Safe, Healthy, Connected People Commission
Regular MeetingWinooski, VT · November 9, 2021
Minutes
11/9/2021 - Minutes
I. Call to Order
Members Present: Ashley Lucht, Christopher Page, Courtney Blasius, Dillon Lovell, Jason
Burds, Jason Williams, Jean Szilva, Laura Dlugolecki, Mary Hussmann, Matthew Francis,
Maurice Matte, Meredith Bushey, Thomas Renner, Yam Basnet.
Council Liaisons Present: Mayor Kristine Lott, , Deputy Mayor Hal Colston, Councilor Bryn
Oakleaf
City Staff Present: Jon Rauscher, Angela Aldieri, Ray Coffey, Wendy Harrison, John Audy, Jon
Rauscher
Call to Order by: Mary Hussman
Meeting Start Time: 6:03 PM
Minutes Recorded by: Thomas Renner, Chris Page
II. Public Comment
None
III. City Council Update
Thomas Renner
Hal Colston gave update on road improvements, small business Saturday (November 27th).
City council approved description for HR position. City attorney is looking to dismiss lawsuit on
all resident voting. Kristine Lott discussed the local options tax revenue and Bryn Oakleaf
brought up that the council met on single member district, the recommendation is that Winooski
remain a two member district and not include any of Burlington.
Christopher Page
Heading into annual road resurfacing, for a couple weeks. Details listed in meeting minutes as
to where that’ll take place.
November 27: small business Saturday; lengthy conversation with council over tax; more details
to be provided to make decision.
Several search firms being considered for the search for the permanent City Manager position.
Council approved HR Director position description.
City attorney will be offering a motion to dismiss lawsuit brought against Winooski with respect
to all-resident voting. Office will be reaching out to lawyers for Civil Rights in Boston also
interested in defending our position.
Local Options Tax revenue was requested by Winooski businesses; council will be hearing
more about this issue next week.
to all-resident voting. Office will be reaching out to lawyers for Civil Rights in Boston also
interested in defending our position.
Local Options Tax revenue was requested by Winooski businesses; council will be hearing
more about this issue next week.
Single Member Districts option, upcoming election cycle for all-resident voting; requests and
support from BCA was that we remain 2-member district, focused entirely on Winooski.
Language being finalized, will be provided soon to committee.
Municipal Infrastructure Commission accepted work plan for the year. We reviewed success
points/lessons learned for the pool. Wonderful tree event that was held in September; will
repeat if we can secure funding.
IV. Discussion/Approval: FY23 Capital Plan
Decision: Unanimous Pass
Motion by: Jason Williams
Second: Jean Silva
Thomas Renner
Angela Aldieri explained to us what the purpose of the capitol plan is intended for. Currently it is
just over a million dollars and any projects must last more than 5 years. Money has been set
aside for the pool, main street and weaver street projects. Councilors asked for more details on
Lafountain scoping study and Manseau Street sidewalk installation, Jon Rauscher explained
what the intention of those plans is. Meredith Bushey asked if there were any plans for sidewalk
installation near Hoods Crossing, Meredith also asked where the money comes from for those
types of projects. Jon explained that the city has been lobbying VTrans to try to get money for a
signaling project in that area and that grant money is the funding pursued for that. Mary asked if
there is a ratio of debt service that the city likes to stay within when making decisions on the
expenses proposed. Angela explained that the city tries to finance items that will last longer than
the dept payment. Jean asked about the West Allen Park improvement, Ray shared that there is
high level design work based on community feedback, the proposal here is to create a more
concrete design. Bryn is wondering if our DPW should invest in the equipment for
striping/marking. Jon said that due to the cost he is working with other cities to do a regional bid
to get one machine that could be shared. Bryn also suggested that city vehicles should
transition to an electric fleet. Jon said that electric vehicles are considered when replacing
vehicles when the opportunity is available. Angela noted that police cruisers are hybrids which
has led to a gas savings. Ashley noted that LaFountain street is frequently used as a travel
through way and that the city should look into the clean water fund for the west Allen park
improvement, Ashely asked to know how Winooski decided to save as opposed to taking out
debt. Angela explained that there is history in the city that some projects can not be done
through bonds and that is what they reserve debt service for. Jason Williams wants to know
about the roll of ARPA or other federal funds coming to Winooski. Angela said they want to make
sure to be taking care of those who stepped up during the pandemic and taking community
