Zionsville Town Council
Regular MeetingZionsville, IN · June 3, 2024
Minutes
Zionsville Town Council
June 3, 2024
ZIONSVILLE TOWN COUNCIL
MEETING MINUTES
FOR
JUNE 3, 2024
AT 7:00 P.M. EST
ONSITE MEETING
1100 West Oak Street
This meeting was conducted onsite. All Councilors participated in person.
Council Members Present: Jason Plunkett, President; Brad Burk, Vice-President; Tim McElderry,
Craig Melton, Evan Norris, Sarah Esterline Sampson, and Joe Stein
Also Present : Heather Harris, Town Council Attorney; Mayor John Stehr; Deputy Mayor Kate
Swanson, Cindy Poore, Director of Finance & Records; Lance Lantz, Director of Department of
Public Works; Corrie Sharp, Director of Economic Development; Amy Lacy, Municipal
Relations Coordinator; and other Town Department Staff
OPENING
A. Call meeting to order
B. Pledge of Allegiance
Plunkett All right, good evening. I will now call to order the Monday, June 3, 2024 Town
Council meeting. If you would please, stand and join me in the Pledge of
Allegiance.
All Pledge of Allegiance.
APPROVAL OF THE MEMORANDUM OF THE MAY 20, 2024 REGULAR
MEETING
Plunkett All right, first on the agenda is the approval of the May 20, 2024 Town Council
meeting memorandum. A copy has been posted. Are there any questions from
Councilors?
Norris I’ve got one very minor edit. On page 6 of 13 where it says under my name –
“And I think like what could, we could do is at the next meeting will be the big
TIF onto this package.” Onto this should be omnibus and that’s –
Page 1 of 35
Zionsville Town Council
June 3, 2024
Lacy Oh, okay. I’ll –
Norris That’s my only.
Lacy Okay, I can change that.
Norris Thank you.
Sampson It didn’t register your vocabulary.
McElderry Enunciate.
Norris Right. With that –
Plunkett Any other questions or any other amendments?
McElderry Move to approve.
Plunkett I got a first from Councilor McElderry.
Burk Second.
Plunkett Second from Vice President Burk. All those in favor signify by saying aye.
All Aye.
Plunkett All those opposed same sign.
[No response]
Motion passes 7 in favor, 0 opposed.
APPROVAL OF THE MAY 2024 PAYROLL CLAIMS
Plunkett Up next is the approval of the 2024 payroll claims. Are there any questions from
Councilors? Otherwise, I would entertain a motion.
Stein Move to approve the 2024, May 2024 payroll claims.
Plunkett I’ll second that. I got a first from Councilor Stein, second by President Plunkett.
All those in favor signify by saying aye.
All Aye.
Plunkett All those opposed same sign.
[No response]
Motion passes 7 in favor, 0 opposed.
Page 2 of 35
Zionsville Town Council
June 3, 2024
APPROVAL OF THE JUNE 3, 2024 CLAIMS
Plunkett Up next is the approval of the June 3, 2024 claims. Questions from Councilors?
Sampson I have a question – okay, so Mia sent – I’m sorry you guys, I really keep telling
myself that I need to contact you before this so I can ask you the question and
then the meeting pops up and I want to make sure I at least address it. Mia sent
the appropriation report and so I was just scanning that and kind of comparing to
the claims that have come across and there’s just two that jump out at me and one
of them is for, I believe, the Finance Department consulting through Crowe and it
came from a July ’23 general consult – $11,661 –
Poore Right –
Sampson And so that got me, I mean I can understand you’ve been telling me some of
these fees you go back and forth on –
Poore Yes –
Sampson It seemed a little long from July –
Poore So, they went through a transition on their billing system and so they last year
instead of billing us monthly, they billed us twice, six months and six months,
but they inadvertently did August through December instead of July through
December so this is just getting that July to them.
Sampson So they left off. Okay so –
Poore Yes.
Sampson The way it affects us though because we’re cash basis –
Poore Yes –
Sampson As far as –
Poore Yes, yes –
Sampson Tracking for our budget so then I go back to – and this is, you know, for anyone
who’s wondering where I’m going with this – this would affect if we hit our
budgeted amount –
Poore Yes –
Sampson And then we end up being asked for more so I’m just like pointing that out like
was that amount known and included when you were budgeting –
Poore No.
Page 3 of 35
Zionsville Town Council
June 3, 2024
Sampson Because when I look at the appropriation report on percentages, and I’m sorry, I
had to print my own appropriation report and –
Plunkett Hold on one second – did you say no, Cindy?
Poore No, it wasn’t budgeted.
Plunkett It was not?
Poore No.
Sampson It was not.
Plunkett Okay.
Sampson But, so when I look at our appropriation report, I think we’re around 30% left –
Poore Yes –
Sampson And we’re at the –
Poore Right.
Sampson Fifth month.
Poore Right.
Sampson When I take these claims in it so I’m just –
Poore So, part, part of that too is that going into the year we have been still using Baker
Tilly on some of the stuff when we were transitioning from ’23 and with our
annual report and, unfortunately, the budget was already set even before that
decision was made so since the budgets are set back in October, that’s the reason
why it’s running a little bit short.
Sampson Okay, cause I am looking at finance contractual services – would that come there
or consulting would that amount fall in?
Poore Uh, which one?
Sampson For, would Crowe’s –
Poore Honestly, it could –
Sampson Be consulting?
Poore It could fall in to either one.
Sampson Okay.
Page 4 of 35
Zionsville Town Council
June 3, 2024
Poore Yes.
Sampson Well both are at the 34 and 30% remaining of the balance that we had –
Poore Right.
Sampson Budgeted for the year. So it’s just –
Poore Yes, and, and I watch those just to make sure that when we get close if we need
to have an ask or something like that I’ll make sure that happens.
Sampson I wasn’t sure if there’s some way we have another amount of this that is
transferrable between –
Poore Yes –
Sampson That’s what I was trying to –
Poore Right.
Sampson Look in the appropriation report for –
Poore And that’s –
Sampson A “slush fund” of sort –
Poore The first thing I usually do too is to see if there’s anything that can be transferred
to cover.
Sampson Okay so that was one concern I just was pointing out that that eat, that that –
Poore Right.
Sampson Kind of eats into your budget for this current year, right?
Poore Yes.
Sampson I wasn’t sure at what point we’re going to keep retaining their –
Poore Yes –
Sampson Between Baker Tilly and Crowe’s expenditures because this says it was Crowe
that was from July ’23.
Poore Correct.
Sampson Okay. I guess just more making a statement at this point that –
Poore Okay.
Page 5 of 35
Zionsville Town Council
June 3, 2024
Sampson Now that you’ve clarified that. But the same thing is also happening and I am
done with you but Mike Dale’s area the same thing is happening with the
engineering and I had been told that we were bringing more in-house engineering
–
Poore Yes –
Sampson Expenses and I still see us – it’s going to take me a second to find it – but I still
see us having a claim, a substantial claim, for engineering fees and when I look at
– here it is – it’s in Planning and Zoning on page 4 if anybody wants to play
along on the accounts, accounts payable register. It’s $35,800 that were for
engineering fees for 2024 and when I go to Planning and Zoning’s engineering
on the appropriation, I think that’s another percentage that we’ve used a lot of
what was budgeted and I’m just, yes, we’re down to 28%.
Poore So usually with that two things: First off, I know I don’t, I don’t believe Mike is
here –
Sampson He’s not here, unfortunately.
Poore But, and Lance might be able to correct me if I’m wrong on this, but they are
transitioning out BLN but there are still projects that BLN is working on so –
Sampson Right.
Poore They’re, they’re finishing out the projects that they’ve already been assigned to
and they’re transitioning out. Now, as far as what is budgeted, that is one thing
that every year because, you know, we bring in those fees as well so every year
an additional appropriation does take place because what we’ve, what we’ve
brought in on the engineering fees then we appropriate those back to the line so
it’s kind of a passthrough and it does usually end up going into the red before the
end of the year and then just the fees that we’ve brought in we reapprop or
appropriate those to the line.
