STAFF: John Howard
1. Call to Order: Achieved when Chair Hall joined the call at 4:43pm.
2. Review and Approval of June 2020 Meeting Minutes: Tabled due to lack of quorum at 4:30 pm.
3. Environmental Considerations with Annexation Proposals:
Gabe Ericksen, a resident of the Pleasant Valley area, described his views on the current City policy
regarding Natural State Areas and creation of protected areas with land development. Gabe believes natural
areas need to be enhanced and managed because static natural areas will degrade and become overrun
with invasive species. Gabe elaborated that this includes understory improvement of forests and general
thinning of woods canopy. John summarized that there are current development regulations around bluffs
and stormwater that provide environmental protections. The CEQC historically has not been active in
reviewing plans since the CEQC is advisory to the Planning Commission and waits for requests from the
Planning Commission. Gabe would like to see the CEQC play a role in the site design plans for the Bradford
development, but also have more role in general in promoting environmental improvement. John described
that the developer will need to come back to the City with a site plan, which is where the City may be most
able to encourage environmentally friendly management of natural areas.
David said disturbance is beneficial and useful for natural ecosystems, and degradation is inevitable. David
asked for details on process with site plan. John gave a summary of the general details (such as erosion
control, building layout, building height, and utility access) that need to be included in a site plan
application. Dan concurred that more detailed plans come forward for plat and site plan reviews.
David asked what role the City site plan review could have in requiring restoration or other improvements.
John replied that requirements could be shaped by public comments, and there is a set checklist of items
that staff reviews prior to the site plan proceeding to the Planning Commission.
Lynette asked about green space requirements in zoning code, which she feels are valuable requirements.
John said there are park dedication fees and guidelines per acre, but it can take a variety of forms. John was
unsure on the specific requirements.
Gabe asked about what can be included in City regulations to advance environmental aspects of project, and
why the City allows annexation of developable but not the rest (such as in the Bradford situation). John
stated that the Unified Development Code would be the place to include revisions since it focuses on
development. John believes it would be challenging to include non-developable areas in with the
annexation, although if the townships led that effort, it might be a different story. Dan thinks the Planning
Commission would be reticent to expand environmental role.
Gabe sees the problem as no one is taking responsibility, and thus degradation results.
David suggested asking the Planning commission to solicit CEQC input. John will draft up a request. Dan
reiterated there is still quite a bit of site plan review needed before any approval would be granted.
Dan explained his rationale for supporting the project at the planning commission.
4. Community Garden Discussion Update: John relayed that the park dept. reviewed the CEQC’s memo, and
disagreed about the suitability of Lake Park for community gardens since Lake Park is a destination park. The
Parks Plan consultant did not think community gardens are suitable in “destination” parks.
Lynette made a motion: The CEQC feels that community gardens and growing food locally is as important as
any other park function. The shrinking of the East End Rec garden necessitates additional community garden
plots. The CEQC urges the Park Department to reconsider community gardens for Lake Park. Seconded by
David. All in favor.
Dan asked about Sobieski Park and community garden plans there. John relayed that the Park Dept. likes
Sobieski Park for community gardens, but there may not be room for many community garden plots.
5. Renewable Energy Procurement Proposal:
John relayed that since the CEQC did not meet in July, he asked the City Council for guidance on whether
there was City interest in collaborating with other Minnesota cities to procure renewable energy. Council
agreed, and John notified the coordinators, who work for the City of Minneapolis, that Winona would like to
join the effort. John does not have any details on when work will start on this.
6. Sustainability Master Plan:
John stated that the long awaited Sustainability Master Plan process is finally about to start. City staff feels it
is important to have a CEQC member on the steering committee of the plan, but it also is important to bring
in the broader community. John asked if any CEQC members would be interested in serving on this steering
committee, and Nikki indicated she is. Nikki has been appointed by the City Council to the CEQC, but still
needs to sign a form in order to become an official CEQC member. Lynette is interested as well, but needs to
see how work plays out.
