Utilities Commission
Regular MeetingBaxter, MN · April 3, 2024
Minutes
UTILITIES COMMISSION MINUTES
Wednesday, April 03, 2024 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
The regular meeting of the Baxter Utilities Commission was called to order at 5:30 p.m. by Vice Chairman Jack
Christofferson.
ROLL CALL
Members Present: Commissioners Douglas Stenberg, Jack Christofferson and Council Liaison Mark Cross.
Members Absent: Commissioners John Brenny and Chairman Rock Yliniemi.
Staff Present: Public Works Director/City Engineer Trevor Walter, Assistant City Engineer Trevor Thompson, and
Administrative Assistant Mary Haugen.
Other Present: SEH Consulting Engineers Scott Hedlund, Neil Heinonen & Traffic Engineer Justin Anabis, Widseth
Consulting Engineer Alex Bitter and resident Chad Kinate.
CONSENT AGENDA
1. Approve the Special Utilities Commission Minutes from March 20, 2024
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to approve the Special Utilities
Commission Minutes from February 7, 2024. Motion carried unanimously.
BUSINESS ITEMS
2. Recommend Planning and Zoning Approve the Ordinance Amendment Addressing Retaining Walls
and for Parking Reduction
Assistant City Engineer Thompson explained that City Council requested staff to review and evaluate
the ordinance related to parking.
The retaining wall ordinance amendment is to address safety concerns on private property. Currently,
a retaining wall, regardless of height does not require a fence or guardrail. The proposed ordinance
amendment would require a 4-foot-tall fence or guardrail on all retaining walls 4-feet high or taller.
The parking lot ordinance amendment is to allow a 10 percent reduction to the current parking
requirements for retailers with buildings consisting of 50,000 square feet or greater. Mr. Thompson
stated that engineering staff understands the request to reduce parking on retailers with large stores
as the parking lots are often not full. However, the City of Baxter (as a whole) is not designed for on-
street parking. Therefore, if a retail site does not have enough parking on site based on the proposed
ordinance amendment, then on-street parking would present a public safety concern. By including the
proof of parking requirement, it allows the city to require the additional 10 percent of stalls to be
incorporated into the site to resolve any on-street parking issues that may arise with the proposed
ordinance amendment.
4/3/2024 Utilities Commission Minutes Page 2
MOTION by Council Liaison Cross, seconded by Commissioner Stenberg to recommend Planning and
Zoning approve the Ordinance Amendment addressing retaining walls and for parking reduction.
Motion carried unanimously.
3. Recommend Planning & Zoning Approve the Preliminary and Final Plat for Haverkamp Addition to
Baxter and Rezoning Application
Public Works Director/City Engineer Walter reviewed the location and access to the Haverkamp
Addition to Baxter. The plat consists of converting eighteen (18) existing lots and one (1) Outlot into
one (1) lot and one (1) Outlot. The existing 18 lots are not serviced by sewer and water and the
easement across private property to access existing 18 lots has been vacated.
Sewer and water have been stubbed into the property off Cedar Scenic Road and is designed to provide
adequate services to the property as it develops. The proposed Lot 1, Block 1 property will need to be
serviced from the existing 8-inch water main and 8-inch sewer main stub. The property owner will be
required to enter into an agreement with the City to connect to the main as there are no services to
supply the proposed parcel.
The current land use is zoned RS which requires a minimum of a 10-acre parcel and does not follow
the future zoning guidelines of the Comprehensive Plan. The Outlot will remain zoned as RS until
platted into buildable lots.
The Plat includes the typical 5-foot and 10-foot drainage and utility easement insert. Additionally, 80-
feet of right-of-way has been dedicated for a future road extension over the existing sewer and water
main.
Council Liaison Cross questioned the access point being located on the curve of Cedar Scenic Road. Mr.
Walter stated that it had been the planned access point for years; however, staff will review the access
location.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to recommend Planning &
Zoning Approve the Preliminary and Final Plat for Haverkamp Addition to Baxter and Rezoning
Application. Motion carried unanimously.
