch is the upper reach of the Great Pinery Heritage
Waterway Trail which is a state trail, and the group is trying for national recognition. The
landing is currently not required to be updated but is part of the attractiveness when applying
for federal and state grants. Bill Bertram from the Wausau/Marathon County Parks and
Recreation Foundation plans on placing signage at the launch indicating name and
distance/mileage to next launch. The WDNR grant coordinator contacted the Village wanting
to schedule a meeting to discuss the project before any applications are filled out.
The grant applications dates for the Wausau/Marathon County Parks and Recreation
Foundation is July 1 - July 31 and they award grants twice a year. State and federal grants
applications are due May 1 and are awarded in late summer/early fall, so work on this project
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
would not begin till 2025.
Corvino asked how much staff time will be invested in this project. Osterbrink responded, it
depends on if the Village uses monies for contracting the project out or having Village staff do
some of the work.
Osterbrink stated the estimated cost for the project is $120,000. This includes installation of
an easy dock, grading and site preparation, and paving of the parking lot.
*M/S/P Corvino/Esker: to recommend moving forward with applying for grant funds to
complete a parking area and improvements to the access at Yellowbanks Park.
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb -----
Esker, Roger YES
Weiland, Jamie YES
POLICY ISSUES – DISCUSSIONS/RECOMMENDATIONS
7. Discussion and possible action improvements at Machmueller Park.
Osterbrink mentioned the Village approved the sewer main extension traveling through the
north end of Machmueller Park to Kramer Lane in 2026. Adding additional restrooms on the
north end of the park is proposed in the CORP. An opportunity for cost savings on installation
could occur during the construction of extending the water and sewer lines.
The 1-5 year short term goals for Machmueller Park is to install 16 pickleball courts with
viewing areas and the 6-10 year plan is to construct a restroom/shelter with a drinking
fountain. The current restroom location is on the south end of the park due to the closest
sewer and water connections from Quentin Street. The closest sewer connection is 750ft from
the restroom in which the Village had to install a grinder station lift pump.
Osterbrink stated there is a need for pickleball courts in the area. Osterbrink met with Trustee
Zeyghami and discussed the cost estimate in the CORP, $745,000 for the installation of 16
pickleball courts and $545,000 for restroom/shelter area. Osterbrink also conversed with
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
Administrator Gebert who received a quote of $50,000 per pickleball court in the Town of
Rome, no specs were included.
Trustee Zeyghami prepared a more precise estimate because he believes the estimate listed
in the CORP is low. Osterbrink stated a cost savings could occur if all 16 courts are installed
at once.
Zeyghami explained that the courts can be installed using blacktop, concrete, or tile. The tile
option is the most expensive, blacktop the least expensive, and concrete is the most
recommended. If concrete is used a special surface must be installed on top of the concrete
for cushion and before the court is painted. Zeyghami estimates the total cost to be $1.5
million. This includes restroom/shelter, water, and sewer, 16 courts, shade, storage, and
fencing. Zeyghami stated that the Pickleball Association will help with fundraising but will need
a commitment from the Village to contribute some monies toward the project.
President of the Pickleball Association reiterated the need of pickleball courts and listed
limiting factors. The courts at Marathon Park are used extensively every day during the
summer and the Pickleball Association is limited to the size of tournaments they can host.
There are 9 pickleball courts at Marathon Park. Constructing 16 courts at Machmueller will
allow for more opportunities to play and for the association to host regional tournaments.
Corvino asked Zeyghami and the Pickleball Association if there are any infrastructure needs
that are not shown on the design in the CORP. Zeyghami responded that everything is shown
in the design. Zeyghami stated that the layout and being able to host tournaments will draw
people to the Village.
Weiland stated that the estimate listed in the CORP of $745,000 for installation of 16 courts
and $545,000 for restroom/shelter is not far off the $1.5 million estimate Zeyghami presented.
Zeyghami stated that the shelter alone is estimated at $250,000 for a 20ft x 100ft.