7. Lake Winona Water Quality Improvement Plan:
Given time constraints, a full discussion on this topic was postponed for a future meeting.
Lynette asked about using alum for phosphorus control and if Dan knew anything about alum. Lynette has
reservations about aluminum components being dumped and added to public waters. Dan said if the EPA
allows it, it is probably safe. David agreed that the sources of phosphorus needs to be addressed, which
alum does not do, but at the same time we need to control in lake circulation which is where alum is useful.
Lynette recommends a residential education effort on phosphorus improvement.
8. Other Business: None discussed.
9. Adjournment:
Motion for adjournment by Lynette, seconded by David. All in favor. Meeting adjourned 5:48 pm.
Notes prepared by John Howard.
Agenda
CITY OF
WINONA
MINNESOTA
July 31, 2020
Citizens Environmental Quality Committee
Winona, Minnesota 55987
Dear Committee Members:
The next meeting of the Citizens Environmental Quality Committee meeting will be held
virtually on Thursday, August 6th, 2020 at 4: 30 p. m. We will be using Zoom to video
conference, with a call in option as well. To access Zoom:
Join Zoom Meeting: https:// us02web. zoom. us/ j/ 85610993614
Optional Call in: + 1 312 626 6799 US ( Chicago)
Meeting ID ( Web and call in): 856 1099 3614
1. Call to Order
2. Review and approval of June 2020 meeting minutes
3. Environmental Considerations with Annexation Proposals ( 20 minutes)
4. Community Garden Discussion Update ( 5 minutes)
5. Renewable Energy Procurement Proposal ( 5 minutes)
6. Sustainability Master Plan ( 5 minutes)
7. Lake Winona Water Quality Improvement Plan ( 15 minutes)
8. Other Business ( 5 minutes)
9. Adjournment
Sincerely,
John Howard
Natural Resources Sustainability Coordinator
CITIZENS ENVIRONMENTAL QUALITY COMMITTEE MEETING NOTES
DATE: Thursday June 4, 2020
TIME: Scheduled for 4: 30 pm ( Virtual Zoom Meeting)
PRESENT: Dan Hall, Julie Fassbender, David Ruff
GUESTS:
STAFF: John Howard
1. Call to Order: Meeting called to order at 4: 32 pm by Chair Hall.
2.
Review and Approval of May Meeting Minutes: Motion by Julie to approve the May meeting minutes, Dan
seconded. Unanimously approved.
3. Volunteer Science and Engagement: John stated that the list of volunteer activities is for CEQC members or
members of the public. The opportunities are ways for the community to help out, and still be following the
pandemic safety guidelines.
Julie liked the list. David asked about whether the Cover it Up activity needed volunteers. John indicated
they are ok with volunteers but would be happy to have more. David is happy to help if needed. David asked
about Healthy Lake Winona having another work day, and would like to talk with John and Healthy Lake
Winona members to set up a work day, probably on a weekend.
4.
Community Garden Discussion: John communicated that he spoke with Lynette about the CEQC Community
Garden report, and she believes it accurately captured the discussion and the CEQC' s conclusions. She did
ask for sq. footages of the sites to be included to better show scale. John made those changes and shared it
with the Park and Rec. department.
Dan asked about whether neighbors have been consulted about the potential garden locations? John said
not yet, but he fully expects the Park and Rec. department would meet with the neighbors if the dept.
wanted to move forward with the sites. John believes the next steps are for the Park and Rec. department to
review the sites, so the CEQC has done their duty. As news develops, it will be shared with the CEQC.
5. CEQC Member Recruitment:
Dan asked about progress on potential candidates. Julie has asked some people she knows about joining the
CEQC. Dan wondered if Richie Swanson would be a good fit. Richie is a very knowledgeable about birds and
active with Aghaming Park. David knows Richie and thinks he may be fully committed with other obligations.