feedback responses when considering ARPA funding. Jon noted that more investment needs to
be put into the capital funds. Angela asked if there were any other project suggestions and Bryn
shared that the walkability of the city is very important. Dillon who was in attendance in person,
asked about the bridge from Winooski to Burlington and if the state can be used to address the
accessibility of the bridge. Jon mentioned that VTrans is being pushed to do a benefit cost
analysis on the bridge to get federal funding as the bridge needs updates that are costly to
Burlington and Winooski. Angela explained money is being set aside for bridges but that there
isn’t enough yet to do a match with a grant. Meredith gave kudos to the committees for
improving the city, she questioned if the Richards Park could have some improvements and get
a plan like West Allen. Ray explained that the parcel was given to the city and the deed has
limits on constructing on the property, which for the moment means it is going to remain as a
green space. Laura Dlugolecki brought up sidewalk upgrades, wondering if money could be set
analysis on the bridge to get federal funding as the bridge needs updates that are costly to
Burlington and Winooski. Angela explained money is being set aside for bridges but that there
isn’t enough yet to do a match with a grant. Meredith gave kudos to the committees for
improving the city, she questioned if the Richards Park could have some improvements and get
a plan like West Allen. Ray explained that the parcel was given to the city and the deed has
limits on constructing on the property, which for the moment means it is going to remain as a
green space. Laura Dlugolecki brought up sidewalk upgrades, wondering if money could be set
aside for sidewalk repairs. Jon explained that internally they want to do more sidewalk
replacement and is not a capital plan project. Meredith asked if there is a place where plans for
the next years’ capital plans would go. Jon explained that projects come from the master plan or
a bond vote. Bryn asked about a basketball court, and wonders if we have done an inventory of
our parks and what assets we have and if there has been thought on how to leverage our open
spaces. Meredith asked how old the structure is at Landry park, Ray shared he doesn't know the
actual age of it, but all the decking was recently replaced due to a warranty issue. Rayl et Bryn
know that there had been a basketball court, and with the west Allen design m the team hopes
that there will be an opportunity for a basketball court there. Jason Williams noted that there was
a notion for a vote, and he would like to have more added details on making Winooski more
walkable and bikeable. Mary asked if we need to move through the budget sheets, Angela
expressed the they are very detailed sheets and that they projects are the same on the
summary page. Christopher page noted that he really thinks it is important to highlight the
mobility around the city. Jon said there are plans to do a study to on public input on what utility
work is important to the public, such as bike lanes, tree lines etc. Matthew Francis wanted to
highlight that Multi-Modal transportation options is important. Council inited to come to city
meeting where these plans will be shared.
Christopher Page
City creates Capital Plan to try to smooth out long-term asset purchases, so we don’t have
spikes to the tax rate; planning ahead.
Portion of budget dedicated to capital programs.
In order for a project to be included in plan, must last for at least 5 years, cost threshold per our
policy ($5,000), higher threshold for street infrastructure, buildings, land; typically more
expensive items.
Goal of Plan is to set aside money before a project is to be completed so we can buy outright,
instead of borrowing to complete project (additional interest, etc.)
About 65% of capital plan is spent on debt service.
Pool: While we did have to borrow to construct pool, we have been setting $ aside in advance
for maintenance of pool systems (pump failure, i.e.) so that debt doesn’t exceed life of pool.
Others: Main Street project, Weaver Street bridge replacement project.
List of criteria that we use to evaluate programs, how we prioritize one project over another
being included. Items discussed by FC and approved by Council.
Seven items:
l Meets a policy goal/strategic objective of city
l Mandated by Federal/State regs?
l Addressing known safety hazard.
l Maintaining or improving delivery of services
l Improving existing capital
l Fulfilling the need of underserved portion of City.
l Will project affect ability to complete another planned project?
Seven Major Projects (and two proposed debt service)
l Maintaining or improving delivery of services
l Improving existing capital
l Fulfilling the need of underserved portion of City.
l Will project affect ability to complete another planned project?
Seven Major Projects (and two proposed debt service)
Are there priority projects that should be listed that aren’t on list?