4. Recommend Planning and Zoning Approve the Fiberhood Preliminary and Final Plat and Vacation of
Drainage and Utility Easements
Assistant City Engineer Thompson explained that CTC had purchased the property from Navillus Land
Company. The 2024 South Forestview Area Improvements Project identified 10 ERU assessments in
the Assessment Roll for the subject property which aligns with the proposed plat. CTC is platting the
remainder of their property as Outlots until a time in which development will be proposed.
The plat has dedicated right-of-way for two new roads along with the existing Maryland Road
extension meeting City Code requirements. The proposed Fiber Drive right-of-way includes 80 feet of
right-of-way with the 10-foot drainage and utility easement. The proposed Mesabi Road includes an
80-foot right-of-way with the 10-foot drainage and utility easement. The extension of Maryland Road
includes the same 80-foot right-of-way with the 10-foot drainage and utility easement.
Mr. Thompson stated that clearing and grubbing of the proposed right-of-way and drainage and utility
easement for use of stockpiling, crushing, and storage to reduce the trucking required on Forestview
4/3/2024 Utilities Commission Minutes Page 3
Drive to the north that was constructed in 2020. The clearing and grubbing was coordinated with CTC
and the Plat, the City currently has an agreement allowing the use of the proposed right-of-way which
will be dissolved with the recording of the plat.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to recommend Planning and
Zoning approve the Fiberhood Preliminary and Final Plat and Vacation of Drainage and Utility
Easements. Motion carried unanimously.
5. Accept the Zip’s Car Wash Municipal Improvements as Outlined in the Development Agreement
Assistant City Engineer Thompson informed the commission that Zip’s Car Wash has completed the
Municipal Improvements as outlined in the development Agreement dated April 19, 2022. The
acceptance of the municipal improvements begins the one-year warranty period for the associated
improvements.
Mr. Thompson stated the Developer is using the existing Irrevocable Letter of Credit No. 1560 to cover
the surety of the warranty period.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to accept the Zip’s Car Wash
Municipal Improvements as Outlined in the Development Agreement. Motion carried unanimously.
6. Approve Astech Corporation Street Crack Sealing Contract in the Not-to-Exceed Amount of
$177,422.00
Public Works Director/City Engineer Walter informed the commission that Street & Utilities Supervisor
Berent sent out four quotes for the 2024 City of Baxter Street Crack Sealing. Streets Division staff
counted approximately 50-60 percent of the roads scheduled for crack sealing.
The remaining roads will be counted as the snow melts. After the total cracks are counted staff will
spot check the number of cracks that are open prior to the contractor crack sealing. Depending on the
severity of the winter and the freeze thaw cycles, typically approximately 50 – 70 percent of the cracks
either never opened or reseal themselves so only approximately 30 - 50 percent of the cracks need
sealing on an annual basis.
Based on the road inspection crack counting for the approximately 50-60 percent of the roads that
have been counted, the total estimated linear footage of cracks on those roads are 229,473 linear feet
of “blow and go” and 52,339 linear feet of “route and seal”.
Three (3) quotes were received and are broken down below:
Contractor Blow & Go Unit Price Route & Seal Unit Price
Astech Corporation $0.58 $0.58
Northwest Asphalt & Maintenance $0.75 $0.75
Fahrner Asphalt Sealers $0.75 $0.95
The estimated value of the contract is shown below:
Contractor Total Estimated Contract Value
Astech Corporation $145,000
Northwest Asphalt & Maintenance $175,000
4/3/2024 Utilities Commission Minutes Page 4
Fahrner Asphalt Sealers $197,500
Council Liaison Cross inquired if it is up to the contractor to determine when the not to exceed amount
has been reached. Mr. Walter stated this year one streets employee will be dedicated to always
accompanying the contractor during the work to ensure only the cracks that are open are being sealed,
track quantities daily and report to the supervisor.
