Mayor & Commission Meetings
Regular MeetingAthens-Clarke County, GA · January 14, 2025
Minutes
Unified Government of Athens-Clarke County
Mayor and Commission Meeting Minutes
Meeting Name: Mayor & Commission Work Session
Meeting Date: Tuesday, January 14, 2025
Meeting Called to Order: 12:05 p.m.
Location: 120 W. Dougherty Street
Virtual? ☐ Yes / ☒ No Public Input Requested or Received? ☐ Yes / ☒ No
Commission Attendees:
☐Kelly Girtz ☒Allison Wright3 ☒Carol Myers
☐Patrick Davenport ☒Dexter Fisher ☒Ovita Thornton
☒Melissa Link ☒Stephanie Johnson1 ☐Mike Hamby
☒Tiffany Taylor2 ☐John Culpepper
Mayor Pro tem Fisher presided
Items Discussed:
1. Vincent Drive Sidewalk Project
2. Leaf & Limb Program Opportunities
3. CY25 Pavement Management Program Resurfacing List
Motion to Adjourn Made by: Link
Motion Seconded by: Thornton
Results: Approved
No votes were taken.
Meeting Adjourned at: 2:13 p.m.
_________________________
1
Arrived at 12:15 p.m.
2
Arrived at 1:10 p.m.
3
Left at 1:40 p.m.
Agenda
The meeting will be streamed live and available on-demand through YouTube
(www.youtube.com/accgov), the YouTube app, and www.accgov.com/videos, as well as on-
demand through the ACCGov Roku channel.
WORK SESSION AGENDA
UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY, GEORGIA
Tuesday, January 14, 2025 – 12:00 PM
Planning Department Auditorium
I. Call to Order (12:00 p.m.) Mayor Kelly Girtz
II. Items for Future Consideration
A. Vincent Drive Sidewalk Project .......................................................... Josh Hawkins
Capital Projects Director
B. Leaf & Limb Program Opportunities ................................................... Suki Janssen
Solid Waste Director
C. CY25 Pavement Management Program .............................................. Rani Katreeb
Resurfacing List Assistant Director Transportation & Public Works
III. Adjourn
NOTE: All reports are draft. No final action is taken at this work session.
The Work Session is open to the public; however, public comments are not received.
SPLOST 2020 Project 31
Vincent Drive Sidewalk Project
Proposed Project Concept
MAYOR & COMMISSION WORK SESSION
January 14, 2025
Prepared by:
• Keith Sanders, SPLOST Program Administrator
• Mike Kajder, SPLOST Project Administrator
• Stephen Bailey, T&PW Director
1
Presentation Purpose and Agenda
Purpose: To present the Proposed Project Concept for the Vincent Drive Sidewalk Project and share
the results of public engagement opportunities. The intent of this project is to improve pedestrian
safety along Vincent Drive.
➢ Project History
➢ Initial Project Statement
➢ Proposed Concept Design
➢ Budget Summary
➢ Public Engagement
➢ Recommendations
➢ Next Steps
➢ Questions & Comments
2
History - Project 31 – Vincent Drive Sidewalk
On August 6, 2019, the M&C approved the Call for the SPLOST 2020 Referendum; which included Project 31 –Vincent
Drive Sidewalk Project.
On December 1, 2020, in order to allocate funds for Program Administration, the Commission approved an Ordinance
which amended the SPLOST 2020 Project Budgets. The budget for SPLOST 2020 Project 31, Vincent Drive Sidewalk
Project was amended to $1,839,460
On May 10, 2021, the Athens Cultural Affairs Commission (ACAC) offered a recommendation in accordance with
Athens-Clarke County Code Ordinance, Section 1, Title I, Chapter 1-25-6, Additional Funding for Public Art, to the
M&C related to the use of public art for SPLOST 2020 Project 31 – Vincent Drive Sidewalk Project
Between March 2023 and July 2024, T&PW staff reviewed existing conditions of the corridor, obtained on-call
engineering team Atlas Technical Consultants (Atlas) to begin data gathering via field surveys, etc.
On July 16, 2024, T&PW staff requested Jacobs to assume the project administration roll due to T&PW staff
availability and resources. Staff reviewed and agreed to the conceptual scope of the project and next steps,
including the continued use of Atlas to perform the design of the project.
