I. Call to Order
Members Present: Matt Bacewicz, Chair; Elsie Goodrich, Secretary; Aaron Guyette; David
Weissberger; Jordan Matte
City Staff Present: Eric Vorwald
Guests Present: Greg Dixon, Martin Courcelle, Jane Ransom, Alain Brunet, Jason Ruwet, Matt
Parisi
Call to Order by: Matt Bacewicz
Meeting Start Time: 6:38 PM
Minutes Recorded by: Eric Vorwald
II. Changes to the Agenda
None
III. Public Comment
None
IV. Approve Previous Meeting Minutes
Decision: 5 – 0
Motion by: Mr. Weissberger
Second: Ms. Goodrich
Mr. Weissberger made a motion to approve the minutes as presented. All were in favor.
V. Public Hearing on Final Subdivision – 165 East Spring Street
A hearing on the final subdivision plan was opened at 6:41 PM. Mr. Bacewicz swore in those
members providing testimony. Following this, Mr. Vorwald provided an overview of the project
and indicated that the proposed subdivision was previously reviewed by the Development
Review Board as a sketch plan and a preliminary plan. He also indicated that, the applicant is
also requesting a wavier to accommodate the existing two-unit dwelling on the property. Finally,
he stated that, while the plans show proposed development on the new lot (lot 2), the request
was only for the subdivision and the development was being shown as an indication that
development could occur on the proposed lot.
Following Mr. Vorwald’s overview, Mr. Courcelle provided a detailed overview of the project in
relation to the comments and conditions that were included in the decision from the DRB on the
preliminary plan. He highlighted several easements that may be needed based on comments
from the City’s Department of Public Works related to sight distances, and a potential easement
for a sewer connection.
After additional details on the updated plan, Mr. Bacewicz requested additional detail related to
Following Mr. Vorwald’s overview, Mr. Courcelle provided a detailed overview of the project in
relation to the comments and conditions that were included in the decision from the DRB on the
preliminary plan. He highlighted several easements that may be needed based on comments
from the City’s Department of Public Works related to sight distances, and a potential easement
for a sewer connection.
After additional details on the updated plan, Mr. Bacewicz requested additional detail related to
the easement across Norman Court. With that Mr. Ruwet provided detail on the research he
had done related to rights of access related to Norman Court and indicated that, there is a clear
chain of title permitting the use of Norman Court to access the existing two-unit dwelling at 165
East Spring Street.
The DRB members had additional questions related to replanting of the existing driveway area
to be removed and setbacks for both lots. Following these questions Mr. Bacewicz asked if
there were any questions or comments from the public. Mr. Parisi asked for clarification on the
DRB’s role in future development. Mr. Vorwald indicated that it would depend on the specific
request that came forward for development, but if no changes were proposed to the subdivision,
the plan that was presented would not need to come back before the DRB. With no other
questions, the hearing was concluded at 7:20pm.
VI. Public Hearing on Site Plan Review – 1 Tigan Street
A hearing on the site plan review for 1 Tigan Street was opened at 7:21pm. Mr. Bacewicz swore
in those members of the public providing testimony on the matter. Following this, Mr. Vorwald
provided an overview of the request and noted that no new buildings were proposed.
Next, Mr. Dixon gave a more detailed overview of the existing use at 1 Tigan Street and why the
project was proposed. He discussed the primary business that occupies the building at 1 Tigan
Street and stated they were proposing the changes to the site to accommodate storage
containers, including tractor trailers, that would be filled with parts and then moved off site. Mr.
Dixon also highlighted stormwater improvements that were proposed as part of the plan.
The DRB asked questions related to grading, stormwater, control, and similar questions. Mr.
Dixon indicated that the Tigan Industrial Park is all under one stormwater permit that would need
to be amended to accommodate the proposed site plan upgrades. He also stated that there is
an existing Act 250 permit that may need to be updated as well. With no additional questions or
discussion, the hearing was concluded at 7:33pm.
VII. Sketch Plan Review – Planned Unit Development – 205 West Allen Street
Mr. Vorwald provided an overview of the sketch plan for the proposed Planned Unit Development
(PUD) at 205 West Allen Street. He stated that a PUD is considered a major subdivision and
therefore requires as sketch plan review prior to a formal submission. He also noted that this
was not a hearing, therefore the comments that would be provided by the DRB would be non-
binding and only advisory as the applicant prepares a preliminary plan.
Next, Mr. Dixon provided information related to the proposed PUD. He indicated that the intent
was to keep the existing dwelling and develop two new units on the property to provide multi-
bedroom housing. He stated that the intent would be to make this a condominium to allow for
the sale of the individual dwellings, once established. Mr. Dixon provided an overview of the site
including the relocation of the curb cut and driveway, and stated that a waiver would be
requested to allow the existing dwelling to remain as is. Mr. Vorwald noted that the existing
dwelling is listed on the State Register of Historic Places.
The DRB asked several general questions about the project including the development pattern
in this area of town, but since this was still a sketch plan, there discussion was limited. Mr.
Bacewicz asked if anyone in attendance was interested in speaking to the project. Ms. Ransom
indicated that she was an adjacent property owner and was interested in screening between this
project and her property. Mr. Dixon indicated that screening was proposed, but would work to
ensure this was included. With no other questions, the discussion on the sketch plan was
concluded.
The DRB asked several general questions about the project including the development pattern
in this area of town, but since this was still a sketch plan, there discussion was limited. Mr.
Bacewicz asked if anyone in attendance was interested in speaking to the project. Ms. Ransom
indicated that she was an adjacent property owner and was interested in screening between this
project and her property. Mr. Dixon indicated that screening was proposed, but would work to
ensure this was included. With no other questions, the discussion on the sketch plan was
concluded.
VIII. City Updates
Mr. Vorwald provided an update on the Environmental Court’s decision related to 9 George
Street.
IX. Other Business
Mr. Vorwald indicated that the next meeting, if necessary, would be on December 15 th . He also
stated that the deadline for that meeting was November 18 th . He also noted that he would
distribute a submission schedule for the DRB consideration.
X. Adjourn
Motion by: Ms. Goodrich
Second: Mr. Weissberger
Meeting End Time: 8:01 PM