Board of Zoning Appeals
Regular MeetingAnderson, IN · March 4, 2009
Minutes
BOARD OF ZONING APPEALS MINUTES
March 4, 2009
MEMBERS PRESENT: Mr. Stires stated this property is located on
the northeast corner of the intersection of
Rudy Williams, Chairperson Enterprise Drive and Quality Circle in The
Harold Smith, Vice Chairperson Flagship. This 3.05 acre site is presently
Connie Klungness, Member vacant and is bordered on the west and north
Greg Spencer, Member by the ACS (Affiliated Computer Services)
Willie Rayford, Member Call Center and parking lot. Mr. Stires added
the property is zoned I-3 Industrial Reserved
MEMBERS ABSENT: and is known as platted Lot #3 in The
Flagship.
OTHERS PRESENT: Mr. Stires stated the petitioner is seeking
special exception approval for an I-3 Planned
Michael Widing, Development Director Industrial Development for the construction of
Tim Stires, Assistant Development Director an industrial office building / warehouse for a
Dave Wilbur Sr. Zoning Administrator new business known as Zatkoff Seals and
Stephanie George, Board Secretary; and Packing. The submitted site plan indicates the
William Kreegar, Attorney Zatkoff building will initially measure 76 ft.
by 190 ft. by 27.3 ft. high, or a 13,345 sq.
ROLL CALL AND DECLARATION OF A facility. Mr. Stires added the same site plan
QUORUM: shows the possibility of a future addition on
the rear and north sides of the building. The
Mr. Spencer called the meeting to order at expansion measures approximately 60 ft. by
4:30 p.m. Ms. George took roll call and 290 ft. by 27.3 ft. high or an additional 17,000
declared a quorum with three members in sq. ft., which will more than double the size of
attendance. Mr. Spencer performed the the new facility. Mr. Stires stated the
Invocation and the Pledge of Allegiance. Mr. proposed building easily meets the minimum
Williams and Mr. Rayford arrived at 4:32 p.m. lot size requirement, minimum setback
requirement, the 50 ft. building setback from
MINUTES: the center line of the interior road, maximum
number of principal entrances from major
The February 4, 2009 minutes were approved thoroughfares and thoroughfares must be
as presented. Motion passed unanimously; 3 adequate to carry additional traffic.
yes, 0 no.
Mr. Stires stated the site plan shows a total of
BUSINESS: 41 asphalted parking spaces (10 ft. by 18 ft.)
on the west side or front of the building. The
PETITION #06-09 parking requirements for an I-3 development
specifies one parking space per two employees
Submitted by Zatkoff Properties Ltd. and on the largest shift. Staff notes the largest
Anderson Corporation for Economic shift at Zatkoff will have nine (9) employees
Development (CED) for a Special which translates to 4.5 parking spaces. Mr.
Exception for an I-3 Planned Industrial Stires added all totaled Zatkoff plans to
Development located at 2730 Enterprise employ about 12 to 15 workers. Staff believes
Drive. the proposed 41 spaces are more than
adequate to serve the new building.
1
the parking lot. Mr. Stires stated the
Mr. Stires stated the site plan shows dual or petitioner’s site plan shows concrete curbing
twin access drives to the site with 30 ft. wide along the driveway entrances, but not the
curbed and asphalted driveways on Enterprise parking lot. Staff would note curbing has been
Drive and Quality Circle. Staff notes the twin installed around the parking lots at the
driveways both tie into the parking area and following Flagship sites: Business
the two loading /unloading berths (docks) on Development Center and Education Wing
the west side or front of the building. Expansion, Accelerator Building, Ivy Tech /
Alliance One and the ACS expanded parking
Mr. Stires stated the site plan indicated the lot.
