Pedestrian & Bicycle Path Advisory Committee
Regular MeetingWhitefish, MT · September 12, 2022
Minutes
Pedestrian and Bicycle Path Advisory Committee Meeting Minutes
September 12, 2022
Committee Members Present: John Repke, John Phelps, Antonia Malchik, Luke Moses
City Staff Present: Carla Belski, Craig Workman, Maria Butts, Angela Jacobs
Public Present: Rachael Schmidt, Bruce Boody, Jedd Sankar-Gorton, Dick Allison, Greg
Gunderson, Riley Polumbus
A. The meeting was called to order 8:32 a.m.
B. The agenda was not officially approved.
C. The minutes were not approved. Approval is delayed until the September meeting.
D. Public Comment: No comments.
E. New Business:
a. Cow Creek Path: Maria gave an updated on the bridge over Cow Creek, which is
sinking and shifting. Engineers and River Design Group have evaluated the bridge
and it can either be removed or replaced. Initial estimates for replacement are
high and it may be more cost effective to remove it, create a viewing area, and
widen the path along the road to be the bike path route. Replacing the bridge
may not fix the problem as the creek is changing and cutting into the bank.
Maria is still waiting on some cost estimates and evaluations and will continue to
provide updates to the committee.
b. Muldown Crossing Guards: It was initially reported that Muldown was short 6
crossing guards. Nia reported that they only need two more.
c. Safe Streets for All Grant: Craig reported that City Council approved Public Works
to move forward with the Safe Streets for All grant to create a safety plan. A
safety plan is needed to be awarded a construction grant. The bi-partisan
infrastructure bill is the funding mechanism. The safety plan would eventually be
adopted as an appendix to the transportation plan.
F. Old Business
a. River Bend Condos: John reported that the conceptual plan was approved by the
Park Board and City Council. Easement area is not yet approved by the HOA.
Craig reported that there is not funding for design, engineering, and
construction. He did receive an estimate for surveying and will consider doing
surveying prior to budgeting for the engineering. Angie reported that she thinks
it would be good to sit down and review all the easement information and then
reach out to Alan from the HOA with a phone call and follow up with sending
photos.
b. Malmquist Easement: Miles Avenue plans have been approved and include
easement with shared use path. Engineering plans have also been approved.
Waiting for permit approval with the conservation district.
c. Viaduct Improvements: Craig reported that he is working with WGM on a phased
approach to this project. This will be reviewed by City Council at a work session.
d. Safe Routes to Schools: Craig reported that pavement markings were all updated
prior to school starting. Asher, 7th, 6th and Pine all have blinking lights. Crosswalk
signs were also provided to the school last year.
e. Paths Needing FWP Approval: John discussed change in bike path width from 10’
to 8’ along the river. As specified in the draft FWP River path guidelines,
minimum width is 8’ with 10’ being desirable within the 75-foot buffer. John
raised concerns that this is not what was conveyed in the Connect WF Plan and it
has not been changed through an amendment process. Engineering standards,
approved in 2019, show that the width could be reduced to 8 feet. Craig
reported that the standards did go through a public process and were approved
by City Council. The goal along the river would be a 10-foot path but could be
reduced within river buffer to compromise with other regulatory agencies during
the permit approval process. Bruce reported that the permit for “The Yards” was
only approved for an 8’ wide path and he feels that this is not the correct width
to accommodate increased use in the future.
John also suggested that the committee meet with Jim Williams, former FWP
Region 1 Chief, to get a perspective on the permitting process. Maria reported
that the process with FWP has been cooperative and going in a positive
direction. Craig also reported that Lee Anderson, the new Region 1 Chief, has
met with the city and has collaborative ideas on how to move forward. Craig
reported that John and other committee members will be include in future FWP
meetings when appropriate.
G. Parks and Recreation Comments: No comments.
H. Public Works Comments: No comments.
I. Committee Comments: No comments.
J. The next meeting is scheduled for Monday, October 3, 2022.
K. The meeting was adjourned at 10:04 a.m.
Agenda
PO Box 158 • Whitefish, MT 59937 • (406) 863-2400 • Fax (406) 863-2419
To: Pedestrian and Bicycle Path Advisory Committee
From: Carla Belski, Community Services Coordinator
Subject: Pedestrian and Bicycle Path Advisory Committee Meeting Agenda
Date: Monday, September 12, 2022, 8:30 a.m. in person at Whitefish City Hall Council
Chambers Conference Room
Agenda Items
A. Meeting Called to Order
B. Approval of Monday, September 12, 2022, Agenda
C. Approval of July 11, 2022, Minutes
D. Public Comment
E. New Business
a. Cow Creek Path Update
b. Muldown Crossing Guards
c. Safe Streets for All Planning Grant
F. Old Business
a. Riverbend Condo Easement Updates – Craig
b. Malmquist Easement – Craig
c. Viaduct Improvements – Craig
d. Safe Routes to School – Karin
e. Paths needing FWP approval – Craig
• Communication within the city - John
• Trail width for the River Trail -John
• Proposed meeting with Jim Williams (former director of FWP Region 1) -John
G. Parks and Recreation Comments
H. Public Works Comments
I. Committee Comments
J. Next Regular Meeting – Monday, October 3, 2022
K. Adjourn
Committee Members City Staff
John Phelps - Chair Dana Smith –City Manager
Mary Behrendt Maria Butts - Parks and Recreation Director
Doug Reed - Resort Tax Committee Carla Belski – Community Services Coordinator
Jim DeHerrera - Park Board Karin Hilding - Public Works Engineer
Antonia Malchik Craig Workman – Public Works Director
Giuseppe Caltabiano – City Council Representative
John Repke – Vice Chair
Luke Moses – High School Representative
CC: Bruce Boody, Greg Gunderson, Karen Nicolletti, Whitefish Legacy Partners, Ron Brunk,
Jennie Bradford, Patty Zanto, Riley Polumbus
Ongoing Project List -
a. Lamb Lane/Assembly of God Paths – Karin/John
b. Les Schwab Easement – Craig
c. Duck Inn Easement – Craig
d. Voerman/Trailview and Shady River Lane Path Connections – Craig
e. West Lakeshore - Birch Point Connection
f. Crosswalk on Lupfer/2nd Street – Karin