Engineering Services Committee Meeting
Regular MeetingAugusta, GA · May 9, 2011
Agenda
Engineering Services Committee Commission Chamber- 5/9/2011- 1:05 PM
Meeting
ENGINEERING SERVICES
1. Motion to approve Change Order to the Engineering Study of Attachments
Sewer Improvements, Rock Creek Basin contract in the amount
of $135,724.00 to ZEL Engineering for engineering services
to complete the design of the Rock Creek Sanitary Sewer
Spihon Project.
2. Motion to approve and accept a Deed of Dedication and a Attachments
Maintenance Agreement on the gravity sanitary sewer main in
The Brownstones at Rae's Creek.
3. Authorize the notification of the selection results to prospective Attachments
firms and proceed with negotiations of a contract with the top
ranked firm, Westin Engineering Inc., for an Emergency
Response Plan (RFQ #11-077).
4. Authorize the notification of the selection results to prospective Attachments
firms and proceed with negotiations of a contract with the top
ranked firm, HDR Engineering Inc., for a Leak Detection Study
(RFQ #11-080).
5. Approve Capital Project Budget Change Number Three 324- Attachments
041110-210824002 and Supplemental Agreement Number One
for the On-Call Construction Services Agreement with LPA
Group, Inc in the amount of $98,498.60 to construction
management services on the Resurfacing Various Roads Urban
& Suburban Phase II Projects as requested by AED. Funding is
available in SPLOST Phase IV Fund Balance account.
6. Approve the deeds of dedication, maintenance agreements, and Attachments
road resolutions submitted by the Engineering and Augusta
Utilities Departments for Richmond Estates, Phase II.
7. Approve Amendment #2 in the amount of $38,900 to the Attachments
Thompson, Ventulett, Stainback & Associates (TVS Design)
Architectural Contract for the TEE Center to add furniture,
fixtures and equipment (FF&E) design.
8. Report from the Tree Commission. (Requested by Attachments
Commissioner Aitken) (Referred from April 25 Engineering
Services Committee)
9. Authorize the notification of the selection results to prospective Attachments
firms and proceed with negotiations of a contract with the top
ranked firm, Dewberry & Davis Inc. for a Watershed
Assessment/Source Water Assessment Plan (RFQ #11-059).
10. Approve the deeds of dedication, maintenance agreements, and Attachments
road resolutions submitted by the Engineering and Augusta
Utilities Departments for Willhaven, Phase II, Section I.
www.augustaga.gov
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Approve Change Order to the Engineering Study of Sewer Improvements, Rock Creek Basin in the
amount of $135,724.00 to ZEL Engineering for the design of the Rock Creek Sanitary Sewer Spihon
Project .
Department: Augusta Utilities Department
Caption: Motion to approve Change Order to the Engineering Study of
Sewer Improvements, Rock Creek Basin contract in the amount of
$135,724.00 to ZEL Engineering for engineering services to
complete the design of the Rock Creek Sanitary Sewer Spihon
Project.
Background: The study project is located in the north-eastern portion of
Augusta GA in the vicinity of the Washington Road corridor and
Riverwatch Parkway corridor. The project evaluated the
conditions of the Rock Creek Trunk Sewer in 2008. The findings
of the study led to several recommendations and suggestions for
rehabilitation, repair, replacement, and new installations along the
route of the trunk sewer. The Utilities Department now is ready to
act on one of the report's recommendations by designing and
constructing the siphon portion of the project. This portion of the
overall study will allow the department to minimize potential
sanitary sewer overflows as well as handle the additional
discharge of sanitary sewer that is expected from the new Costco
Development along Riverwatch Parkway. The design project will
include but will not be limited to: the design of a relief sewer by
providing engineering design, surveying, environmental design,
land acquisition, and bid-phase services & engineering through
construction services.
Analysis: AUD has evaluated ZEL Engineering proposal to design the
project and has considered the proposal fair and reasonable to
accomplish the task.
Financial Impact: The construction proposal submitted for this project is
$135,724.00. These funds are available from account 509043420-
5425210/80800010-5425210
Alternatives: Rejection of this change order would delay the design of the Rock
Creek Spihon Sewer Project and potentially delay the ability Cover
to Memo
Item # 1
handle the additonal sewer discharge from the Costco
Development in Augusta Richmond County.
Recommendation: Recommend Commission approve change order to the existing
contract to ZEL Engineering in the amount of $135,724.00
Funds are Available
$135,724.00 from account 509043420-5425210/80800010-
in the Following
5425210
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Attachment number 1
Page 1 of 5
435 Telfair Street
Joseph J. Tankersley, P. E. Municipal Engineering
Augusta, Ga. 30901-2494
[Type text]
Jorge E. Jiménez, P. E. Water Plants – Distribution
Charles D. Drown, P. E. Wastewater Plants – Collection
Stacey W. Gordon, P. E. Investigations – Planning Studies
Frank W. Byne, P. E. Recreational Facilities
Kenneth M. Wardenski, EIT, MCSE Zimmerman, Evans and Leopold, inc. Industrial Parks – Roadways
Civil – Structural – Mechanical
Founded 1946 (706) 724-5627 – FAX (706) 724-5789 Electrical & Instrumentation
January 21, 2011
Mr. Jerry Delaughter, P.E.,
Assistant Director, Engineering
Augusta Utilities Department
360 Bay Street, Suite 180
Augusta, GA 30901
Dear Mr. Delaughter:
Zimmerman, Evans and Leopold, Inc. is pleased to provide a proposal for engineering
services for Augusta Utilities Department’s Rock Creek Relief Sewer. This proposal
includes the design of a relief sewer to service the upper reaches of the Rock Creek basin.
The sewer will operate under low-head operating conditions and provide backup pumping
capability, and will provide support service for the Village at Riverwatch. The design
includes surveying, environmental, design, land-acquisition, and bid-phase services to
Augusta Utilities. We believe that this scope of work is inclusive and will provide a cost-
effective solution to the surcharged conditions of the Rock Creek sanitary sewer.
The requested fee to complete the design is $117,124.00. Items such as easement plats are
included as additional services, and total $18,500. The total cost expected to complete the
design is therefore $135,624.00.