Corvino asked Zeyghami about sound barriers. Zeyghami responded there are natural tree
barriers between the courts and houses and the plan shows for installation of fencing and
shade around the courts. Osterbrink added that the fence will have slats and not fabric to
deaden the sound.
Zeyghami stated that an official detailed plan needs to be constructed to help with the
fundraising. Weiland asked how the Village moves forward with a layout so the association
can start fundraising. Osterbrink stated that staff could work with Trustee Zeyghami if he
chooses to be part of the design team, or the Village will have to hire a consultant which will
increase the cost estimate of the project. The Village will need to budget monies in the CIP for
design or construction of the project which the Finance Committee and Village Board will have
to approve. Zeyghami stated he will help oversee the project.
*M/S/P Corvino/Esker: to recommend moving forward with planning for improvements
at Machmueller Park.
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb -----
Esker, Roger YES
Weiland, Jamie YES
8. Discussion and possible action utilizing a consultant for Kennedy Park fundraising.
Osterbrink met with a consultant from a marketing firm that the Village has worked with before
about developing a strategy/story to move forward. Having multiple user groups involved, it is
important to have a strategy moving forward. The consultant suggested the kids lead the
effort in fundraising and not the Village.
DCE Youth Baseball, DCE Youth Hockey, and DCE Fastpitch Softball are organizing and
preparing to fundraise. Currently, DCE School District and DCE Youth Baseball are helping
the Village reconstruct a little league diamond at Kennedy Park to allow for JV Softball to play
on.
Jim Olafson met with the Community Foundation and set up a pass-through account.
Osterbrink mentioned if the committee decides to move forward with using a consultant, then
he will contact other firms and take the quotes to Finance and see if there is funding
available. Using ARPA Funds and/or Parkland Dedication Funds are possible sources.
Osterbrink stated the AI technology that CVB has access to would be able to provide us with
statistics about how many people were at Kennedy Park, where they came from and where
they stayed during any time period. AI technology is a huge marketing tool.
Osterbrink stated that the Village will need to make the initial contribution to get the project
started and then determine fundraising amounts and future CIP funds.
Corvino stated that the Village needs to put the first dollar in and contact firms to talk about
how to fundraise in the future. Invest in the quality of life and make the Village of Weston a
destination people want to live, work, and visit.
Wodalski stated that support facilities are the Village’s responsibility. For example, the well
house and other park buildings in the northwest corner of the park will be updated and or
removed. The Village will upgrade the restrooms and parking lots that are proposed in the
plan.
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
*M/S/P Corvino/Clark: to recommend seeking out and working with a consultant for the
fundraising effort for Kennedy Park.
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb -----
Esker, Roger YES
Weiland, Jamie YES
9. Discussion and possible action replacement roof panels at Sandhill and Machmueller
Parks.
Osterbrink received a cost estimate of $13,000 in spring of 2023 for replacement roof panels
for Sandhill and Machmueller Parks. The estimate did not include installation. Osterbrink
included pictures in the packet showing the deterioration of the roof panels. Osterbrink would
like to update the cost estimates and contact a contractor who works with masonary and
welding. The contractor will also have to supply a crane. One roof panel is 10,000 pounds.
Osterbrink wants to contact Norcon, a local contractor, who does masonry work and has a
crane for an estimate. Parkland Dedication Funds, $46,000 of which need to be used this
year, are a possible funding source along with the $15,000 budgeted in the CIP for this
project.
*M/S/P Corvino/Esker: to recommend moving forward with the replacement of the
roofing panels and repairs and forward to the Finance Committee for a funding
recommendation.
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb -----
Esker, Roger YES
Weiland, Jamie YES
FUTURE ITEMS
10. Next meeting date: March 25, 2024 at 5:00 pm.
11. Topics for future meetings.
a. Playground border proposals.
12. Remarks from Staff
Osterbrink stated he received the measurements for the playground borders Saturday so he
can now finish the RFP and send out. Osterbrink also stated that staff went and got 7 dump
truck loads of ball diamond material for the infield of diamond one at Kennedy Park. Staff
needs to get one more load of material. Youth Hockey is working with Findorff drawing up
plans for their facility. Hockey is hoping to have a shovel in the ground this fall. Osterbrink
met with Disc Golf; they are wanting to move forward with secondary pin placements at
Yellowbanks which was discussed last year as part of the agreement.