Chad Kinate, 13081 Kingwood Drive, stated with the contractor should be responsible party for
meeting the not to exceed amount. Mr. Walter stated the city needs to verify that the contractor does
not stop in the middle of the road.
Council Liaison Cross stated that not to exceed means not to exceed and the Contractor should be
responsible for the project so as not to require staff to follow them to verify quantities. Mr. Walter
stated that staff will verify quantities at the end of the day and verify that the contractor is only filling
the open cracks and not sealing all the cracks as the contractor did last year. Mr. Walter stated the not
to exceed is for staff to track.
Council Liaison Cross inquired what causes the cracks to open. Mr. Walter stated that moisture can
cause the pavement to break down immediately after seeping into the pavement. Exposure to
moisture washes away the gravel and sand base of pavements making them brittle and developing
cracks in the asphalt. Heavy snow and rainfall lead to the penetration of water into existing cracks
resulting in their expansion. Rainwater that seeps into cracks freezes at the onset of winter and causes
the cracks to grow bigger.
Mr. Walter stated the City is now buying the product to ensure that it is the quality the City of Baxter
wants used on the roadways.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to approve the Astech
Corporation Street Crack Sealing Contract in the not-to-exceed amount of $177,422.28. Motion carried
unanimously.
7. Cypress Drive Connection to Woida Road Improvements Feasibility Report Monthly Update
There was no new information or questions from the commission or the public.
8. Accept Amended Feasibility Report for Cypress Drive Connection to Woida Road Improvements &
Cypress Drive and Clearwater Road Full Depth Reclamation and Trail Improvements, City Project
Number 4128
SEH Consulting Engineer Heinonen reviewed the amended Feasibility Report for the Cypress Drive
Connection to Woida Road Improvements & Cypress Drive and Clearwater Road Full Depth
Reclamation and Trail Improvements. This project includes road improvements, bike and pedestrian
trail improvements, storm sewer improvements, stormwater pond improvements, sanitary sewer
improvements, watermain improvements, and street lighting improvements. In addition to the new
segment of roadway connecting Cypress Drive to Woida Road, the project includes rehabilitation (Full
Depth Reclamation) on Cypress Drive and Clearwater Road, and trail improvements along both Cypress
Drive and Clearwater Road.
4/3/2024 Utilities Commission Minutes Page 5
Public Works Director/City Engineer Walter requested the proposed trails be reduced to 10-feet to
match today’s standard. He also noted the bituminous thickness should be 3 inches not 2.5 and the
aggregate base is 5 inches instead of 6 inches.
Council Liaison Cross inquired if MnDOT will provide any financial assistance for the project. Mr. Walter
explained the report will be presented to MnDOT District 3 Staff for review; however, any contribution
is unknown at this time.
Council Liaison Cross inquired if the project would have commercial street lighting. Mr. Kinate stated
lighting should be dark sky compliant light. Mr. Walter stated the lighting would meet dark sky
requirements.
Mr. Heinonen informed the commission this project has right of way acquisition and full title
acquisition. Mr. Walter stated the project will not be constructed until 2026 or later and requested the
“will likely be” removed from the presentation.
Mr. Walter stated the City Council is aware of the property acquisition so the earliest timeframe for
the project would be 2026; however, property acquisition should be considered for 2025. Mr.
Heinonen stated he would make the changes to 2026 construction with preliminary design and
acquisition shown for 2025.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to accept the amended
Feasibility Report for Cypress Drive Connection to Woida Road Improvements & Cypress Drive and
Clearwater Road Full Depth Reclamation and Trail Improvements, City Project Number 4128 with
changes as noted. Motion carried unanimously.
9. Approve Fee Amendment Request in the Not To Exceed Amount of $6,000.00 for Cypress Drive
Connection to Woida Road Feasibility Report Update, City Project Number 4128
Public Works Director/City Engineer Walter stated the fee amendment is for updating the report and
preparing cost breakdowns for MnDOT. Mr. Walter had no concerns with fee amendment and
recommended approval.
