Mayor & Commission Meetings
Regular MeetingAthens-Clarke County, GA · November 12, 2024
Minutes
Unified Government of Athens-Clarke County
Mayor and Commission Meeting Minutes
Meeting Name: Work Session
Meeting Date: November 12, 2024
Meeting Called to Order: 12:06 p.m.
Location: 120 W. Dougherty Street
Virtual? ☐ Yes / ☒ No Public Input Requested or Received? ☐ Yes / ☒ No
Commission Attendees:
☒Kelly Girtz ☐Allison Wright ☐Carol Myers
☒Patrick Davenport ☒Dexter Fisher ☒Ovita Thornton
☒Melissa Link ☒Jesse Houle ☐Mike Hamby
☒Tiffany Taylor ☒John Culpepper
Items Discussed:
1. HRC Workplan & People & Belonging Update
2. Sycamore Drive Sidewalk – Project Concept
3. ACC Library – Schematic Design Presentation
4. Public Engagement Results Leisure Services Masterplan
5. Quarry Options
No votes were taken.
Motion to Adjourn Made by: Commissioner Houle
Motion Seconded by: Commissioner Taylor
Results: Approved
Meeting Adjourned at: 1:39 p.m.
Agenda
The meeting will be streamed live and available on-demand through YouTube
(www.youtube.com/accgov), the YouTube app, and www.accgov.com/videos, as well as on-
demand through the ACCGov Roku channel.
WORK SESSION AGENDA
UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY, GEORGIA
Tuesday, November 12, 2024 – 12:00 PM
Planning Department Auditorium
I. Call to Order (12:00 p.m.) Mayor Kelly Girtz
II. Items for Future Consideration – Questions Only
A. HRC Workplan & People & Belonging Update. ..................................... Remy Epps
People & Belonging Director
B. Sycamore Drive Sidewalk – Project Concept. ....................................Josh Hawkins
Capital Projects Director
C. ACC Library – Schematic Design Presentation. .................................Josh Hawkins
Capital Projects Director
III. Items for Future Consideration
D. Public Engagement Results .................................................................BerryDunn
Leisure Services Masterplan Consultants
E. Quarry Options .....................................................................................Hollis Terry
Public Utilities Director
IV. Adjourn
NOTE: All reports are draft. No final action is taken at this work session.
The Work Session is open to the public; however, public comments are not received.
NOVEMBER 2024 - MAYOR & COMMISSION WORK SESSION
PEOPLE & BELONGING
DEPARTMENT
and
HUMAN RELATIONS
COMMISSION
Remy Epps, PhD, Director of People & Belonging
Donikia Gray, MSW, Programs Coordinator, People & Belonging
TODAY’S
AGENDA
01 About People & Belonging Department
02 People & Belonging Department Updates
03 Human Relations Commission Updates
04 Questions & Answers
People & Belonging
vs. Inclusion
This name reaffirms our dedication to creating inclusive
spaces that adapt and thrive amidst changing conversations
and expectations globally
Reflecting Evolving DEI Conversations
Our name change aligns with global shifts in DEI, addressing charged
discussions and prioritizing sustainable, people-centered approaches
over traditional labels.
Emphasizing Belonging for Lasting Impact
Moving from “Inclusion” to “People & Belonging” highlights our
commitment to a culture where everyone genuinely fits, feels valued, and
can contribute meaningfully and Emphasizes people-first approach.
Learning from Other Municipalities
Inspired by successful models, this change supports a resilient,
community-centered framework that meets the evolving needs of both
our organization and the wider community.
Importance vs. Sustainability
Shifts focus from short-term diversity goals to sustainable cultural
transformation. By prioritizing belonging alongside inclusion, we align with
practices that ensure lasting impact and genuine engagement rather
than superficial changes
Our Mission Our Vision
Cultivate an inclusive, equitable, and supportive community We envision a community where every individual feels a
by embracing diversity, equity, and inclusion principles. We genuine sense of belonging, equity, and inclusion. Our goal
achieve this through education, advocacy, outreach, and is to create an environment where diversity is celebrated, all
ensuring accessible city services and equitable outcomes for voices are heard, and every person has equal access to
all community members and employees. Our dedicated opportunities and resources. We strive to be a model of
efforts are focused on protecting the fundamental rights of fairness and inclusivity, proactively leading the way in
individuals, recognizing and valuing diverse lived fostering a culture of respect, understanding, and mutual
experiences, and using community input and research to support within Athens-Clarke County.
proactively address and close equity gaps.