This proposal includes separate bid packages for the sewer and the pumping station. An
itemized schedule of services is included for your review, along with a proposed project
schedule.
ZEL looks forward to working with AUD to complete this project.
Very truly yours,
ZIMMERMAN, EVANS AND LEOPOLD, INC.
Frank W. Byne, P.E.
Principal
Attachments
Item # 1
Attachment number 1
Page 2 of 5
Description of Services
Regulatory Services: Regulatory services include the complete preparation of documents to
address environmental and regulatory components of the project. This scope of services includes
interaction at the local, state, and federal levels to resolve any permitting issues during the pre-
design and design stages.
Preliminary Services: Preliminary services are established to provide the design basis for the
work to be performed on the project. The services include research on existing facilities and
location of utilities along the path of the project, in addition to preliminary cost estimates. At the
conclusion of the preliminary services stage, the project should be clearly defined for AUD and
ZEL, and the design should be established and a report will be generated to describe the design
considerations.
Design Services: Design services include the preparation of the electrical, mechanical, and civil
plans in addition to environmental plans. The design services stage will bring the conceptual
plans to construction.
Bid Assistance: Bid Assistance services provide interaction between client, designer, and bidder
in order to provide clear understanding of the expectations of AUD to the contracting
community. Services include pre-bid meeting attendance and representation, and interpretations
and clarifications of pre-bid addenda, in addition to providing expanded bid tabulations and
preparing conformed contract documents.
Engineering During Construction Services: Engineering During Construction Services include
attendance of the pre-construction meeting, review of material submissions, and performing
periodic site visits to investigate progress during critical construction times. In addition, this
includes conflict resolution in the field, and closure of documents and red-line to as-built
drawing conversion.
Item # 1
Attachment number 1
Page 3 of 5
Professional Services Worksheet
Rock Creek Relief Sewer
Augusta Utilities Department
ZEL Engineers January 21, 2011
Contract 1: Rock Creek Siphon Station
Contract 2: Pipeline from Rock Creek to Rae's Creek Sewer
MAN -
Task Description HRS Costs
Engineering Services
Regulatory $ 18,860
1 NPDES Permit, NOI, Contract 1 18 $ 1,740
2 EPD Plan Submittal 30 $ 2,820
3 Wetlands Identification & Permitting 120 $ 12,560
4 NPDES Permit, NOI, Contract 2 14 $ 1,740
$ 18,860
Preliminary, Contracts 1 & 2 $ 15,290
5 Pump Station Design Criteria, Hydraulics 64 $ 6,640
6 Pipeline Design Criteria, Hydraulics 32 $ 3,380
7 Pipeline path evaluation 53 $ 5,270
$ 15,290
Design Services $ 65,770
Contract 1: Pump Station
8 Drawing: Cover Sheet - Contract 1 10 $ 730
9 Drawing: General Arrangement - Contract 1 11 $ 860
10 Drawing: Site, SE&SC Details, Etc. 14 $ 1,010
11 Drawing: Structural and Details 24 $ 1,620
12 Drawing: Site Piping Plan 25 $ 1,750
13 Drawing: Electrical Power Supply 30 $ 2,400
14 Drawing: Electrical Details, Backup Power 30 $ 2,400
15 Drawing: Electrical Control, P&ID, & Flow Measurement 42 $ 3,780
16 Drawing: Mechanical, Pumps Selection, Piping, Valving 88 $ 7,240
17 Drawing: HVAC Contract 1 12 $ 960
18 Drawing: Electrical Schedules Contract 1 44 $ 3,440
19 Specifications for Equipment Contract 1 43 $ 3,760
$ 29,950
3
Item # 1
Attachment number 1
Page 4 of 5
Contract 2: Pipeline Rock Creek to Rae's Creek
20 Coordination - Project Review with Staff Contract 2 44 $ 4,820
21 Project Management Project Meetings - Contract 2 56 $ 5,480
22 Drawing: Cover Sheet - Contract 2 10 $ 730
23 Drawing: General Arrangement - Contract 2 11 $ 860
24 Drawing: Soil Erosion and Sediment Control Plan 56 $ 3,920
25 Drawing: Soil Erosion and Sediment Control Plan Details 37 $ 2,590
26 Drawing: Sta 0+00 to 20+00 Plan and Profile 29 $ 2,030
27 Drawing: Sta 20+00 to 40+00 Plan and Profile 29 $ 2,030
28 Drawing: Sta 40+00 to 60+00 Plan and Profile 29 $ 2,030
29 Drawing: Sta 60+00 to 80+00 Plan and Profile 29 $ 2,030
30 Drawing: Sta 80+00 to 100+00 Plan and Profile 29 $ 2,030
31 Drawing: Bridge Crossing at Lake Shore Loop 29 $ 2,030
32 Drawing: Specialty Structures, Details. 80 $ 5,240
Contract 2 Sub Total $ 35,820
Bid Assistance Services $ 2,400
Contract 1
33 Pre Bid Conference Contract 1 37 $ 400
34 PreBid clarifications and interpretation, addenda, Contract 1 47 $ 400
35 Bid Evaluation and Recommendation Contract 1 20 $ 400
Contract 2 $ 1,200
36 Pre Bid Conference Contract 2 21 $ 400
37 PreBid clarifications and interpretation, addenda, Contract 2 47 $ 400
38 Bid Evaluation and Recommendation Contract 2 12 $ 400
$ 1,200
Engineering During Construction Services $ 8,600
Contract 1
39 Pre Construction Conference Contract 1 20 $ 400
40 Shop Drawing Review Contract 1 124 $ 1,800
41 Bi-Weekly Progress Meeting Contract 1 76 $ 600
42 Periodic Site Visits Contract 1 84 $ 800
43 Closure Documents Contract 1 52 $ 400
44 Certification Contract 1 6 $ 400
$ 4,400
4
Item # 1
Attachment number 1
Page 5 of 5
Contract 2
45 Pre Construction Conference Contract 2 26 $ 400
46 Shop Drawing Review Contract 2 68 $ 800
47 Bi-Weekly Progress Meeting Contract 2 52 $ 600
48 Periodic Site Visits Contract 2 74 $ 800
49 Testing, Flushing Assistance 30 $ 800
50 Closure Documents Contract 2 44 $ 400
51 Certification Contract 2 6 $ 400
$ 4,200
Reimbursable costs (printing and mileage) $ 6,204
Mileage, Trips x X miles $ 104
Printing (includes mailing costs):
30% Submittal $ 720
60% Submittal $ 720
90% Submittal $ 720
100% Submittal $ 720
Executed Contracts $ 420
Regulatory Submittals $ 2,800
$ 6,204
Extra Services (Directly Billed) $ 18,500
Geotechnical Services $ 2,000
Easement Plats $ 16,500
$ 18,500
TOTAL $ 135,624
5
Item # 1
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Brownstones at Rae's Creek Deed of Dedication and Maintenance Agreement
Department: Augusta Utillities Department
Caption: Motion to approve and accept a Deed of Dedication and a
Maintenance Agreement on the gravity sanitary sewer main in The
Brownstones at Rae's Creek.
