Comprehensive Plan Work Group
Regular MeetingWhitewater, WI · February 11, 2026
Minutes
MEETING MINUTES
From: RDG Planning & Design
Project Name: Whitewater Forward
Meeting Date: Wednesday, February 11, 2026
Whitewater Forward | Comprehensive Plan Working Group Meeting #2
Meeting Attendees
Comments, additions, or corrections to this memo should be communicated in writing to RDG Planning & Design within seven (7) days of
receipt. If no comments are received within that period, this memo will be assumed accurate and filed as part of the permanent record for
this project.
Elizabeth Anderson (Working Group Member)
Mason Becker (City of Whitewater)
Christ Christon (Working Group Member)
Charlie Cowell (RDG Planning & Design)
Corey Davis (Working Group Member)
Llana Dostie (City of Whitewater)
Ben Freiermuth (Working Group Member)
Dave Friend (Working Group Member)
Neil Hicks (Working Group Member)
Brad Marquardt (City of Whitewater)
Brian Schanen (Working Group Member)
Orin Smith (Working Group Member)
Maya Struhar (RDG Planning & Design)
Terry Tumbarello (Working Group Member)
Discussion
This memorandum summarizes the items discussed during the meeting referenced above.
A. Schedule Update
1. Recap of first Working Group Meeting discussions
2. Recap of process
a. February is month four of twelve, and still in the discovery phase
3. Recap of hosted events that have occurred
a. Eight listening sessions
b. One community roundtable event
4. Recap of hosted events to come
a. More listening sessions to occur
b. Pop-up events beginning in March
c. More public events, starting in April
2
B. Public Comments
1. None
C. Project Website Updates
1. Number of visits to the project website
2. Number of unique visitors to the website
3. Number of contributions on the website
4. New website updates will occur as the process continues
a. Pop-up events in March will be advertised
b. The monthly poll will be updated monthly, and reminders will be sent via email
D. Goals Exercise
Working group members were asked to determine one “asset/opportunity” and one
“weakness/barrier” for each of the below topics. Each bullet in quotations is a comment made
by a working group member. These identified barriers and opportunities, along with
conversations had during listening sessions, public events, and input made on the project
website, will all be used to help guide the goals of the plan.
1. Land Use and Design
a. Assets/Opportunities
i. "More single family home developments"
ii. "A lot of industrial land/zoning available"
iii. "City has a lot of land available"
iv. "City owned business park land"
v. "Lots of opportunity around Hwy 12"
b. Weaknesses/Barriers
i. "Not enough land for larger houses and property; Ex. - Estates 1+ acre"
ii. "Prime residential land is privately owned, unlisted"
iii. "Land hoarding"
iv. "Very regulated conditional use permitting"
v. "State zoning requirements and impact on land use"
vi. "Unaware of land available for larger industry near Hwy 12"
2. Transportation and Mobility
a. Assets/Opportunities
i. "Make US 12 4-lanes from Fort to Elkhorn"
ii. "Hwy 12 and 59 access"
iii. "Plentiful 2-lane state highway access in all directions" ....
3
iv. "More parking at WHS"
v. "Lack of public transportation. This is an opportunity"
vi. "Increased public safety"
vii. "Community partnerships?"
viii. "Commerce almost exclusively on Main Street or walking distance from Main"
ix. "Extension of bike lanes and sidewalks north/east of town"
b. Weaknesses/Barriers
i. "Lack of 4-lane highway/interstate"
ii. "Little public transport/ride-share"
iii. "Funding public transit"
iv. "Location/distance from large metro cities"
v. "Late hours would be beneficial, but difficult to source"
vi. "Lack of mass transportation in general"
vii. "Public transportation; Lack of; Some sort of shuttle from W+E side town"
viii. "Cost"
ix. "Lack of connection to trains, including to nearby communities"
3. Parks, Trails, and Greenways
a. Assets/Opportunities
i. "Landmarks!"
ii. "Lakes!"
iii. "A support for parks and rec youth sports to compete with pay 2 play travel leagues"
iv. "Better marketing"
v. "Lots of parks available currently in good locations"
vi. "Connect to existing walking/bike trails that runs Jefferson to Janesville"
vii. "Multiple walking trails"
viii. "Utilities for concession stand and restrooms at Moraine View Park behind Innovation
Center (soccer fields)
ix. "Kettle Moraine"
x. "Kettle Moraine is a local draw"
xi. "Starin Park"
xii. "Great asset at Starin Park with Treyton's Field and 3 other baseball fields"
xiii. "Starin Park" ....