MOTION by Council Liaison Cross, seconded by Commissioner Stenberg to approve the Fee
Amendment Request in the Not To Exceed Amount of $6,000.00 for the Cypress Drive Connection to
Woida Road Feasibility Report Update, City Project Number 4128. Motion carried unanimously.
10. 2024 South Forestview Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
11. Approve Assessment Waiver Agreement with Property Owner of PID 40240611 to allow for a water
assessment related to 2024 South Forestview Area Improvements Project, Municipal Project No.
4138
SEH Consulting Engineer Heinonen informed the commission of a property owner on Paris Road has
requested a water service to a vacant parcel for a future home. This agreement will allow the
assessment to be levied against this property and includes provisions that do not allow the property
owner to appeal the assessment. The agreement is necessary for this parcel, as it was not included in
the Feasibility Report, nor was it included in the assessments that were adopted by Council in March.
4/3/2024 Utilities Commission Minutes Page 6
MOTION by Council Liaison Cross, seconded by Commissioner Stenberg to approve Assessment Waiver
Agreement with Property Owner of PID 40240611 to allow for a water assessment related to 2024
South Forestview Area Improvements Project, Municipal Project No. 4138. Motion carried
unanimously.
12. Accept the Novotny Road Traffic Impact Study Report
Traffic Engineer Anabis explained the traffic study was conducted for a proposed development. The
study analyzed the impacts of the development on Novotny Road, Pine Beach Road, and Woida Road
at the intersections with Edgewood Drive and TH 371.
Mr. Anabis stated the proposed development is estimated to generate 3,460 daily trips to the site
location. No roadway or intersection improvements were recommended as Novotny Road was
extended in 2023 and no additional extension is needed for the proposed development.
Public Works Director/City Engineer Walter stated the developer had reviewed the report and had no
comments or concerns.
MOTION by Council Liaison Cross, seconded by Commissioner Stenberg to accept the Novotny Road
Traffic Impact Study. Motion carried unanimously.
13. 2024 CSAH 77 Utility Improvements Project, Municipal Project No. 4118 Project Monthly Update
There was no new information or questions from the commission or the public.
14. Adopt Resolution No. 2024-XXX Receiving Revised Feasibility Report and Calling the Improvement
Hearing for the 2024 CSAH 77 Utility Improvements Project, Municipal Project No. 4118
WiDSETH Consulting Engineer Bitter informed the commission that minor updates were made to the
exhibits and cost estimated to extend water and sanitary sewer to the west side of CSAH 77.
MOTION by Council Liaison Cross, seconded by Commissioner Stenberg to adopt Resolution No.
2024-XXX Receiving Revised Feasibility Report and Calling the Improvement Hearing for the 2024
CSAH 77 Utility Improvements Project, Municipal Project No. 4118. Motion carried unanimously.
15. Approve the Widseth Proposal for Professional Survey, Preliminary Assessment, Design and Bidding
Services in the Not to Exceed Amount of $56,100.00 for the 2024 CSAH 77 Utility Improvements
Project, Municipal Project No. 4118
WiDSETH Consulting Engineer Bitter explained the proposal is for preliminary survey, preliminary
assessment, design, and bidding services for the 2024 CSAH 77 Utility Improvements Project.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to approve the Widseth
Proposal for Professional Survey, Preliminary Assessment, Design and Bidding Services in the Not to
Exceed Amount of $56,100.00 for the 2024 CSAH 77 Utility Improvements Project, Municipal Project
No. 4118. Motion carried unanimously.