Background: Bruker Davis, LLC is constructing a townhome development
named The Brownstones at Rae's Creek, on Jackson Road and has
requested that Augusta accept the gravity sanitary sewer main into
its system.
Analysis: The gravity sanitary sewer main has been inspected by the
Augusta Utilities Department and has passed said testing. An
eighteen month Maintenance Agreement is being submitted, along
with the Deed of Dedication.
Financial Impact: N/A
Alternatives: Deny the motion to approve and accept a Deed of Dedication and
a Maintenance Agreement on the gravity sanitary sewer main in
The Brownstones at Rae's Creek.
Recommendation: Approve the motion to approve and accept a Deed of Dedication
and a Maintenance Agreement on the gravity sanitary sewer main
in The Brownstones at Rae's Creek.
Funds are Available
in the Following N/A
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement. Cover Memo
Item # 2
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
Attachment number 1
Page 1 of 3
Item # 2
Attachment number 1
Page 2 of 3
Item # 2
Attachment number 1
Page 3 of 3
Item # 2
Attachment number 2
Page 1 of 2
Item # 2
Attachment number 2
Page 2 of 2
Item # 2
Attachment number 3
Page 1 of 1
Item # 2
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Emergency Response Plan
Department: Utiltiies
Caption: Authorize the notification of the selection results to prospective
firms and proceed with negotiations of a contract with the top
ranked firm, Westin Engineering Inc., for an Emergency Response
Plan (RFQ #11-077).
Background: The Utilities Department through the Procurement Department
prepared and advertised a Request of Qualification for an
Emergency Response Plan. The RFQ’s were opened on January
26, 2011. Since the submittal of the RFQ’s, both the Utilities
Department and Procurement Department have been involved in
the process of ranking the qualified firms. This process began with
a review of the information submitted from interested firms,
continued with a short listing of qualified firms, and culminated
with interviews of the top two (2) firms by a Selection Committee.
Analysis: The Selection Committee conducted interviews on March 30,
2011. At the completion of the interviews, the Selection
Committee ranked the firms as follows: 1. Westin Engineering
Inc. 2. TECTONICS Upon approval by the Augusta Commission,
the Utilities Department will begin negotiations with the top
ranked firm. If negotiations for a mutually acceptable agreement
cannot be reached, we would like to reserve the right to negotiate
with the remaining firms in the order as shown.
Financial Impact: No funds are being requested at this time. The cost for the
Emergency Response Plan will be brought to the Commission
when negotiations are completed.
Alternatives: If the Augusta Utilities Department cannot reach a satisfactory
agreement with the top ranked firm, the remaining firms should be
considered for negotiations in the order as shown.
Recommendation:
We recommend the Commission authorize the notification of the
selection results to prospective firms and proceed with
negotiations of a contract with the top ranked firm, Westin Cover Memo
Item # 3
Engineering Inc. for an Emergency Response Plan (RFQ #11-
077).
Funds are Available
in the Following No funds are being requested at this time.
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1
Page 1 of 2
Item # 3
Attachment number 1
Page 2 of 2
Item # 3
Attachment number 2
Page 1 of 1
REQUEST FOR QUALIFICATIONS
Request for Qualifications will be received at this office until Wednesday, January 12, 2011 @ 3:00 p.m. FOR
FURNISHING:
RFQ Item #11-054 Water and Wastewater System Master Plan for Utilities Department
RFQ Item #11-055 Utility Business Plan for Utilities Department
RFQ Item #11-056 Water and Wastewater Rate Study for Utilities Department
RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for Utilities
Department
RFQ Item #11-077 Emergency Response Plan for Utilities Department
RFQ Item #11-080 Leak Detection Study for Utilities Department
RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
RFQ documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street
– Room 605, Augusta, GA 30901. All questions must be submitted in writing to the office of the
Procurement Department by Tuesday, December 28, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by email
@ procbidandcontract@augustaga.gov. No RFQ will be accepted by fax, all must be received by mail
or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and
receive bid preference on an eligible local project, the certification statement as a local bidder and all
supporting documents must be submitted to the Procurement Department with your bonafide bid
package.
No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number
of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the bid which are not waiveable
or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope.
Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE,
MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the
Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business
Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds,
Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in
accordance with State and Federal laws.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle December 2, 9, 16, 23, 2010
Metro Courier December 8, 2010
cc: Tameka Allen Interim Deputy Administrator
Tom Wiedmeier Utilities Department
Drew Goins Utilities Department
Item # 3
Attachment number 3
Page 1 of 1
RFQ Item #11-077
Emergency Response Plan
for the City of Augusta - Utilities Department
RFQ Due: Wednesday, January 26, 2011 @ 11:00 a.m.
