A committee meeting was held on October 4, 2012, for the above referenced project. The meeting was held at
10:00 a.m. at Zionsville Town Hall. Attendance was as follows:
Matt Brown A&F Engineering Co., LLC mbrown@af-eng.com
Ed Mitro Town of Zionsville emitro@zionsville-in.gov
Wayne Delong Town of Zionsville wdelong@zionsville-in.gov
Lance Lantz Town of Zionsville llantz@zionsville-in.gov
Courtney Lehman Committee Member courtneyl@scannellproperties.com
Elizabeth Hopper Committee Member ehopper@zionsville-in.gov
Joan Voyles Representing Committee Member James Voyles jvoyles@vzplaw.com
Jeremy Stephenson Committee Member jstephenson@reirealestate.com
Renee Gallagher Committee Member renee.gallagher@ymail.com
Rob West Committee Member rwest@talktotucker.com
The following items were discussed during the meeting:
• No outstanding questions from the previous meeting were heard.
• A discussion was held regarding review of the past Traffic Impact Fee study and the selection of a baseline
level of service for the study revision.
• Level of service C was chosen as the baseline LOS for intersections while LOS D was chosen as the
baseline for roadway segments. These are the same baselines as used previously.
• The topic of roadway exclusions was discussed. Ed pointed out that he thought no roadways should be
excluded within the study. Instead, the roadways should only be excluded from the impact fee calculation
(if necessary) after report review.
• A review of the existing intersection LOS revealed what locations were currently operating below LOS C.
• A&F Engineering was asked to revisit the intersection of Ford Road and Bloor Road. {It should be noted,
this intersection was reviewed and verified that it is currently operating at LOS C. Additional analysis did
show that it was close to meeting signal warrants but for the time being is operating at acceptable LOS
standards during the peak hours).
Page 1 of 2
• Ed suggested that A&F Engineering contact Steve Lains to verify that the proposed land use plan seemed
reasonable based on information BAGI has concerning possible future development within the Town. {Per
email, Steve Lains verified that the proposed land use map was sufficient and did not suggest any changes
to the map}
• It was agreed upon that the next meeting would be held on 11/1/12 at 10:00 a.m. at Town Hall. Exiting
intersection and roadway level of service will be discussed as well as possible mitigation improvements
needed to meet baseline LOS requirements.
These notes reflect the writer’s interpretation of the comments made at the meeting. Please notify the writer of any
errors or omissions to these minutes.
Minutes prepared by Matt Brown, A&F Engineering Company, October 9, 2012.
cc: All attendees
Page 2 of 2
Agenda
AGENDA
Zionsville Road Impact Fee Committee
Meeting #2 – 10/4/12
1. General Q & A
2. LOS Discussion & Determination
3. Detailed Parcel Discussion & Finalization
4. Timeline
5. Adjourn