16. 2024 Mill & Over and Full Depth Reclamation Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
4/3/2024 Utilities Commission Minutes Page 7
17. Adopt Resolution 2024-XXX for Accepting the Bid from Knife River Corporation – North Central in
the amount of $3,843,672.50 for the 2024 Mill & Overlay and Full Depth Reclamation Improvements
Project Municipal Project No. 4424
WiDSETH Consulting Engineer Bitter informed the commission that pursuant to authority of the City
Council and after proper legal advertisement, bids were obtained at 10:00 A.M., in the Baxter City
Hall on Tuesday, March 19, 2024.
The following two bids were received:
Knife River Corporation – North Central $3,843,672.50
Anderson Brothers Construction Company $3,953,304.86
Engineer’s Estimate $4,556,799.50
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to adopt Resolution 2024-XXX
for accepting the bid from Knife River Corporation – North Central in the amount of $3,843.672.50 for
the 2024 Mill & Overlay and Full Depth Reclamation Improvements Project, Municipal Project No.
4424. Motion carried unanimously.
18. 2025 Mill & Overlay, Full Depth Reclamation and Reconstruction Improvements, Project Monthly
Update
There was no new information or questions from the commission or the public.
19. Adopt Resolution No. 2024-XXX Ordering Preparation of Report for the 2025 Mill & Overlay and Full
Depth Reclamation Improvements Project, Municipal Project No. 4425
WiDSETH Consulting Engineer Bitter informed the commission this is the first step in the Chapter 429
process.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to adopt Resolution No. 2024-
XXX Ordering Preparation of Report for the 2025 Mill & Overlay and Full Depth Reclamation
Improvements Project, Municipal Project No. 4425.Motion carried unanimously.
20. Adopt Ordinance 2024-xxx Amending the Text of Title 8, Chapter 5, “Stormwater Control and
Regulations” of the Baxter City Code
Assistant City Engineer Thompson informed the commission that Title 8, Chapter 5, “Stormwater
Control and Regulations” of the Baxter City Code was repealed and replaced at the April 18, 2023, City
Council Meeting.
The stormwater management plan was intended more for commercial sites of less than one acre, a
couple exceptions were left out in the original code approval that are proposed with this code
amendment. The exceptions proposed are as follows:
Construction of single-family home or duplex.
Site improvements involving the enlargement of a building less than five thousand (5,000)
square feet.
Land disturbance activities conducted by the City affecting less than one (1) acre.
4/3/2024 Utilities Commission Minutes Page 8
The ordinance amendment also addressed additional requirements for when a Stormwater Facilities
Maintenance Agreement is required. The following stormwater changes address when an agreement
is required which is consistent with how the City has treated the agreements in the past:
At time of zoning approval from the City of Baxter.
When improving existing stormwater management facilities.
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to adopt Ordinance No. 2024-
XXX Ordering Preparation of Report for the 2025 Mill & Overlay and Full Depth Reclamation
Improvements Project, Municipal Project No. 4425. Motion carried unanimously.
21. Water Treatment Plant Filter Annual Evaluation Completed by Orthos
Public Works Director/City Engineer Walter stated the sample from Filter No. 3 was not within the
limits of degradation. SEH resampled on April 3 resent the sample for testing.
INFORMATIONAL ITEMS
22. 2022 Full Depth Reclamation and Reconstruction Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
23. 2022 Trunk Highway 210 & Inglewood Drive Railway Crossing Improvements Project Update,
Municipal Project No. 4121
There was no new information or questions from the commission or the public.
24. 2023 Commercial and Residential Full Depth Reclamation and Quiet Zone Improvements Project
Monthly Update
There was no new information or questions from the commission or the public.
25. 2023 Cypress Drive and Douglas Fir Drive Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
26. 2023 Knollwood Drive Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
27. 2023 Novotny Road Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
28. HR Green 2023 Stormwater Program
There was no new information or questions from the commission or the public.
29. 2024 Evergreen Drive Improvements and Southeast Baxter Stormwater Overflow Improvements
Project Monthly Update
There was no new information or questions from the commission or the public.
4/3/2024 Utilities Commission Minutes Page 9
30. 2024 Micro Surfacing Project Update
There was no new information or questions from the commission or the public.