Addendums
VENDORS Attachment B Bidders Form Original 7 Copies
1&2
Southeastern Technical Solutions
1722 SW Biltmore Street YES YES YES YES YES
Port St Lucie FL 34984
Tectonic Engineering & Surveying
8639 Mayland Drive Suite 102 YES YES YES YES YES
Richmond VA 23294
URS Corporation
400 Northpark Town Center
YES YES YES YES YES
1000 Abernathy Road NE Ste 900
Atlanta GA 30328
Westin Engineering Inc
260 Peachtree Street NW Ste 2200 YES YES YES YES YES
Atlanta GA 30303
Public Safety Consultants
Non-Compliant
PO Box 608
Submitted only 6 Copies
Union WA 98592
Brown & Caldwell
990 Hammond Drive Suite 400 SUBMITTED NO BID RESPONSE
Atlanta GA 30328
Heery International
999 Peachtree St NE Suite 300 SUBMITTED NO BID RESPONSE
Atlanta GA 30309
Jacobs Engineering Group
6801 Governors Lake Parkway
SUBMITTED NO BID RESPONSE
Building 200
Norcross GA 30071
Woodard & Curran
2905 Premiere Parkway Ste 175 SUBMITTED NO BID RESPONSE
Duluth GA 30097
Zel Engineers
435 Telfair Street SUBMITTED NO BID RESPONSE
Augusta GA 30901
Item # 3
Page 1 of 1
Cumulative Evaluation Sheet - RFQ Item #11-077
Emergency Response Plan
for the City of Augusta - Utilities Department
Southeastern URS Corporation
Tectonic Engineering Westin Engineering
Technical Solutions 400 Northpark Town
& Surveying Inc
1722 SW Biltmore Center
8639 Mayland Drive 260 Peachtree Street
Street 1000 Abernathy Road
Suite 102 NW Ste 2200
Port St Lucie FL NE Ste 900
Richmond VA 23294 Atlanta GA 30303
Evaluation Criteria PTS 34984 Atlanta GA 30328
1. Firms experience and
15.0 24.3 16.0 18.3
performance on projects of
similar size and scope 25
2. Firms Quality Control,
Quality Assurance and Project 12.3 16.3 16.3 16.3
Tracking 20
3. Project Approach and 18.3 21.7 19.7 22.3
Understanding 25
4. Qualifications, experience, 17.7 21.3 22.0 20.0
references and availability of
Key Staff 25
1.7 1.7 3.3 3.0
5. Proximity to Area 5
Total 65.0 85.3 77.3 80.0
100
Shortlist 1 2
Presentations 2 1
Item # 3
Attachment number 5
Page 1 of 1
Item # 3
Attachment number 6
Page 1 of 2
Item # 3
Attachment number 6
Page 2 of 2
Item # 3
Attachment number 7
Page 1 of 7
Item # 3
Attachment number 7
Page 2 of 7
Item # 3
Attachment number 7
Page 3 of 7
Item # 3
Attachment number 7
Page 4 of 7
Item # 3
Attachment number 7
Page 5 of 7
Item # 3
Attachment number 7
Page 6 of 7
Item # 3
Attachment number 7
Page 7 of 7
Item # 3
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Leak Detection Study
Department: Utilities
Caption: Authorize the notification of the selection results to prospective
firms and proceed with negotiations of a contract with the top
ranked firm, HDR Engineering Inc., for a Leak Detection Study
(RFQ #11-080).
Background: The Utilities Department through the Procurement Department
prepared and advertised a Request of Qualification for a Leak
Detection Study. The RFQ’s were opened on January 26, 2011.
Since the submittal of the RFQ’s, both the Utilities Department
and Procurement Department have been involved in the process of
ranking the qualified firms. This process began with a review of
the information submitted from interested firms, continued with a
short listing of qualified firms, and culminated with interviews of
the top three (3) firms by a Selection Committee.
Analysis: The Selection Committee conducted interviews on March 31,
2011. At the completion of the interviews, the Selection
Committee ranked the firms as follows: 1. HDR Engineering Inc.
2. W. K. Dickson 3. Shaw Environmental & Infrastructure Upon
approval by the Augusta Commission, the Utilities Department
will begin negotiations with the top ranked firm. If negotiations
for a mutually acceptable agreement cannot be reached, we would
like to reserve the right to negotiate with the remaining firms in
the order as shown.
Financial Impact: No funds are being requested at this time. The cost for the Leak
Detection Study will be brought to the Commission when
negotiations are completed.
Alternatives: If the Augusta Utilities Department cannot reach a satisfactory
agreement with the top ranked firm, the remaining firms should be
considered for negotiations in the order as shown.
Recommendation:
We recommend the Commission authorize the notification of the
selection results to prospective firms and proceed with Cover Memo
Item # 4
negotiations of a contract with the top ranked firm, HDR
Engineering Inc. for Leak Detection Study (RFQ #11-080).
Funds are Available
in the Following No funds are being requested at this time.
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1
Page 1 of 1
Item # 4
Attachment number 2
Page 1 of 1
REQUEST FOR QUALIFICATIONS
Request for Qualifications will be received at this office until Wednesday, January 12, 2011 @ 3:00 p.m. FOR
FURNISHING:
RFQ Item #11-054 Water and Wastewater System Master Plan for Utilities Department
RFQ Item #11-055 Utility Business Plan for Utilities Department
RFQ Item #11-056 Water and Wastewater Rate Study for Utilities Department
RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for Utilities
Department
RFQ Item #11-077 Emergency Response Plan for Utilities Department
RFQ Item #11-080 Leak Detection Study for Utilities Department
RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
RFQ documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street
– Room 605, Augusta, GA 30901. All questions must be submitted in writing to the office of the
Procurement Department by Tuesday, December 28, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by email
@ procbidandcontract@augustaga.gov. No RFQ will be accepted by fax, all must be received by mail
or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and
receive bid preference on an eligible local project, the certification statement as a local bidder and all
supporting documents must be submitted to the Procurement Department with your bonafide bid
package.
No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number
of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the bid which are not waiveable
or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope.
Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE,
MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the
Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business
Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds,
Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in
accordance with State and Federal laws.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle December 2, 9, 16, 23, 2010
Metro Courier December 8, 2010
cc: Tameka Allen Interim Deputy Administrator
Tom Wiedmeier Utilities Department
Drew Goins Utilities Department
Item # 4
Attachment number 3
Page 1 of 1
RFQ Item #11-080
Leak Detection Study
for the City of Augusta - Utilities Department
RFQ Due: Wednesday, January 26, 2011 @ 11:00 a.m.