4
xiv. "Starin water tower"
b. Weaknesses/Barriers
i. "Landmarks"
ii. "Could use more paved trail routes that are near local businesses"
iii. "Bike trail; Would like rural; Possibly community joining"
iv. "Current condition of lakes"
v. "Some parks/facilities need TLC"
vi. "Many small parks that don't get used as much as Starin Park"
4. Housing and Neighborhoods
a. Assets/Opportunities
i. "There is a demand for affordable quality housing non-student"
ii. "More entry-level single family homes - houses and condos and townhomes"
iii. "More residents = More local economic impact"
iv. "Convert UWW students to residents"
v. "Intentional partnerships to keep or re-engage UWW and WWSD students, faculty, and
staff"
vi. "Room to grow"
vii. "Increased support for renewing old housing"
viii. "No real "bad" neighborhoods"
b. Weaknesses/Barriers
i. "Lack of single family, affordable housing"
ii. "Not enough starter housing"
iii. "Lending options to first-time home buyers"
iv. "Single family housing; Need more 1st time home buyer; Need more "high" end to assist
with upgrading first to second homes"
v. "Inflation"
vi. "Accessibility of entry level homes less than $300k"
vii. "UWW is centrally located. Forces student housing to grow outward, taking up entry
level homes"
viii. "Student housing vs. resident housing development"
ix. "Quality of rentals is geared towards students as temporary tenants, not residents"
x. "Need family focused rentals (not chopped up student)"
....
5
xi. "Landlord push-back to family apartments"
xii. "Not a lot of incentive to move and live in Whitewater"
xiii. "Zoning"
xiv. "Lack of upper scale housing and neighborhoods"
xv. "Not enough single-family housing"
xvi. "Newer (20 years and newer) neighborhoods/subdivisions are starting to show age. Lack
of caring or lack of code enforcement?"
xvii. "Community perception"
5. Facilities and Infrastructure
a. Assets/Opportunities
i. "Hwy 12"
ii. "Library, etc. remodeled; Community resources"
iii. "Newly remodeled library; Municipal building well maintained"
iv. "Historic buildings"
v. "High speed internet expansion (wired)"
vi. "Upkeep of downtown armory"
vii. "Aquatic center"
b. Weaknesses/Barriers
i. "Lack of 4-lane highway"
ii. "Lack of 4-lane highway"
iii. "Lack of suitable energy transmission to support industrial growth"
iv. "Electrical supply to industrial park"
6. Downtown
a. Assets/Opportunities
i. "Unused commercial spaces"
ii. "Creating public/city events; Food truck fest; Xmas/holiday parades"
iii. "Creating community "feel" and space. Beautification into tangible impact"
iv. "Large potential for annual events that cater all generations near Cravath downtown"
v. "More local restaurants open weekdays for lunch"
vi. "Collaboration with CoBE?"
vii. "Most properties in reasonably good shape/appearance"
b. Weaknesses/Barriers ....
6
i. "Empty storefronts"
ii. "Neglected Center St. downtown"
iii. "Center St. visually off-putting building; Empty storefronts as storage"
iv. "Aging buildings"
v. "Lack of store front businesses to utilize "Main Street" window front"
vi. "Boring. Lack of character."
vii. "Lots of opposition for local community events downtown"
viii. "Lack of higher end shopping and dining"
ix. "Fluctuation of the student population in Whitewater. Summer and school year"
x. "Lakes: Overgrown; Not practical for use"
7. Economic Development
a. Assets/Opportunities
i. "Community development department"
ii. "Business park"
iii. "Partnerships with UWW CoBE?"
iv. "UWW should bring opportunities to commercial and businesses to grow"
v. "Grants"
vi. "Downtown Whitewater/Chamber"
vii. "Increased small business and independent job growth"
viii. "Starting to see small commercial development that compliment size of town with
direction to grow (Aldi, Kwik Trip, Fairfield, Starbucks)"
ix. "4th of July"
x. "More social/entertainment options"
b. Weaknesses/Barriers
i. "Stagnant growth; Low job creation due to slow industrial growth"
ii. "Battles between which is first - housing or jobs"
iii. "Not enough industry to support local jobs. High priority"
iv. "Skilled workers"
v. "Hard to attract/retain skilled workers"
vi. "Businesses to keep people in town; Compatibility shopping"
8. Other
a. Assets/Opportunities ....