Zatkoff building, when fully built, will only
have a lot coverage of 46 percent by building Mr. Stires stated staff is recommending
and hard surface and 54 percent by green approval of the special exception, and two (2)
space or landscaping. This is well under the waivers (sidewalks and cross access) because
maximum lot coverage allowance of 80 percent the Zatkoff building meets or exceeds all
in an I-3 zone district. applicable setbacks and Figure 9
Requirements. Staff notes the new building, if
Mr. Stires stated the submitted landscaping approved, will allow the petitioner to relocate
plan shows a modest amount of trees and its operations to Anderson from Indianapolis
shrubs will be planted around the west side or along with 12 to 15 job opportunities.
front of the building around the perimeter of
the parking lot. Mr. Stires stated staff is recommending denial
of the concrete curbing wavier because the
Mr. Stires stated the submitted lighting plan curbing gives the project a finished and
shows the Zatkoff site will be illuminated by professional appearance which has been
five (5), 400 watt, metal halide, wall mounted carried over in various new Flagship
lights around the exterior of the building. A construction sites such as: Business
satisfactory isolume plan is on file. Development Center, AU / Purdue Education
Wing Expansion, Ivy Tech / Alliance One,
Mr. Stires stated the petitioner is only Accelerator Building, and Affiliated Computer
proposing a single ground sign on the Zatkoff Services (ACS) call center parking lot
site. A 4 ft. by 8 ft. by 6 ft. high ground sign is expansion and upgrade.
shown on the west side of the access drive off
of Enterprise Drive. Mr. Stires added the 32 Jerry Hoffman, 1107 S. Tillotson Avenue,
sq. ft. sign would state “Zatkoff Seals and Muncie, Indiana, stated he would be the
Packing.” architect for the project. Mr. Hoffman added
he had his partner Karl Fettig, and Norb
Mr. Stires stated the petitioner is requesting Haben from Zatkoff with him also tonight. Mr.
waivers from three of the Board’s Design Hoffman added Zatkoff has been a family
Standards and they are from concrete curbing, owned business since 1958.
sidewalks and cross access requirement. The
petitioner is seeking the sidewalk waiver Norb Haben, 2301 W. Pineview Drive, Muncie
because there are no sidewalks in close Indiana stated his corporation has been in
proximity of the site. Mr. Stires added the business since 1958, and this will be their 8th
only sidewalks in The Flagship are at the facility in the Midwest. This is very similar to
Business Development Center. The petitioner their Cincinnati and Cleveland facilities that
is seeking the cross access waiver because they built in the last five or six years. Mr.
cross access easements are generally used in Haben added he opened the Indianapolis
retail or commercial settings to promote facility back in 1994 and he is the branch
frontage roads. Mr. Stires added the petitioner manager for Zatkoff of Indianapolis, and they
doesn’t believe cross access is practical or are needing to expand their operations and
warranted at this site. The petitioner is also their current building will not allow it.
seeking a waiver from the concrete curbing of
2
Mr. Williams asked what exactly does Zatkoff Mr. Kreegar stated no, it wouldn’t be a
do? Mr. Haben stated they are an industrial waiver, it is part of the special exception
distribution facility. They supply seals and requirements, and would be a variance. But in
gaskets to original equipment manufacturing this case, it doesn’t fit the definition.
(OEM) companies such as Guide, Remy and
Nestle which need these parts. Mr. Hoffman stated he is also on the Board of
Zoning Appeals in Yorktown, Indiana and he
Mr. Williams asked why can’t they relocate has been on both sides before. The site in
the loading / unloading berths from facing Anderson, also had a couple of other
Quality Circle, so they wouldn’t be seen from negatives, such as needing to add a foot of fill
the front of the street? Mr. Haben answered on the property, no gravity sewer and they
they tried two or three different layouts and had to get a lift station.
the one they are presenting tonight is the
most functional. Mr. Haben added when the Mr. Hoffman stated just think of the
truck is in the loading bay the trucks would be engineering of a 15 ft. masonry wall, with
parallel with Quality Circle. wind load, the foundation would be costly. The
masonry on the normal building is about $10 a
Mr. Widing stated they have worked with the sq. ft. Mr. Hoffman added it is an expensive
architect through several sessions and they item that you normally wouldn’t see in an
recommended a “wing wall.” US Architects did industrial park.
a cost analysis and they found it would cost
$24,000, which became a cost prohibitive Mr. Williams asked why doesn’t Zatkoff want
measure. Mr. Widing added the Figure 9 cross access? Mr. Hoffman stated he didn’t
Requirements state the berths shall not face know what purpose it would serve in this case.