Addendums
VENDORS Attachment B Bidders Form Original 7 Copies
1&2
Shaw Environmental & Infrastructure
11560 Great Oaks Way Ste 500 YES YES YES YES YES
Alpharetta GA 30022
HDR Engineering Inc
1201 Peachtree Street NE YES YES YES YES YES
Atlanta GA 30361
W.K. Dickson
1450 Greene Street, Ste 225 YES YES YES YES YES
Augusta GA 30901
Wachs Valve & Hydrant Services LLC
801 Asbury Drive YES YES YES YES YES
Buffalo Grove, IL 60089
Woolpert
375 Northridge Road Ste 100 YES YES YES YES YES
Atlanta GA 30350
Zel Engineers
435 Telfair Street YES YES YES YES YES
Augusta GA 30901
Gannett Fleming
Non-Compliant
301 South McDowell Street Ste 1008 Attachment B Missing Notary Seal
Charlotte NC 28204
Utilities Services Associates Non-Compliant
919 SW 150th Street Ste B Missing E-Verify Number
Burien WA 98166 Missing Business License Info
Black & Veatch
11401 Lamar Avenue SUBMITTED NO BID RESPONSE
Overland Park KS 66211
Heery International
999 Peachtree Street, NE Ste 300 SUBMITTED NO BID RESPONSE
Atlanta, GA 30309
Jacobs Engineering Group Inc
6801 Governors Lake Pkwy Bldg 200 SUBMITTED NO BID RESPONSE
Norcross, GA 30071
Parsons Brinckerhoff
3340 Peachtree Road, NE Ste 2400 Tower
SUBMITTED NO BID RESPONSE
Place 100
Atlanta GA 30326
Woodard & Curran
2905 Premiere Parkway Ste 175 SUBMITTED NO BID RESPONSE
Duluth GA 30097
Item # 4
Page 1 of 1
Cumulative Evaluation Sheet - RFQ Item #11-080
Leak Detection Study
for the City of Augusta - Utilities Department
Wachs Valve &
Shaw Environmental
HDR Engineering Inc W.K. Dickson Hydrant Services Woolpert
& Infrastructure Zel Engineers
1201 Peachtree 1450 Greene Street, LLC 375 Northridge Road
11560 Great Oaks 435 Telfair Street
Street NE Ste 225 801 Asbury Drive Ste 100
Way Ste 500 Augusta GA 30901
Atlanta GA 30361 Augusta GA 30901 Buffalo Grove, IL Atlanta GA 30350
Alpharetta GA 30022
Evaluation Criteria PTS 60089
1. Firms experience and
22.0 21.7 23.3 20.7 19.3 15.0
performance on projects of
similar size and scope 25
2. Firms Quality Control,
Quality Assurance and Project 17.0 17.0 17.0 15.3 17.0 17.0
Tracking 20
3. Project Approach and 22.0 21.0 21.7 21.0 20.3 15.7
Understanding 25
4. Qualifications, experience, 21.0 20.0 21.3 19.7 19.0 16.7
references and availability of
Key Staff 25
2.7 3.3 5.0 2.3 3.3 5.0
5. Proximity to Area 5
Total 84.7 83.0 88.3 79.0 79.0 69.3
100
Shortlisted 2 3 1
Presentation 2.7 1.0 2.3
Item # 4
Attachment number 5
Page 1 of 1
Item # 4
Attachment number 6
Page 1 of 2
Item # 4
Attachment number 6
Page 2 of 2
Item # 4
Attachment number 7
Page 1 of 5
Item # 4
Attachment number 7
Page 2 of 5
Item # 4
Attachment number 7
Page 3 of 5
Item # 4
Attachment number 7
Page 4 of 5
Item # 4
Attachment number 7
Page 5 of 5
Item # 4
Engineering Services Committee Meeting
5/9/2011 1:05 PM
On-Call Construction Services - LPA SA#1
Department: Abie L. Ladson, PE, CPESC, Director
Caption: Approve Capital Project Budget Change Number Three 324-
041110-210824002 and Supplemental Agreement Number One
for the On-Call Construction Services Agreement with LPA
Group, Inc in the amount of $98,498.60 to construction
management services on the Resurfacing Various Roads Urban &
Suburban Phase II Projects as requested by AED. Funding is
available in SPLOST Phase IV Fund Balance account.
Background: On May 18, 2010 the Augusta Richmond County Commission
approved the On-Call Professional Services of construction
management, construction inspection and field engineering
services on various projects under construction for 2010 and 2011
to include the Resurfacing Various Roads Urban & Suburban
Phase II Projects.
Analysis: This request will allow AED to maintain the current level of
existing Construction Management (CM) and Construction
Quality Assurance and Quality Control (QA/QC). QA/QC and
CM are critical factors to constructing a good road and to ensure
the work is completed per design standards and specifications.
Also, Resurfacing Various Roads Urban & Suburban projects
requires a full-time inspector, construction quality control and
daily activity logging.
Financial Impact: Funds are available in the amount of $98,498. 60 in SPLOST
Phase IV Fund Balance account to be transferred to the On-Call
Construction Services Consultant Agreement with the LPA Group
upon Commission approval.
Alternatives: 1) Approve Capital Project Budget Change Number Three 324-
041110-210824002 and Supplemental Agreement Number One
for the On-Call Construction Services Agreement with LPA
Group, Inc in the amount of $98,498.60 to construction
management services on the Resurfacing Various Roads Urban &
Suburban Phase II Projects as requested by AED. Funding is
available in SPLOST Phase IV Fund Balance account. 2) DoCover
not Memo
Item # 5
approve and accept substandard roadway by discontinuing
QA/QC and CM controls.
Recommendation: Approve Alternative Number One.