7
i. "Coordination with local townships (Cold Spring, Town of Whitewater, etc.)"
b. Weaknesses/Barriers
i. "Lack of a newspaper for getting info out to community"
ii. "Lack of strong local newspaper"
iii. "Community engagement would be great! Is lacking"
iv. "Flawed MSP payment formulas from state"
9. Next Steps
a. Working Group Members
i. Members to continue advertising the planning process and project website within their
circles
ii. Members to share any additional contacts for listening sessions
iii. Members to share any meetings and events to promote the project
b. Planning Team and Staff
i. Continue to collect data and review past planning documents
ii. Host additional listening sessions
iii. Update the project website regularly
iv. Prepare for April Design Workshop
Next Working Group Meeting: Wednesday, March 11 at 4:00pm
....
COMPREHENSIVE PLAN
Work Group #2
AGENDA
• Introductions
• Schedule Update
• Engagement Update
• Goals Exercise
INTRODUCTIONS
Plan Advisory Work Group members
• Neil Hicks – Common Council
• Brian Shanen – Common Council
• Orin Smith – Common Council
• Sherry Stanek - PARC
• Elizabeth Anderson - Generac
Charlie Cowell Maya Struhar Flavia Tourek
Project Manager + Planner + Engagement Urban Planner + GIS + • Corey Davis – Kiwanian, UWW
Planner Communication
• Rebecca Goodacre - Chamber
• Terry Tumbarello - UWW Executive of Housing
• Benjamin Freiermuth – WRA
• Christ Christon - CDA and local business owner
• Dave Friend - Whitewater School District
Cory Scott Ryan Peterson
Land Use + Mobility + Environments
Districts
ORIENTATION MEETING RECAP
What does success mean to you? Process and/or Where can we go wrong? Process and/or
outcomes. outcomes.
- Sustainable plan between the community, school district, - Downtown is unappealing and confusing to navigate
university, etc. that Is realistic - Stagnation, and the community is still recovering
- Brings balance to the community, most growth has been from the pandemic, but there's movement now and
related to the university in recent years (off-campus student
growth happening that we can capitalize on and use
housing)
- The ability to sustain and be a thriving community without the
as catalyst for the future
university - There's flexibility within the plan to account for things
- Limited housing availability for residents that are not students we can't predict – pandemics, recessions, etc.
- Family housing options - The document can't just be a pretty picture, it should
- Expanding commercial to include additional grocery, etc. be actionable
- The entire community sees themselves in the plan - The plan should be cost-conscious
- Lots of outreach and community sessions in multiple places at - Be something people can get excited about!
multiple times of day to reach everyone, meet people where
- Don't concentrate too much on the university – learn
they are at
- Preservation of city facilities, particularly the aquatic center how to grow and sustain without it
and the downtown Whitewater armory - More activity options in the community that don't
- Downtown, discover what comes next for the downtown involve drinking
- Outreach in multiple languages, particularly Spanish
AGENDA
• Introductions
• Schedule Update
• Engagement Update
• Goals Exercise
Nov Dec Feb Mar Apr May June July Aug Sept Oct
Task 1 Communications/Marketing Plan
Task2
Task3
Task4 PLAN ELEMENTS
Draft Plan to PMT Editing
Task5
PMT
Meetings
'" '" "' "' APPROVAL
"' "' "' "'
PMT Outreach Outreach Issues and Emerging Design Review Review Review Implementation Final
Trends Workshop Plan Elements Plan Elements Plan Elements Plan Review
•
Kick-Off Strategies Strategies Opportunities
Work
Group
Meetings
Orientation
[Zoom]
Goals
Workshop
Discuss Trends
[Zoom]
Attend Design
Workshop
"'
Concept Feedback
