Architectural Review Committee

Regular Meeting

Whitefish, MT · February 2, 2021

AgendaMinutes

Minutes

WHITEFISH ARCHITECTURAL REVIEW COMMITTEE MINUTES February 2, 2021 The meeting was called to order by Shane Jacobs at 8:15AM PRESENT: Stacy Caldwell, Shane Jacobs, Diane Kane, Leslie Lowe, Tracy Rossi ABSENT: Paul McElroy STAFF: Wendy Compton-Ring APPOINTMENT OF CHAIR: Stacy, Diane 2nd appoint Shane to be the chair – unanimous APPOINTMENT OF VICE CHAIR: Tracy, Leslie 2nd appoint Diane to be the vice chair - unanimous PUBLIC COMMENT: none MINUTES: The minutes from January 5, 2021 were unanimously approved. OLD BUSINESS Façade Change, 1000 Wisconsin Avenue, Solus Architects (ARC 20-29) Ken summarized the changes from the previous meeting. The Quarry has approved the design and they provided a material mock-up (staff showed to the ARC via camera). Described the changes to the landscaping, location of the bike rack and trash enclosure. Tracy – likes the color of the stain on the coffee shop, it ties it together better Leslie – the project has come along way and the various changes have really improved the project Diane – it looks great likes the space between the boards on the Shane – the slats how finished? Clear coat and will be looking at how to maintain it over the long-term – it will be a challenge; wants to be able to remove the slats as they are damages or need updating, the rain screen is behind the slats Shane – trash enclosure materials stained to match the building appreciates how the two buildings tie together Motion: Leslie – move to approve as submitted Diane – 2nd Discussion: none 1 Vote: motion passes unanimously 205 Central Ave, façade change (ARC 21-03) The applicant found plaster under the existing siding so they are now proposing this current design. The applicant described the materials and their application. Diane – what is the space between the slats of wood 4” wood with 2” gap Shane – backing? Same wood with a slighter darker stain Tracy – Any windows under the old siding? A vent, but no windows Shane – Describe the awning. The overall dimensions are the same, repair and a new stain Leslie – likes the brick on the 1st floor because it has brought an intermediate tone to the front versus the option with the wood slats that look very similar Diane – likes that the front façade is brought down lower to match the neighboring buildings Tracy – likes the changes Stacy – the design is nice, unique Motion: Stacy – move to approve as submitted Tracy – 2nd Discussion: none Vote: motion passes unanimously 715 Cottonwood Court, amendment, Marc Bessette (ARC 19-15) The applicant described what happened with this duplex versus the plans approved by the ARC. They had some challenges finding some of the materials; however, the design is different than the other duplexes Leslie – the changes were pretty significant to what was approved Tracy – concerned this would set a precedent for future projects; something needs to be done to make it look like what was approved Shane – agrees, one of the challenges with the ARC is having the Board do the design versus having a well thought out design before coming into the Committee and the Board unfortunately helped a lot with this design; this sets a dangerous precedence; the building is pretty plain and the variation of material helped Diane – agrees, so markedly different than what was approved; a lot of horizontal siding; what was submitted is much better; pretty disappointed in what transpired Marc asked staff to forward the plans and he will fix the building. Marc takes full responsibility for what transpired. Leslie – appreciates moving on it to fix it and agrees with the fellow Committee members; concerned with the precedent 2 Marc asked how he can move forward with occupancy and he offered to put together an estimate, financial guarantee and schedule for completion. Once received, staff can sign off on the C of O. Motion: Diane – move to deny the amendments to the original plan and retain the original approval Tracy – 2nd Discussion: none Vote: motion passes unanimously NEW BUSINESS Monterra, Phase 2, Monterra Avenue, Brandon Prinzing (ARC 21-05) The applicant described the project, updates to the site plan since the pre-ap last month including: the pool and pavilion area, otherwise the site plan remains the same. Also, they provided site details (bike parking, concrete wall, lighting – pathway and streets, trash enclosure, other facilities). The building roof and form is the same as the last meeting while being distinct and complementary to Phase 1. They simplified the materials and colors – eliminated metal siding and updated to a Hardi siding. The applicant described the materials, colors and their location. Entrances still have screen walls and detail to make them standout. The gray is in between the Material D and E. The pool house & pavilion building materials complement the condo buildings. Overall, the materials will not have a reflective nature. Wanted this phase to make Phase 2 a community within a community – all facilities are shared. All the units are 2 bedroom, but could add a 3 bedroom to units, if someone would want one. Leslie – likes the simplification, but sort of likes some of the boldness of the different colors; the new colors are quite muted concerned the metal would not be timeless, so they added more wood; the wood product is a more of a warm inviting material; they have found that either you love Corten or you don’t Tracy – wants to make sure the details don’t get lost Shane – appreciates the simplicity of the materials; what is the finish of Material ‘B’ they are still working on it – maintenance-free as possible, it will be as natural as possible Diane – appreciates the simplification; they are large buildings, and the more muted colors will emphasize the form versus something popping out Motion: Leslie – move to approve as submitted Tracy – 2nd Discussion: none Vote: motion passes unanimously 3 OTHER ITEMS Wright’s Furniture, Pre-Ap, façade update, 6325 Highway 93 S, Paradigm 3 Architecture The applicant described the project – existing building, materials, colors, and the site and the proposed elevations and materials. Plan to also update the signs to complement the building. Tracy – nice upgrade; balanced; brings a lot of nice light inside the building Leslie – looks nice – would like to see pedestrian and bicycle connection between the building and sidewalk along the street; we really want to see that interaction along this entire corridor; would like to see more detail on the landscaping; appreciates the landscaping in front of the building; interested to see the next iteration Stacy – nice upgrade; any upgrades to the site plan Diane – nice improvement; simplifying the front of the building – nice; looks forward to reviewing the full application Shane – agrees; looks forward to reviewing the material palette; generally don’t like the heavy materials above a lighter material, but seems to work; don’t love the brick or stone on the 2nd entrance; understands the need to tie together Discussed the need for a material board and possibly a mock-up Riverwalk Condos, Pre-Ap, three new buildings, Shiloh & JP Road, Cushing Terrell Described the project, it’s the final build out for this neighborhood. Described the site plan, buildings, materials – roof is a bit different than the original buildings. Screening for meters – suggested landscaping; update around these areas; the Hardi is a bit different (more durable) than the original bldgs but it can be painted to match; reviewed the original approved landscaping plan for the project; because of the HOA they cannot make the buildings too much different Tracy – paint question; will all nine buildings be painted at the same time so they all look updated? An HOA question – thinks all the buildings have been repainted recently; it would be up to the HOA Leslie – would like to see an updated landscaping plan and show what was planted, how the berms will work Shane – will also need to see the carports – existing versus new Diane – like the idea of doing some extra landscaping where the meters are located – would help Shane – or some screen walls; hiding from street side Diane – understands the need not wanting a lot of variation; they are simply completing a plan that was approved a long time ago Stacy – agrees with Diane; what is the paint schedule for the older buildings Don’t need approval from the HOA – agreement for construction; the buildings would not change too drastically Leslie – bike parking, refer to the new standards Other Mexican Restaurant – want to see the garbage enclosure? Yes. Staff will let him know 4 ADU building design standards – the City is looking at updating these and would like to incorporate some light design standards to complement the neighborhood and maintain privacy between ADUs and neighboring buildings. One ARC Member Opening – encourage any design people in the city limits/59937 zip code to apply for the ARC; Shane will see if we can add this to the state architects professional organization since we only advertise in the local paper and online. Starbucks – did the sidewalk from the building to the sidewalk on Hwy 93 S get installed? Staff will check it out. Meeting adjourned at 10:14 AM 5