Sampson Okay. I think what concerned me was more the percentage left –
Poore Sure –
Sampson Just when I’m scanning the appropriation report.
Poore Sure –
Sampson I’m sorry – I think I only got this recently so –
Poore She sent it out today.
Sampson Yes – that’s what I thought. I was like wait, I didn’t have that. Okay.
Poore Yes.
Sampson All right, well, then that’s just my question is –
Page 6 of 35
Zionsville Town Council
June 3, 2024
Poore Okay –
Sampson That we’re scanning those –
Poore Right, yes.
Sampson So that we don’t end up in an ask situation when we could maybe have said hey,
let’s not use those –
Poore Sure.
Sampson Consulting firms if we don’t have to.
Poore Oh yes, I understand.
Sampson Yes, okay.
Plunkett Any other questions on claims? I’ll make a motion to approve.
Melton Second.
Plunkett Second from Councilor Melton. All those in favor signify by saying aye.
All Aye.
Plunkett All those opposed same sign.
[No response]
Motion passes 7 in favor, 0 opposed.
REQUEST TO SPEAK
Plunkett Up next on the agenda is a Request to Speak on Agenda Item. I have one here.
Amy, do we have anymore?
Lacy No, we do not.
Plunkett All right. We have Brad Gressel – we’re at request to speak right now.
Stehr Oh we do?
Plunkett Did I say Mayor Update?
Burk No.
Stehr Oh.
Plunkett All right, so we have Brad Gressel. Brad, you’ve got three minutes and what I’ll
do after two minutes is just kind of –
Page 7 of 35
Zionsville Town Council
June 3, 2024
Gressel Okay.
Plunkett Give you a sign there.
Gressel Yes, good evening Council.
McElderry Good evening.
Gressel I just wanted to make a few quick –
Plunkett I’m sorry Brad – if you would just state your name and address.
Gressel Address? You got it. Brad Gressel, 3668 Evergreen. I just wanted to make a few
quick comments on the Sentry TIF or the, and bond ordinance that you’ll be
reviewing here shortly, specifically, the pathway portion of it and a caveat – I
know it’s possible that some of these details might be in some of the legal
documents that are attached. I am not a lawyer but I’ve been involved alongside
my neighborhood in Hidden Pines and as well as Bridlewood and Brittany Chase
in working with this so I just wanted to make a few comments so.
We worked with the developer, Sentry, to basically figure out a way to use this
project to fund the connections for the missing multi, multi-use path from the
new Appaloosa Crossing down to Willow Road which would be beyond their
minimum requirements that’d be right in front of the property. So to do this
$650,000 would come off the top of, of the TIF at the beginning to be used
towards constructing this path. The benefits is it would bring connection to 3,000
and growing plus residents down to Willow Road, bring connection to District 5
which would be great, we don’t have a lot of that.
Last meeting, last Town Council meeting a few things were still missing around
the concern of to ensure these funds are kind of protected for this specific path so
now at this meeting we do have the Developer or Project Agreement with the
developer stating the intent to use their contractors to build the construction of
this path and the Trust Indenture now has the, what’s called the Michigan Road
Trail Account that shows the amount and the location which is great as long as
everything goes as, as planned.
So the question is, is this fund and these dollars protected as, as much as we can
protect them? So I have some questions – like, for example, what happens if the
pathway portion of the Project Agreement doesn’t materialize as stated, what
happens, like specifically what happens? What happens if the Town doesn’t
procure the land? Doesn’t secure it in time in that window or the design plans
aren’t agreed to? Is it clear what happens to the funds? What happens if the
developer’s obligation window expires? Do the funds remain in this specific
account for this specific location? The concern being if, if not, they’ll get
gobbled up immediately so. I also thought like the, I was hoping to see the word
like only in there so it only goes to that. So just a thought but, again, I just, it, it’s
more, again, some of these may be in there or maybe they could be a little bit
more robust to, to make this airtight to protect these funds. It’d be a shame to lose
these after everything we’ve gone through so just kind of hope you guys can talk
Page 8 of 35
Zionsville Town Council
June 3, 2024
through those questions and maybe answer them as you’re looking through it.
Thank you.
Plunkett Brad, will you do me a favor real quick and just repeat those questions one at a
time?
Gressel I can sure try. Umm – I mean, they’re all under the window of are they, are they
protected but –
Plunkett I mean, did you write them down?
Norris I–
Gressel You got them all?
Norris I summarized it as what if the pathway doesn’t materialize, what happens to
those funds?
Gressel Yes, there’s kind of the, ideally, it happens as the Project Agreement states
within that 12-month from commencement. If it doesn’t, the land is not there, the
plans aren’t in place and it doesn’t happen, is it, is it crystal clear what happens
those funds? Do they go back to that fund? Is it, is it very clear they go only to
that location and only for a, for a path?
Plunkett Okay.
Gressel Does that help?
Plunkett It does.
Gressel Okay.
Plunkett Thank you.
Gressel Appreciate it. Thank you.
MAYOR/ADMINISTRATION UPDATE
Plunkett All right, up next is the Mayor and Administration Update. Mayor Stehr –
Stehr Sorry I was a little overanxious there before but good evening everyone. It’s
good to see everybody tonight.
McElderry Good evening.
Stehr The first thing that we in the Administration report tonight is a banking RFP that
we’re going to put out this week in which we’ll invite other banks to make us an
offer to house our accounts. We have 12 separate accounts with the three major
ones covering payroll, wastewater and our general fund. Now, it’s a good
practice to go through this every 3-5 years. The last time we did this was in 2020
but we didn’t act on it because we had problems with OpenGov and we had
Page 9 of 35
Zionsville Town Council
June 3, 2024
COVID and before that it had not been done since 2018 so we’re overdue on
doing this. The goal is to make sure that we’re getting the best deal on fees and
general banking expenses and I expect to be able to report back to you on the
RFP responses at your July 1st meeting.
Also, I have an update on the discussions between us and Whitestown for us to
take over the Town Court docket in Whitestown. We have an agreement in
principle to the arrangement. Attorneys from both sides have signed off. The
agreement is now on Judge Spencer’s desk for her approval and then after that
both Town Councils will have to agree and by the way the calendar falls over the
next several weeks, we expect Whitestown to vote on it first and if their Council
approves, we will bring it to you on July 1st is the plan right now.
And also as promised, I want to offer you an economic development update at
the first meeting of each month. There’ve been – yes sir?
Plunkett Can, can I ask a question real quick on the banking RFP, RFP? Will that also
include P-card usage or no?
Stehr That’s, that’s a separate arrangement.
Plunkett Okay.
Stehr So we are thinking of moving P-cards from Chase to another bank because the
state has switched and that will be a way for us to maximize our rebates through
that program.
Plunkett Thank you.
Stehr You’re welcome. Okay, I’ll move on – the economic development update. There
have been some positive movements at Creekside Corporate Park and Corrie
Sharp is here to talk more about that.
Sharp Thank you Mayor. Good evening Councilors. The RDC over the last couple of
months has taken some action involving some lots in Creekside. I believe we
have a map of the Creekside – no? No, I believe this is in his slide deck, the
Mayor’s slide deck. Okay. There you go – thank you Joe.
First, I want to discuss Lots 4 and 5. They are on the northeast side of the park.
The Commission has entered into a Development Agreement with Behforouz
Vision for the purchase of Lots 4 and 5 which is approximately 5 acres for
$359,060. Their plan is to build an office/healthcare facility and they are
currently working through their due diligence phase. So, the process for us to sell
land in Creekside has been we enter into an, an LOI that highlights a very broad
layout of a purchase, then we enter into a more formal agreement that lays out
their due diligence timeframe, some commitments on both sides, who’s
responsible for closing costs, things like that. Then once they work through their
due diligence and make sure that their site, the site meets their potential, then we
will work towards closing. Our hope is to close in 2024. The primary tenant of
this office building will be Center for Sight and their services relate to eyes and
the face regarding medical, surgical and aesthetic procedures.