[Zoom or In-Person]
Policy Feedback
[Zoom]
"'
Implementation
Workshop
Major
Events Launch
@ Launch
@
Focus Groups
@
Design
@
Online Polling
@
Online Polling
@
Open House
Website Interactive Map & Roundtable Workshop
PROCESS OVERVIEW
Project Launch
Input Today: Tomorrow: Tomorrow: Implementation
Collect and Land Use & Special Plan Elements
Analyze Data Area Concepts
Approval
SCHEDULE UPDATE
Future Work Group Meeting Dates
• March 11th: 4:00-5:15 p.m. – Work Group #3 (In-Person & virtual)
– Trends and Goals Report
• April 22, 4:00-5:15p - Work Group #4 (In-Person & virtual)
– Design Workshop
• June 3rd: 4:00-5:15 p.m. - Work Group #5 (Virtual)
– Plan Elements I
• August 5th: 4:00-5:15 p.m. - Work Group #6 (Virtual)
– Plan Elements II
• September TBD – Work Group #7 (In-Person & virtual)
– Implementation
AGENDA
• Introductions
• Schedule Update
• Engagement Update
• Goals Exercise
ENGAGEMENT UPDATE
Listening Session Schedule
Date Time Group Additional Follow-ups
Monday, February 9 6pm PARC • Whitewater Chamber
Tuesday, February 10 9am Education • UWW Students
11:30am Service Providers • UWW Faculty and Staff
2:30pm Realtors
• High School Students
4pm Builders and Developers
• Retirement Communities
6pm Community Roundtable • Immigrant Support Coalition
• Greater Whitewater Committee
Wednesday, February 11 8am Business Owners
9:30am Property Managers • Service Organizations
Noon City Staff • Realtors
1:30pm Major Employers
ENGAGEMENT UPDATE
Website Tracking
238
Website Views
159
Unique Visitors
8
Contributions
ENGAGEMENT UPDATE
Still Taking Input on Events to Plug
Information
• Business Cards
• Comment Box
• Idea Board
AGENDA
• Introductions
• Schedule Update
• Engagement Update
• Goals Exercise
GOALS EXERCISE
Plan Focus Elements
1. Land Use and Design
2. Mobility
3. Parks, Trails, and Greenways
4. Housing and Neighborhoods
5. Facilities and Infrastructure
6. Downtown
7. Economic Development
Other Items?
GOALS EXERCISE
Plan Focus Elements
1. Land Use and Design
2. Mobility
3. Parks, Trails, and Greenways Opportunities
4. Housing and Neighborhoods At least one
5. Facilities and Infrastructure per topic
6. Downtown
7. Economic Development
Other Items?
Weakness/
At least one
per topic
NEXT STEPS
Advisory Work Group Planning Team/Staff
• Promote the website and project • Data collection and document review
• Share any additional contacts for listening • Hold additional virtual listening sessions
sessions • Update website and monthly polls
• Share any meetings and events to promote the • Prepare for April Design Workshop
project
NEXT WORKING GROUP MEETING MARCH 11
HITE ATER
MOVING TOGETHER TOWARD 2045
COMPREHENSIVE PLAN
Work Group #2
WHITEWATER P�NNINGRGPg:••
AGENDA
• Introductions
• Schedule Update
WHITE.WATER
...
• Engagement Update
• GoaIs Exercise r., ........
MOVING TOGETHER TOWARD 2045
-�-...·---
WHITEWATER
r., .. .,., .......... ,
MOVING TOGETHER TOWARD 2045 P�NNINGRGPg: ••
rm·-r-r
INTRODUCTIONS
Plan Advisory Work Group members
• Neil Hicks - Common Council
t
Charlie Cowell Maya Struhar
D Flavla Tourek
•
•
•
•
Brian Shanen - Common Council
Orin Smith - Common Council
Sherry Stanek - PARC
Elizabeth Anderson - Generac
Project Manager+ Planner+ Engagement Urban Planner+ GIS + • Corey Davis - Kiwanian, UWW
Planner
•
Communication
Rebecca Goodacre - Chamber
• Terry Tumbarello - UWW Executive of Housing
• Benjamin Freiermuth - WRA
• Chris Christon - CDA and local business owner
• Dave Friend - Whitewater School District
..
Cory Scott Ryan Peterson
Land Use + Mobility + Environments
Districts
_.........
W HITEWATER R.Dg:••
r•ft ....... ,:,
MOVINO T OGE TH ER T O W A R D 2
04 5 PLANNING•o,.11GN
ORIENTATION MEETING RECAP
What does success mean to you? Process and/or Where can we go wrong? Process and/or
outcomes. outcomes.