Listen. Serve. Advocate
STAFF CULTURE, CLIMATE, & COMPETENCE
Strengthen a culture of accountability, inclusivity, and respect within
the organization by enhancing training and communication, and
ensuring workforce diversity reflects the community
ORGANIZATIONAL SUSTAINABILITY
Ensure long-term success by strengthening diversity, equity, and
inclusion within the organization, and holding leaders accountable to
create a welcoming environment for everyone.
ACCOUNTABILITY TO RESIDENTS
Build partnerships with diverse groups, include equity in decision-
making, and revisit & consult policies that cause inequalities to enhance
the community's quality of life.
What Do We Do?
The People & Belonging Department operates TYPES OF SERVICES WE OFFER:
with a dual focus: internally within the
organization and externally within the broader
Internal & External Guidance/Consultations
community. This approach ensures that both
employees and the public experience an
environment rooted in equity, inclusivity, and Provide Internal & External Resources
support.
Offer Employee Support
Customized Internal/External Training
WHAT WE’VE BEEN UP TOO
Key Initatives & Projects
ORGANIZATION-WIDE EQUITY STRATEGY
We have made significant strides in formulating a
comprehensive Equity Strategy designed to address disparities
within our organization and promote a culture of fairness and
inclusion. This strategy has been shaped through collaboration
with diverse employee groups and stakeholders to ensure it
reflects the diverse perspectives and needs of our workforce.
ENGAGING WITH ATHENS!
We continue to build and strengthen partnerships with
local organizations, educational institutions, and businesses
to collaboratively work towards shared equity goals. These
partnerships are essential for creating a unified approach
and leveraging resources to maximize impact.
Community Events
Total Hours*
Attended & Hosted in last
Year (estimate) LISTEN. SERVE. ADVOCATE
WHAT WE’VE BEEN UP TOO
Key Initatives & Projects
Training & Consulting
We have initiated a series of equity training and
development programs for county staff and community
partners. These programs focus on building awareness,
skills, and competencies needed to foster an inclusive
environment and address systemic inequities effectively.
Resources & Data Hubs
Our department has prioritized the collection and
analysis of equity-related data to identify gaps and
monitor progress. This data-driven approach helps us
better understand disparities and informs our decision-
making to ensure equitable outcomes for all residents.
Listen. Serve. Advocate
01 Pilot Testing of the DEI Training Program: The DEI training series will be
piloted for select staff and community leaders, and feedback will inform any
necessary adjustments.
02
Community Resource Hub Development: Progress will begin on a
Expected People & Belonging centralized online hub providing resources for trauma support, counseling,
and legal aid, aiming for a Q1 2025 launch.
Department Accomplishments
in Q2
03
Community Listening Sessions: Two listening sessions will be hosted to
gather community feedback on experiences related to trauma and violence,
providing crucial insights for further strategy development.
04
Introduction of a Reporting Mechanism: A confidential reporting system
will be implemented to document and track incidents of racism, trauma,
harm, and violence, helping inform preventive measures and future
strategies.
05
Launch of the Language Guide: The language guide will be published across
all departments and shared with community partners, accompanied by
workshops for seamless adoption.
06
Center for Racial Justice and Black Futures Approval/ Linnentown Art:
Pending approval, the Center for Racial Justice and Black Futures will take critical
steps toward establishment, with community-led programming aimed at
addressing racial justice.
OCTOBER 2024
2nd year Work Plan
developed
APRIL 2024
1st Members Terms
Mission of HRC Expired
Provide a communication bridge
between the Mayor and Commission
and the community and foster
JANUARY 2024
dialogue throughout the community 1st Community
Education Session
MAY 2023
M&C Approved 1st Workplan *
*Per Human Relations Commission Ordinance & Bylaws, M&C only approves the first-year workplan
UNLAWFUL DISCRIMINATION
ORDINANCE (NDO)
Assess and improve the accessibility of the Unlawful
Discrimination Ordinance (NDO) and create an
effective communication strategy
INITIAL FOCUS COMMUNITY OUTREACH,
RELATIONSHIP-BUILDING, AND
AREAS (FY24) LISTENING
Enhance community awareness of the Human
Relations Commission (HRC) through outreach
INTRODUCE COMMISSION & activities and community event support:
CREATE BRAND
RECOMMEND POLICY
Make policy recommendations for 2024,that are
relevant to its work, aligned with current community
needs and feedback.