Agenda

Whitefish Architectural Review Committee AGENDA February 2, 2021 at 8:15AM via Webex The Whitefish City Council Approved Emergency Ordinance No. 20-18 to provide for continued remote meetings of the City Council, City Boards and Committees to protect the health and wellbeing of all attendees, practice social distancing and to continue to have public meetings to serve the community during the Covid-19 pandemic. To attend the meeting, and provide live comment via WebEx on your computer, tablet or smartphone, residents and other attendees should go to the following web address. REGISTRATION IS NOT REQUIRED. For best participation, download the Webex App to your desktop/phone/tablet prior to the meeting. Meeting Link: https://cityofwhitefish.webex.com/cityofwhitefish/j.php?MTID=m047126656a29f43e29d42e131cdc3072 Meeting Number: 146 618 2722 Password: qzSGD89bSu6 For the Audio Conference Call option: call the number below and enter the access code. • United States Toll: +1-408-418-9388 • United States Toll Free: (From a land line phone) 1-844-992-4726 • Access code: 146 618 2722 We encourage individuals to provide written public comment to the Planning & Building Department (wcompton-ring@cityofwhitefish.org) or deliver by 12:00 p.m. February 1, 2021, at City Hall. Written comments should include name, address, should be short and concise, courteous, and polite. All written comments received by 12:00 p.m. will be provided to the Committee members. At the end of "live" comment, city staff will read the name and address of each individual providing written comments and their comments. 1. Call to Order and Roll Call 2. Appointment of Chair 3. Public Comment 4. Approval of Minutes of the January 5, 2021 meeting Old Business: • 1000 Wisconsin Avenue, minor amendment, Ken Huff (ARC 20-29) • 205 Central Ave, façade change (ARC 21-03) • 715 Cottonwood, amendment (ARC 19-15) New Business: 1. Monterra, Phase 2, Monterra Avenue, Brandon Prinzing (ARC 21-05) Other Business: • Pre-Ap, Wright's Furniture, façade update, 6325 Highway 93 S, Paradigm 3 Architecture • Pre-Ap, Riverwalk Condos, Three New Buildings, Shiloh & JP Road, Cushing Terrell Adjourn Next meeting: March 2, 2021

Get email alerts for Whitefish

A daily email when new agendas and minutes are posted.

Report an issue with this meeting