Municipal Infrastructure Commission
Regular MeetingWinooski, VT · September 21, 2023
Minutes
9/21/2023 - Minutes
I. Call to Order
Attendance:
l In person: Jon, Noah, Adam, Michelle, Bryn, Kevin, Micayla
l Zoom: Erik M. (WSP), Kevin M. (WSP), Susan G. (Local Motion), Peter
II. Public Comment
None
III. Approve Previous Meeting Minutes
August minutes cannot be approved without the attendance of Emily.
IV. Appoint Secretary
Micayla Schambura was appointed as Secretary.
V. Lafountain/Dion Street Scoping Study – Draft Alternatives Review
l Recapped lower cost, immediate alternatives (1 and 2) to be implemented prior to utility
work
l Discussed long-term alternatives (3 and 4) to be implemented post-utility work
¡ Timeline: likely ~ 8-10 years
l Priorities: Traffic calming aspects (safety), public accessibility, and greenery
¡ Variability in alternatives includes chokers, mini- roundabouts, tree strips
¡ Unanimous favor across commission towards removing centerline in all
alternatives for additional greenery/sidewalk space and slowing traffic.
¡ Parking on first block for all the alternatives (backed by parking data)
¡ Red/dark paint (if used) should only be cheaper alternative for the short-term to
help get to the long-term goal. Curbing should replace paint to help squeeze the
lanes. paint tends not to control traffic as much as intended.
l To do: Pass MIC proposal slides for review to show at next Public Meeting (date TBA;
likely October or early November) for final look through
l Recap from 8-17-2023, short term alternatives (1-2):
¡ Alt 1: 10.5’ travel lanes & 5’ green-painted shoulders (Lafountain), 11’ shared
travel lanes, 3’ [brick]red-painted shoulders (Dion)
¡ Red/darker paint: ‘shrinks’ the road visually – could slow down drivers (concern
of public)
¡ Alt 2: 11’ shared travel lanes, 4.5’ red-painted shoulders, chokers for traffic
calming (Lafountain), 11’ shared travel lanes, 3’ red-painted shoulders (Dion)
¡ Small traffic circle to replace 4-way stop signage?
l Questions:
¡ What does short/medium/long term mean in this context?
n Alt 1 / 2 (pre-utility work) are low cost & to be put in before utility work
n Alt 3 / 4 (post-utility work) implement after utility project complete
¡ Small traffic circle to replace 4-way stop signage?
l Questions:
¡ What does short/medium/long term mean in this context?
n Alt 1 / 2 (pre-utility work) are low cost & to be put in before utility work
n Alt 3 / 4 (post-utility work) implement after utility project complete
¡ Can we establish down conditions to Main St to have public get used to?
n Yes. Parking on LeClair is a debate point, though. There is some use there
based off parking inventory data.
¡ Comments:
n Commission agrees for center line removal in either Alt 1 or Alt 2 à 10’
lanes instead of 11’
n Less paint
n Traffic calming
n Could do planters with extra space à trees might be too much pre-
utility
l New, longer-term alternatives (3-4):
¡ Alt 3: 5’ sidewalks at existing gaps, 11’ shared travel lanes, chokers for traffic
calming (Lafountain), 5’ sidewalk at existing gaps (west side only, 11’ shared travel
lanes, 3’ red painted shoulders (Dion)
¡ Alt 4: 6’ sidewalk to be installed at existing gaps, 11’ shared travel lanes, 4 ft
tree/snow storage strip (LaFountain), 6’ sidewalk on west side, 11’ shared travel
lanes, 3’ red painted shoulders (Dion)
¡ Questions:
n Can project be extended to Florida Ave?
n current scope is just class 2 section
n Do we have an alternative for parking on Dion?
n No, there’s curb to curb 28’. There’s currently no parking so
alternatives did not include it. It would calm traffic, but may not be
heavily utilized and then would not calm traffic.
n Need to revisit alt 3/4 after Act 47 & zoning changes?
¡ Comments:
n prefer 5’ tree strip
n Key benefits these options: narrower pavement, reduces width of street &
makes crossing shorter with perpendicular cross walks (diagonal in Alt 1/2)
n Try to increase width of sidewalk side to 6’– easier for walkers to pass one
another or walk side by side
n Bring level of traffic down to level 1 or 2 to make more appealing to cyclists
n Parking is good by Armory and the park, a lot of the parking is single family
homes with off street parking, removal is anticipated not to have that big of an
impact in accordance with Act 47 housing regulations
n Prior to housing we’ll have reduced parking: what will that mean for
the neighborhoods?
n Parking on south side from main street to LeClair Street
n In Alt 4: why red paint on Dion? And not chokers?
n Concern: it has been difficult getting line striping
n Narrowing the road would be the best alternative to squeeze down
visually.
n Could be a good idea but maybe could only have 3’-4’ chokers out of
the sidewalk.. it’s only 2 blocks
n In Alt 4: why red paint on Dion? And not chokers?
n Concern: it has been difficult getting line striping
n Narrowing the road would be the best alternative to squeeze down
visually.
n Could be a good idea but maybe could only have 3’-4’ chokers out of
the sidewalk.. it’s only 2 blocks
1. Redesignate money spent on red paint to moving curb (lots of
maintenance on paint)
n If reconstructing that street, would push that curb in
n Changes: remove centerlines, add a foot to tree strip depending on alt
VI. City Council Liaison Updates
Bryn:
l First public hearing for Winooski Bridge took place on Tues 9/10.
¡ high public interest; most concerns in pedestrian measures and timing of phases
¡ sitting on bridge committee
¡ Public Bridge Meeting: 45 folks online; over 1 hr of questions
¡ recording of meeting is available
n Questions:
n Separating bicyclists from pedestrians
n Electric bike speeds
n Phase 1 v Phase 2 timeline
n Incorporates intersection on Burlington Side
n Most of funding is coming from Federal (~80%), 10% state, 10% split
between Winooski and Burlington (still being finalized)
l LOT 7D hotel parking lot breaking soon
l Oct 2 nd – Proposal Ordinance Changes related to parking and bike parking
VII. City Staff Liaison Updates
Jon:
l Main St.
¡ Bids received in late August – look higher than engineers’ estimates ($18m)
¡ Low ($22m). Still under threshold & working with USDA on loan documentation to
wrap up financing work to take to Council for Award.
l Exit 16 work is being wrapped up.
VIII. Adjourn
l Next two meetings to include budgeting with Finance Committee
l Motion to adjourn (7:58 pm): Michelle
l Moved: Peter
l Second: Adam