KEY INDICATOR ACTIVITY OUTCOME
Attended 20 community events, Expanded HRC presence and
Events Attended including town halls, forums, and local visibility within the community,
festivals connecting with diverse
audiences
Increased public awareness of
Individuals Interacted With Engaged with over 10,000 community
HRC services and mission,
members through events, surveys, and
fostering stronger community
outreach efforts
relationships
Provided direct education on HRC
HRC Hosted Events Organized 9 HRC-hosted events focused
mission and services, fostering
on equity, inclusion, and community
community trust and
rights
understanding
Measuring Progress of HRC
KEY INDICATOR ACTIVITY OUTCOME
Demonstrated dedication to HRC
Hours per Member goals, enhancing the
Committed 150 hours per member in
effectiveness and impact of
planning, outreach, and event support
community outreach
Community Awareness Developed a comprehensive action plan Broadened community awareness
to raise HRC visibility, including social and knowledge of HRC resources
media and informational campaigns and reporting pathways
Conducted targeted outreach with local Strengthened ties with key
Stakeholder Relationships
leaders, organizations, and advocates stakeholders, creating
through coordinated activities collaboration opportunities to
address community needs
Measuring Progress of HRC
KEY INDICATOR ACTIVITY OUTCOME
Educated residents on the
Community Education Session ordinance’s purpose, application,
Hosted an education session on the Non-
and how to report discrimination,
Discrimination Ordinance
boosting community trust in
ACCGov’s commitment to equity
Potential Steps include conducting
needs assessment, engaging
ACC Menstrual Product Researching ordinance to provide free stakeholders, and reviewing best
Ordinance menstrual products in public facilities practices; proposal to be developed
for Mayor & Commission
consideration
Increased awareness expected
Communication Strategy Developing a comprehensive
upon completion, with focus on
communication plan to inform residents
clear, accessible language and
about the NDO
outreach channels.
Measuring Progress of HRC
FY25
Focus
Areas COMMUNITY OUTREACH, ORDINANCE REVIEW
The Human Relations RELATIONSHIP
BUILDING, AND Conduct thorough reviews
Commission (HRC) focus
LISTENING of existing policies
for this year centers on affecting residents' rights,
community outreach, Develop and implement tabling access, and equity, and
and bridge-building initiatives
equitable policy review, recommend improvements
to foster stronger relationships
and advocacy to foster a to align them with best
between the community and
practices and community
more inclusive and local government
standards.
accessible environment in
Athens-Clarke County.
(NOVEMBER 2024 – JUNE 30, 2025)
REFLECTS ALIGNMENT WITH FISCAL YEAR AND MEMBER TERMS
Focus Area 1:
Community Outreach, Task 1: Develop & Host Educational Series
Create a speaker series (in-person or virtual)
Relationship Building, covering key topics such as civics, budgeting,
and Listening and ordinances under review.
Strategy: Implement a tabling and bridge-
building initiative to foster stronger community
Task 2: Increase Visibility
connection
Develop branding materials and distribute
through tabling at community events, social
media, and local organizations.
Focus Area 2: Ordinance Review
Strategy: Conduct a thorough review of key ordinances affecting resident rights and accessibility,
recommending improvements to align with best practices and community standards.
Access to Unlawful Juvenile Curfew
Downtown Dress
Menstrual Discrimination Ordinance (Sec. 3-
Code *
Products Ordinance 16 & Sec. 3-17)
Assess and advocate Review ordinance for Analyze the Ensure the dress code
for policies that ensure accessibility ordinance’s impact on respects diversity and
free access to improvements, such youth and assess equity, avoiding
menstrual products in as extending the filing enforcement equity. discriminatory practices.