The potential project was presented to the User Group (AiM) for TSPLOST 2023 Project #25 Bicycle and Pedestrian
Improvements to see if the project wanted to supplement the budget for the Vincent Drive Sidewalk Project. While
the desire was there, all current funding for the TSPLOST 2023 Project #25 has been designated or earmarked by the
User Group or Obligated by the Mayor & Commission for current projects.
On August 6, 2024, M&C approved a revised Tier Funding Schedule. The revised tiering schedule retained funding for
the Vincent Drive Sidewalk Project (SPLOST 2020 Project 31) during Tiers 2-4 (FY22 – FY24).
During November 2024, several public engagement opportunities were held for residents to provide feed back on 3
the project. These opportunities and results are noted on the Public Engagement slides.
SPLOST 2020 Project 31
Initial Project Statement
Project 31, Vincent Drive Sidewalk Project
This project will provide funding for constructing a sidewalk and all related
improvements on the approximate 1.4 mile section of Vincent Drive between
Jefferson River Road and Newton Bridge Road. Depending upon costs and funding
availability, the project may include, but not be limited to, land acquisition,
design, and construction of sidewalk improvements and/or installation of
pedestrian safety devices as needed such as stamped and colorized crosswalks,
flashing crosswalks, ADA compliant elements, pedestrian signage, pedestrian
countdown timers, and other safety equipment. Additionally, to the extent
allowed by law, funds may be used as matching funds for leveraging grant
opportunities.
4
Project Area Map
*
*
Vincent Drive is approximately 1.4 miles (~ 7,400 feet) in length between the Vincent Drive and Jefferson River Road intersection and the Vincent Drive and
Newton Bridge Road intersection.
5
Vincent Drive Sidewalk Project – Proposed Concept Design Budget
REVENUES:
$ 1,839,460 SPLOST 2020 Project 31 – All Tiers
EXPENSES:
$ 132,920 Expensed or Encumbered
$ 250,000 Designated Land/Easement Acquisition
$ 238,140 Designated for Remaining Design
$ 106,646 Designated Testing/Misc./PM Fee
$ 202,754 Designated for Design and Construction Contingency
$ 9,000 Designated for Public Art
$ 900,000 Available for Construction of Vincent Drive Sidewalk Project
Designer’s estimated cost for complete scope of sidewalks, utility
relocations, land, etc. = $3,450,000. This estimate exceeds budget
by $1,610,540.
6
Project Options Map
These are the Options that were shared with the public via
online survey and in person meetings. All options are along
the north side of Vincent Drive. This side of the roadway
was chosen for the sidewalk to preserve the south side for a
multi-use trail since it has fewer potential conflict points 7
(intersections, driveways, etc.)
Option #1 (Newton Bridge Road to Chesterton Way)
Matchline A
Matchline A
8
Option #1 (Newton Bridge Road to Chesterton Way)
• Approximately 3,000’ of 5’ wide sidewalk on the north side of Vincent Drive (Approx. 40% of entire road
length.)
• Connecting Newton Bridge Road, Hope Haven, Holland Youth Sports Complex
• Three ACCGov transit stops
• Four neighborhood streets via crosswalks across Vincent Drive
• Crosses two gas transmission lines (potential cost impact)
• Does not provide pedestrian connection to Jefferson River Road and future multi-use trail
• Current Budget does not provide for sidewalks along the full length of Vincent Drive
9
Option #2 (Holland Youth Sports Complex to Winery Way)
Matchline B
Matchline B
10
Option #2 (Holland Youth Sports Complex to Winery Way )
• Approximately 2,500’ of 5’ wide sidewalk on the north side of Vincent Drive from the Holland Youth
Sports Complex entrance to approximately the intersection with Winery Way. (Approx. 34% of entire
road length.)
• Provides largest neighborhood pedestrian connection from Holland Youth Sports Complex
• Three ACCGov transit stops
• Three neighborhood streets via two cross walks across Vincent Drive
• Crosses one natural gas transmission line (potential cost impact)
• Does not provide pedestrian connection to Jefferson River Road and future multi-use trail
• Current Budget does not provide for sidewalks along the full length of Vincent Drive
11
Option #3 (Jefferson River Road to Vineyard Drive)
Matchline C
Matchline C
12
Option #3 (Jefferson River Road to Vineyard Drive)
• Approximately 3,500’ of 5’ wide sidewalk on the north side of Vincent Drive. (Approx. 47% of entire road
length.)