- Sustainable plan between the community, school district, Downtown is unappealing and confusing to navigate
university, etc. that Is realistic Stagnation, and the community is still recovering
- Brings balance to the community, most growth has been from the pandemic, but there's movement now and
related to the university in recent years (off-campus student
growth happening that we can capitalize on and use
housing)
as catalyst for the future
- The ability to sustain and be a thriving community without the
university There's flexibility within the plan to account for things
- Limited housing availability for residents that are not students we can't predict - pandemics, recessions, etc.
Family housing options The document can't just be a pretty picture, it should
- Expanding commercial to include additional grocery, etc. be actionable
- The entire community sees themselves in the plan The plan should be cost-conscious
- Lots of outreach and community sessions in multiple places at Be something people can get excited about!
multiple times of day to reach everyone, meet people where
Don't concentrate too much on the university - learn
they are at
- Preservation of city facilities, particularly the aquatic center
how to grow and sustain without it
and the downtown Whitewater armory More activity options in the community that don't
- Downtown, discover what comes next for the downtown involve drinking
- Outreach in multiple languages, particularly Spanish
P�NNINGBCPg••
I I ilill -r -11
AGENDA
WHITEWATER
�
• Introductions
• Schedule Update
• Engagement Update
- ... ·-- -
rw , ........ .,
• Goals Exercise
MOVING TOGETHER TOWARD 2045
...... -. .
WHITEWATER
-..-- ..,.....,,,
r.,...
MOVING TOGETHER TOWARD 2045 P�NNINGBGpg ..
Nov Dec Jan '26 Feb Mar Apr May June July Aug Sept Oct
Task 1 Communications/Marketing Plan
Task2
Task3
Task4 PLAN ELEMENTS
Draft Plan to PMT Editing
Task 5 IMPLEMENTATION
PMT
Meetings
JI&
PMT
Kick-Off •Outreach
Strategies
Ill
Outreach
Strategies "' • • • •
Issues a n d
OppQrtunities
Ill
Emerging
Trends
Design
Workshop
Rev10W
Plan Elements
Review
Plan Elements
Review
Plan Elements
I&\
Implementation
Ill
Final
Plan Review
Committee
Meetings
•
Orientation
[ZOOmJ • • • •
Goals
Workshop
@
• Discuss Trends
[Zoom]
Attend Design
WOrllshOp
Concept Feedback
[Zoom or In-Person]
Policy Feedback
[Zoom] •
Implementation
Workshop
@ @ @ @ @
Events launch Launch Focus Groups Desrgn Online Polling Online Polling Open House
Website Interactive Map & Roundtable Workshop
T I � TI
PROCESS OVERVIEW
Project Launch
.m
Input Today: I Tomorrow: Tomorrow: Implementation
C
Collect and Land Use & Special Plan Elements
Analyze Data Area Concepts ,
Approval
SCHEDULE UPDATE
Future Work Group Meeting Dates tt
• March 11th: 4:00-5:15 p.m. - Work Group #3 (virtual)
- Trends and Goals Report
• April 22, 4:00-5:15p - Work Group #4 (In-Person & virtual)
- Design Workshop
• June 3rd: 4:00-5:15 p.m. - Work Group #5 (virtual)
- Plan Elements I
• August 5th: 4:00-5:15 p.m. - Work Group #6 (virtual)
- Plan Elements II
• September TBD - Work Group #7 (In-Person & virtual)
- Implementation
.W..H.IT..E..W.A..TER RDg••
r•ft w. . . . . , ;,
MOVING TOGETHER TO W A R D20 45 PLANNINGeO!SIGN
I ,1111 Ii ------------------------------ r
AGENDA
• Introductions
WHITEWATER
• Schedule Update
.... ...
r� ........ .,
�� �
• Engagement Update
• GoaIs Exercise
MOVING TOGETHER TOWARD 2045
_.........._
WHITEWATE R
r., ......... ,.,.......... ,
MOVING TOGETHER TOWARD 2045 •�NNINGBGPg••
ENGAGEMENT UPDATE
Listening Session Schedule tt
Date Time Group Additional Follow-ugs
Monday, February 9 6pm PARC
• Whitewater Chamber
Tuesday, February 10 9am Education • UWW Students
11:30am Service Providers • UWW Faculty and Staff
2:30pm Realtors
4pm Builders and Developers • High School Students
• Retirement Communities
6pm Community Roundtable • Immigrant Support Coalition
Wednesday, February 11 8am Business Owners • Greater Whitewater Committee
9:30am Property Managers • Service Organizations
Noon City Staff • Realtors
1:30pm Major Employers
..........