Page 10 of 35
Zionsville Town Council
June 3, 2024
Sampson Corrie, can I ask you a question? You said 4 and 5 but on here those are marked
as available and not active interest –
Sharp This is a, this is a map that is just a standard map that we have been using. It’s –
Sampson Okay.
Sharp But we will –
Sampson So, we still have active –
Sharp We can update it on the website.
Sampson Interest in 2 and 3 as well?
Plunkett And 7?
Sampson And 7?
Sharp Let me keep going.
Sampson Okay.
Sharp So, Dr. Michael Behforouz is the sole owner of Center for Sight and he plans to
practice for another 10-15 years. He does have two other partners, one, one that,
two other practicing members, one that is a similar age and one that is almost 30,
so plans to practice for many decades to come. The reason why they chose
Creekside is to have access to enough parking and square footage to grow their
business. They are currently not located in Zionsville and they are both limited,
they are limited by those factors today. They cannot grow and there’s not enough
parking. So they plan to build a 15,000 to 20,000 square foot building and the
business plans to expand with the building growing to, from 50, from 25 to
possibly 50 employees with an average salary of around $70,000 annual. As I
mentioned, they are working through their due diligence time, timeframe and our
hope is to close in 2024.
So, let me move on to 7 and 8 – we, the RDC, has received a letter of interest
from Exclusive Land, LLC. We, they have accepted the broad terms, the high-
level terms of this LOI which is to purchase Lots 7 and 8 totaling 3.35 acres for
$294,800 to construct a motorsport office building. In that LOI, they have also
expressed interest in Lots 2, 3 and then 4 and 5, if 4 and 5 fall, fall away so just
for first right of refusal on, on those lots for the future. So we’re currently
working on developing a Purchase Agreement with them and expect to take that
up in our June meeting which is the last Tuesday of the month 9 a.m.
Our last couple meetings we’ve also taken up some Project Agreements,
Development Agreements, and then also the last meeting we adopted RDC
Bylaws which have never been put in place. We assigned roles to our officers
and then created two standing committees, a finance committee and a governance
committee.
Page 11 of 35
Zionsville Town Council
June 3, 2024
And then I’ll touch on the Sentry Project Agreement when the Sentry agenda
item comes up but also we approved a Development Agreement with Wild Air
and this is really to put in a hold on what our bond documents say, specifically
associated with the transfer of the 10 acres of land, the dedication of that land at
Marysville Road and Oak Road. We wanted to have in strong language to make
sure that that land will be dedicated in a certain timeframe and so that’s basically
the outline of the Project Agreement, the big, significant part of it. It also lays out
in addition to the bond documents, the bond terms of the developer receiving
100% of the proceeds and that generally what the development economic impact
is. So that concludes my update. I’m happy to take questions.
Plunkett Corrie, I’ve got a couple questions about Creekside. I didn’t have any of the
documents or anything on all the other stuff so I’ve just got the Creekside –
Sharp Yes –
Plunkett Stuff here. So if I’m hearing you right, the medical facilities in Lots 4 and 5,
Exclusive Land, LLC is in 7 and 8 and if 4 and 5 goes through with the medical
facility then Exclusive Land will then move on 2 and 3 also?
Sharp Exclusive Land has a specific offer for 7 and 8. That is their primary preference
because that’s what’s available. If 4 and 5 falls through, then they have first right
to take or to purchase 4 and 5 instead of 7 and 8 –
McElderry Instead of –
Plunkett Okay. So I guess I thought, I thought you said that 2 and 3 was also of interest
from Exclusive Land.
Sharp They are, they are and so they included options on – if their due diligence, during
their due diligence they would like to have the first rights on Lots 2 and 3 and I
don’t know if the Commission will accept this first right concept in the
Development Agreement. In the letter of interest it’s a non-legally binding letter
and it basically highlights the terms.
Plunkett Okay. So, so I guess just to, again, kind of to backup and just to be clear –
they’ve offered on 7 and 8 –
Sharp Yes.
Plunkett And if 4 and 5 doesn’t go through, they would rather have 4 and 5 –
Sharp Yes.
Plunkett But either way whether 7 and 8 gets sold to them or 4 and 5, they still want 2 and
3 also?
Sharp Their offer is, the –
Norris I’ve got the same confusion because I don’t know if they want –
Page 12 of 35
Zionsville Town Council
June 3, 2024
Sharp Okay –
Norris Two lots, four lots or six.
Sampson And the price changes.
Sharp Their offer for $294,800 is for Lots 7 and 8.
Plunkett 7 and 8, yes.
Sampson Right.
Sharp They have not made a price offer for any other lot other than stating they would
be interested in these lots if something should fall through on 4 and 5 – on 7 and
8. The reason why they’re interested –
Plunkett Well, hold on – you were saying if something fell through on 4 and 5 –
Sharp 5–
Plunkett Yes.
Sharp Yes.
Plunkett So they’re, so they’re in, they want 7, they have an offer for 7 and 8. If 4 and 5
doesn’t go through, they would rather have 4 and 5?
Sharp Right.
Plunkett But where does the 2 and 3 come into play?
Sharp So 2 and 3 come into play for actually both of those properties dealing with
stormwater. So 7 and 8 in their due diligence timeframe they will investigate if
there’s adequate stormwater space on that property. If there is not, they want the
option to put stormwater management on Lot 3, potentially Lot 2. Lot 2 drains
off and Lot 3 is very narrow and so these are items that both buyers are
contemplating to be able to put stormwater on their site which is our preference
and the preference of the existing codes. So they’re going –
Plunkett Yes, I was just trying to understand –
Sharp Yep, that’s –
Plunkett If they’re shaded as, as active interest. If that’s the active interest –
Sharp That is, that is the active interest.
Plunkett Okay.
Sharp It’s dealing with stormwater management.
Page 13 of 35
Zionsville Town Council
June 3, 2024
Plunkett And then do you know – two other questions I guess. What’s the Subarea F that
shows active interest where, where GRP is? What’s the –
Sharp That is GRP.
Plunkett Yes, so what’s the, I guess, why, why would it be active interest and what does
Subarea F mean?
Sharp Subarea F is part, is a code associated with the PUD today as it’s written and then
Subarea C is also associated with the land use code. Active interest it should be a
sold and a star in there –
Plunkett Okay.
Sharp Instead of a hash.
Plunkett All right and last question, I promise –
Sharp Yes sir.
Plunkett 7, so 4, 5, 7 and 8 – let’s say all, let’s say both of those go through – 7 and 8 and
4 and 5. Will they both require a change to the PUD?
Sharp Lots 7 and 8 Exclusive Autosports would not require a change to the PUD. Lots 4
and 5 would require an amendment to the PUD because of medical office and the
way this, the current PUD is written is that medical office can only take up 30%
of the building square footage. So that’s, that would be the amendment.
Plunkett Okay.
McElderry Can I ask a question real quickly? So –
Plunkett Thank you, by the way.
Sharp Yes.
McElderry Lots 2 and 3 sound like they are destined for stormwater retention regardless of
what happens here and I guess my question is from a tax revenue standpoint is
that what we want if those lots are sitting there without anything constructed on
them don’t we generate a lot less tax revenue if it’s just holding stormwater? It
just doesn’t seem like a great use of that land for us.
Sharp I would say that it’s not destined for that because we have entertained offers on,
on these two, two properties. In fact, we’re talking with another company that is
thinking about making an offer on Lots 2 and 3, however, in the process of
figuring out how they can manage stormwater, this is an option. It is definitely
not our preferred option because certainly we want a building office, whatever
there, employees. We want an active corporate park but we also know that the
challenges of Creekside are directly associated with how these lots are laid out
and Lot 3 is a very skinny lot which basically gets us into a very narrow building
Page 14 of 35
Zionsville Town Council
June 3, 2024
that is very difficult to park and then you have to put stormwater on top of that
which makes Lot 2 a stormwater facility for Lot 3 so it is kind of all an ebb and
flow of figuring out how best we can create some activity in Creekside to the
highest and best use. Either way we’ve got to solve stormwater and it might end
up being underground so.