• Connecting Jefferson River Road and it’s potential, future, multi-purpose trail to five neighborhood roads
• Connects to five ACCGov transit stops along Vincent Drive via crosswalks.
• Does not provide pedestrian connection to Holland Youth Sports Complex or Newton Bridge Road
• Current Budget does not provide for sidewalks along the full length of Vincent Drive
13
Proposed Project Concept Typical Section
(looking east towards Newton Bridge Road)
Notes:
• Typical section based on GIS
information. Will be refined based on
field run survey.
• While it is anticipated that the sidewalk
itself will be located in existing ROW, it
will be necessary to obtain Temporary
Construction Easements during the
construction phase.
• Utilities located in shoulder section will
be identified during the field run survey 14
and relocated or the design modified to
accommodate.
Public Engagement Opportunities
➢ Notifications for public involvement was listed on the following resources:
➢ 1,100 Postcards mailed to neighborhood residents
➢ ACCGOV.com: SPLOST Webpage
➢ Athens-Clarke County Unified Government Social Media: Facebook,
Twitter, Instagram
➢ Drop-in Public Meetings – 5 responses
➢ Location: Fire Station #8 – 3955 Jefferson Road, Athens, GA
➢ Date/Time: November 13, 2024 @ 5:30-7:30 PM
➢ Location: Holland Youth Sports Complex – 250 Vincent Drive, Athens, GA
➢ Date/Time: November 16, 2024 @ 12:00-2:00 PM
➢ On-line Survey – 22 responses
➢ Opened: November 11, 2024
➢ Closed: November 24, 2024
15
Results of Public Engagement
➢ The survey gathered responses from 27 Athens-Clarke County residents, with 20
respondents living on Vincent Drive.
➢ The Drop-in Public Meetings had 5 attendees, with all 5 being neighborhood residents.
➢ The results from the public engagement show:
➢ 26 respondents anticipate using the facilities once constructed.
➢ Option #1 (Newton Bridge Road to Chesterton Way) was preferred by 7 respondents.
➢ Option #2 (Holland Youth Sports Complex to Vineyard Dr.) was preferred by 11
respondents.
➢ Option #3 (Jefferson River Road to Vineyard Dr.) was preferred by 5 respondents.
➢ Leisure Services staff has noted pedestrian traffic along Vincent Drive to access the
Holland Youth Sports Complex, supporting the selection of Option #2.
16
Project Recommendations
• The Vincent Drive User Group (T&PW Asst. Director, Bicycle & Ped.
Coordinator & Vision Zero Planner) recommend Option #2 because:
• Most popular result from public engagement
• For available budget, it provides connectivity to most residents to
the Holland Youth Sports Complex
• The Holland Your Sports Complex is in a TAD and may be able to
17
provide funding for sidewalk from Newton Bridge Road to the
Holland Youth Sports Complex.
Next Steps & Project Schedule
➢ Concept Design Approval for M&C Consideration February 2025
➢ Preliminary Design & Proposed Phasing Approval
for M&C Consideration August 2025
➢ Final Design, Permitting & Land Acquisition August 2025-Spring 2026
➢ Bidding and Contractor Award Spring 2026
➢ Start Project Construction Phase Summer 2026
➢ Construction Completion Spring 2027
18
Questions
19
Leaf and Limb
Proposed Changes
Nancy Flowers, Route Supervisor
SW Department
Presentation Highlights
Purpose
History
Current Leaf and Limb Challenges
Proposed New Leaf and Limb Collection Methods
Summary
Next Steps
Purpose
Present an alternative to the current leaf and
limb collection method. Review the challenges
with the current collection and opportunities with
the proposed new method including some
suggested ordinance changes.
History
DATE ITEM
Prior to City of Athens provided leaf and limb service to residents in the
Unification USD on a two to three week cycle
August 1994 Leaf and limb Service expanded from USD to GSD for six leaf and
limb pick-ups per year through a nine week rotation in nine
zones
FY00 Leaf and limb service altered to provide a six week rotation in
six zones.
FY08 Budget reduction forced leaf and limb rotation from a six week
rotation to an eight week rotation.
FY12 Budget reduction again forced leaf and limb from the eight week
rotation to a nine week rotation.
FY15 Budget increase allowed for the rotation to be every six weeks
again.
Current Leaf and Limb Collection Method
We currently strive to pick-up leaf and limb
once every six weeks from all residential
customers in zones A-F. This methods
provides eight pick-ups/customer in one
year.