Are there things on the list that you wouldn’t consider a priority based on criteria?
Question: LaFountain Street: what is scoping study?
Looking to get ready for potential reconstruction project on that street sometime in the future.
Don’t have the funds yet, but some may be on the way. Start outreach with residents, talk
about how LaFountain corridor could get replaced; narrower traffic lanes? Wider sidewalks?
Bike lane? Underneath the street is a 100+ year water line, which is high priority to replace
ASAP. Whenever replacing a water main, whole street gets torn up. What improvements can
we make (multimodal) as we’re doing that water line work? Scoping study is preliminary work,
primarily grant-funded through RPC; typically RPC funds 80%, 20% local match.
Manseau Street Sidewalk; where’s that going?
Lot of discussions with folks on Manseau, we have sidewalk prioritization plan; council
authorized prioritizing the installation of a new sidewalk on Manseau (west side) all the way from
Hood’s Crossing; very narrow ROW so trying to fit 5 foot sidewalk into 48 foot ROW, so folks
don’t walk on the street.
Hood’s Crossing drove one member to apply; safety of that intersection, living so close to
Hood’s Crossing; not sure where funding would come from for that? Huge new development,
increase in pedestrian and car traffic, how do you request that your street get a sidewalk?
Where is money coming from for Hood’s Crossing? Seems like a public safety concern.
We performed a scoping study, triggered by Hood’s Crossing; multiple roads coming in, railroad
tracks, lots of crashes, geometry of intersection. Through study, determined what is the best
configuration for E. Allen going forward. Specific to HC, signalize that intersection; $2M project
to do that work. Winooski has been lobbying VTRANS to put money towards that project. With
scoping study, we “get in line” for some Federal money; relying heavily on grant funding to get E.
Allen corridor work done. Relying on VTRANS for the work. Priority project that we want to
complete very soon. VTRANS will be resurfacing all of Rte. 15 next year. Short-term
improvements = calming traffic, pedestrian/multimodal improvements (striping, road paint); with
VTRANS doing work next year, they will incorporate short-term improvements. Expand refuge
island, replace refuge island at Dion and make it larger, etc. Small cost for curbing work, but
pennies on the dollar given contractor is already there. Long-term effort for signalization.
Gateways with thru-traffic, we have a good case for State/Federal money, it’s not all local traffic
moving through the area- not fair to Winooski residents to fund multi-million dollar signalization
package.
If we were to try to fund $2M project ourselves, we’d have to set aside money for at least 10
years or else borrow for, but that would tie up more of our existing capital in Debt Service; trying
to seek alternative funding sources.
Hood Street is also a priority sidewalk location. Transportation Master Plan includes sidewalk
priorities.
Just because something doesn’t appear on CIP list doesn’t mean it isn’t a priority as well;
alternate funding sources being sought out.
Is there a cap to the debt service % that you seek to stay within?
Just because something doesn’t appear on CIP list doesn’t mean it isn’t a priority as well;
alternate funding sources being sought out.
Is there a cap to the debt service % that you seek to stay within?
Doesn’t make sense to finance police cruisers, we replace every year. Certain other projects
can be paid for with reserves. For equip that is financed over time; we only have 376K available,
trying to balance getting the best for those dollars, trying to finance things that we know will last
longer than their debt payments (plow truck, for example).
West Allen Park Improvement; has that design been solidified or work in progress?
2019-2020 study prioritized West Allen for needed work. As part of study from consultant, some
conceptual design work of what that park could look like, based n community feedback (desired
elements). This proposal is to move beyond conceptual design process to a more concrete
design; right now very conceptual, but needs detailed engineering (erosion control, etc.) to go
further with the plan.
Community members have asked about striping; would that be something our DPW should
invest in as far as equipment? Similar to resurfacing. Curious about capacity to pull that into
capital projects. Vehicle replacement; wonder if those estimates include enough funding for
replacing with electrical vehicles; we should consider the concept of moving to an electric
vehicle fleet.