31. 2025 Design Road & TH 371 Stormwater Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
32. 2026 Mill & Overlay, Full Depth Reclamation and Reconstruction Improvements Project Monthly
Update
There was no new information or questions from the commission or the public.
33. 2026 North Lynndale and West Clearwater Area Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
34. Baxter 20-Year Public Works Facility Assessment Project Monthly Update
There was no new information or questions from the commission or the public.
35. Eagle Drive Area Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
36. EPA Lead & Copper Service Line Inventory Monthly Update
There was no new information or questions from the commission or the public.
37. Evergreen Drive/Douglas Fir Drive Traffic Impact Study Monthly Update
There was no new information or questions from the commission or the public.
38. Fairview Road Extension Feasibility Report Project Monthly Update
There was no new information or questions from the commission or the public.
39. Holiday Station Store Contamination Project Monthly Update
There was no new information or questions from the commission or the public.
40. Inglewood Drive to Garrett Lane Stormwater Outlet Study Project Monthly Update
There was no new information or questions from the commission or the public.
41. Lift Station 13 Reconstruction Project Monthly Update
There was no new information or questions from the commission or the public.
42. Lift Station No. 15 Reconstruction Project Monthly Update
There was no new information or questions from the commission or the public.
4/3/2024 Utilities Commission Minutes Page 10
43. Oakwood Drive Improvements Project Feasibility Report Project Monthly Update
There was no new information or questions from the commission or the public.
44. Timberwood Drive Traffic Impact Study Monthly Update
There was no new information or questions from the commission or the public.
45. Wastewater Treatment Plant Charges for February 2024
There was no new information or questions from the commission or the public.
46. Wellhead Protection Plan Part II Project Monthly Update
There was no new information or questions from the commission or the public.
47. Whiskey Creek Pedestrian Bridge Inspection Project Monthly Update
There was no new information or questions from the commission or the public.
48. Whiskey Creek Stormwater Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
49. Whiskey Creek Planting Plans Project Monthly Update
There was no new information or questions from the commission or the public.
ADJOURN
MOTION by Commissioner Stenberg, seconded by Council Liaison Cross to adjourn at 8:00 p.m. Motion carried
unanimously.
Approved by: Respectfully Submitted,
_____________________________ _____________________________
Jack Christofferson Mary Haugen
Vice Chairman Administrative Assistant
Agenda
UTILITIES COMMISSION AGENDA
Wednesday, April 03, 2024 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
ROLL CALL
CONSENT AGENDA
1. Approve the Special Utilities Commission Minutes from March 20, 2024
BUSINESS ITEMS
2. Recommend Planning and Zoning Approve the Ordinance Amendment Addressing Retaining Walls
and for Parking Reduction
3. Recommend Planning & Zoning Approve the Preliminary and Final Plat for Haverkamp Addition to
Baxter and Rezoning Application
4. Recommend Planning and Zoning Approve the Fiberhood Preliminary and Final Plat and Vacation of
Drainage and Utility Easements
5. Accept the Zip’s Car Wash Municipal Improvements as Outlined in the Development Agreement
6. Approve Astech Corporation Street Crack Sealing Contract in the Not-to-Exceed Amount of $177,422
7. Cypress Drive Connection to Woida Road Improvements Feasibility Report Monthly Update
8. Accept Amended Feasibility Report for Cypress Drive Connection to Woida Road Improvements &
Cypress Drive and Clearwater Road Full Depth Reclamation and Trail Improvements, City Project
Number 4128
9. Approve Fee Amendment Request in the Not To Exceed Amount of $6,000.00 for Cypress Drive
Connection to Woida Road Feasibility Report Update, City Project Number 4128
10. 2024 South Forestview Improvements Project Monthly Update
11. Approve Assessment Waiver Agreement with Property Owner of PID 40240611 to allow for a water
assessment related to 2024 South Forestview Area Improvements Project, Municipal Project No.