David or Dan will talk with Richie when they see him next.
John mentioned Nathan Engstrom who is the WSU sustainability coordinator. Nathan expressed interest in
December 2019, so John will follow up. Dan expressed that Nathan sounds like a qualified candidate.
6. Other Business:
Dan asked about the dredge sand disposal sites and if the DNR was in charge of that process. John explained
that the US Army Corps of Engineers is the main regulatory body and driver of the project. The Corps of
Engineers continues to work with the City on developing plans for dredge sand disposal. John noted that the City
Council did communicate to the Corps that they disapproved of the plan to expand the Latsch Island sand
storage area. John is not sure what progress has been made for the Homer sand storage area.
7. Adjournment:
Julie excused herself from the meeting at 4: 49 pm, and quorum was lost.
Notes prepared by John Howard.
CITIZENS ENVIRONMENTAL QUALITY COMMITTEE
AGENDA ITEM: 3. Environmental Considerations with Annexation Proposals
PREPARED BY: John Howard
DATE: August 6, 2020
20th
At the July City Council meeting, there was a public hearing regarding the annexation of
parcels of land within Wilson Township. One of the commenters, Gabe Ericksen, inquired
about environmental protections and enhancements, and urged the City to require ecological
improvements with annexation proposals. His letter to the City Council and staff is attached.
Mr. Ericksen will join the CEQC to discuss this idea.
Gabe Ericksen Letter to City Council
Aware that the City of Winona plans to expand its urban development of the surrounding rural
landscape ( the Bradford Senior Living Cooperative), we would like to see the city better address
environmentally sustainable development in our natural areas. The residents of Winona, and in this
case specifically the residents of Pleasant Valley, greatly value the visual, ecological and aesthetic
characteristics of our natural areas. We urge that city policy continue to be developed that will both
protect and enhance these assets. Attempts have been made by the City of Winona to protect our
slopes with its bluffland ordinance. Article XVII, Section 43. 81 point 4 states one of the goals: To
promote the retention and improvement of those ecological and vegetative qualities[..].
Previously, the City of Winona has required very little in the way of` improvement' of areas surrounding
development projects. They have opted, rather, for a hands- off approach to `natural areas'. But simply
leaving environments in their supposed given ` natural- state' does not guarantee ecosystem health or
sustenance. Most of Winona' s surroundings suffer from a state of Terrestrial ( and Aquatic)
Eutrophication. This is a condition where a historically recent lack of natural disturbances such as fire or
grazing, as well as inputs of atmospherically deposited Nitrogen from fossil fuel combustion and
agriculture have led to an imbalanced ecosystem. In turn, this has led to invasion by exotic species,
collapse in diversity, and a reduction in the provision of many beneficial ecological services ( such as
erosion control and water purification).
If the City of Winona continues to expand its footprint out into the surrounding valleys, we would like to
see its administration begin to address these concerns in a comprehensive manner. Plans specifically
detailing how natural areas will be both enhanced and maintained should be agreed upon before
development proceeds. Development in the bluffs and valleys will take place on properties with varying
slopes. Much of the land will be entirely unbuildable. Large percentages of each property will be
available for enhancement. To mitigate the negative environmental impacts of urban development, it is
important that these areas be specifically addressed rather than simply ignored.
Components to an environmentally appropriate plan for developing within and adjacent to natural areas
include:
Requiring on- site Water Retention and Infiltration recharging the aquifers ( rain- gardens,
detention swales etc.)
Grassland and Wildflower Habitat for Birds, Pollinators and other Invertebrates
most slopes to < 30% canopy cover,
Woodland ( Savanna) Canopy Reduction ( returning
selecting for primarily White Oak and Hickory species) with the restoration of a grass and
wildflower understory (this is our optimal ecosystem for sustaining diversity and for the provision
of beneficial ecosystem services).
Long Term Ecosystem Management Planning that may include Prescription Burning, Grazing,
Haying, Biomass/ Timber Harvest etc.