WHITEWATE.R
r.,........ ,.,. ..... ,
MOVING TOGETHER TOWARD 2045 P�NNINGBCPg ..
I 1111 II
ENGAGEMENT UPDATE
1-t
Website Tracking
238
Website Views
159
Unique Visitors
8
Contributions
...............
WHITEWATER
r� .. ..,.._ .. .,
MOVING TOGETHER TOWARD 2045 P�NNINGRGPg••
ENGAGEMENT UPDATE
tt
Still Taking Input on Events to Plug
Information
• Business Cards
• Comment Box
• Idea Board
WHITEWATER
-.---..----
r ........................ ,
MOVING TOGETHER TOWARD 2045
--.--r -!ill I II
AGENDA
• Introductions
WHITEWA TER
• Schedule Update
....
• Engagement Update
• Goals Exercise
r., ........
MOVING TOGETHER TOWARD 2045
....... ._.
WHITEWATER
r.., ...... ,......... ,
MOVING TOGETHER TOWARD 2045 MNN1NGBaPg••
GOALS EXERCISE
tt
Plan Focus Elements
1. Land Use and Design
2. Mobility
3. Parks, Trails, and Greenways
4. Housing and Neighborhoods
5. Facilities and Infrastructure
6. Downtown
7. Economic Development
Other Items?
PLANNINGRPg •.
I ' I 11111 i' If
GOALS EXERCISE
Plan Focus Elements
1. Land Use and Design
2. Mobility
3. Parks, Trails, and Greenways
Opportunities
4. Housing and Neighborhoods
5. Facilities and Infrastructure
6. Downtown
7. Economic Development
�, -
Other Items?
[ - t_.. ...:•,·.;,_I • �
l \\' ·, r,,-·,..--_-:, 1s·c;.·.·.,."•"'_·_,_-'_r'- 'I
,
' A '" :. ,_.
_!
',I /n, ' i -,. ~·'
:-�·c\.:.:.:--�-�- .....:. ?�'-"-:.�L.i
1
_-
a i
I G);·l_;'.J�t::; rs
1.·
�(;' '.�t�§�,_:0,1
:;J
1=
�� Jsitc11Si:;t\\�} �
[I� _.!_, -�·
lilliaiii
1,.
��=�)
.............
WHITEWATER
r., .. .,. .......... ,,
MOVING TOGETHER TOWARD 2045 P�NNINGBGPg••
NEXT STEPS
Advisory Work Group Planning Team/Staff
• Promote the website and project • Data collection and document review
• Share any additional contacts for listening • Hold additional virtual listening sessions
sessions
• Schedule March 10th and 11th drop ins
• Share any meetings and events to promote the
• Update website and monthly polls
project
• Prepare for April Design Workshop
....-
-.H-I.T-EWATER
W
M..
OV IN.
G.TO.
GE..
TH .T.
ER .A.
OW RD 204:5,
RDg-•
PLANNINGe DWGN
··, 11 f
Agenda
Comprehensive Plan Work Group
Whitewater Municipal Building Cravath Lakefront
Conference Room, 312 West Whitewater St. 2nd
Floor, Whitewater, WI 53190 *In Person*
Wednesday, February 11, 2026 - 4:00 PM
TO WHOM IT MAY CONCERN
This notice is given to inform the Public that the City of Whitewater is participating in Comprehensive
Plan Work Group The information is as follows:
When: Wednesday, February 11,2026, from 4:00 PM to 5:00 PM
Where: City of Whitewater Municipal Building, 2nd floor Cravath Lakefront
Conference Room, 312 W. Whitewater St., Whitewater, WI 53190.
A quorum of the Common Council and/or Committee members may be present. This notice is given to
inform the public that no formal action will be taken at this event. The event is open to the public.
Dated: February 6, 2026
Llana Dostie, Zoning Specialist