13. Remarks from Committee Members
None
14. Announcements.
None
15. Adjournment.
*M/S/P Esker/Clark: motion to adjourn the meeting at 6:00p.m.
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
Yes Vote: 4 No Vote: 0 Abstain: 0 Not Voting: 1 Result: PASS
Member Vote
Clark, Katrina YES
Corvino, Dino YES
Ermeling, Barb -----
Esker, Roger YES
Weiland, Jamie YES
Jessica Falkowski, Recording Secretary
Village of Weston Parks and Recreation Committee Meeting February 26, 2024
REQUEST FOR CONSIDERATION
Public Mtg/Date: Park & Recreation Committee – 3/25/2024
Description: Arbor Day Proclamation (P-24-001)
From: Shawn Osterbrink, Director of Parks, Recreation &
Forestry
Question: Should the Park Committee recommend approving
Proclamation P-24-001 designating May 24th, 2024, as
Arbor Day in the Village of Weston?
Background
The Village has celebrated Arbor Day for the past thirteen years by holding an
observance and planting trees. Besides the benefits of planting trees, the Arbor
Day observance and proclamation are two of the requirements that the Village
must complete to be designated as a Tree City. National Arbor Day in 2024 is
April 26th but the observance can take place anytime. We have chosen to dedicate
Friday, May 24th, 2024, as Arbor Day in the Village.
Attached Docs: Proclamation P-24-001
______________________________________________________________________
Committee Action: No prior review.
Fiscal Impact: N/A
Recommendation: Staff recommends approval.
Recommended Language for Official Action
I move to recommend approval of Proclamation P-24-001 designating May 24,
2024, as Arbor Day in the Village of Weston.
Or
I move to not recommend approval of Proclamation P-24-001.
Or
Something else.
______________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
Arbor Day Proclamation (P-24-001)
Whereas, in 1872, J. Sterling Morton proposed to the Nebraska Board of Agriculture
that a special day be set aside for the planting of trees, and
Whereas, the holiday, called Arbor Day, was first observed with the planting of more
than a million trees in Nebraska, and
Whereas, Arbor Day is now observed throughout the nation and the world, and
Whereas, trees can reduce the erosion of our precious topsoil by wind and water,
lower our heating and cooling costs, moderate the temperature, clean the air, produce
oxygen and provide habitat for wildlife, and
Whereas, trees are a renewable resource giving us paper, wood for our homes, fuel
for our fires and countless other wood products, and
Whereas, trees in our city increase property values, enhance the economic vitality of
business areas, and beautify our community, and
Whereas, trees, wherever they are planted, are a source of joy and spiritual renewal,
NOW, THEREFORE, I Mark Maloney President of the Village of Weston, do hereby
proclaim Friday, May 24, 2024 as Arbor Day in the Village of Weston, and I urge all
citizens to celebrate Arbor Day and to support efforts to protect our trees and
Woodlands, and
Further, I urge all citizens to plant and care for trees to gladden the heart and promote the
well-being of this and future generations.
Dated this 15th day of April in the year of 2024
President _______________________________________
Attest __________________________________________
REQUEST FOR CONSIDERATION
Public Mtg/Date: Park & Recreation Committee – 3/25/2024
Description: Authorizing Resolution (2024-008)
From: Shawn Osterbrink, Director of Parks, Recreation &
Forestry
Question: Should the Park Committee recommend approving
Resolution 2024-008 authorizing Jessica Falkowski to
submit a grant application and complete all necessary
paperwork required for a grant?
Background
The Village approved applying for a grant for improvements at Yellowbanks Park
through the Wisconsin Department of Natural Resources at their March meeting.
As part of the grant application process, Resolution 2024-008 needs to be
approved and submitted with the grant materials as it gives authority to Village
staff to submit the grant on behalf of the Village of Weston.
Attached Docs: Resolution 2024-008
______________________________________________________________________
Committee Action: No prior review.