public facilities. period and adding
translations. * Pending consult with ACC
Attorneys Office
ALL RECOMMENDATIONS MADE WILL REQUIRE MAYOR & COMMISSION APPROVAL
Fill Current HRC
Vacancies*
Continue work on
Next Steps education series
development
Finalize
recommendation on
Menstrual Product
Ordinance
Get in
Touch Contact us to get more info
belong@accgov.com
301 College Ave
706-613-3015
accgov.com/belonging
TSPLOST 2023 Project 15
Sycamore Drive Pedestrian
Improvements Project
Proposed Project Concept
MAYOR & COMMISSION WORK SESSION
Category 2
November 12, 2024
Prepared by:
• Keith Sanders, TSPLOST Program Administrator
• Mike Kajder, TSPLOST Project Administrator
• Stephen Bailey, T&PW Director
1
Presentation Purpose and Agenda
Purpose: To present the Proposed Project Concept for the Sycamore Drive Pedestrian
Improvements Project and identify proposed public engagement opportunities. The intent of this
project is to improve pedestrian safety on and around Sycamore Drive in Athens, Georgia.
Project History
Initial Project Statement
Proposed Concept Design
Budget Summary
Public Engagement
Next Steps
Questions & Comments
2
History - Project 15 – Sycamore Drive Pedestrian Improvements
On September 10, 2019 Transportation and Public Works staff conducted a Roadway Safety Audit
for Sycamore Drive. This audit identified safety concerns along Sycamore Drive and non-capital
fund improvements that could be used to address these issues. Some of the safety issues identified
included: no sidewalk, pedestrians walking in the street, excessive speed by automobiles along
Sycamore Drive and apparent dark areas at night from lack of or shaded street lights.
On October 4, 2021, Athens-Clarke County Southern Off Road Bicycle Association (SORBA)
presented the original project request for a multiuse path to connect the Sycamore Drive area to
Beech Haven Park and adjacent greenway projects. The original project application request was
$8,940,000 for the project.
On May 24, 2022, Athens-Clarke County voters approved the TSPLOST 2023 Program referendum,
which included Project 15 – Sycamore Drive Pedestrian Improvements Project with a budget of
$1,500,000.
On July 16, 2024, the project was transferred from T&PW to Jacobs, for Project Management.
Also, Atlas Technical Consultants, LLC, was selected as the on-call engineering firm to perform the
professional design services for the project.
On November 6, 2024, at a Regular Session, Mayor & Commission voted to adopt a Commission
Defined Option (CDO) which recommends moving forward with GDOT’s Safety Improvements along
Atlanta Highway. The GDOT Project Concept includes a shared use path along the southside of
Atlanta Highway where improvements at the intersection of West Broad Street and Sycamore
3
Drive; which will be coordinated with the Sycamore Drive Pedestrian Improvements Project.
TSPLOST 2023 Project 15
Initial Project Statement
Project 15, Sycamore Drive Pedestrian Improvements
This project will provide for capital improvements for pedestrian improvements
in the general vicinity of Sycamore Drive to provide improved pedestrian
connectivity to Atlanta Highway, surrounding transit stops, businesses, and/or
residential areas. Depending upon actual costs and funding availability,
improvements may include, but are not limited to: sidewalks, crosswalks,
signage, waste receptacles, lighting, and/or other similar safety
improvements. To the extent allowed by law, budgeted project funds may be
used as matching funds for leveraging grant opportunities. Additionally, to the
extent allowed by law, other funding sources, including, but not limited to,
grants, may be utilized to offset and/or reduce the project budget. Any unspent
project funds that accrue as a result of the receipt of grants or other funding
sources may be assigned to other approved TSPLOST projects.
4
Project Area Map
corresponds with
pictures on the next slide. 5
Existing Conditions along Sycamore Drive
Sycamore Drive at dead end looking towards West Broad Street. No
sidewalk, one street light and multifamily residential on both sides.
6
Existing Conditions along Sycamore Drive
Sycamore Drive looking towards West Broad Street. No sidewalk, one
(same) street light and multifamily residential on both sides. Steep
slopes on left side of Sycamore Drive at back of curb.
7
Existing Conditions along Sycamore Drive
Sycamore Drive looking towards West Broad Street. No sidewalk, one street
light, no shoulder on left side of road and condominium complex on right side.
8
Existing Conditions along Sycamore Drive
9
Proposed Project Concept Map
Concept Layout based on GIS information.
Will be refined based on field run survey.
10
Proposed Project Concept Typical Section
(looking towards W. Broad Street)
Notes:
• Typical section based on GIS
information. Will be refined based on
field run survey.
