Muyni
← Back to Whitefish

Architectural Review Committee

Regular Meeting

Whitefish, MT · September 21, 2021

AgendaMinutes

Minutes

WHITEFISH ARCHITECTURAL REVIEW COMMITTEE MINUTES September 21, 2021 The meeting was called to order by Shane Jacobs at 8:15 AM PRESENT: Christine Bleyhl, Stacy Caldwell, Shane Jacobs, Diane Kane, Leslie Lowe, Paul McElroy, Tracy Rossi ABSENT: none STAFF: Wendy Compton-Ring PUBLIC COMMENT: none MINUTES: The minutes from August 17, 2021 and September 7, 2021 were unanimously approved. OLD BUSINESS none NEW BUSINESS 968 Colorado Avenue, townhouse, Chelmo (ARC 21-28) The applicant described the townhouse elements from the Architectural Review Standards for townhouses and changes made to the project and described these standards. The garage is stepped in a bit to meet the garage-forward standards. The retaining walls will likely be stacked rock. Leslie – questions/concerns about the landscaping design with this design; any landscaping along the street Tracy – any way to screen the utility box Diane – landscaping can be more than just trees Tracy – is there a solution to the very wide asphalt driveway Leslie – seems like there is an opportunity to better consider landscaping with the project Christine – we’ve seen a few projects with no landscaping; because this project is maximizing its use, we need to see more landscaping Leslie – ensure the plans are making a livable place The applicant described the building materials and their application on the building. Christine – the side elevation are in the same plane? Yes Committee discussion about the requirement for 8 corners and the reason for the corners; the applicant proposed to push in the garage in 2-feet Christine – the intent is not being met with just a rectangular box Tracy – can the southern unit be shifted back? 1 Christine – only have the siding change makes an attempt to break up the side but almost accentuates it; can also bump in versus bump out Paul – can the front portion of the building be pushed in a couple of feet? The light gray in the front might even be better than the dark gray in the front Christine – maxing out the footprint but the design needs to go hand in hand The lot is very tight; there isn’t as much space as it seems – narrow, slopes Christine – doesn’t feel comfortable approving not meeting the requirements; need to see more before we move forward Paul – need to help us overcome the boxy-ness of the building; consider swapping colors Stacy – like the mix of materials – boxy-ness and landscaping Leslie – we created new design guidelines and these need to be met Part of the reason for not stepping back the buildings is cost; stepping in would be challenging due to the stairs Motion: Leslie – move to table Tracy – 2nd Discussion: none Vote: motion passes unanimously Golf Accessory Building, WFGC, Terry Nelson (ARC 21-29) No one attended the meeting Motion: Tracy – move to table until the next meeting, as the committee had questions for the applicant Paul – 2nd Discussion: none Vote: motion passes unanimously OTHER ITEMS • Tree Preservation During Construction – continue until the next meeting Meeting adjourned at 9:02 AM 2

Agenda

Whitefish Architectural Review Committee AGENDA September 21, 2021 at 8:15AM 418 E 2nd Street City Hall, Council Conference Room, 2nd Floor 1. Call to Order and Roll Call 2. Public Comment 3. Approval of Minutes of the August 17, 2021 and September 7, 2021 meetings Old Business: none New Business: 1. 968 Colorado Avenue, townhouse, Chelmo (ARC 21-28) 2. Golf Accessory Structure, WFGC, Terry Nelson (ARC 21-29) Other Business: • Tree Preservation During Construction – continuation from April Adjourn NEXT MEETING: October 5, 2021

Get email alerts for Whitefish

A daily email when new agendas and minutes are posted.

Report an issue with this meeting