Fiscal Impact: Approving the resolution makes the Village eligible for
grant funding.
Recommendation: Staff recommends approval.
Recommended Language for Official Action
I move to recommend approval of Resolution 2024-008.
Or
I move to not recommend approval of Resolution 2024-008.
Or
Something else.
______________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
VILLAGE OF WESTON, WISCONSIN
RESOLUTION NO. 2024-008
A RESOLUTION, approving that Jessica Falkowski of the Weston Park Department is
authorized to act on behalf of the Village of Weston to submit a grant
application, submit reimbursement claims, submit signed
documents, and take necessary action to undertake, direct, and
complete the approved project.
WHEREAS, the Village of Weston is interested in developing lands for public
outdoor recreation purposes as described in the application; and
WHEREAS, a cost-sharing grant is required to carry out the project;
THEREFORE, BE IT RESOLVED that the Village of Weston has budgeted a sum sufficient to
complete the project and
HEREBY AUTHORIZES Jessica Falkowski, Parks Department, to act on behalf of the Village
of Weston to:
• Sign an application to the State of Wisconsin Department of Natural Resources for
any financial aid that may be available.
• Submit reimbursement claims along with necessary supporting documentation
within 6 months of project completion date.
• Submit signed documents; and
• Sign and submit reimbursement claims along with necessary supporting
documentation.
• Take necessary action to undertake, direct and complete the approved project.
BE IT FURTHER RESOLVED that the Village of Weston shall comply with all state and
federal rules for the programs; may perform force account work; will maintain the completed
project in an attractive, inviting, and safe manner; will keep the facilities open to the general
public during reasonable hours consistent with the type of facility; and will obtain from the
State of Wisconsin Department of Natural Resources or the National Park Service approval in
writing before any change is made in the use of the project site.
PASSED BY THE BOARD OF TRUSTEES OF THE VILLAGE OF WESTON, at a regular
meeting thereof, this 15 day of the month of April 2024.
VILLAGE OF WESTON, a Municipal Corporation of the State of Wisconsin.
By: ___________________________
MARK MALONEY, President
ATTEST:
By: ___________________________
PAMELA BREHM, Clerk
REQUEST FOR CONSIDERATION
Public Mtg/Date: Park & Recreation Committee – 3/25/2024
Description: Development Plan for Kennedy Park
From: Shawn Osterbrink, Director of Parks, Recreation &
Forestry
Question: Should the Park Committee recommend approving the
development steps for the development of Kennedy
Park?
Background
The fundraising and development of Kennedy Park will take place over multiple
years in different phases with multiple different individuals in different roles
throughout the process. Staff have drafted a document that we believe will help
outline the process and the order in which items should take place. This
document will also help everyone involved know where we are in the process and
when things were completed. Remember this is just a draft outline and we
suspect that priorities and the order will be changed throughout this process.
Attached Docs: Development Plan
______________________________________________________________________
Committee Action: No prior review.
Fiscal Impact: N/A
Recommendation: Staff recommends approval.
Recommended Language for Official Action
I move to recommend approval of the Kennedy Park Development Plan.
Or
I move to not recommend approval of Kennedy Park Development Plan.
Or
Something else.
______________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
Plan for the Development of Kennedy Park
The Plan below was developed as a start of steps
forward for the development of Kennedy Park. The Plan
is in draft format as steps will likely still need to be
added as we begin to move through the development
process. The Plan will help to identify where the Parks
Committee and user groups are in the process, as the
overall development is large and will take years to
complete. The dates following each item are when they
were completed, recommended, or approved.