Staff drive down all roads in every zone each
scheduled week to ensure material is
collected.
Residential customers are allowed to put out
one “load” each time. A “load” is defined
as 25 paper leaf and limb bags or a pile of
limbs that measure 6 feet long by 6 feet
high by 4.5 feet deep or a combination of
both.
Customers must place their material out the
week prior to their scheduled pick-up.
Current Leaf and Limb Collection Challenges
Until FY21, we achieved our performance measure of a
98% on-time collection rate. Although our collection rate
in FY21 was 89%, below our performance measure, we still
managed to provide eight pick-ups that year to each zone.
In FY23 and FY24, storms and staff shortages have
hindered our ability to provide the expected service.
The recent storm put leaf and limb collection behind by
two months.
By ordinance, leaf and limb piles must be in front of the
residential customers’ house. Currently, no shared piles
and piles on an vacant lots are allowed.
Currently, there is no minimum pile size, and the
maximum size is limiting for homeowners with large lots
and heavy vegetation.
Leaf and Limb Collection Options:
1. No changes to current leaf and limb collection
service.
2. Retain the six leaf and limb areas and require
customers to use an online request system allowing
staff to collect only routed material in each area.
Alter ordinances for shared(community) piles and
vacant lots.
3. Remove areas and provide on-demand leaf and limb
service. Alter ordinances for shared(community)
piles and vacant lots.
NOTE: all options require no budget increase.
Opportunities for New Methods
Both collection methods provide efficiencies
through the use of routes to collect requested
material. Meaning staff only drive down certain
roads that have material and not all roads in an
area each week. These methods offer less wear and
tear on public infrastructure and better fuel
consumption. Both methods provide a more
sustainable approach to leaf and limb collection.
Leaf and Limb Collection Request Methods
Customers log on to the ACCGov website through their
phone or computer to request a leaf and limb pick-up.
This request would be logged by the Wednesday prior to
the following collection week.
Staff routes the requested collections between leaf and
limb crews.
Staff collects the requested collections each week. There
will be a certain number of slots available for requests
each week.
This service was successfully used during the clean-up
after Hurricane Helene in fall 2024.
Note: A call-in option will still be available for those that need the
extra assistance.
Image of
Computer Request
Image of Phone
Request
Leaf and Limb Customer Engagement
Water Bill
News Flash - Leaf and Limb News Flash has 2,902
Subscribers
Email, Social Media, and website
Flagpole Ad, yard signs, WUGA announcement, Mixtape
monthly newsletter feature, ACTV/digital signage slides,
postcards with QR code for distribution at our events
(and give to Neighborhood Leaders as well), and maybe
hold music messages across ACCGov phone system and
video production.
Staff Recommendation Summary
Staff recommends leaf and limb on-demand service
with ordinance changes allowing for approved shared
(community) piles and use of approved vacant lots.
Additionally, over the next year staff would like to
explore minimum pile sizes and expanding maximum
pile sizes.
Next Steps
March 2025 agenda report with recommended ordinance
changes:
Allow approved shared (community) piles
Allow the use of approved vacant lots
March 2025 begin customer engagement about the new
changes and process.
May 2025 begin new leaf and limb collection method.
Questions and Comments?
Calendar Year 2025
Pavement Management Program
(CY25 PMP)
Project List
Athens-Clarke County
Transportation & Public Works Department
Work Session Presentation to Mayor & Commission
Presented by
Derick Mason, Engineering Administrator
Work Session Meeting
Jason Mize, Pavement Management Coordinator
January 14, 2025
Purpose
Review Pavement Condition Index (PCI);
Present status of the ongoing 2024 Calendar Year
Pavement Management Program (CY24PMP) Project.
Present for review and future consideration the
proposed 2025 Calendar Year Pavement Management
Program (CY25 PMP) roadway maintenance list and
maps (AKA Project List);
Present future CY26 PMP Project objective and
geographical location map.
Discuss funding & available budget
2
Outline
Pavement Condition Index
Pavement Treatments
On-Going CY24 PMP Project/Contract
Typical Notification Process
Proposed CY25 PMP Project List
Future 26 PMP Project Priority List
Q&A
PCI explained – what it is, and what it is not
Pavement Condition Index (PCI):
A. Is a quantitative measure of the physical condition
Distress of a paved roadway
Quantity
B. A snapshot in time that accounts for visible distress,
not structural, base, or subgrade conditions
C. While Pavement Management Software is essential in
Distress
Type, assisting municipalities in future planning and
Ex. cracks,
PCI funding of pavement programs, individual annual
rutting,
potholes programs are finalized based on field conditions
observed and verified by staff prior to the
advertisement of each contract.