Funds are Available
SPLOST Phase IV Fund Balance to be transferred to 324-041110-
in the Following
5212119/210824002
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 5
Attachment number 1
Page 1 of 1
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission
AUGUSTA-RICHMOND
for execution. For information reference this request, COUNTY
contact Engineering at ext 5070. Thanks
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project Number(s): 324-041110-210824002
Supplemental Agreement Number: 1
Purchase Order Number: P181968
WHEREAS, We, “The LPA Group, Inc.” Consultant, entered into a contract with Augusta-
Richmond County on “May 18, 2010”, for On-Call Construction Services”, Project No. 324-
041110-210824002, File Reference No. 10-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not
covered by the scope of the original contract, we desire to submit the following Supplemental
Agreement to-wit:
Construction Engineering and Inspection Services for
Resurfacing Various Roads, Urban and Suburban Phase 2
It is agreed that as a result of the above described modification the contract amount is
increased by $98,498.60 from $50,000.00 to a new total of $148,498.60.
Any modifications to submittal dates shall be as identified in the attached proposal. This
agreement in no way modifies or changes the original contract of which it becomes a part,
except as specifically stated herein.
NOW, THEREFORE, We, “The LPA Group, Inc.”, Consultant, hereby agree to said Supplemental
Agreement consisting of the above mentioned items and prices, and agree that this
Supplemental Agreement is hereby made a part of the original contract to be performed under
the specifications thereof, and that the original contract is in full force and effect, except insofar
as it might be modified by this Supplemental Agreement.
This day of , 2011.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY
AUGUSTA, GEORGIA
Honorable Mayor, Deke Copenhaver THE LPA, Group, Inc
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST:
Title:
Item # 5
(SA02 – For changes more than $20,000) December 2010
Attachment number 2
Page 1 of 2
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information
reference this request, contact Engineering at ext 5070. Thanks
Augusta-Richmond County, Georgia CPB#324-041110-210824002
CAPITAL PROJECT BUDGET
ON-CALL CONSTRUCTION SERVICES
CHANGE NUMBER THREE
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby amended:
Section 1: The project change is authorized to CPB# 324-041110-210824002 for Supplemental
Agreement Number One for The LPA Group. This project proposes to continue to provide
professional services on the Resurfacing Various Roads Urban and Suburban Ph II projects.
Funding in the amount of $98,498.60 is available SPLOST Phase IV Fund Account Balance
and will be transferred to the LPA Agreement upon Commission approval.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Resurfacing $ 50,000
Resurfacing $ 16,920
SPLOST Phase IV Fund Account Balance $ 56,400
SPLOST Phase IV Fund Account Balance $ 99,000
$ 222,320
Section 3: The following amounts are appropriated for the project:
By Basin By District
Varies $222,320 Varies $ 222,320
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Mayor, Deke Copenhaver
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Item # 51.4.11
Attachment number 2
Page 2 of 2
Augusta-Richmond County, Georgia CPB#324-041110-210824002
CAPITAL PROJECT BUDGET
ON-CALL CONSTRUCTION SERVICES
CHANGE NUMBER THREE
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
RESURFACING
324-04-1110-5411120-201824044 ($66,920) $0 ($66,920)
SPLOST PHASE IV FUND ACCOUNT
000-00-0000-0000000-000000000 ($56,400) ($99,000) ($155,400)
TOTAL SOURCES: ($123,320) ($99,000) ($222,320)
USE OF FUNDS
PROFESSIONAL SERVICES
324-04-1110-5212119-210824002 $123,320 $99,000 $222,320
TOTAL USES: $123,320 $99,000 $222,320
Item # 51.4.11
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Richmond Estates Phase II Dedication
Department: Engineering Department-Abie L. Ladson, P.E., CPESC, Director
Caption: Approve the deeds of dedication, maintenance agreements, and
road resolutions submitted by the Engineering and Augusta
Utilities Departments for Richmond Estates, Phase II.
Background: The final plat for Phase II was approved by the Commission on
May 4, 2010. The subdivision design and plat for this section,
including the storm drain system, have been reviewed and
accepted by our engineering staff and the construction has been
reviewed by our inspectors. The Utilities Dept. has inspected and
reviewed the water and sanitary sewer installations, and hereby
requests acceptance of the utility deed.
Analysis: This section meets all codes, ordinances and standards. There are
no wetlands or 100-year flood plain boundaries involved in this
section. Acceptance of said utility deed shall dedicate, as required,
the water and sanitary sewer mains along with the applicable
easements to Augusta, Georgia, for operation and maintenance.
Financial Impact: By accepting these roads and storm drainage installations into the
County system and after the 18-month maintenance warranty by
the developer/contractor for the roads and storm drainage has
expired, all future maintenance and associated costs will be borne
by Augusta, Georgia. By acceptance of the utility deed and
maintenance agreement, all future maintenance and associated
costs for water and sanitary sewer installations will be borne by
Augusta, Georgia, and positive revenue will be generated from the
sale of water and sanitary sewer taps and monthly billing of same.
Alternatives: 1. Approve the deeds of dedication, maintenance agreements, and
road resolutions submitted by the Engineering, and Augusta
Utilities Departments for Richmond Estates, Phase Two. 2. Do not
approve and risk litigation.
Recommendation: Approve Alternative Number One.
Cover Memo
Item # 6
Funds are Available
in the Following N/A
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 6
Attachment number 1
Page 1 of 1
Item # 6
Attachment number 2
Page 1 of 1
Item # 6
Attachment number 3
Page 1 of 2
Item # 6
Attachment number 3
Page 2 of 2
Item # 6
Attachment number 4
Page 1 of 1
Item # 6
Attachment number 5
Page 1 of 2
Item # 6
Attachment number 5
Page 2 of 2
Item # 6
Attachment number 6
Page 1 of 4
Item # 6
Attachment number 6
Page 2 of 4
Item # 6
Attachment number 6
Page 3 of 4
Item # 6
Attachment number 6
Page 4 of 4
Item # 6
Attachment number 7
Page 1 of 2
Item # 6
Attachment number 7
Page 2 of 2
Item # 6
Engineering Services Committee Meeting
5/9/2011 1:05 PM
TEE Center – Design Amendment #2 - FF&E
Department: Public Services Department - Facilities Management Division
Caption: Approve Amendment #2 in the amount of $38,900 to the
Thompson, Ventulett, Stainback & Associates (TVS Design)
Architectural Contract for the TEE Center to add furniture,
fixtures and equipment (FF&E) design.