Paint marking: Proposing for the FY ’23 budget, but doesn’t meet CIP threshold because it only
lasts a season. Equipment piece, pretty specialized; pretty large trucks, probably in $200K
range. Trying to work instead with Burlington and South Burlington for a regional bid; let’s get
together and share equipment, reduce costs, helps everyone. Our crew will continue to do
crosswalks in-house; stencils and paint. Could not find paint this year; remnant COVID issues
trying to get supplies, so not much accomplished this year. We will look for electrical vehicle
replacements where possible; where there are opportunities we will pursue that.
A lot of vehicles are moving to hybrid; lot of savings in gas budget because all police vehicles
are hybrid.
*Long-term cost/maintenance lower on electrical vehicles, potentially.
LaFountain Street is used as through-traffic; could make argument as through-traffic for funding.
Stormwater improvements associated with West Allen; could tap into Clean Water state
revolving fund. May be opportunity for significant subsidies with upgrades there. Also, how did
Winooski decide to save for long-lived assets and not take out debt service? If an asset is long-
lived, it may be better to take out debt for it, intergenerational equity, and debt is very cheap right
now.
We will still use debt service for long-term projects. Intent is to save money for truly long-term
projects, that are not necessarily bond-financeable.
Pretty major storm line that runs underneath West Allen Park, so SRF funding might be a very
good call. Will definitely be looking at that.
Role our infrastructure has in local economy versus amount we have to invest in it is striking;
seems like there would be more. ARPA and other funding coming to Winooski?
There is going to be a lot of public outreach in next few months to see what priorities community
has for using ARPA; infrastructure projects are included, also social services/partner agencies,
local businesses, folks who stepped up to serve community.
Regarding funding, back in FY ’18 budget was only about $500K; council and city manager at
the time recognized we need more investment in Capital Fund; Local Tax Option revenue new
There is going to be a lot of public outreach in next few months to see what priorities community
has for using ARPA; infrastructure projects are included, also social services/partner agencies,
local businesses, folks who stepped up to serve community.
Regarding funding, back in FY ’18 budget was only about $500K; council and city manager at
the time recognized we need more investment in Capital Fund; Local Tax Option revenue new
source for capital fund. Slight increase in FY ’19 to start funding Myers pool.
Prior to the increase for Main Street and Pool, annual Cap budget was about $450K.
Any other priorities?
Walkable/Bikeable components; goal in Master Plan but that we don’t see a lot of project work
on the ground to that effect. Another area that Bryn hears about.
Highlighting components that incorporate multi-modal improvements.
Is it Winooski or Burlington or both responsibility for bridge on Colchester Ave? Sidewalks are
starting to look dangerous, exposed rebar, who should be thinking about that?
Bridge is owned 50:50 by Winooski and Burlington. For some reason, State doesn’t want to
take $18M expense off our hands. 2018 scoping study on bridge to look at how we would
replace it and improve multi-modal connection. Alternative was to put lanes that could be used
by bikes/pedestrians. Bridge is structurally in good shape, though deck looks a little ratty. We
will be talking with VTRANS about sidewalk repairs there, as they’re doing the Rte. 15 work.
Benefit/Cost Analysis on the bridge in order to get Federal funding; no way that either Burlington
or Winooski would cover that cost. Coming up on its useful life. In the past we have set aside
money for work on the bridge, but nowhere near what we would need even for a match on a
grant. We have other bridges, like Weaver Street, that are more urgent to replace.
As a resident, want to commend all the commission members; quality of life has improved
significantly over past 7 years. Much more walkable; improvements in plowing. Continued
improvement with walkability for sidewalks. Richards Park is a lot of green space; is that under
umbrella of armory or is that Winooski property? Seems underutilized, often empty.
Richards Park: The deed for the parcel has strict limitations on what we can do there. Not
allowed to construct permanent recreational infrastructure on the property. Got some legal
opinions that implied it would be very difficult to unwind and adjust that. By and large, will have
to remain as open green space per deed gift. Trying to get in more playable conditions for
soccer program; busting at seams at Landry Park. Would be good to potentially expand. More
organized activity there could be in the works.
Sidewalk repairs and installation tend to be very expensive. Could money be set aside for
annual sidewalk repairs? -- usually wrapped into other work being done in specific area, so they
tend to be repaired opportunistically; is it possible to have a little reserve for sidewalk repairs that
need attention?