Control of Urban Deer Populations ( among other things, to reduce vehicle and property damage
and to increase human safety).
Natural area planning requires additional environmental engineering consultation ( by engineers who
understand effects of Terrestrial Eutrophication). It is important that Winona develop a strategy for
a we continue to grow.
addressing these concerns while, as city,
CITIZENS ENVIRONMENTAL QUALITY COMMITTEE
AGENDA ITEM: 5. Renewable Energy Procurement Proposal
PREPARED BY: John Howard
DATE: August 6, 2020
At the end of June, the CEQC staff liaison received a letter from the City of Minneapolis
asking if the City of Winona would be interested in joining a group procurement for renewable
energy. The basic idea is a pool of municipalities would get a better rate on renewable
energy credits or have sufficiently large enough energy use to incentivize Xcel Energy to
create a bulk rate. Current green energy offerings from Xcel Energy ( Windsource and
Renewable* Connect) come with a small extra cost ( about 1 cent/ kWh). The attached letter
provides some additional information on the City of Minneapolis proposal.
City Staff took this request to the City Council who passed a motion supporting staff
involvement with Minneapolis on exploring renewable energy option. Staff will keep the
CEQC abreast of developments.
Minneapolis
www.minneapolismn. gov
City of Lakes
July 23, 2020
Mr. John Howard
Natural Resources Sustainability Coordinator
City of St. Louis Park
207 Lafayette Street
Winona, MN 55987
Dear John:
The City of Minneapolis has embarked on a plan to have all of its municipal operation' s electricity needs
come from 100% renewable sources by 2023. The City is planning to release a Request For Proposals this
summer for developers to submit resource plans to provide the renewable electricity at a reasonable price.
As Energy Manager and Sustainability Director for the City of Minneapolis, we are contacting the City of
Winona and other governmental customers of Xcel Energy to see if your organization would be interested
in joining the City in this effort. The concept here would be to aggregate all of our organizations'
renewable electricity needs into a single large request for a new program from Xcel or an outside
developer to provide renewably sourced electricity at a price significantly less than Xcel Energy' s current
green tariff offerings.
In several areas around the country, large electricity users are working with their electricity providers to
create new special contracts and innovative tariffs that bring inexpensive renewably generated power to the
users. Some of these successful efforts have occurred even in highly regulated power markets such as ours
here in Minnesota. The City has begun talks with Xcel Energy about these alternatives, and our next meeting
with Xcel will occur in the July. We would like to provide Xcel with an aggregated list of large governmental
users at that time to help them plan for new renewable resources in the 2020— 2025 timeframe. If the city
of Winona would be interested in discussing this effort, please get back to either of us with a contact from
within your organization to carry out further discussions.
Thank you for your attention to this project to bring more renewably generated electricity onto the gird.
Sincerely,
Brian Millberg, Energy Manager City of Minneapolis
brian. millberg@minneapolismn. gov
Kim Havey, Sustainability Director City of Minneapolis
kim. havey@minneapolismn. gov
CITIZENS ENVIRONMENTAL QUALITY COMMITTEE
AGENDA ITEM: 6. Sustainability Master Plan
PREPARED BY: John Howard
DATE: August 6, 2020
The City will begin the first stages of a sustainability master plan in the coming month. One of
the very first steps is to develop a planning committee to guide the planning process. City
leadership feels it is important to include a wide swath of the community, and thus have
CEQC members and the public be on the planning committee. At this meeting, staff would
like to determine which CEQC member( s) would be interested in serving on this committee.
CITIZENS ENVIRONMENTAL QUALITY COMMITTEE
AGENDA ITEM: 7. Lake Winona Water Quality Improvement Plan
PREPARED BY: John Howard
DATE: August 6, 2020
At the second City Council meeting of June, the Council received a presentation about a
study to improve the water quality of Lake Winona from consultants commissioned by the
County and City. The emphasis of the consultants' work was toward phosphorus reduction.