Distress
Severity D. The goal is to develop multi-year program scenarios
based on available funding.
3
Pavement Condition Index (PCI)
Pavement Condition Pavement Condition
PCI = 86 - 100 (Excellent) PCI = 41 - 60 (Marginal)
Pavement Condition Pavement Condition
PCI = 71 - 85 (Very Good) PCI = 26 - 40 (Poor)
Pavement Condition Pavement Condition
PCI = 60 - 70 (Good) PCI = 0 - 25 (Very Poor)
4
New Pavement Rating Scale (100 to 0)
Pavement Condition Index (PCI)
100
Crack Seal + Pavement Preservation
($0.2 - $0.6 SF)
80
Patching
($7- $10/SF)
60
PCI value
ACC Should Be Here
Minor Rehab
($3 - $5/SF)
40 ACC Is Here
Major Rehab/
Reconstruction/
($3 - $5/SF)
20
0
0 5 10 15 20 25 30
Age, years 6
PCI Table
PCI Roadway Preferred Treatment (goal)
Range Condition
85 - 100 Excellent Like new conditions – crack sealing planned four years from
resurfacing
70 - 85 Very Good Good to very good conditions that may/should receive crack
sealing as preventative treatment
55 - 70 Good Good conditions that should have received crack sealing and
may be considered for other preventative treatments based
on observed localized deteriorations.
40 - 55 Marginal Acceptable conditions that requires immediate planning for
heavier surface treatments, thin overlays and/or
resurfacing. May require immediate localized treatments.
25 - 40 Poor Not acceptable condition that requires overlays, surface
replacement, base reconstruction, and/or possible subgrade
stabilization.
0 - 25 Very Poor Similar to poor conditions with high percentage of full
reconstruction.
7
Current vs . Proposed CURRENTLY ALL ROADS
Treatment Selection Decision Tree
Arterial Streets Collector Streets Local Streets
PCI PCI PCI
Pavement Treatments Pavement Treatments Pavement Treatments
Value Value Value
85 - 85 - 85 -
Crack Seal Crack Seal Crack Seal
100 100 100
70 - 85 Crack Seal 70 - 85 Crack Seal 70 - 85 Crack Seal
60 - 70 Patching 60 - 70 Patching 60 - 70 Patching
55 - 60 Patching 48 - 60 Patching 40 - 60 Patching
Patching + 2.0" Mill & Patching + 2.0" Mill & Patching + 1.5" Mill &
0 - 55 0 - 48 0 - 40
Inlay Inlay Inlay
Add Preservation Treatment on All Roadways and between 90-70 PCI
8
Crack-Seal
Performed on pavement 4 years-old (Post 4)
Least expensive pavement preventative maintenance measure
9
Deep-Patch
Effective measure that protects the sub-base of the road
Performed as a single maintenance measure or preparatory to paving
This type of maintenance is outside in-house resource's ability
10
Pavement Resurfacing
Overlay / Mill and Inlay
Asphalt Overlay is performed on a prepared roadway surface
and may include full width milling or curb milling depending
on existing roadway conditions
Mill and Inlay is performed on a full width prepared roadway
surface and may include full width or curb milling depending
on existing roadway conditions
It is the most common of all pavement maintenance practices
Involves major traffic control and lane closure procedures
11
CY24 PMP - Work Completed
Notice to Proceed was issued on
July 11, 2024 for CY24 PMP and
the Contractor began work on
July 15, 2024.
Contractor has completed
approximately 60% of the
resurfacing work associated
with the CY24 PMP Contract
which includes three approved
change orders.
Current Contract Sum
$9,109,995.84
All CY24 PMP Preventative
Maintenance including patching
and post resurfacing crack
sealing has been completed.
Upon completion of the CY24
PMP Project, we will have
addressed all critical roads in
ACC.
Progress Map was shared and
updated periodically for the
CY24 PMP resurfacing program.
12
CY25 PMP Neighborhood Notification
Contractor shall print, coordinate, and place yard signs measuring 18” X 24” (water resistant on foam or similar
acceptable material to the Project Manager). Signs shall be placed seven (7) calendar days prior to work
commencement on each street, and no more than 500 feet apart, and at each end of every roadway. Signs shall be
removed within 2 days of work being complete on each street. Yard signs might be displayed as needed when utility
adjustment may require additional parking restrictions and as approved by the Project Manager.