Sidewalk replacement work; way cheaper for City to do it vs. contractor; one 5x5 slab = $250
contracted, versus cost of materials if done internally. Unfortunately with COVID impacts, didn’t
have staff to make repairs happen this year. It doesn’t land on Capital Plan per se but we do
call it out on budgets/meetings with Council.
Proposed capital expenses; list of things you’d like to target this year? More ideas next year, or
is this everything?
This is what we have on tap for FY ’23 that we have now. Some improvements will be done in
the Spring that are in FY ’22 plan. This is a 5-year plan. We do have some other projects that
we’ll be putting in as we get more detailed on FY ’23 budget. Any of these projects that come in
are from bond vote or one of our Master Plan documents. We will try to add more detail as to
what we think is going to happen in the next couple years. We have a Tower Truck that needs to
be replaced; will hit in the next couple years. How do we fund that? $1.2M asset. To give folks a
This is what we have on tap for FY ’23 that we have now. Some improvements will be done in
the Spring that are in FY ’22 plan. This is a 5-year plan. We do have some other projects that
we’ll be putting in as we get more detailed on FY ’23 budget. Any of these projects that come in
are from bond vote or one of our Master Plan documents. We will try to add more detail as to
what we think is going to happen in the next couple years. We have a Tower Truck that needs to
be replaced; will hit in the next couple years. How do we fund that? $1.2M asset. To give folks a
heads-up of what’s coming in the next 5 years gets on to plan.
Park improvements in general, constraints at Landry; where is closest basketball court? Have
we done an inventory of parks as far as co-locating some of those assets wrapped into planning
as well as design work, but thinking about opportunities to leverage what’s available in a better
way.
How old is structure at Landry Park?
Don’t know exact date of playground structure. All decking got replaced; warranty issue with
rubber coating. Recommended/Average number of various types of park infrastructure based
on population; X number of tennis courts per 1K people. Used that to make some decisions
about what would be added in or improved upon. Basketball; was a court up at Landry behind
tennis courts; not sure why dismantled. We are hoping with West Allen redesign, add second
court there and improve infrastructure at that facility. With Landry, 3 conceptual designs
brought to the community at various forms; ultimately the design concept looks similar to what
we have now with some embellishments, based on feedback from the community directly.
Pretty sure we did talk about possibility of basketball court there was a discussion, but
ultimately there wasn’t an appetite to add hardscape. Parking lot is getting utilized to its
capacity, especially on softball nights.
Indeed, there was a basketball court right at the bottom of sledding hill. One reason it was
removed was for # of kids who crashed into basketball pole was too high. Deemed a safety
hazard.
We did 1 pg. summaries for each of the proposed projects, overview, cost, what are benefits,
criteria. Two were in the packet, just to give an idea.
Approval; is that a motion? What are we looking for?
If the group was in support of the CP as proposed, they could vote to agree to the submission of
this plan to the council.
Calling out areas of budget specifically focused on multimodal infrastructure is very good.
Beyond that, I would move to recommend this plan.
Budget sheet review for commissions?
Very detailed, but projects are the same as that summary page displayed.
What we will do in future: there are a lot of streets in Winooski that could be right-sized.
Anywhere we’re looking to do major utility work, do scoping study properly; so we know what
folks want/public feedback on the correct multimodal uses folks want to see on that corridor.
For Hickock Street, scoping studies were skipped over because there were so many water line
breaks. Also, for that project, did a lot of repaving and did some sanitary work, but a lot of it was
trenchless work (lined sewers, didn’t fully replace) and didn’t change catch basin locations;
didn’t allow us to modify curb lines so much.
Focus on multimodal makes a lot of sense around the city. Also, Joint Commission meetings
are great, what was the process in deciding the joint commission meeting?
We could have this be an annual event; more public feedback is always good. More folks
around to advocate for these projects, priorities of residents, not just doing things willy-nilly.
Focus on multimodal makes a lot of sense around the city. Also, Joint Commission meetings
are great, what was the process in deciding the joint commission meeting?
We could have this be an annual event; more public feedback is always good. More folks
around to advocate for these projects, priorities of residents, not just doing things willy-nilly.
V. Adjourn
Motion by: Thomas Renner
Second: Laura Dlugolecki
Meeting End Time: 7:12 PM
Get email alerts for Winooski