Both lake basins have elevated phosphorus at or above state standards, and thus the state
will require action to reduce the phosphorous load.
The final study report is complete, and is accessible online:
https:// drive. google. com/ file/ d/ 1wDNBIzhgEMUPMrDvN8Va- r- PKJPIvdXx/ view. It is a long
report at nearly 60 pages, but if you read the executive summary and pages 23, 24 and
section 7. 3, you will get a broad perspective of the problem and potential solutions. Staff will
give a short presentation of the conclusions and answer questions. The slides presented to
information The 45 minutes
the City Council are included to give the overall and conclusions.
presentation can be viewed here:
https:// www. facebook. com/ watch/ live/? v= 579943639376641.
whks
BARR
mC
m j4si
j ? `
a Water quality improvement plan
to restore Lake Winona
f
4
reg Wilson June, 2020
whks
Project background and objective
Lake ecology, water quality and
phosphorus sources
Outline TMDL vs. current study
Watershed characteristics and
monitoring
Watershed and in- lake modeling
Prioritizing improvement options
whks
Elevated phosphate concentrations in
Lake Winona are causing water quality
problem problems. WHKS & Barr were retained
statement and to evaluate possible solutions for
project
reducing phosphorus loads to Lake
objective
Winona.
whksTYPICAL FOOD CHAIN
BARR
PISCIVOROUS ---- , L
Noe"
FISH
1- 2 FEET
LITTORAL ZONE
IIIII- PIANKTIVOROUS '' '.../
TERRESTRIAL ii;... ..
PLANTS
EMERGED FISH t.'-. I FEET
PLANTS
1
FLOATING
PLANTS
ZOOPLANKTON
background on t SU6MERGED
V 1 0 INCHES
ii MTS
lake ecology 4 .4
ALGAE
P 4"
111 RONS
3
BENTHIr_ ZONE--# 1• t a
NUTRIENTS NUTRIENTS
BENTHIC ,.-
1 -
ORGANISMS
whks
BARR
Phosphorus feeds algae
and causes algal blooms
excess
Algae decreases water
phosphorus
1XL4
clarity
means poor
water quality Algal decay depletes
dissolved oxygen near the
T
lake bottom
M
whks
External Sources
Storm water runoff from hard
impervious) surfaces
where does the Leaves & grass clippings
phosphorus
Fertilizers
come from?
Pet/ animal waste
Soil erosion
Septic systems
1
whks
BARR
Internal Sources
Phosphorus can be stored in lake
bottom sediments and released when
where does the oxygen levels are low
phosphorus
come from?
O 0
O
M
whks
BARR
Growing Season Mean Water Quality Standards and Lake
Wiriogik Oisentations
Minnesota Water Quality: Chl- a( Secchi( m)
TP( ppb) ppb)
Standards and Lake Name
2010 2011 2018 2010 ( 2011 2018 2010 12011 2018
North Central Hardwood
evidence of Forest( Minnesota General
40 14 1. 4
Standards for Phosphorus,
problem Chl- a, and Turbidity)
Lake Winona( Southeast Bay) 52
I 54 63 53
I 50
I 31 1. 0 1. 0 —
North Central Hardwood
Forest( Minnesota Shallow
Lakes Standards for 60 20 1. 0
Phosphorus, Chl- a, and
Turbidity)
Lake Winona( Northwest Bay) 87 83 55 76
I 60
I 18 1. 1 0. 6
whks
BARB
the maximum
TMDL Load Reduction
amount of a
specific
total maximum
pollutant that can
daily load dischargedMos
TMDL) be to
0
a waterbody and
still meet water
Existing TMDL
quality standards
whks
BARB
39% TP load reduction to NW basin
38% from MS4 stormwater
23% from remaining watershed
TMDL summary 94% from internal load
31 % TP load reduction to SE basin
41 % from MS4 stormwater
30% from NW Bay and direct drainage
100% from internal load
whks
BARR
TMDL This study
Watershed None Seven sites; three with flow
monitoring
Watershed Land use specific, annual
P8 calibrated to daily water
TMDL and modeling export rates ( from quality monitoring and
literature) phosphorus load data;
current study o
o simulates Boilers Lake (& other
differences o BMP) phosphorus removal
Lake water BATHTUB average annual, Mass- balance spreadsheet
quality steady- state model w/
model calibrated to daily
modeling optimized internal load observations
residuals. NW Bay
modeling based on lower
volume
Implications for Overestimates internal Quality control issues with
results load and phosphorus
some of the 2018 water quality
leaving Boilers Lake and samples
NW Bay
Lake Name
Developed Developed( Low Developed( Medium Developed( High
Forest Shrub/ Scrub Herbaceous Emergent Herbaceous Open
whkSJ Open) Intensity) Intensity) Intensity)
Wetland Water
18% 0% 1% 1% 22%
BARB Winona SE 13% 25% 17% 3%
isommine
23% 0% 3% 1% 10%
Winona NW 10% 29% 20% 3%
N
to
N.