• Based on GIS information it appears that
the work will be able to be completed in
the existing ROW.
• Utilities located in shoulder section will
be identified during the field run survey
and relocated or the design modified to
accommodate. 11
To be coordinated
Concept Map Segment #1 with GDOT Proposed
Project Concept
12
Concept Map Segment #2
13
Concept Map Segment #3
14
Sycamore Drive Pedestrian Improvement Project – Proposed Concept Design Budget
REVENUES:
$ 1,470,000 TSPLOST 2023 Project 15 – All Tiers
EXPENSES:
$ 96,150 Expensed or Encumbered
$ 50,000 Designated Land/Easement Acquisition
$ 140,670 Designated for Remaining Design
$ 165,181 Designated Testing/Misc./PM Fee
$ 168,000 Designated for Design and Construction Contingency
$ 8,400 Designated for Public Art
$ 841,600 Available for Construction of Sycamore Drive Pedestrian
Improvements
Designer’s estimated cost for complete scope of sidewalks, utility
relocations, land, etc. = $952,000. This estimate exceeds budget by
$100,400. Preliminary Design will include funding options and 15
potential phasing plan.
Upcoming Proposed Public Engagement
Online information and survey seeking public input and comments
Postcards sent to property owners and residents along Sycamore Drive
Yard signs in community linking to online project information & survey
Coordinate with Family-Connection Community Leaders
Public Information meeting scheduled for December 12, 2024, at the ACC Library
16
Next Steps & Project Schedule
TSPLOST Oversite Committee November 2024
Public Engagement Nov./Dec. 2024
Concept Design Approval for M&C Consideration February 2025
Preliminary Design & Proposed Phasing Approval
for M&C Consideration May 2025
Final Design, Permitting & Land Acquisition June 2025
Bidding and Contractor Award July 2025
Start Project Construction Phase August 2025
Construction Completion Spring 2026
17
Questions?
18
SPLOST 2020
Project 25 – East Side Public
Library Project
Work Session Presentation
Proposed Schematic Design Review
11/12/24
Presented by:
John Simoneaux, SPLOST Project Administrator
Agenda & Purpose
PURPOSE: Present the current Schematic Design to Mayor and Commission before it is
presented to the public for comments. Final Proposed Schematic Design will come back
to M&C, after public input, for further consideration and approval.
AGENDA:
• History
• Schematic Design
• Budget
• Schedule
• Next Steps
• Q&A
2
HISTORY
• On April 5, 2022, the M&C approved McMillan Pazdan Smith for the Design Professional
and Construction Administration Services for the project.
• On November 1, 2022, the M&C approved the Project Concept and Site Selection
Criteria and authorized the SSC to advance the project into the Site Selection Stage II
and ultimately to develop the Candidate Sites list.
• On August 1, 2023, the M&C approved the Candidate Sites list for the project and
authorized the SSC to advance the project into the Site Selection Stage III for the
evaluation of the candidate sites and recommendation to the M&C for site acquisition.
• On September 3, 2024, the M&C voted to approve 1030 Barnett Shoals as the selected
site for the East Side Public Library Project. This kicked off the Schematic Design effort
by the Design Professionals.
3
SITE PLAN
Items shown that may require Additional Funding:
• Potential Connection to Greenway
• Outdoor Programming Area
• Building Expansion
• Deceleration Lane
• Potential Hybrid Beacon for pedestrian crossing
• Future Parking or entrance at Cotton Creek Drive 4
OVERALL FLOOR PLAN
5
BUILDING
ELEVATIONS
6
BUILDING EXTERIOR
7
BUILDING EXTERIOR
8
Proposed Schematic Design Project Budget
FUNDING
SPLOST 2020 Project 25 East Side Public Library Funding Available $ 14,160,020
State Grant Funding Available $ 2,000,000
Total Funding: $ 16,160,020 Items shown that are not
included in the Schematic
Design but are planned for
Proposed Project Budget future funding, when
Expensed & Encumbered $ 856,805 available:
• Potential Connection to
Designated Additional Design & Construction Admin. Fees $ 600,000 Greenway
Designated Testing, Utilities, PM Fees, and Commissioning $ 410,000 • Outdoor Programming
Area
Designated Public Art $ 61,000 • Building Expansion
Designated Furniture, Fixtures, & Equipment $ 1,800,000 • Deceleration Lane
• Potential Hybrid Beacon
Designated Books and Resources $ 2,000,000 for pedestrian crossing
Designated Project Contingency $ 1,732,215 • Future Parking or
entrance at Cotton Creek
Total Available for New Construction* $ 8,700,000 Drive
* Cost estimator still developing estimate for Schematic Design (SD) documents. Cost estimate for 1030
Barnett Shoals at Site Selection Phase was approximately $9.7M. Based on SD Cost Estimate, some edits
may need to be made to SD program to align with budget.