Yard signs shall display the following in Red color:
NO PARKING
RESURFACING OPERATIONS
ARE ABOUT TO BEGIN
CARS PARKED IN THE STREET
WILL BE TOWED AWAY
AT OWNER’S EXPENSE
FOR INFORMATION CALL 762-400-7814
ACCGOV.COM/5341/PAVEMENT-MANAGEMENT-PROGRAM
13
CY25 PMP – Timeline
Key Dates (tentative and subject to change):
Bid Advertisement January 9, 2025
M&C Approve CY25 PMP List February 4, 2025
Addendum # 1 February 5, 2025
Bid Opening February 13, 2025
Bid Award M&C Action March 4, 2025
Notice To Proceed to Contractor April 14, 2025
Project Completion November 1, 2025
A Progress Map will be generated for the CY25 PMP resurfacing to inform of contractor’s
progress and will be posted on the program’s web page;
Visit https://www.accgov.com/5341/Pavement-Management-Program to view:
Planned Resurfacing Work Schedule (ETA April/May 2025)
Progress Map for CY25 PMP (ETA May 2025)
Videos showing different types of pavement maintenance activities compiled by the Public Information Office.
Staff will continue to utilize yard signs to inform of upcoming work. The yard signs will have
our Pavement Coordinator’s phone number and email address listed to answer any questions or
concerns which may arise.
14
CY25 PMP Project Contract Estimated to cost:
CY25 PMP
Preventative Maintenance
Resurfacing
≈ $2.0 million
≈$6.8 million
Post Resurfacing Contingency
Total
≈$0.3 million
≈$7.1 million
Crack Sealing
Currently in Bid
Advertisement Phase.
Anticipate Approval by
M&C on February 4,
2025.
Prioritization based on
Post Four (4) Year
resurfacing completed.
15
CY25 PMP Project Contract Estimated to cost:
CY25 PMP
Preventative Maintenance
Resurfacing
≈ $2.0 million
≈$6.8 million
Deep Patching Contingency
Total
≈$0.3 million
≈$7.1 million
Currently in Bid
Advertisement Phase.
Anticipate Approval by
M&C on February 4,
2025.
Prioritization based on
combining equity
(completing patching
work on Arterial Streets
with PCI’s of (55-60)
and patching work on
Collector Streets with
PCI’s of (48-60) with
cost efficiency
(identifying other low
scoring roads that were
adjacent to planned
roads in order reduce
mobilization costs)
16
CY25 PMP Project Contract Estimated to cost:
CY25 PMP
Preventative Maintenance
Resurfacing
≈ $2.0 million
≈$6.8 million
Resurfacing North Contingency
Total
≈$0.3 million
≈$7.1 million
Currently in Bid
Advertisement Phase.
Anticipate Approval by
M&C on February 4, 2025.
Prioritization is based on
combining equity
(completing work on low
scoring roads that were
left out of last year’s
program) with cost
efficiency (identifying
other low scoring roads
that were adjacent to
planned roads in order
reduce mobilization costs)
Resurfacing North was
selected; in leu of
Resurfacing South, in the
interest of addressing the
lowest PCI scores first as
well as reducing
mobilization costs overall. 17
Future CY26 PMP
Resurfacing South
Anticipated Future
CY26 PMP Program
depending on
available funding.
Prioritization based on
combining equity
(completing work on
low scoring roads that
were left out of last
year’s program) with
cost efficiency
(identifying other low
scoring roads that
were adjacent to Next Year’s
planned roads in order CY26 PMP Project Contract Estimated to cost:
Resurfacing ≈$4.9 million
reduce mobilization
costs) To be funded with remaining TSPLOST 2023, GDOT
LMIG, and FY26 General Capital.
15
Funding
Available Funding for CY25 PMP Project
FY25 General Capital Cary Forward $2,556,433
TSPLOST 2023 Project #21 PMP & Bridges - CY2024 $4,000,000
GDOT LMIG FY2024 $1,555,750
Total Available for CY25 PMP Project - NOW $7,112,183
Total set aside for Epps Bridge Pkwy preservation $1,000,000
treatment
32
Questions / Comments
20
Get email alerts for Athens-Clarke County
A daily email when new agendas and minutes are posted.