i
N.
Lake Winona I., . ;
e
watershed land
4 °
a
n.
cover III: 1
Storm Sewer
1( e
Marta
Flow Arrows
Creeks
s 1 1 Po Ponds
National Land Cover etl, Low O Po Watersheds
Dataset 11) oresst [
yyoody
Emergent
en
Develcped, O
11411 Herbauuaus High Intensity
Wetlands
Weds
Shrub/ Scrub Deuduous m
a- engirt Dpen water O
Developed,
spm
® Forest
r' n cuinvated
Mused Forest
Developed. M. Crops
i whks
ks HerEa.. N. NI Metlium r-:: I Barren Land
1 FT' lntensity
O Hay/ Pasture
1:
whks
BARR
liel
w
0. N 4_
1 '
3 v
City of Winona 1 Y
storm sewer
e -? irp
drainage til
4
r
i.--' Creeks
3'• 4-4 Storm Sewer
Mains
40 4ela Stormwater Ponds
Y
44 416,
m
m
44
4
whks
1
whks
BARR
1. 1
114. 4
b4„..
Ti
i
t
Lake Winona arelaanie. '
subwatersheds i
Or
1. 3 ..;
A: e'/, ' --- 1 Flow Arrows
75 l
Creeks
i P8 Ponds
d- • .!. ,. •
I
7 .
4 p P8\ Watersheds
BARRm.
whks
1
whks f
BARR
I—.-
nrr, r rt,
r
414°'''.;;'''', 7$ h_,
VL a yC ti if .
4C
T
yj'
f .; ,'
F - i ':,, D -
i,,
a . x ,. .„-,
v,„}...,-.
4.,...„.,..i.,... ir.,:::.: 4
n,
i
1' ,
S..„ f = t` rt' s
i„
7
i
4
l I Jltu ur,
9 Q, C
it
f--'''''''.-':-""'''..;.., .
7 ii s, rrore- rKe or! IOW
1.
t
a -
t .. mak ' ,
t
n
Flow Rile
ro mmwv+ rou+
iill * x
F•
t
a
k j{
l
Y onc.trilan
Creeks
Po Palls
y'
1
z (
N
1
k a** 0 3. o00
a
It y"
STORMWATER FLOW
r whks DIAGRAM
1
R
x
e i. .; 1:: FIGURE4
whks
BAR R
ibaigitHIPASENSI
ii
111 I • . II 1.. 1 I
I•1 I
1i
ll ' 1'
I
El rill i.