1. Develop Master Plan
a. Prepare request for proposals for master plan and
distribute to qualified consultants. 8/2022
b. Present proposals to Village Park Committee and
Board to develop and fund master plan for
Kennedy Park. 9/2022,
c. Gather input from the public, staff, committee,
board, and user groups through meetings and
surveys. 4/2023
d. Develop master plan options and refine with
additional input from public, staff, committee,
board, and user groups. 2023
e. Review, recommend and approve master plan
through committee and board. 10/2023, 12/2023
2. Implementing Master Plan and Fundraising
a. Receive recommendation and approval from
committee and board to move forward with
planning to complete improvements. 1/2024
b. Meet with user groups to determine steps moving
forward with fundraising. Village to oversee but
groups will be integral in the process as the Village
won’t be making the fundraising requests. 2/2024
c. Meet with Community Foundation and set up a
pass-through fund so all the groups do not have to
combine and set up their own tax-exempt
organization. 2/2024
d. Request recommendation/approval to work with a
marketing consultant and funding to develop plan,
story, strategy, and materials. 2/2024
e. Prepare a request for proposals for marketing plan
and distribute to qualified consultants.
f. Set goals for fundraising, commitment from the
Village of their participation in the development
and determine the order of development/phasing
plan.
g. Meet with potential consultants to assist with
services related to the fundraising/marketing plan.
h. Review marketing proposals and award.
i. Work with approved consultant, staff, committee,
board, and user groups to develop our marketing
strategy, materials, etc.
j. Secure funding for the development of
construction documents, bidding services and
construction management of project.
k. Begin fundraising by completing grant
applications, meeting with donors, etc. to meet
goals of phasing plan.
l. Prepare request for proposals for development of
construction documents and distribute them to
qualified consultants.
m.Meet with potential consultants to assist with the
development of the construction documents.
n. Review proposals and award.
o. Prepare construction documents.
3. Next Steps
a. Determine if construction of phase one can begin
once the first fundraising goal is met.
b. Prepare bidding documents for development of
phase one.
c. Advertise and disburse biddings documents.
d. Recommend and approve contractor.
e. Continue fundraising for the next phase.
f. Apply for necessary permits.
g. Begin construction.
REQUEST FOR CONSIDERATION
Public Mtg/Date: Park & Recreation Committee – 3/25/2024
Description: Phasing Plan for Kennedy Park
From: Shawn Osterbrink, Director of Parks, Recreation &
Forestry
Question: Should the Park Committee recommend approving the
Phasing Plan for the development of Kennedy Park?
Background
The development of Kennedy Park will take place over multiple years in different
phases. Public Works Director Wodalski put together a phasing plan based on all
the input he heard throughout all the meetings regarding this project. He also put
together a brief explanation regarding the reasoning for each phase. Which is
included below in red. Remember this is just a plan and priorities may change
throughout the process that could change the plan.
Attached is a shot at a phasing plan for Kennedy Park based on what I believe
I’ve heard are priorities from the various user groups.
- Phase 1-BB is the southernmost baseball field and the east playground.
- Phase 1-H is the hockey portion at the NW corner – this would include then the
demolition of the existing buildings and a new multipurpose building as well as
the hockey rink.
- Phase 2 would be redoing the east parking lot and the shelter/restroom facilities.
- Phase 3 would be the skate park, batting cages and then eastern big field and
south cloverleaf field (I believe through the construction/design process it’d be
possible to get these 2 fields built without having to disturb the existing Jones
fields. This would then also include a new restroom on the west side and get the
asphalt path connection from west to east.
- Phase 4 would then be the northern small field, and this would then officially take
the current Big Field out of play and would include the construction of the central
bathroom and concessions area with the utility lines.
- Phase 5 would be the final field and then the parking lot on the west side. This
would take Jones 1 and Jones 2 then out of service.
I didn’t phase in the splashpad/playground within the Aquatic Center but figured
that’d be done whenever and didn’t need to be tied to a specific phase.
Attached Docs: Phasing Plan
______________________________________________________________________
Committee Action: No prior review.
REQUEST FOR CONSIDERATION
REQUEST FOR CONSIDERATION
Fiscal Impact: N/A
Recommendation: Staff recommends approval.
Recommended Language for Official Action
I move to recommend approval of the Kennedy Park Phasing Plan.
Or
I move to not recommend approval of Kennedy Park Phasing Plan.
Or
Something else.
______________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
PHASE 1 - H
PHASE 4
PHASE 5
PHASE 3
PHASE 2
PHASE 1 - BB
END OF
PACKET