Background: The architectural contract for design of the new TEE Center was
negotiated and executed without additional services of furniture,
fixtures and equipment (FF&E) design included. The project
design has now advanced to the point that these services are
needed in order to keep the project moving forward in an efficient
manner. The choice of this Architect was based in part on the
experience and the interior design expertise they bring to the
project is substantial. Including this work within their scope of
responsibility is in the best interest of the project. It is
recommended that approval be given to the attached proposal, and
that the Architect’s contract be amended accordingly.
Analysis: The project’s FF&E design is needed in order to plan power, data
and lighting systems so that their locations can be properly
coordinated by the design engineers. In addition, selection and
specifications of furnishings is needed.
Financial Impact: The amount of additional architectural fees is $38,900. The overall
architectural fee for the TEE Center will increase from $2,205,022
to $2,243,922. The overall contract amount for both Reynolds
Street Parking Deck and the TEE Center project will increase to
$3,019,469.
Alternatives: 1. Approve Amendment #2 in the amount of $38,900 to the
Thompson, Ventulett, Stainback & Associates (TVS Design)
Architectural Contract for the TEE Center to add furniture,
fixtures and equipment (FF&E) design 2. Hire alternative firm to
design FF&E for the TEE Center project
Recommendation: Cover Memo
Approve Amendment #2 in the amount of $38,900 to the
Item # 7
Thompson, Ventulett, Stainback & Associates (TVS Design)
Architectural Contract for the TEE Center to add furniture,
fixtures and equipment (FF&E) design.
Funds are Available
in the Following GL-325-05-1130; JL-206351102 Object Code: 52-12112
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 7
Attachment number 1
Page 1 of 6
Item # 7
Attachment number 1
Page 2 of 6
Item # 7
Attachment number 1
Page 3 of 6
Item # 7
Attachment number 1
Page 4 of 6
Item # 7
Attachment number 1
Page 5 of 6
Item # 7
Attachment number 1
Page 6 of 6
Item # 7
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Tree Commission
Department: Clerk of Commission
Caption: Report from the Tree Commission. (Requested by Commissioner
Aitken) (Referred from April 25 Engineering Services
Committee)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 8
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Watershed Assessment / Source Water Assessment Plan
Department: Utilities
Caption: Authorize the notification of the selection results to prospective
firms and proceed with negotiations of a contract with the top
ranked firm, Dewberry & Davis Inc. for a Watershed
Assessment/Source Water Assessment Plan (RFQ #11-059).
Background: The Utilities Department through the Procurement Department
prepared and advertised a Request of Qualification for a
Watershed Assessment/Source Water Assessment Plan. The
RFQ’s were opened on January 26, 2011. Since the submittal of
the RFQ’s, both the Utilities Department and Procurement
Department have been involved in the process of ranking the
qualified firms. This process began with a review of the
information submitted from interested firms, continued with a
short listing of qualified firms, and culminated with interviews of
the top three (3) firms by a Selection Committee.
Analysis: The Selection Committee conducted interviews on March 30,
2011. At the completion of the interviews, the Selection
Committee ranked the firms as follows: 1. Dewberry & Davis Inc.
2. AECOM 3. Jacobs Engineering Group Inc. Upon approval by
the Augusta Commission, the Utilities Department will begin
negotiations with the top ranked firm. If negotiations for a
mutually acceptable agreement cannot be reached, we would like
to reserve the right to negotiate with the remaining firms in the
order as shown.
Financial Impact: No funds are being requested at this time. The cost for the
Watershed Assessment/Source Water Assessment Plan will be
brought to the Commission when negotiations are completed.
Alternatives: If the Augusta Utilities Department cannot reach a satisfactory
agreement with the top ranked firm, the remaining firms should be
considered for negotiations in the order as shown.
Recommendation:
We recommend the Commission authorize the notification ofCover
the Memo
Item # 9
selection results to prospective firms and proceed with
negotiations of a contract with the top ranked firm, Dewberry &
Davis Inc. for a Watershed Assessment/Source Water Assessment
Plan (RFQ #11-059).
Funds are Available
in the Following No funds are being requested at this time.
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 9
Attachment number 1
Page 1 of 2
Item # 9
Attachment number 1
Page 2 of 2
Item # 9
Attachment number 2
Page 1 of 1
REQUEST FOR QUALIFICATIONS
Request for Qualifications will be received at this office until Wednesday, January 12, 2011 @ 3:00 p.m. FOR
FURNISHING:
RFQ Item #11-054 Water and Wastewater System Master Plan for Utilities Department
RFQ Item #11-055 Utility Business Plan for Utilities Department
RFQ Item #11-056 Water and Wastewater Rate Study for Utilities Department
RFQ Item #11-059 Watershed Assessment/Source Water Assessment Plan for Utilities
Department
RFQ Item #11-077 Emergency Response Plan for Utilities Department
RFQ Item #11-080 Leak Detection Study for Utilities Department
RFQs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
RFQ documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street
– Room 605, Augusta, GA 30901. All questions must be submitted in writing to the office of the
Procurement Department by Tuesday, December 28, 2010 @ 5:00 p.m. by fax at 706-821-2811 or by email
@ procbidandcontract@augustaga.gov. No RFQ will be accepted by fax, all must be received by mail
or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and
receive bid preference on an eligible local project, the certification statement as a local bidder and all
supporting documents must be submitted to the Procurement Department with your bonafide bid
package.
No RFQ may be withdrawn for a period of 90 days after time has been called on the date of opening.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number
of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the bid which are not waiveable
or modifiable by the Procurement Director. Please mark RFQ number on the outside of the envelope.