Sampson I’m still a little stuck on the shading of 2 and 3 and 7 but not 8 and 4 and 5. So
this is just an old map?
Sharp We will update the map.
Norris It’s just an old map.
Sampson Okay. And I was hearing that 1 was a difficult build as well.
Sharp One is a very difficult build.
Sampson So is there any way to like replat those so that 2 becomes more of the green area
and we grow?
Sharp Absolutely. We have contemplated a lot of different options. Our first priority
right now though is to bring in jobs to Creekside and so we continue to have
conversations with potential buyers and if they are willing to work with us on the
complications of the site then we’re certainly willing to negotiate with them.
Sampson Is this a standard pricing for these acreage?
Sharp No, it’s a discounted pricing.
Sampson It seems like it.
Melton So it’s already discounted?
Sharp Yes sir.
Melton Okay. So it’s kind of like you’re prepping us for underwater storage usage and
that potential as we move forward on these lots?
Sharp Yes –
Melton That cost to go up, therefore, maybe the price of the lot to go down?
Sharp No, we fully expect these prices to be locked in. We also fully expect that there
not be any further requests for assistance from TIF, for example.
Melton Great.
Sampson Right.
Sharp None of the projects in Creekside have been TIF’d thus far and we’ve been able
to stand firm on that because we have a bond obligation payment out of the TIF
Page 15 of 35
Zionsville Town Council
June 3, 2024
funds and we have an agreement with the school to split the TIF 50/50. In fact, if
we’re able to close on this land before the end of the year, we’ll have cash funds
to be able to make up some delayed payments for the school split agreement
because there were not enough cash funds available in the Creekside TIF area so
there’s not much to go around as far as TIF incentives there.
Sampson And how many more years are on this TIF?
Sharp Umm, you know what – when I come back up I will have that answer for you.
Sampson Thank you.
Sharp Yes.
Plunkett Any other questions from Councilors?
Stein Corrie, I mean I’m kind of with some of you guys, stuck on the stormwater issue
and thinking back to when I was involved with Creekside a little bit, I mean, I’m
looking at the green areas which I assume are greenspace, probably wooded. Are
retention ponds or anything like that a consideration or is that a no based on what
it used to be?
Sharp The green is actually owned by the Community Development Corporation. It is
ravines and trails today. It, it, very hilly and beautiful. If you haven’t been out
there, I would encourage you to walk the trails out there. When we were working
with Graham Rahal on Lots 10 and 11, one of the things that we amended in the
zoning ordinance was to allow an open detention basin because it is more cost
efficient to go that route rather than underground detention. We also want to have
the aspect of sustainability and being able to filter naturally through an open
system rather than a closed system using mechanical units is also something that
allows us to think about this. It is the space that is very difficult to manage,
especially when we’re looking at skinny lots for Lots 2 and 3 – there is not
enough physical space to put a 10,000, 15,000 square foot building, adequate
parking and then open detention. That would require underground parking.
Stein That makes sense. Thank you.
Sharp Yes. Or underground detention, not parking.
Stein Yes, yes.
Plunkett Any other questions from Councilors? Thanks Corrie.
Sampson Thank you.
Stehr And I just have a couple more notes real quick. One of them has to do with
communication. Our communication, I think, is a little bit scattershot between
social media and our website and just other, other avenues that we have so our
Communications Manager, Kaitlin Watson, has put together a template for a
Town newsletter that initially we’re going to send out once a month, maybe we’ll
go bi-monthly eventually. The first one went out on Friday and it’s meant to be a
Page 16 of 35
Zionsville Town Council
June 3, 2024
community bulletin board of sorts. Since we don’t have a newspaper anymore
maybe this can be the clearinghouse for information and in the future we’re
going to ask Town Councilors and our department heads to contribute content to
it. We think it’s a good way to communicate with our constituents and we want
to encourage everyone to go to our Town website and sign up and I want to
encourage all of you to take part going forward in that.
And then one final thing tonight. I think I would be remiss if I didn’t mention
that the 136th graduating class of Zionsville High School is coming up this
weekend. Close to 600 students will get their diplomas and it really is an
extraordinary group of young people and I think I’m okay to say on behalf of the
Town that we want to tell them that we’re proud of them and we wish them well
in all their future endeavors and congratulate them for graduating from high
school.
Sampson And congratulations to your daughter.
Stehr Oh thank you. I appreciate that. Any questions or anything?
Plunkett Any questions for the Mayor?
Stehr All right, as on the board thank you. Thank you very much. I appreciate it.
Plunkett Thank you.
Norris Thank you.
TOWN COUNCIL UPDATES
Plunkett All right, up next on the agenda is Council Updates. Are there any updates from
Councilors?
Sampson I have an update. Thanks for that cue. I have received the check for the Fire
Department from the citizen who would like to make the donation for the
LUCAS device and I was going to bring it to the department head. I can bring,
get that to you from her and just lovely, thank you to her for taking a time of
what was tragedy in her life and recognizing the helpers and the Town for being
really key and giving family members extra life with the use of the LUCAS and
thank you to her.
Norris Yes, that’s very cool.
Sampson It’s a $25,000 check so.
Norris Wow.
Sampson This a big deal.
Plunkett That’s very generous.
Norris That’s very generous.
Page 17 of 35
Zionsville Town Council
June 3, 2024
Sampson So.
OLD BUSINESS
Consideration of an Ordinance Authorizing Bonds (Sentry) Ordinance 2024-11
(Final Reading)
Plunkett Any other updates from Councilors? All right, we will move on to Old Business.
The first item on Old Business is a Consideration of an Ordinance Authorizing
the Bonds. This is for Sentry. This is Ordinance 2024-11. This is final reading. I
would remind Council that since we’ve heard this before, this would be the final
vote for this and we have Corrie instead of Heather, right? All right.
Sharp And Matt Price as a backup. Good evening Councilors. Okay, I’m going to cover
all of Sentry and hopefully I tackle lots of questions while I give this presentation
and then I’ll just address both of your agenda items in one presentation. Is, is that
okay?
Plunkett Well, we’ll go to New Business for the other one.
Sharp Yes, for your action but can I, may I speak to it? Okay.
Plunkett I mean is it, I guess is it –
Sharp Okay, this, this step – so you have two agenda items for the Sentry project. This
first one is the bond ordinance and this is the final step of the bond process to
make, make sure that we statutorily are required to state the findings and approve
the issuance of the Sentry bonds and the maximum parameters of what those
bonds are. This is basically, the, it’s a – what you have in front of you is
substantially complete. It is as far as we can take it until we have the closing. So
Heather sent around an updated Trust Indenture prior to this meeting and we
updated it together with Councilor Burk in an effort to really solidify this
commitment of constructing the trail with funds from the bonds. So first – Joe, if
you could put that up for me. I feel like a little teacher. A big teacher, not a little
teacher.
Okay, you have had lots of different approvals at different times for this project.
So there’s been expansion of the TIF allocation area. That is your second agenda
item. For the bonds, we have added some language in the Trust Indenture
document. That will be finalized at bond closing. So what we have done is we’ve
added language that states: The issuer shall deposit a total sum of $650,000 into
the Michigan Road Trail Account. This account is held by a Bond Trustee and
only for the trail. They also have a project fund which is separate that will go
towards the other items that are approved in the bond documents. This account is
to be used by the company, the developer, and others. That’s important because
others as you will hear later is the belt and suspenders to get the trail complete
should something fail.
Plunkett Corrie is this – and I’m sorry if I’m missing this – is this in our packet
somewhere?
Page 18 of 35
Zionsville Town Council
June 3, 2024
Harris It’s what was sent around this afternoon.
Burk Not the presentation.
Sharp Not this –
Plunkett This right here?
Harris Not the presentation.
Sharp No, no.
