The meeting was called to order by Kathy Skemp at 8:17 AM
PRESENT: Stacy Caldwell, Shane Jacobs, Diane Kane, Leslie Lowe, Paul McElroy,
Tracy Rossi, Kathy Skemp
ABSENT: none
STAFF: Wendy Compton-Ring, Hilary Lindh
PUBLIC COMMENT: none.
MINUTES: The minutes from March 3, 2020 were unanimously approved.
OLD BUSINESS
718 Edgewood Place, material change, Devin Stus (ARC 19-14) The applicant presented
the requested material changes. Asphalt shingles originally approved for the roof, but the
low slope of the roof requires a different material – a steel standing seam in light gray that
is similar color to the asphalt. Since the building is three stories, the material will not be
visible from the street.
Paul – not familiar with building, is it visible from viaduct? The building is a couple blocks
away and could be visible from the viaduct. Roof is already installed. Does it stand out
more driving?
Shane – there is already a similar corrugated light gray material on the building. This is a
warranty issue, a standing seam roof is necessary. He has no problem with the change.
Diane – standing seam material color is okay with her.
Paul – windows are almond color? Yes. Desert tan is the fascia? Yes, and matches
windows. How do we handle something after the fact? Wendy says it was at the
designer’s risk to go ahead with installation before approval. Should the committee go
look in the field? Devin shared some photos of the building under construction at the end
of March. The roof material was not yet installed but the photos show that you cannot
see the roof material from the ground. Paul is wondering how the beige fascia matches
the roof color. No photos of the new roof are available, but a photo showing the windows
and fascia were shown. The drip shows the roof color. Paul wants to see photos of the
roof and fascia colors together.
Shane – the roof color is probably more compatible than the fascia. There is a photo of
the back of the siding sample the committee was looking at previously that was confusing
to them.
Leslie – from the viaduct, the bright fascia might highlight the roof from a distance. Might
not know the effect until it’s done. She understands the difficulty of having to make
1
changes on site and unforeseen events. Devin shows photo of soffit fascia material,
windows, and color swatch of roof.
Paul – fascia on metal roofs usually matches the roof color. Devin explained that different
color was chosen due to the ARC comments from the initial approval.
Shane – is flashing also from Glacier Steel? Difficult to tell from swatches. Probably best
to see a physical sample of both colors next to each other.
Paul – soffit to be done in same color as fascia? Yes. Wood siding stain color to match.
Paul – doesn’t think the colors match and wants to see actual samples and worst-case
scenario, might have to change the fascia, not the roof.
Shane agrees.
Tracy – also agrees.
Diane – agrees with Paul. Can’t imagine the committee said the gray and tan colors
should go together. The flashing, wood, roof colors all need to be reviewed
Kathy – need a photo of all the final colors for all the materials together.
Stacy – agrees it would be good to see together.
Leslie – should be easy enough to change CAD drawing to show true colors
Paul – two physical colors needed. Maybe don’t put soffit up until the ARC meeting in
May approves it. The fascia probably needs to go the roof color, soffit should complement.
Gray and tan together no good. Devin offers to make the changes now.
Kathy – we need to see the colors before approving those changes.
Wendy – want photos of all the updated materials, and an updated elevation drawing?
Paul – need to see all the colors of all materials together in a color board. Is the gray roof
the color of the corrugated metal siding? No, the siding is a darker gray. The roof color is
lighter based on the previous approval and discussion.
Motion:
Shane – moves to table until the colors are brought back
Diane – 2nd
Discussion: none
Vote: passed unanimously
Alta Views, façade change – Pod 3, Ken Huff (ARC 19-04B) The applicant presented the
amendment changes. Two-thirds of projects are 2-BR units with loft, other third is 3-BR
units with 18-foot ceilings. Over time, the developer realized they needed more 3-BR
units. So they’ve been converting the 2-BR units to 3-BR by using the loft as a third
bedroom. Now they know how many and where these conversions will happen, they were
asked to come back and describe.