Bidders are cautioned that sequestration of RFQ documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFQ documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Disadvantage Business Enterprise (DBE) Augusta-Richmond County, Georgia does not operate a DBE,
MBE or WBE Program for Augusta funded projects, as a Federal Court has entered an Order enjoining the
Race-Based portion of Augusta’s DBE Program. Instead Augusta operates a Local Small Business
Opportunity Program. However, for various projects utilizing the expenditure of State or Federal funds,
Augusta enforces DBE requirements and/or DBE goals set by the Federal and/or State Agencies in
accordance with State and Federal laws.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle December 2, 9, 16, 23, 2010
Metro Courier December 8, 2010
cc: Tameka Allen Interim Deputy Administrator
Tom Wiedmeier Utilities Department
Drew Goins Utilities Department
Item # 9
Attachment number 3
Page 1 of 1
RFQ Item #11-059
Watershed Assessment/Source Water Assessment Plan
for the City of Augusta - Utilities Department
RFQ Due: Wednesday, January 26, 2011 @ 11:00 a.m.
Addendums
VENDORS Attachment B Bidders Form Original 7 Copies
1&2
AECOM
1360 Peachtree Street, NE Ste 500 YES YES YES YES YES
Atlanta GA 30309
Dewberry
2835 Brandywine Road Ste 100 YES YES YES YES YES
Atlanta GA 30341
Jacobs Engineering Group
6801 Governors Lake Pkwy Bldg 200 YES YES YES YES YES
Norcross GA 30071
Mactec
3200 Town Point Drive Suite 100 YES YES YES YES YES
Kennesaw GA 30144
Stevenson & Palmer
723 Industrial Park Drive, Suite 2 YES YES YES YES YES
Evans GA 30809
Brown & Caldwell
990 Hammond Drive Ste 400 SUBMITTED NO BID RESPONSE
Atlanta GA 30328
Heery International
999 Peachtree Street NE Suite 300 SUBMITTED NO BID RESPONSE
Atlanta Ga 30309
Parsons Brinckerhoff
3340 Peachtree Road, NE Ste 2400
SUBMITTED NO BID RESPONSE
Tower Place 100
Atlanta GA 30326
Item # 9
Page 1 of 1
Cumulative Evaluation Sheet - RFQ Item #11-059
Watershed Assessment/Source Water Assessment Plan
for the City of Augusta - Utilities Department
Jacobs Engineering
AECOM Dewberry Mactec Stevenson & Palmer
Group
1360 Peachtree 2835 Brandywine 3200 Town Point 723 Industrial Park
6801 Governors Lake
Street, NE Ste 500 Road Ste 100 Drive Suite 100 Drive, Suite 2
Pkwy Bldg 200
Atlanta GA 30309 Atlanta GA 30341 Kennesaw GA 30144 Evans GA 30809
Norcross GA 30071
Evaluation Criteria PTS
1. Firms experience and
19.7 23.7 21.3 18.3 18.7
performance on projects of
similar size and scope 25
2. Firms Quality Control,
Quality Assurance and Project 17.0 17.0 18.7 17.0 18.7
Tracking 20
3. Project Approach and 21.3 22.7 20.7 18.3 17.0
Understanding 25
4. Qualifications, experience, 20.0 22.0 20.0 20.0 18.7
references and availability of
Key Staff 25
3.0 3.0 3.0 3.0 3.3
5. Proximity to Area 5
Total 81.0 88.3 83.7 76.7 76.3
100
Shortlisted 3 1 2
Presentation 2 1 3
Item # 9
Attachment number 5
Page 1 of 1
Item # 9
Attachment number 6
Page 1 of 2
Item # 9
Attachment number 6
Page 2 of 2
Item # 9
Attachment number 7
Page 1 of 6
Item # 9
Attachment number 7
Page 2 of 6
Item # 9
Attachment number 7
Page 3 of 6
Item # 9
Attachment number 7
Page 4 of 6
Item # 9
Attachment number 7
Page 5 of 6
Item # 9
Attachment number 7
Page 6 of 6
Item # 9
Engineering Services Committee Meeting
5/9/2011 1:05 PM
Willhaven Phase II Section I Dedication
Department: Engineering Dept-Abie L. Ladson, P.E., CPESC, Director
Caption: Approve the deeds of dedication, maintenance agreements, and
road resolutions submitted by the Engineering and Augusta
Utilities Departments for Willhaven, Phase II, Section I.
Background: The final plat for Phase II, Section I, was approved by the
Commission on May 18, 2010. The subdivision design and plat
for this section, including the storm drain system, have been
reviewed and accepted by our engineering staff and the
construction has been reviewed by our inspectors. The Utilities
Department has inspected and reviewed the water and sanitary
sewer installations, and hereby requests acceptance of the utility
deed.
Analysis: This section meets all codes, ordinances and standards. There are
no wetlands or 100-year flood plain boundaries involved in this
section. Acceptance of said utility deed shall dedicate, as required,
the water and sanitary sewer mains along with the applicable
easements to Augusta, Georgia, for operation and maintenance.
Financial Impact: By accepting these roads and storm drainage installations into the
County system and after the 18-month maintenance warranty by
the developer/contractor for the roads and storm drainage has
expired, all future maintenance and associated costs will be borne
by Augusta, Georgia. By acceptance of the utility deed and
maintenance agreement, all future maintenance and associated
costs for water and sanitary sewer installations will be borne by
Augusta, Georgia, and positive revenue will be generated from the
sale of water and sanitary sewer taps and monthly billing of same.
Alternatives: 1. Approve the deeds of dedication, maintenance agreements, and
road resolutions submitted by the Engineering, and Augusta
Utilities Departments for Willhaven, Phase Two, Section I. 2. Do
not approve and risk litigation.
Recommendation: Approve Alternative Number One. Cover Memo
Item # 10
Funds are Available
in the Following N/A
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 10
Attachment number 1
Page 1 of 1
Item # 10
Attachment number 2
Page 1 of 1
Item # 10
Attachment number 3
Page 1 of 2
Item # 10
Attachment number 3
Page 2 of 2
Item # 10
Attachment number 4
Page 1 of 2
Item # 10
Attachment number 4
Page 2 of 2
Item # 10
Attachment number 5
Page 1 of 2
Item # 10
Attachment number 5
Page 2 of 2
Item # 10
Attachment number 6
Page 1 of 3
Item # 10
Attachment number 6
Page 2 of 3
Item # 10
Attachment number 6
Page 3 of 3
Item # 10
Attachment number 7
Page 1 of 2
Item # 10
Attachment number 7
Page 2 of 2
Item # 10
Get email alerts for Augusta