Harris Sorry.
Sharp This is, no. I put this together after I spoke with Councilor Burk just to help me
outline how I was going to walk through this.
Plunkett Okay.
Sharp So, this first item is the bond closing and all of those details are in your packet,
the Trust Indenture. So this is just kind of my bullet line items. So their
commitment is to build segments of the trail along Michigan Road from
Appaloosa Crossing down to Willow Road and then we’ve also attached an
exhibit in the Trust Indenture and our Project Agreement and those exhibits show
where the trail would be located. We’ve also added language – this is on page 24
of your Trust Indenture. Yes sir?
Norris I apologize – Joe, I apologize. Notification that sound isn’t working online for
some reason. I just, I know people are watching so. Go ahead – I apologize
Corrie.
Sharp It’s okay.
Sampson Maybe it’s pulling her – maybe pull your mic towards you. I don’t know.
(inaudible) capture you.
Sharp Sure. Okay, so we have outlined that they need to construct this trail all right? As
a part of the construction of trail, they will, they have this commitment to do the
trail design. In our Project Agreement between the RDC and the developer, we
state that the team to design the trail is DPW, the developer and the RDC just by
way of us having to pick up the pieces if anything should fall apart. We also have
a role, the RDC has a role during this design timeframe to basically hit the play
button that says once 421 Forward is, preliminary design is complete, we then
provide written notice to the developer stating you now shall commence design
and coordinate with DPW to make sure that we are building an efficient trail.
McElderry So wait, so the trail planning process does not start until Michigan Road Forward
is –
Sharp Preliminary design, until we know what’s happening with the 421 Forward.
Page 19 of 35
Zionsville Town Council
June 3, 2024
Sampson Isn’t that like a 5-year projection or did I miss that?
McElderry Yes, that’s – that could be a while.
Sampson It was like 5 to 10 years when they were –
Sharp I am unaware on the 421 Forward project but I know that DPW was very
interested to make sure that this trail project aligned with the 421 Forward plans
so that we’re not duplicating efforts or having to rip out a portion of the trail after
421 Forward moves, moves forward.
Burk I mean Lance is the expert. My understanding is that INDOT is prepared, during
2024 this fall, to release their plans for construction that will take place in 2027
and so, therefore, we would have enough basic information to design the trail.
Sampson Well you would know more than me but I was at that meeting and they acted like
it was 5 years from now.
Norris I can bring some, I believe –
Burk Please do.
Norris What I, what I heard at the meeting was the preliminary design documents will
be done sometime in early 2025. That might be accelerated to 2024 but as it sits
right now on the priority list, I think it’s slated for like 2030 or 2032 or
something like that but that doesn’t mean that INDOT won’t expedite that much
faster, it’s just the way that it currently is ranked in the list of priorities.
Burk That’s for the build though not the design.
Norris That’s for the build but the preliminary design I heard was supposed to be done I
–
McElderry There we go –
Sampson Yes, sorry.
Lantz So yes, you’re all very, very close. Of course, INDOT is hoping by the end of
this year or early 2025 to reveal what the future of that corridor is going to look
like. Currently there is no funding or anything beyond the current effort. What I
had heard was that they hoped to put together an internally competitive project
that could be early, late 2020s and into the 2030s for actual substantial
construction but all we know now is they’re going to wrap up this corridor study
in the foreseeable future. Beyond that we don’t know anything for certain.
Norris Thank you.
Sampson Lance, can I ask you a quick question? I’ve heard you say before that and my, I
don’t know that it was with this actual project but I have heard you say
Page 20 of 35
Zionsville Town Council
June 3, 2024
sometimes it’s worth going forward with something when we know there’s going
to be a 5-year delay anyway –
Lantz Oh sure, yes. I mean I think the goal is not necessarily – I think the goal is to see
where INDOT goes with this project because remember, we have to get their
permission to build anything within their right-of-way.
Sampson Yes.
Lantz So we can come up with this elaborate plan and they’re going to look at it and go
oh, you know what, when we build this we’re going to have to wipe all this out
and pay for it again –
Sampson Yes.
Lantz And they might be a little reluctant to allow us in their right-of-way. So there’s a
little bit of, of politicizing within INDOT to make sure that we don’t harm their
successes on a future project.
Sampson But do you –
Lantz But we could advance it anytime we want, yes.
Sampson Okay, if they came up with a plan that they were pretty solid with that we could
approach them you think that that would be something they would allow or
historically are they kind of a –
Lantz I don’t know. This is –
Sampson Yes –
Lantz This is unchartered territory –
Sampson Okay.
Lantz With a project of theirs on the horizon I think that they would be very cognizant
of adding future costs to their project. We could always go outside the INDOT
right-of-way but that immediately doubles the price because we’re buying all
new real estate along there so it’s really kind of a see what they’re developing
and how can we mesh for their best interest and ours.
Sampson Well and it’s also, it ties into the concerns that our, our request to speak asked if,
if the money would be saved only for the path but time value of money – what is,
what is cement in 5 years from now? So does that create a future problem as far
as being able to afford that portion of the path?
Lantz I haven’t read the Trust Indenture in its entirety but I’m assuming these are going
to be placed in interest-bearing accounts so we’re going to be building some
interest over this at $650,000. I think the gist of the Developer Agreement is
look, we’re all in for $650,000. We believe in talking to our contractor and our
designer that we can design and build this for $650,000. What a lot of the
Page 21 of 35
Zionsville Town Council
June 3, 2024
conversations are about are the what ifs. What if there is more money involved?
What if you have to purchase land? So that’s where we have to realize that the
Town is going to have to pony up if we want to keep seeing this project advance.
So that’s what I was looking for was clarity in the agreement. What does that
$650,000 pay for? So going into this you have to understand that when those
funds run out we’ve got a couple of choices – we stop where we are. Maybe
we’ve built 75% of something, we’ve got something in the ground. What
happens to any residual funds and I think that’s the biggest question that people
want to answer is will that go back to a secure account that can only be used until
such time as the Town then can come up with our additional funds and build the
rest of the pathway. Did I get to your question?
Sampson Yes, I think so.
Lantz Okay.
Stein Lance, you’ve dealt with INDOT probably a lot more than any of us have. I’m
thinking of the timing of this thing and just we throw this thing down and they
come through and change their mind and all of a sudden it’s torn up. I mean, if it
were you spending your dollars would you wait until they were ironclad or, I
mean, how do you, how do you deal with that from a timing standpoint because
the last thing I want to do is drop $650k in the ground and then have INDOT
throw us a curveball that tears it up.
Lantz So, we have, I will say we have limited experience in, in these types of
relationships. We started building the Sycamore pathway along Raintree when
that was still State Road 334 then we ended up taking over the road so we
immediately wiped out all the challenges during that design process. So when
INDOT comes in and takes and looks at a project they will general – these are all
generalities, right? Nothing is etched in stone but they will replace in-kind. So if
they’re, if we have constructed a 10-foot, 12-foot pathway in their right-of-way
and they going to move that road out and then they going to push that pathway
out further their going to have to acquire more right-of-way so that pathway that
we’ve put in that they’ve allowed in their right-of-way is adding to their project
cost because they going to tear it out and rebuild it because they like to go back
in-kind. They won’t reduce the amount of amenities in a quarter. So when there’s
no pathways existing, they might come forward with their typical suburban or
urban cross section and say look, this is what we will provide you is an 8-foot
sidewalk right behind the curbs. Now, the Town, if you want to do something
different, I’m sorry – I’ve lost Corrie’s, I don’t want to lose Corrie’s page there –
you’re going to have to pony up for the delta. If you want something more robust
than we’re willing to give you’re going to have to pay there so there’s just a lot
of moving parts and I think a lot of this agreement is, is advancing on good faith
and intentions and those are fine but they can also burn you. So I really think
with all of the uncertainties you want to make sure that this $650,000 wholly,
whether it’s expended now or is deferred into the future, is truly reserved for that
purpose and that allows us to pick up on projects that don’t come to fruition.
