City Council Special Meeting
Special MeetingBaxter, MN · February 13, 2025
Minutes
CITY COUNCIL SPECIAL MEETING MINUTES
Thursday, February 13, 2025 at 6:00 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
Mayor Olson called the meeting to order at 6:00 p.m.
ROLL CALL
Mayor Darrel Olson and Council Members Connie Lyscio, Zach Tabatt, Patrick Sundberg and Mark Cross were
present.
Assistant City Administrator Kelly Steele and Assistant City Engineer Trevor Thompson were present.
PRESENTATIONS
1. Improvement Hearing for the 2025 Design Road & TH 371 Stormwater Improvements Project
Alex Bitter, with Widseth, presented the improvement hearing. This improvement project was
originally scheduled for 2021 but was postponed to work with MnDOT on drainage issues.
The city will be following Minnesota Chapter 429 for assessment procedures.
Design Road was originally constructed in 1981. In 2002 a mill and inlay was performed on the
roadway. In 2022 the roadway had a PASER rating of a 4. In 2011 MnDOT added impervious coverage
that caused major flooding in the TH 371 corridor, especially during heavy rain events. Storm water
drainage that flows under Fleet Farm is overloaded.
The proposed improvements include a 10-ton design, 6” bituminous pavement, 6” aggregate base,
and a 36” face to face roadway width. This will be a reduction to the roadway width and will align
with Universal Road. There will be sanitary sewer and watermain adjustments. A 60” storm sewer
pipe will be extended to the west boulevard of TH 371.
Benefitting commercial properties will be assessed 100% of project costs up to 44’ in roadway width.
The city will assume roadway width costs in excess of 44’ and underground improvements. The
remaining project costs will be assessed on a front foot basis.
The total estimated project cost is $4,197,698. Total MnDOT project funding is $3,025,000. The total
assessable costs are $438,565. The city costs are $734,133. For estimation purposes, the assessment
interest rate is 7%. The actual interest rate will be known this fall after the city sells bonds.
Assessment swill be amortized over 12 years for commercial full depth reclamation.
Mr. Bitter summarized the project schedule. Access will be maintained to the properties during
construction and a temporary water system will be utilized as some businesses in the project
boundary require water service.
The council did not have any questions for Mr. Bitter.
2/13/2025 City Council Special Meeting Minutes Page 2
OPEN PUBLIC HEARING
Mayor Olson opened the public hearing at 6:15 p.m.
Brent Gunsbury, Pillsbury Forest Ventures, explained he supports the project and that he would like the selected
contractor to be careful with private investments such as flag poles, signs, and irrigation lines. Mr. Gunsbury
inquired if dewatering would be needed for the project and if so, who would pay for it.
Mr. Bitter explained dewatering would be required and since it is needed for the underground improvements, the
cost for dewatering is directly related to MnDOT, so they will be paying for the expense.
CLOSE PUBLIC HEARING
MOTION by Council Member Cross, seconded by Council Member Sundberg to close the public hearing at 6:19
p.m. Motion carried unanimously.
NEXT STEPS
None.
ADJOURN
MOTION by Council Member Lyscio, seconded by Council Member Cross to adjourn at 6:19 p.m. Motion carried
unanimously.
Approved by: Respectfully submitted,
_____________________________
Darrel Olson Kelly Steele
Mayor Assistant City Administrator
Agenda
CITY COUNCIL SPECIAL MEETING AGENDA
Thursday, February 13, 2025 at 6:00 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
ROLL CALL
PRESENTATIONS
1. Improvement Hearing for the 2025 Design Road & TH 371 Stormwater Improvements Project
OPEN PUBLIC HEARING
CLOSE PUBLIC HEARING
NEXT STEPS
ADJOURN