Tracy – the loft area becomes a third bedroom? Yes. The ceiling is raised.
Kathy – how much higher? It goes 4’ higher
Paul – anything showing the comparison of the original versus the conversion? Ken’s
drawing shows both elevations. Paul thinks it doesn’t look quite as good. Ken doesn’t
think the elevation drawing that shows just one unit is as useful as when they’re all
together.
2
Paul – any way to also bring up the lower roof line higher so the gap between isn’t so
much? And any way to change the windows to accommodate the additional height? Ken
says it’s better on the inside to keep the windows close together, it feels airier than if you
had the windows spread out. It’s not possible to adjust the height of the lower roof. The
revised elevation for one building was approved a year ago and they built it as a model
unit. They now want to do the remainder of the 2-BR units to these higher buildings, but
need approval for all.
Kathy – asking for approval to do this on the northwest corner of the property, correct?
Will come back for approvals for other parts of property? Yes. She would like to see a mix
of the unit types for variety.
Paul – when the units are attached does the look improved? Yes, more than the single
unit rendering. How many units attached, how many front doors? The raised lofts can go
anywhere in the building groupings – end units, middle units, etc. The Committee
reviewed photos of built units on Alta Views website.
Tracy – making top floor windows a little taller would help fill some of that extra space?
They are pushing the limit of how big the vinyl window can go, so not much.
Paul – proposing for buildings with two front doors, so both sides would be high. Also 3-
and 4- door attached? Ken, for this phase there are only 10 units with some triplexes –
no quads. Has concerns about multiplying all the tall buildings throughout the project.
Kathy – only design changes he is asking for are height changes in this pod.
Paul – has some issue with roof lines and space between roof and windows. Can they
put transom windows to fill some space? Ken can ask and see if it can be worked into
budget. Have to be conscious of scope creep.
Diane – taller units don’t really stand out as you drive by. We should approve the 10 units
only to get a feel for what it will look like on a larger scale, before deciding about the
remainder of the project.
Paul – location of the proposed taller units? On JP Road behind bank.
Kathy – future locations would be near the original condos, and one other spot further
east.
Stacy – with Diane on this. Doesn’t seem like this is a big shift and worth seeing the look
of the additional 10 units for now.
Shane – nothing to add, would be comfortable with what Diane and Stacy are proposing.
Tracy – likes the idea of seeing something between top window and roofline.
Paul – since it’s so visible on JP Road he doesn’t like it.
Leslie – agrees with Paul and Tracy, there’s an awkwardness in the massing. Would like
to see a transom or something to make transition more graceful. Prominent location along
JP Road.
Kathy – this change won’t be facing JP Road, they are facing E-W, not N-S orientation,
so wouldn’t be as visible as some think, right? Ken confirms that’s true of the whole
project, the garages don’t face the main roads.
Shane – wouldn’t change the window elevations as you round the corners, leave them in
place and then figure out how to balance the extra space with transoms.
Tracy – front side of revised elevation, why that one window was moved? Ken- a floor is
inserted in that area, so the window needs to be moved up. The windows on the front are
kept together because no extra floor in front – makes it feel like huge window.
Stacy – suggesting approval conditional on design changes?
3
Kathy – suggests they approve what’s proposed now but for future requests look at ways
to improve the look with transom or other ideas.
Paul – wants the transom added now.
Motion:
Paul– move to approve with condition transoms added to rear elevation of all modified
units
Tracy – 2nd
Discussion: Diane, suggest amending addition of transom to some, not all, of what’s
requested right now to see affect to cost. Paul does not like the amendment. Wants
transom for all. Wants uniformity, transom added to all. Stacy – would it be possible for
develop to follow through? Ken would need to discuss with developer, builder, etc.
whether it’s possible. These units are on hold for this approval, further delay may be a
problem and cause builder to bail out. Stacy appreciates the concerns, but they’ve already
had approval for one unit. Given market would be okay with ask for future consideration
of transoms. Ken acknowledges that if they knew they were all going to change to this,
they wouldn’t look like that.