Sampson And how far are we, how far does the right-of-way go from the existing road into
the east, how –
Page 22 of 35
Zionsville Town Council
June 3, 2024
Lantz It varies. Now I believe the old INDOT right-of-way through there is 50 feet
from the centerline of the roadway. There are several developments where we’ve
required them to put an additional 20 foot of right-of-way there but generally the
apparent right-of-way is about 50, is 50 feet from the centerline.
Sampson Thanks.
Lantz Okay, I’ll be in the back.
Norris Thanks Lance.
Burk Don’t go too far Lance. Yes, I think Corrie will speak to, I mean, I think that the
concern all along has been knowing that we want to, we want this trail to happen,
the constituents want the trail to happen but there’s a huge INDOT project
coming and so how do you, how do you make sure that you build the right
timeline to everything Lance spoke about and, at least the questions I was really
driving to was how do you secure those funds for a long period of time to make
sure that they’re not used for another purpose if it’s going to take longer than 24
months to build this? I think there’s some clarification on that that you came to
around kind of 10 years so I think Corrie can speak to how the fund is set up and
how it’s set aside for a long period of time.
Sharp Yes sir, thank you. So I have covered so far that we have a separate fund
specifically for $650,000. We’ve also added language here under the highlighted
that speaks to what Councilor Burk was just referring to is that the Trustee will
hold these funds for 10 years and will transfer any remaining funds to the bond
fund for the purposes of paying back those bonds if they have not been used
during that 10 years. Now, during those 10 years let’s talk about that just a little
bit. We’ve got the trail design which INDOT is currently working on, we know
we’ll have preliminary design. They will then use 2025 to work on the trail
design. Trail construction – once the design is complete, they have 12 months to
construct the trail. If they are not able to complete that trail within 12 months,
then the RDC, the “others” as I mentioned, can step in and complete that trail
with the bond proceeds and that language is in the Project Agreement between
the RDC and the developer. This was approved at their, the last RDC meeting.
This speaks to, this is the trail section and we talk about trail design and that the
trail planning process commences when the Commission provides written notice
to the developer. So we control the start and then at the end it says upon
commencement, the construction or developer shall complete the trail project
within 12 months subject to Force Majeure. So, meaning, if they do not complete
the project, RDC then can pick up the pieces and finish that project with the
project fund specifically.
Once the project is complete, the developer – let’s assume the developer will do a
stunning job and follow through on the commitments and get this all done. The
developer then will submit a bond claim. The bond claim will come to the RDC
for reimbursement of those expenses to construct the trail. The RDC will review
all of those costs for the entire bond, not just the trail construction, and we do this
for, this is part of our responsibility is to review developer bond expenses
associated with what they were approved in the bond documents to make sure
that they’re, they’re spending money the way that they should. We review that.
Page 23 of 35
Zionsville Town Council
June 3, 2024
We then tell the bond trustee that they are approved for reimbursement of their
costs and it comes solely out of that $650,000 fund. As Director Lantz
mentioned, it is a cap of $650,000 so if the trail expenses are, are above that then
the Town will have to pony up and contribute towards the completion of that
trail. If the fund is, if the trail costs less than $650,000, then those funds can only
go back to the bond for repayment of the debt obligation. It cannot be shifted into
other project costs. So that basically highlights the bond Trust Indenture and
specifically how the trail funds are isolated. Mr. Price, do you want to add
anything? Okay. Yes Councilor Melton –
Melton Corrie, what section does the, what section talks about the 10 years that you
mentioned?
Sharp This is on page 24 of the Trust Indenture. This is what was added today.
Melton Gotcha.
Sharp And previously the last draft that you saw it stated at a date to be defined.
Because these dates are written or finalized at, at –
Melton At closing?
Sharp Bond closing. But we wanted to put a cap in it now because we know that it’s
important to you to make sure that we have a timeframe associated with this so
we capped it at –
Melton How’d you come up with 10 years?
Sharp Well it seemed reasonable. One year is too fast, right? Five years is close but
given an act of God you just don’t know so 10 years seemed to be reasonable and
that was the recommendation of Heather James, our bond counsel.
Melton Thank you for sharing that with me. I didn’t see the 2034 on, on there but I see it
now so. I think that makes me more comfortable with the 10 years on there. I
think that was a great addition by Heather and Brad or whoever worked on that.
Vice President Burk, thank you. That makes me feel more comfortable as a
Pathways member as we’re hearing this. It seems like the $650,000 as, as
Councilor Sampson mentioned, I don’t know if that’s really going to be enough
to do it in 10 years or whatever the situation is but the good faith and all the
efforts put into this, this, this makes me feel a lot better about the situation and it
does sound like the dollars can either go towards this project or the dollars can go
back towards the bond payment. After 10 years what happens with it again? Can
you just refresh me on that? After the 10-year mark –
Sharp Yes –
Melton What’s the situation after 10 years?
Sharp So what, what it states is that after 10 years the Trustee shall transfer any funds
remaining in the Michigan Road Trail Account to the bond fund to redeem, to
repay the bond payments early basically.
Page 24 of 35
Zionsville Town Council
June 3, 2024
Melton So by default it automatically goes back and pays like it would be if there was a
remainder? Okay.
Sharp Correct.
Melton I think 10 years is reasonable.
Burk I think we felt like 10, I mean, it could’ve been 20 but that’s so far down the
road. I feel like if this is going to get done and even if it’s dramatically just
pushed back 10 years it feels like we’re definitely going to be done with it and
wrapped up by then.
Sampson And this is an asphalt path or is this sidewalks?
Sharp A multi-use path is asphalt, yes. And that $650,000 is a cost estimate provided by
the developer’s contractor with, based on the Town’s development standards.
Sampson And what are we with Pathways already aiming to do on? Do we have anything
over there? I thought we had something –
Melton Well this is definitely a priority of the, of the Pathways Committee. The
Pathways Committee set out four major pathway connections that we were
eyeing –
Sampson Yes –
Melton Pretty closely. By far, I believe that this one was the most, was going to allow the
most “traffic” to the Town of Zionsville from that area next to West Oak is
obviously on the radar because West Oak and east and west from out west in
Royal Run and Stonegate areas all the way obviously to town but that’s a bigger,
that’s a big bite also –
Sampson Right.
Melton But we control that so we have some advantages to there.
Sampson So in the Pathway Committee your funding has been hopeful through this TIF.
There’s no other funding put, set aside for that high priority project?
Melton So when we talk about funding and Pathways Committee –
Sampson Yes –
Melton The committee makes recommendations. The DPW really is in charge of how we
align the priorities. We’re going to make the recommendations to the Council as
well as DPW, however, there’s no fund, we have no funding control –
Sampson Right. I didn’t know if you had any like direct line to Lance’s ARPA dollars or
any, any sort of thing that –
Page 25 of 35
Zionsville Town Council
June 3, 2024
Melton Well, I think that’s where, that’s where the Pathways Committee and myself will
make these recommendations as the priorities which we did I believe in the
fourth quarter of last year –
Sampson Yes –
Melton To kind of prep us for this next Administration as moving forward and it really
boils down to is does this Council also see the value in that priority and
closing this gap of pathway that needs to, that we believe as the Pathways
Committee needs and there’s several others around Town that are –
Sampson Right.
Melton Are high priorities as well and we’re going to make some more suggestions and
we have a really nice list and if you, I believe it’s on the Town website some of
our information, some of our minutes –
Sampson Yes.
Melton Etc., but this one definitely stands out as one that access will allow access to a lot
more pedestrians and, and people in general, again, next to the larger
elephant which is West Oak Street.
Burk There’s no restricted dollars though to this particular project. You may recall
there were some ARPA dollars that were passed by the last Council –
Sampson Yes.
Burk None of it was applied to this particular trail. There were some dollars that were
put on 300 –
Sampson Yes –
Burk Kind of going east-west for a small portion of potential trail so I do believe that
at the time we were hoping that, at least last year, that this project which was in
the works could cover this and so it allowed ARPA dollars to be spent
somewhere else.