9
SCHEDULE
10
NEXT STEPS
• 11/12/24 – Work Session Presentation to the Mayor and Commission
• 11/13/24 – Public Engagement Online Survey goes live
• 12/2 – 12/13/24 – In Person public engagement sessions
• 12/13/24 – Public Engagement Online Survey closes
• 2/4/25 – M&C Consideration of the Proposed Schematic Design
11
Questions/Comments
12
Ath e n s - C la rke C o u n t y
U n i fi e d Gove r n m en t
Leisure Services
Master Plan
Engagement Summary Presentation
November 12, 2024
Presented by Lisa Paradis, Senior Manager
BerryDunn
1
Provide an introduction to the Leisure Services Master Plan
Purpose Importance of Master Plan Process
Introduction to the planning team
Overview of process
Present public engagement findings received
Touchpoints summary
Statistically Valid Survey Results
Online Tools: Survey, Interactive Map, Budget Priorities
In Person: Pop-ups, Community Events, Dot Voting, Focus Groups
Key Themes
Discuss next steps for the project
Q&A
2
Importance of the Master Plan Process
Roadmap for the next 5-10 years
Better defining the role of Leisure Services
Understand opportunities to better serve the community
Determine priorities for future investments
(financial, facilities, programs, services)
Plan for future growth and development
3
Overview of Planning Process
1 2 3 4 5 6
Project Engagement Analysis Visioning Implementation Draft and Final
Planning and May - September October - January January - February Strategy Plan
Administration March - April April - June
2. Engagement (Recently completed) 3. Analysis (We are here) 4. Visioning (This is next)
• Statistically Valid Survey • Conduct inventory of parks, facilities, • Level of Service Analysis
• Focus Groups trails, open space • Park Classification System
• Stakeholder Meetings • Research similar providers • Natural/Culture Resource
• Online Engagement Website (Survey, • Prepare inventory and analysis of Management
Ideas Wall, Map) programs • Land Acquisition Review
• Dot-Voting • Analyze Trends • Pocket Park Policy
• Open Comments • Assess staffing, operations, and • Recommendations
funding 4
Matt
Lisa
The Team Pond & Co. Kate
Landscape
Architect
Becky BerryDunn Carson
Prime Consultant
Karington
Rich
Caylon
Meredith
IBCCES
Athens-Clarke County Sensory &
Leisure Services Department Inclusivity
Specialist
Jesse
Tom BerryDunn
Subject Matter
Experts th
A ty
en n i Jason
Adrian s- C m u
l a rk m ETC
e Co un ty Co National Survey
Firm
Lakita
5
Touchpoints Summary
4,491
6
Statistically-Valid Survey
Q18: Demographics: Race
7,000 surveys printed and mailed to ACC by percentage of respondents (multiple selections could be made)
residents 70%
60%
Goal was 600 surveys, 619 completed 60% 56%
50%
5-page survey with cover letter
40%
Option to take online or paper
30%
25% 26%
95% level of confidence, +/- 3.9%
20%
15%
11% 11%
Survey respondents were representative of 10% 7%
4% 4% 3%
community demographics
0%
White Black Hispanic/Latino Asian Other Didn’t Respond
One survey per household
ACC Demographics Statistically Valid Respondent Demographics
7
Statistically-Valid Survey Findings by Zip Code
Parks and Facilities Programs and Activities
30622: 30601:
Lowest rating for “needs Highest rating for "needs met“
met” for programs and Empha for programs and activities
activities overall overall
Highest use of other Highest satisfaction of
cities/county parks and nature/outdoor programs
facilities
Highest response of "Too far 30607:
from home” Lowest satisfaction of aquatic
programs overall
30602/30605:
Lowest awareness of parks 30605:
and facilities Highest satisfaction overall of
programs
8
Statistically-Valid Survey: Facility Satisfaction
9
Statistically-Valid Survey: Facility Importance
10
Statistically-Valid Survey: Barriers
11
Statistically-Valid Survey: Communication
12
Statistically-Valid Survey: Program Satisfaction
13
Statistically-Valid Survey: Priority Programs
Priorities for Facility/Amenity
Investments: The Priority
Investment Rating (PIR) was
developed by ETC Institute to
provide organizations with an
objective tool for evaluating the
priority that should be placed on
facilities/amenities.