Vote: Motion passes 5-2 (Diane, Kathy voting in opposition)
Carport, 59 Crestwood Drive, Cole Blackwell, (ARC 18-26) The applicant presented the
amendment. An existing cottage had a townhouse added on and now a carport is
proposed behind the original unit. There will still be parking in front of the townhouse. The
carport will have a 10x20’ office enclosed; otherwise the carport will be open. The siding
materials will match existing structures, mix of horizontal and vertical barnwood with some
variable sizes. Rough sawn trim. Same soffit material as existing structures. Roofing is
black, snap lock standing seam panels.
Shane – windows match? Yes, black and match existing.
Paul – existing driveway? Currently just in front of new unit, landscaping hasn’t yet been
installed. Gravel for now, two pads one in front of each unit. They will do a Geotech
material with grass so not a hard material. The preference is for all to park behind in the
carport.
Kathy – ties in well with existing structures. Makes good use of back of site.
Diane – looks great, thinks it’s a good addition. When finished will look great.
Shane – no comment
Stacy – appreciates continuation of materials, will improve site
Paul – likes the use of Geotech material
Leslie – likes parking to the back, more people friendly
Tracy – agrees, like parking to back
Motion:
Paul– move to approve
Shane – 2nd
4
Discussion: none
Vote: passed unanimously
NEW BUSINESS
420 E 3rd Street, Toby Scott, Awning (ARC 20-11) The applicant described the project,
building and materials. Intends to use the same colors for the awning as the building.
Metal roof and wood posts. Awning will go around a city tree and lamppost with a cutout
u-shape. Awning will provide shade, intercept rain and snow.
Diane – do you have a photo of just your building? Yes.
Kathy – how does awning affect upstairs balcony? It will be below it.
Tracy – how does the growth of the tree affect the cutout of the awning in the future? It
won’t grow as big as the cutout, and the branches are above the height of the awning. A
replacement tree would also have high branches.
Paul – drawings showing where posts go?
Leslie – do we have other examples of awnings with street trees? Wendy explained that
on Central where most awning is there aren’t any street trees. The other example is the
liquor store, which was grandfathered in with posts in the middle of the sidewalk. Leslie
is trying to visualize how the awning and tree will work. Will the added moisture affect the
tree? Wendy thinks we can work with City to determine what’s best for tree (which may
be removed or replaced).
Paul – drawings showing relationship of posts, tree, etc.?
Kathy – consider a gutter to get water away from where people walk? Toby is not
interested in a gutter.
Paul – does roof shed onto sidewalk? No. Paul thinks the awning would be a complement
to the building. The posts are in line with the lamp and tree? Yes, eight feet from the wall
as per City specifications. Open rafter? Yes, looked at Imagination Station example. Might
bevel the corner toward the alley to avoid problems with liquor store delivery truck. Paul
likes the Imagination Station details – they are important so don’t omit them. Frost proof
foundation? Yes. Photo showing awning on this building? No. What’s the height of the
awning at bottom? Attaches to building at about 10 feet, bottom of awning at 8’6”, exactly
to specifications of City.
Diane – no problem with awning.
Tracy – likes proposal.
Leslie – likes it.
Kathy – can’t allow exposed concrete from sonotube? Otherwise looks good. Wendy
reads regulations. Needs to be raised up to 8”.
Shane – likes accommodations for tree, light. Anything for building? Is it paint or stain?
Building is painted and needs another coat of same color. Building and awning color will
be same. Sonotubes need to be covered. Brackets should be either decorative or
concealed. Take care of detail all the way through.
Motion:
Diane– move to approve
5
Stacy– 2nd
Discussion: none
Vote: passed unanimously
WF Manor, 1305 E 7th Street, façade change, Cole Blackwell (ARC 20-12) The applicant
described the project, buildings and materials. Replacing siding material.
Paul – likes colors and product
Kathy – definite improvement
Diane – agrees it’s a much-needed improvement
Leslie – it’s much nicer
Paul – asks about windows? Vinyl, in almond color. Trim with acadia.