McElderry And is it fair to say that Sentry is responsible for that segment in front of the
development? So the $650,000 is, is that the Town’s contribution to the other two
segments or who’s are they paying for that portion that’s in front of –
Sharp Their obligation is to build the trail from Appaloosa all the way down to Willow
Road so it does include in front of their project. They’ve got to build it all and
they’ll spend as –
McElderry But,had this TIF not been developed, had that area not been designed for
this, they would’ve had to put – is that not true? Okay. Correct me please Mr.
Price.
Price For the record, Matt Price representing Sentry. No, without the TIF there would
Page 26 of 35
Zionsville Town Council
June 3, 2024
not have been a project.
McElderry Okay, so that’s segment in front –
Price There would be no segment in front of the building, yes. That’s, that’s really a
critical issue is we’ve proceeded in good faith believing that there was support
for the project which was unanimously approved by the last Council which
included this trail component that we worked closely with Hidden Pines,
Bridlewood and the property owners that we’ve talked to already about the
availability of their land for a trail. Certainly haven’t secured all those rights but
we believe that there are several very significant contributors who are onboard
for contributions at no cost. I think, I think this will be one of those where you
have to coordinate and kind of focus your resources on the few holdouts, a
holdout or two along the way, but you can obviously do a lot of good with that
$650,000 just based on who the kind of the coalition of the willing are just from
what we know today.
McElderry Thanks for clarifying that Mr. Price.
Price Yes, no, absolutely.
McElderry I appreciate it.
Price Thank you for the opportunity to do it – and I should say too the, we view Mr.
Gressel and the RDC and the Council really as partners on this. This is going to
be, this is going to be an all hands on deck kind of thing, right? We’re going to
have to pull together to get this thing done and one of the things Jordan Dorsey
who’s, who’s watching online is, is committing to do in addition to the financial
commitments in the Project Agreement is really to, to help lead that and use his
resources, his engineering team to help coordinate with the Town and work
closely with Brad Gressel and the Pathways Committee going forward and I
think he’s, he’s, he’s excited about his project and excited about making sure this
happens.
Norris Yes, that’s what I was going to add earlier when, when Sarah kind of asked that
question about funding and all that. I mean it’s really a convenience thing at this
point too because he’s already going to be out there –
Price Right, yes.
Norris With, with earth moving and he’s willing to go way beyond the bounds of his
property to do it –
Price Right.
Norris And it’s convenient and the time’s right and –
Price Yes.
Norris Let, let’s get it done.
Page 27 of 35
Zionsville Town Council
June 3, 2024
Price And because we’ve worked through the zoning issues, we’ve talked to all the
landowners. We basically know everybody from the south end of Appaloosa all
the way down to Willow Road because we’ve met with them all in connection
with this project so. Some of them are chomping at the bit to contribute their
land. Others, I think, have legitimate concerns just because of where their
properties relate to 421 but, but there’s a lot of positive goodwill out there. I
would suggest I think Brad Gressel would agree with me on that, yes.
Sampson So then that leads to my – why don’t we ask them if we can put the outside of the
possible right-of-way now?
Price Yes, yes.
Sampson And see how far we can get because you say moving the land. If we end up with
two missiles that actually miss each other that we’re moving the land while we’re
waiting for 421 –
Price Exactly.
Sampson Then we’re not moving the land and then it is more expensive –
Price Right.
Sampson So have we considered some of the pathway to just go for it now if people are
willing –
Price Sure.
Sampson To do further in. To me that is the smartest planning.
Price Sure, absolutely and that’s exactly what would happen here. I think, I think just,
just the same way Zionsville would be if, if someone wanted to put an
improvement into an area where they wanted to make a future road improvement,
they’d be very protective of that area and I would expect INDOT and from other
experience working with INDOT that they’re going to pretty much tell us where
that pathway has to go so they never have to pay for it.
Sampson Right.
Price And so I think there’s not going to be a lot of mystery as far as the pathway for
where this goes. I think that’s going to be determined pretty much upfront.
McElderry The mystery is the timing of it, right?
Price Yes, it’s the – the mystery would be some of the timing but I think that’s, I think
that’s going to be sooner rather than later. I don’t think it’s as, I don’t – one,
there’s just some, there’s some finite boundaries just because of where structures
and utilities and things are so I think they’re going to be able to point us to the
right area just, just like they do on other pathways that are going in now along
421. That’s done very carefully coordinated with the Town’s plans and with
INDOT’s plans.
Page 28 of 35
Zionsville Town Council
June 3, 2024
Sampson I just almost think there needs to be some sort of breakpoint where if we’re not
getting very far with 421 then we approach looking at where the right-of-way
exists and seeing if Interactive wants –
Price Right.
Sampson Is willing to have a closer one and so we get that part built while we are –
Price Yes.
Sampson Moving land.
Price I think, and I think what we’ve tried to capture and it’s, you’re always kind of at
the mercy of, of words but what we tried to do is in the trail design section in
Section 2 of the Project Agreement is we’ve, we’ve defined what we’ve called a
trail planning process and I think that what we’re envisioning is that’s going to be
a dialogue with all the stakeholders around the table to say, to exactly deal with
those kind of issues. I think what’ll happen is the project will emerge from that
process as we get more information from INDOT, as we know exactly who’s
onboard to commit their land, it’ll, the design will start to emerge from that
process.
Sampson Okay, thank you. I mean, our concerns from the prior weeks were feeling like we
didn’t have a Development Agreement. Now we have an agreement that has a
timeline even though that timeline might miss 421 shouldn’t but it might? Do
you feel that your part of it that you were concerned about before?
Burk I think going back a couple meetings I think what we were looking for in a
Development Agreement were a few things that we just didn’t see which was
even very clearly defining where the trail would be, very clearly defining that
there would be a fund that would be completely set up and how it could be
protected, how it would be used, how long it would last, putting in parameters of
what happens if 10 years goes by or making sure that if for some reason
something happens and Sentry can’t meet their obligation within that 12 months
after they began the project then making sure that there’s language that the RDC
could finish the project. So, I think a number of things that were missing are all
kind of in place and to Corrie’s point, I think we’ve taken it as far as we can
without the impact of the INDOT timeline but the money is protected and it’s
there for a long period of time and I would love to see this come to fruition and,
of course, Sentry wants to get this done while their equipment is there.
Sampson Right, come back.
Burk They don’t want to have to come back –
Norris Yes –
Burk In four years to do this so I think we want to move it as quickly as we can but
there is some chance and that was my concern all along is we’re, we’re doing this
but there’s a portion out of our control and that’s a stake but I was very
Page 29 of 35
Zionsville Town Council
June 3, 2024
encouraged to hear that even potentially this year or Q1 of 2025 they should
have, we should have what we need to be able to put the plan together and that
still gives Sentry 12 months from when RDC says go to do the construction and a
lot of homework can be done now so I’m thrilled. I think it’s as far as we can
probably get it to really guarantee that we can do this trail. As Councilor Melton
mentioned, this is a priority of the Pathways Committee, it has been for a period
and I can tell you from District 5 I’m sure that Evan knows this as well as Joe but
this is, this is the top concern of people who live along that corridor. They want
this trail. I’ve heard over and over again for the past year this is the top priority
and they’re all very invested in this process. They were engaged with Sentry
which I think is why we got to this point so I think there’s a lot of people who,
who are really counting on this being built.
Sampson And you feel that same way because I know this was some concern –
Norris Yes.
Sampson With your area living over there.
Norris Yes, no. It’s a, it’s a major concern. My, my question – do we have a fully
executed Project Agreement?
Price I have a, I’m not sure if the RDC has signed their copy or not –
Sharp Yes.
Price But I have a signed version of it. I –
Norris In counterparts?
Price In counterparts, yes.
Norris Okay.
Price Thank you counsel.
Norris Okay.
Price The, I did, I didn’t want to be presumptuous because I didn’t know if there were
going to be other changes to make to the Project Agreement but we have it
signed. Jordan is onboard.