Dally Prectortaban
a
7
50
7
Precipitation
inches)
Lake Winona
1'
7t
1
40
7
subwatershed Discharge
30
7
monitoring
Tore Creek
Winona Inlet
weer CeeJt,
man eAny su
Lake Winona Met
ft..... 14eVe. 9
vhzto 0, 1O, ilk kiik 4 I, qi, k t. ,
Munk; ay IAN, oi
0
f I
M
7/ 9 8/ 8 9/ 7 01/ 7
5/ 10 6/ 9
Date( 2018)
1,
BARR y
MON
di
wr • mss;. ,,... y
p
MIN
g tt
a ,+ •
s • P } h '
1'
1
f 1! V '^ S
j'. Ih..
i k1
7.
4,..
4,,
s
f t.„}`' y
1 fir dS `..`
J
1, 388 ounds
818 pounds Q,
228 pp b
1.. . 185 ppb
i•- R y
t„,
594 pounds
76 ppb
r
f
a
K
wx
r
rryk
k
sL }
r /-_
Legend
C.
F
N
Monitoring Sites
IIIIIIIIIIIr— ANEW
2018 monitored TP load ( pounds) and flow- weighted mean TP conc. ( ppb) at each site
c:
t r F rr *
BARR i J
immoimeo
y,
y
VI
1
72 , c — ''' ''"\.
7' . ,- '
0,.
t ‘-.:
s',
Boilers Lake r
bathymetry
zoo
sooI'
Foe r
r SURVEYED DEPTH( FEET)
Boilers Pond
Water Quality Improvements
Winona, MN
i`T
FIGUREX t,
whks
BARR
7.:- t'..1* •
x--; 1. ..--;'.' 4'.:. .. '., -' . - 1!
j _ ' ,-"''''':'.'- ,, 3.-
A '-'
0,41,,,.
di-•, '. -,•
t, ,"
I.:<
2.,:•
4.,. 7;..'
10"--- e*. 744 ;;,."
47. - ' - 7-.----,::.- sh
s‘,* '• ' . or,, -„
1'..-.*:.'' '''--"''''''- '"
eli ' -*
Lake Winona
2 „ 2:,,.,
bathymetry i
1 .,
4-,
8 ;
i_
i 4.
0,„ ..„
7,..„.„.
t,
BARR Ihh-j. .
whks
IA 2''
1. 111111111111111111W IMO. 11111. 111111. 11. 1111. 11111111111 0*—
hks Relationship between Modeled and Measured TP—Lake Winona NW Basin
0. 30
BARB
Modeled TP 140
0. 28 • —
Measured TP
0. 26 • •
internal Load
120
0. 24•
0. 22 -
E0. 20 • 100
0 0. 18
calibrated lake a 0. 16 .
Bo N
water c 0. 14 •
quality 60
0. 12 •
modeling 0. 10 -
40
0. 08
0. 06 •
20
0. 04•
0. 02
0
0. 00
5/25118 6/ 4/ 18 6114/ 18 6124118 714/ 18 7114/ 18 7/ 24/ 18 8/ 3/ 18 8113/ 18 8/ 23/ 18 9/ 2/ 18 9/ 12/ 18 9/ 22/ 18 102/ 18 10/ 12/ 18
whks
BARB
Lake Winona Northwest Bay Lake Winona Southeast Bay
Phosphorus Sources Phosphorus Sources
2018 lake water Atrnospenc
Deposition, 4, 0% r
Internal Loading,
10° o
152,
Internal
Loading, 307,
25, 0
quality Direct
Watershed,
modeling— 5,,,-/,W,), Boilers Lake,
442, 37%
1
262, 18%
phosphorus
loads
pounds, %)
5 I
Lake tMnona \,
NW Outflow. \
440, 37%
Atmos hen
Deposition
Direct Drainage i
12, 1/ o
to Lake, 446,
30%
NW Lake Winona TP load reduction
whks
to meet standard:
BARR 700
Lake Winona NW Existing
600
ICondition
a Lake Winona NW Modeled
S 500 Outcomes
0a
0 400
0
F 300
2018 lake water E 200
15% from
100
quality Internal
watershed
Direct Drainage to WS Runoff to Atmosperic Loading Rollers Lake
modeling- Lake Gilmore
Ditch
Creek Deposition
phosphorus SE Lake Winona
loads 700
Lake Winona SE Existing
Condition
600
pounds, Lake Winona SE Modeled 60 ppb in NW
a 500 Outcomes
o basin; 46 lb.