on bordering highway. In this situation, it is Normally, cross access is when they are trying
perpendicular to the road, and staff concluded to promote an access road parallel to the main
it really didn’t face the road, it would be road. Mr. Hoffman added he didn’t see cross
sunken down in the ground. access anywhere else in the park. Mr. Widing
stated the primary reason for cross access is
Mr. Spencer stated part of the concern is, the on major thoroughfares, so we don’t have
view from the building across the street, traffic running out onto the thoroughfares and
would that affect the future development? Mr. immediately back into the adjoining business.
Widing stated that is why they recommended Enterprise Drive and Quality Circle are
a “wing wall.” known as secondary roads, not primary
thoroughfares.
Mr. Spencer asked how often would Zatkoff
have incoming and outbound freights? Mr. Mrs. Klungness asked what about concrete
Widing stated one or two a day, maximum. curbing, why only curbing certain areas and
not the whole project area? Mrs. Klungness
Mr. Spencer asked would the Corporation for added she has asked other engineers and they
Economic Development (CED) be involved say because it can direct water flow, if you
with the marketing of the building that is don’t want it, why would curbing hinder this
across the street, if so, what is there opinion? development? Mr. Hoffman stated they are
Mr. Widing stated in communication with Mr. proposing curbing, the only place where they
Sparks, we shared our concerns and Mr. are not proposing it is along the parking
Sparks felt comfortable with it. areas, and we are going to use bumper blocks.
Right now, it is designed for the water to flow
Mrs. Klungness asked would it be appropriate just directly off of the paving into the swales.
then to make a waiver of that or just forget it Mr. Hoffman added they can put curbing in
all together? Mr. Widing stated in an I-3 zone and once again it is $20 a foot times the whole
class is for industrial office and business uses, length, it is a money issue once again.
it is a mixed use environment.
3
Mr. Spencer stated if there is some concern in this community. Mr. Spencer added
about the curbing and this expansion that you Petition #06-09 should also consider approving
have mentioned, what is the timeline on that? a waiver from the Board’s cross access and
Mr. Haben stated they don’t know yet. sidewalk requirements, but deny the waiver
for concrete curbing requirement. Mr. Rayford
Mr. Williams asked how much curbing would seconded. Motion passed 5 yes, 0 no.
be needed to do the parking lot? Mr. Hoffman
stated 280 ft., which would cost $6,000 to Meeting adjourned at 5:07 pm
$7,000 worth of curbing.
BY: ______________________________
Mr. Smith stated the driveway off of Quality Rudy Williams, Chairperson
Circle, when it comes into the parking lot that
should be curbed at least around that radius. ATTEST: ___________________________
Mr. Hoffman stated it’s going to be curbed. Stephanie George, Board
Secretary
Mr. Williams asked has the petitioner
submitted plans for the engineering permits?
Mr. Hoffman stated they have all been
submitted.
Mr. Spencer asked Mr. Widing if he felt
comfortable that the sidewalk requirement
waiver be granted? Mr. Widing stated there
are no sidewalks out past the Flagship Center
itself, we don’t intend on bringing sidewalks
out in this area at this time.
Mr. Smith asked what is the difference
between the using the pre-cast curbs and
building the fixed concrete curbs? Mr.
Hoffman stated the fixed concrete curbing are
about $20 a linear foot and the parking
bumpers are $12 a piece or $1.50 a linear foot.
Mr. Spencer made a motion to approve
Petition #06-09 based on the following
findings of fact. The proposed special
exception is in a proper zone district. The
requirements of Figure 9 have been met, or
variances were granted. The proposed special
exception will serve a public need and
convenience, because it will add needed
development in the Flagship area, resulting in
job creation for this community. The proposed
special exception will not permanently injure
the appropriate use of the surrounding
properties, because the surrounding
properties are zoned industrial as well. The
proposed special exception is consistent with
the spirit, intent and purpose of the zoning
ordinance, because the zoning ordinance
certainly allows for responsible development
to enhance business activity and job creation
4