4138
12. Accept the Novotny Road Traffic Impact Study Report
13. 2024 CSAH 77 Utility Improvements Project, Municipal Project No. 4118 Project Monthly Update
14. Adopt Resolution No. 2024-XXX Receiving Revised Feasibility Report and Calling the Improvement
Hearing for the 2024 CSAH 77 Utility Improvements Project, Municipal Project No. 4118.
4/3/2024 Utilities Commission Agenda Page 2
15. Approve the Widseth Proposal for Professional Survey, Preliminary Assessment, Design and Bidding
Services in the Not to Exceed Amount of $56,100.00 for the 2024 CSAH 77 Utility Improvements
Project, Municipal Project No. 4118
16. 2024 Mill & Over and Full Depth Reclamation Improvements Project Monthly Update
17. Adopt Resolution 2024-XXX for Accepting the Bid from Knife River Corporation – North Central in the
amount of $3,843.672.50 for the 2024 Mill & Overlay and Full Depth Reclamation Improvements
Project Municipal Project No. 4424
18. 2025 Mill & Overlay, Full Depth Reclamation and Reconstruction Improvements, Project Monthly
Update
19. Adopt Resolution No. 2024-XXX Ordering Preparation of Report for the 2025 Mill & Overlay and Full
Depth Reclamation Improvements Project, Municipal Project No. 4425
20. Adopt Ordinance 2024-xxx Amending the Text of Title 8, Chapter 5, “Stormwater Control and
Regulations” of the Baxter City Code
21. Water Treatment Plant Filter Annual Evaluation Completed by Orthos
INFORMATIONAL ITEMS
22. 2022 Full Depth Reclamation and Reconstruction Improvements Project Monthly Update
23. 2022 Trunk Highway 210 & Inglewood Drive Railway Crossing Improvements Project Update - City of
Baxter - Municipal Project No. 4121
24. 2023 Commercial and Residential Full Depth Reclamation and Quiet Zone Improvements Project
Monthly Update
25. 2023 Cypress Drive and Douglas Fir Drive Improvements project – Monthly Update
26. 2023 Knollwood Drive Improvements Project Monthly Update
27. 2023 Novotny Road Improvements Project Monthly Update
28. HR Green 2023 Stormwater Program
29. 2024 Evergreen Drive Improvements and Southeast Baxter Stormwater Overflow Improvements
Project Monthly Update
30. 2024 Micro Surfacing Project Update
31. 2025 Design Road & TH 371 Stormwater Improvements Project Monthly Update
32. 2026 Mill & Overlay, Full Depth Reclamation and Reconstruction Improvements Project Monthly
Update
33. 2026 North Lynndale and West Clearwater Area Improvements Project Monthly Update
34. Baxter 20-Year Public Works Facility Assessment Project Monthly Update
4/3/2024 Utilities Commission Agenda Page 3
35. Eagle Drive Area Improvements Project Monthly Update
36. Evergreen Drive/Douglas Fir Drive Traffic Impact Study Monthly Update
37. Fairview Road Extension Feasibility Report Project Monthly Update
38. Holiday Station Store Contamination Project Monthly Update
39. Inglewood Drive to Garrett Lane Stormwater Outlet Study Project Monthly Update
40. Lift Station 13 Reconstruction Project Monthly Update
41. Lift Station No. 15 Reconstruction Project Monthly Update
42. Oakwood Drive Improvements Project Feasibility Report Project Monthly Update
43. Timberwood Drive Traffic Impact Study Monthly Update
44. Wastewater Treatment Plant Charges for February 2024
45. Wellhead Protection Plan Part II Project Monthly Update
46. Whiskey Creek Pedestrian Bridge Inspection Project Monthly Update
47. Whiskey Creek Stormwater Improvements Project Monthly Update
48. Whiskey Creek Planting Plans Project Monthly Update
49. EPA Lead & Copper Service Line Inventory – Monthly Update
ADJOURN