Leslie – any pictures showing one-story building attached. Yes. How will entry change?
Gables will have Acadia shake.
Tracy – thinks it looks great
Motion:
Paul – move to approve, as submitted
Diane – 2nd
Discussion: none
Vote: passed unanimously
City of Whitefish, 118 Edgewood Place, Carla Belski, WF Lake Decontamination Station
(ARC 20-14) The applicant described the site plan, project, building and materials.
Building donated by MT FWP, prefabricated. Can store decontamination unit in it on site,
plus an office space and space to store tools.
Paul- where on lot will the building go?
Kathy – will the doors stay white? Yes, that is the current plan so they match windows.
Paul – not attractive, but a great service performed there. How funded? A grant by the
DNRC. Any funding for landscaping? Carla said they will do the landscaping in-house.
Can the building be hidden better? Carla – could do some landscaping to hide it a bit
more.
Leslie – if could break up the front face of the building a bit with some shrubs would be
great. Carla - could also put the decontamination sign in the front. Jeff from Parks – they
could also add some wainscoting and/or paint the doors.
Paul – very visible with lots of traffic. Painting the man doors would help.
Leslie – could the building be shifted south a bit so existing trees not impacted as much?
Provide as much natural screening as possible.
Paul – painting to blend into environment, add shrubs to screen. Jeff – front will be
concrete, so shrubs up front tough, to south and east sides would be do-able.
Diane – agree with Paul, paint and shrubs to get it to blend in, add character.
6
Leslie – awning over man doors might help.
Tracy – likes idea of changing door color, wainscoting to add character.
Kathy – paint two man doors, move building to minimize effects to trees, add landscaping,
might be enough.
Motion:
Stacy– move to approve with painting man doors to match roof, move building to minimize
effects to trees, add landscaping
Paul – 2nd
Discussion: none
Vote: passed unanimously
OTHER ITEMS
Council directed amendments: Wendy got photos for Old Town and will get more of other
areas today – will share with Committee once ready. Keni is reviewing text amendment
language. When pictures selected, will use InDesign to put it together in next few weeks.
The Core townhouses on Kalispell has some slight update changes. Do they need to
come in? It’s a prominent location and they should come into the next meeting.
Meeting adjourned at 10:35 AM
7
Agenda
Whitefish Architectural Review Committee
AGENDA
Due to the Stay-at-Home Directive from Governor Bullock
due to the global outbreak of COVID-19, City Hall will remain
closed. The regular meeting of the Whitefish Architectural
Review Committee will be held April 21, 2020 at 8:15AM.
To access the meeting online and provide oral comment, individuals and the applicants
presenting projects must click on the link below, which will take you to the Event Information
page. From there you can register and join the event:
https://cityofwhitefish.webex.com/cityofwhitefish/onstage/g.php?MTID=e5fceecff269cbd75ef
10ae04b5272684
To audio conference the meeting, you can register above and leave a call back number, or
you can call 1-408-418-9388 and use the following Access Code: 967 408 824
Attendees should register for the meeting ahead of time, especially those wanting to make
comments. Further instructions for commenting will be given orally during the meeting.
1. Call to Order and Roll Call
2. Public Comment
3. Approval of Minutes of the March 3, 2020
Old Business:
• 718 Edgewood Place, material change, Devin Stus (ARC 19-14)
• Alta Views, façade change – Pod 3, Ken Huff (ARC 19-04B)
• Carport, 59 Crestwood Drive (ARC 18-26)
New Business:
1. 420 E 3rd Street, Toby Scott, Awning (ARC 20-11)
2. WF Manor, 1305 E 7th Street, façade change, Cole Blackwell (ARC 20-12)
3. City of Whitefish, 118 Edgewood Place, Carla Belski, WF Lake
Decontamination Station (ARC 20-14)
Next meeting: May 5, 2020
Other Business:
• City Council Directed Amendments – on-going item
Adjourn