v 400 from direct
0
watershed and
1
t'- 300
eliminate
E
L
2
internal load
100
0
Direct Watershed Lake Winona NW Atmospheric Internal Loading
Outflow Outflow Deposition
whks
1. Stormwater treatment in NW Bay inflow
2. Assess carp movement and control population
Best 3. Control internal P release in SE Bay
Management 4. Stormwater treatment in SE Bay direct
Practice (BMP) drainage
prioritization 5, Lower priorities ( not integral for WQ
compliance)
Gillmore Creek BMPs ( septics, WASCOBs, grassed
waterways)
sex) Modifications to Boilers Lake
whks
BARB
w
Treatment of d`
NW Bay inflow
ttza
r
1-
r,
y Pond- j-
b
row;
Y
v
r_ m
L/ 2EWMOFM
F
WATER W4rtY 51UO0
3
whks7
yV I
STORANf4TEA
PROPOSEDPONO
IAPGF FR: UFlE In
Need 15% TP reduction from combined watershed inflow to NW Bay :'
i
Whks ahe Num a no; t Alum Treatment
BARR
control SE Bay a 25
internal P load 3 20
1
15-
1i T •.
11111111111111
j,.
G
d AJC
0 19881989191019311932113315111' 33513. 13. 1998133/ 1 020012W22W3 N. 2005] W6200, 0013 MO 2010 2011 2012 2013 2019 2015 2015 201] 201')
r•
e
r,
f,,1 j
7..:' '
7,,,,,,,,,
77
First Day of Alum Treatment Last Day of Alum Treatment
whks
BARB
Aluminum forms permanent bond with
phosphorus
Forms " floc" that sweeps phosphorus from the
water column and settles on the lake bottom
how alum works Works under low oxygen conditions
O.. w
00-00 11),!"
whks
BARR
it
c.,.. 4 bad-!4
q•
otential
grassed s
waterways in
r
Lake Winona 1,
i
E
watershed
kr V F : c
whks
BARR
ii*
e' er
potential water
and sediment r<
control basins
WASCOBs) in
Lake Winona
0
watershed
x
f s
vamrut wostoe
gyp; . ....
Whks fia" BASIN
r
whks
BARB
Estimated Summer
Water Quality Improvement
P
Option
Season TP Reduction Opinion of Potential Costs Annual Cost per Pound TP
Removed($/ lb)
lbs/ yr)
Construct Stormwater
Treatment Pond for Ditch
210 1, 600, 000 500
Drainage to Northwest Bay
of Lake Winona
cost- benefit Alum Treatment of
Southeast Bay of Lake 246 200, 000 54
Winona
Southeast Bay Direct
Watershed Stormwater 46 2, 500, 000 3, 600
BMP( s)
Carp Assessment and
60 500, 000 560
Control
Alum Treatment of
Northwest Bay of Lake 120 400, 000 220
Winona
whks
Dredging
High cost, water quality benefit limited
by underlying sediment P concs.
other BMPs
Rain gardens and distributed filtration
considered
practices
Higher cost; could work with street
reconstruction if native soils can infiltrate
whks
BARB
2018 monitoring/ modeling results
Stormwater runoff from direct drainage areas represent
Overall largest source of TP loads to Lake Winona
Summary Sediment P release is important for SE Bay
Boilers Lake is providing good treatment for TP
Carp population exceeds management threshold
a;' :
Y Recommendations
Treat stormwater from direct drainage to each Bay
Control internal P load in SE Bay
k
y
Assess carp movement and control population
Lake vegetation management plan; control curlyleaf