The PIR equally weights
(1) the importance that residents
place on facilities/amenities and
(2) how many residents have
unmet needs for the
facility/amenity.
14
Statistically-Valid Survey: Priority Facilities
15
Online Survey
16
Online Survey: Facility Improvements
17
Online Survey: New Amenities, Trails, or Facilities
18
Online Survey: Activities and Events
19
Online Survey: New Programs and Activities
20
Budget Tool
21
Interactive Map
22
Community Events & Pop-Ups
We talked with over 2,100 people over 38 pop up
events and 3 large community events (Hot Corner
Festival, LatinX Festival, Star-Spangled Classic)
Goals of public engagement:
Connect with underserved communities
Meet people where they are
Build awareness and promote more engagement online
Understand needs, gaps, and opportunities
23
Focus Group Feedback
We talked with over 116 people over 12 focus groups.
24
Key Themes
Taking care of existing parks and facilities
Emphasis on trails, access, and connectivity
Continued maintenance and accessibility improvements
Additional resources for programs and activities
Continued emphasis on youth programming
More special events, adult programs, and nature/outdoor programs
25
Next Steps
1 2 3 4 5 6
Project Engagement Analysis Visioning Implementation Draft and Final
Planning and May - September October - January January - February Strategy Plan
Administration March - April April - June
26
Questions/Comments?
27
Quarry Options
Mayor & Commissioners
Work Session
November 12,2024
Public Utilities Department
Agenda
• History
• Quarry options
• Recommendations
• Next steps
FY23-25 Strategic Plan Goal Area 6: Built and Natural Infrastructure
A-3. Develop timeline to have quarry online.
Why?
• Public recreation
• Economic development/new water source
• Public Safety-Provide adequate fire protection
• Resiliency
HISTORY
• Drought history- 2007, 2012 and
2016.
• Rock Hill Quarry Purchase:
$23 million purchase (2020)
• Population growth and Safe Yield
Water Demand Forecasting: Rock Hill Quarry (RHQ)
• Population Growth
• 125,000 in 2020
• 200,000 in 2065 (almost 40%)
• Water Demand
• 25.5 mgd – Current Permit (during drought)
• 12.3 Bear Creek Safe Yield (SY)*
• RHQ Reservoir will double our Safe Yield
• Will double our safe yield in a drought
mgd - Million Gallons per Day
* Safe Yield – safest amount of water use which meets demand during drought
INTAKE PUMP STATION
System
Components
Description Existing Intakes
• Located next to the existing
intakes at the JG Beacham
Water Treatment Plant.
• Maximum station capacity of
20-25 MGD
• 2 duty + 2 standby vertical
turbine pumps New Intake Pump
Station
• 400 HP motor size
Preliminary
CONRAD DR. & NORTHSIDE DR.
Analysis
Workshop
Summary
(VWLP DWHG(DVHP HQW$FTXLVLWLRQ
$UHD
ON SITE RESERVOIR PUMP STATION
System
Components
Description
Northeast On-Site Pump Station
Low Head Pump High Head Pump Station
• Maximum station capacity of • Maximum Station Capacity
14 MGD 14 MGD
• 2 Duty + 1 standby vertical
• 2 duty + 1 standby vertical turbine submersible pumps
turbine submersible pumps
• 1000 HP motor size
• 700 HP motor size
High Level Cost
• $259,624,717
• Civil
• Raw Water Conveyance
• River Intake Pump Station
• On Site Pump Station
• Site work
• Design
• Contingency
Next Steps
• Funding Strategy
• Service Delivery Plan 2025 Update
• Concept approval
Get email alerts for Athens-Clarke County
A daily email when new agendas and minutes are posted.