Norris And then, and then, Corrie, on the record we have a signed executed Project
Agreement stamped ready to go?
Sharp Yes sir.
Norris Okay, all right. That answers my concerns then.
Plunkett Are there any other questions for Corrie or for Mr. Price?
Page 30 of 35
Zionsville Town Council
June 3, 2024
Norris Well, were – were, were you going to – Corrie, we kind of –
Sampson We did kind of jump you around –
Sharp Well I, Councilor Sampson I owed you a date for Creekside.
Sampson Thank you.
Sharp The expiration of that TIF area is October 26, 2040.
Sampson Thank you.
Norris I have a comment on the Trust Indenture itself if you could go to page 23 for me.
Is it okay if I ask some questions?
Plunkett Yes, absolutely.
Norris The very, very bottom line says project fund in there. That term is not defined
anywhere in there. Are we able to – I assume it’s supposed to say construction
fund but that’s a pretty important provision in that contract because it discusses
what, what happens if construction doesn’t start and we have to start paying the
interest down on the bond and so I control F’d it while I was sitting up here as
well and project fund doesn’t appear anywhere else.
Sharp Yes, we will make sure that gets defined –
Norris Okay.
Sharp Prior, prior to closing.
Norris I believe it should say construction fund but I don’t want to assume.
Sharp Thank you.
Norris Yes. And then – are we also approving the Bond Purchase Agreement as well
then as part of the Trust Indenture?
Sharp This is –
Norris It’s included in our packet so that’s why I’m trying to make sure – no, go ahead,
go ahead.
Price Yes, I think and I apologize for this phraseology because I’m sure it doesn’t add
any comfort but the term you hear often is that the agreements are in substantially
final form but that typically means that what we’re doing is filling in the closing
information between the time you approve the document and the time we actually
have a closing. If there are cleanup items like that definition you noted, we can
do that as well.
Norris Okay.
Page 31 of 35
Zionsville Town Council
June 3, 2024
Price Yes.
Norris And so that’s something we can talk about just offline?
Price We can do that offline –
Norris Okay, just –
Price If you’d prefer, absolutely.
Norris Yes. There, there are just some minor, minor things that I caught in the Bond
Purchase Agreement specifically that I just think maybe out of place a little bit.
Burk Evan, we are going to vote on it, I mean, so, I mean –
Norris Yes, okay, fine. I’ll, I’ll just go to it real quick.
Harris Yes, so I think, because I think what you typically would leave open is like what
–
Burk Dates.
Harris The interest rate is and you’ve got maximums –
Burk Yes.
Harris That are included but if there’s –
Norris Yes –
Harris Type, typos or anything substantive.
Norris Corrie, do you have a copy of the Bond Purchase?
Harris Corrie, do you need one?
Lacy No, that’s just the Trust Indenture.
Harris I think it has the bonds in here.
Norris On page 3, Section D it refers to Whitsitt & Nooning, P.C. as counsel to the
Town. Is that, is that still accurate? I was going to, I wasn’t aware so I just
wanted to make sure because it spells it out specifically instead of just counsel
for the Town it says Whitsitt & Nooning.
Sharp Okay, thank you.
Harris What page are you on?
Norris I’m on page 3 of the Bond Purchase Agreement.
Page 32 of 35
Zionsville Town Council
June 3, 2024
Sharp Okay.
Norris And then also on page 3, Section 2, subsection A it says – subject to all the terms
and provisions of the Project Agreement (as defined in the Indenture) and then I
reviewed the Indenture and I don’t see that the Project Agreement was defined so
that definition –
Sharp Add the Project Agreement?
Norris Yes, it, it, it didn’t make it into the Indenture but we referred to it in the Bond
Purchase so, therefore, going to bring them all together. And then let me just
make sure I have my ducks in a row – I believe that’s all the questions that I had.
Thank you. I apologize, I didn’t mean to commandeer that.
McElderry President Plunkett, would it be alright to ask Brad if, if he’s happy with
everything having come here to speak tonight? Would you be willing to step up
and just share with us if, if everything has met your expectations?
Gressel Yes, I mean in, in general, yes. I think, I know Brad, the other Brad, has done a
lot of work getting this buttoned up. I think this is what I was hoping to see
having not having the newest version copy in front of me but I would just kind of
reiterate what a few people have said. I mean, the whole group I’m not
necessarily representing, I’m the only one here from that group, but I’ve been
involved and worked with Jordan and Matt through this whole time so we’ve
been very – you know, they, they could’ve just not been receptive to this from –
McElderry Right.
Gressel The start so I think we approached them to kind of figure out, and this goes all
the way back to the PUD. I mean, to try to get this to, to work out where it was
mutually beneficial and I, knock on wood, we can, we can make it happen
because it, it would be very beneficial to our district as I said earlier so.
McElderry Thank you.
Gressel Yep.
Plunkett Are there any other questions from Councilors for Corrie, Matt or anyone else? I
would remind Council that this is a final reading for the Ordinance 2024-11 and I
would entertain a motion.
Norris I’ll make a motion to approve on final reading Ordinance 2024-11.
Burk Second.
Plunkett I have a first from Councilor Norris, a second from Vice President Burk. All
those in favor signify by saying aye.
All Aye.
Plunkett All those opposed same sign.
Page 33 of 35
Zionsville Town Council
June 3, 2024
[No response]
Motion passes 7 in favor, 0 opposed.
NEW BUSINESS
Consideration of a Resolution Approving Expansion of the EDA and Holliday
Farms Allocation Area and Creation of New TIF Allocation Area Resolution 2024-
13
Plunkett Up next is New Business – a Consideration of a Resolution Approving the
Expansion of the EDA and Holliday Farms Allocation Area and the Creation of a
New TIF Allocation Area. This is Resolution 2024-13. I would point out to
Councilors that this a resolution so this would be one vote on this and we have
Corrie again.
Sharp This TIF resolution is the final step in the TIF process which allows a bond to be
taken out. So this resolution expands the boundaries of an existing EDA, the
Holliday Farms EDA and that project is located on the west side of Michigan
Road and we’re expanding the EDA to incorporate the Sentry project. So this is a
geographic boundary adjustment to an existing EDA and that is the action item
that you are taking up.
Plunkett Are there any questions or comments from Councilors? Again, I would reiterate
that this a resolution that comes to us and it’s one action so. Questions,
comments? Otherwise I would entertain a motion.
Norris I’ll make a motion to approve Resolution #2024-13.
Plunkett We have a first from Councilor Norris.
Stein Second.
Plunkett Second from Councilor Stein. All those in favor signify by saying aye.
All Aye.
Plunkett All those opposed same sign.
[No response]
Motion passes 7 in favor, 0 opposed.
OTHER MATTERS
Plunkett All right up next is Other Matters. Are there any other matters from Councilors?
Having none, I would just say I’m going to send out an email on behalf of the
Council, we’ve got rules and procedures to make sure we get everything in our
hands well in advance. I mean we had three different items on the agenda that
were items received after our cutoff and I don’t think that’s fair to Amy Lacy
who’s got to put in all the effort to get this to us and obviously expect Councilors
Page 34 of 35
Zionsville Town Council
June 3, 2024
to review everything in time either. It makes for a lot of frustration from time to
time. So, that’s all I have for that. So any other updates from Councilors?
ADJOURN
Plunkett Having none, I would make a motion to adjourn.
Norris Second.
Plunkett A second from Councilor Norris. All those in favor signify by saying aye.
All Aye.
Plunkett All those opposed same sign.
[No response]
Motion passes 7 in favor, 0 opposed.
The next regular Town Council meeting is scheduled for Monday, June 17, 2024
at 7:30 a.m. in the Zionsville Town Hall Council Chambers. Final notice will be
posted in compliance with the Indiana Open Door Law. Thank you.
Respectfully submitted,
Amelia Anne Lacy, Municipal Relations Coordinator
Town of Zionsville
Page 35 of 35