City Council Special Meeting
Special MeetingBaxter, MN · August 10, 2023
Minutes
CITY COUNCIL SPECIAL MEETING MINUTES
Thursday, August 10, 2023 at 6:00 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
Mayor Olson called the meeting to order at 6:00 p.m.
ROLL CALL
Mayor Darrel Olson and Council Members Connie Lyscio, Zach Tabatt, and Jeff Phillips were present. Council
Member Cross was absent.
City Administrator Brad Chapulis, Assistant City Administrator Kelly Steele, and Public Works Director Trevor
Walter were present.
PRESENTATIONS
1. Improvement Hearing on for the 2024 South Forestview Improvements Project
Scott Hedlund, with SEH, presented the improvement hearing presentation.
The street improvements include the following segments:
Forestview Drive – south of River Vista Drive
Maryland Road
River Vista Drive
River Vista Court
Medford Road
Riverwood Road
Parkview Circle
The improvement project will provide municipal sewer and water services to neighborhoods
currently using well and septic systems, improve deteriorated street surfaces, and improve non-
motorized connectivity/complete streets within the city.
The existing streets are 24 to 26 foot wide rural sections that are 26 to 37 years old. In 2022 the
streets were rated 2 and 4 out of 10.
Forestview Drive and Maryland Road will be built 32 feet wide to accommodate 5’ on-street bike
paths on both sides. The remaining street segments will be built 26 feet wide. There will be a
bituminous paved trailhead and parking area on the south end of Forestview Drive. A gravel trail
alignment is planned through the wooded city parcel from the new trailhead north to Maryland
Road. The trail will connect with the previously constructed gravel trail at Maryland Road.
The proposed improvements include the extension of sanitary sewer mains and water mains
throughout the neighborhood. Sewer and water services will be provided to every parcel at the right-
of-way line. Due to the topography of the neighborhood, a sanitary sewer lift station will be required.
Hydrants will be installed throughout the project for fire protection and flushing.
8/10/2023 City Council Special Meeting Minutes Page 2
The total estimated project cost is $8,901,900.
All properties will be assessed on a per equivalent residential unit basis. Assessments will be
amortized over a 15-year term. The special assessment amount for a single parcel with a home is
$19,720. If the entire project costs were assessed, the assessment would be approximately $62,000
per developed ERU.
OPEN PUBLIC HEARING
Mayor Olson opened the public hearing at 6:35 p.m.
Karen Kronbeck, 11806 River Vista Drive, inquired what are the WAC and SAC charges and explained when the
north project was completed it was not organized and asked if this project will be more organized.
Public Works Director Walter explained the water and sewer availability charges are for property owners to buy
into the city’s water and sewer system and explained the staging process for the project.
Darin Dirkes, 6587 Riverwood Road, explained due to rain and erosion he would like the city to address the steep
embankment located near his property. Mr. Dirkes asked if a generator will be placed at the lift station should
power be lost and how the construction staging area will affect traffic flow.
Public Works Director Walter explained he will review the embankment during design, staging is determined by
the contractor, and there will not be a permanent generator on site as the city uses a portable generator during
power outages.
Kevin Kronbeck, 11806 River Vista Drive, inquired what is the city’s water pressure and when will the depth of the
sewer be known.
Public Works Director Walter explained the city’s water pressure is between 52 and 55 PSI and the depth of the
sewer will be determined in November.
Matt Neubert, 11686 Forestview Drive, inquired if the walkway will be removed and how is the interest rate
determined.
Public Works Director Walter explained the walkway will be removed as part of the project and the interest rate
will be known once the bonds for the project are sold in the fall of 2024.
CLOSE PUBLIC HEARING
Mayor Olson closed the public hearing at 6:55 p.m.
NEXT STEPS
The council will consider ordering the improvement during the August 15, 2023 council meeting.
ADJOURN
MOTION by Council Member Lyscio, seconded by Council Member Tabatt to adjourn at 6:57 p.m. Motion
unanimously carried.
Approved by: Respectfully submitted,
8/10/2023 City Council Special Meeting Minutes Page 3
_____________________________
Darrel Olson Kelly Steele
Mayor Assistant City Administrator
Agenda
CITY COUNCIL SPECIAL MEETING AGENDA
Thursday, August 10, 2023 at 6:00 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
ROLL CALL
PRESENTATIONS
1. Improvement Hearing on for the 2024 South Forestview Improvements Project
OPEN PUBLIC HEARING
CLOSE PUBLIC HEARING
NEXT STEPS
ADJOURN