CALL TO ORDER
The regular meeting of the Baxter Utilities Commission was called to order at 5:30 p.m. by Chairman Rock Yliniemi.
ROLL CALL
Members Present: Commissioner Douglas Stenberg, Jack Christofferson, Chairman Rock Yliniemi and Council
Liaison Mark Cross.
Members Absent: Commissioner John Brenny.
Staff Present: Public Works Director/City Engineer Trevor Walter and Assistant City Engineer Trevor Thompson.
Other Present: Bolton & Menk Consulting Engineer Bryan Drown, SEH Consulting Engineer Neil Heinonen and
WiDSETH Consulting Engineer Aric Welch.
CONSENT AGENDA
1. Approve the Utilities Commission Minutes from March 5, 2025
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to approve the
Utilities Commission minutes from March 5, 2025. Motion carried unanimously.
BUSINESS ITEMS
2. Cypress Drive and Greenwood Road Bus Stop Compliance Concerns
SEH Consulting Engineer Heinonen gave an update on the bus stop compliance issues that Reichert
Reichert Bus Service has noticed stop compliance concerns for northbound Cypress Drive traffic when
southbound school buses are stopped at Greenwood Road, despite the school buses having red
flashing lights and bus stop signs extended during the stop. As a result, Reichert Bus Service has
requested signage to warn drivers of the upcoming bus stop and warn drivers that they are required
to stop for buses with flashing red lights.
Currently, school buses stop at the intersection of Cypress Drive and Greenwood Road along
southbound Cypress Drive to pick-up and drop-off children living in the multi-family residential units
on Greenwood Road, west of Cypress Drive. No children cross Cypress Drive from the east side to get
to the bus stop on the west side of the roadway. The bus stop cannot be relocated onto Greenwood
Road, west of Cypress Drive, because the existing cul-de-sac on Greenwood Road is not large enough
for buses to turn around. Northbound traffic on Cypress Drive is not always stopping.
With no children currently crossing Cypress Drive, the compliance issues with northbound vehicles not
stopping for the bus stop at the intersection of Cypress Drive and Greenwood Road does not present
an immediate safety issue for children trying to get on or off the bus. However, it is still illegal for
4/2/2025 Utilities Commission Meeting Minutes Page 2
drivers to not stop for a bus with flashing red lights and stop sign extended and compliance issues at
this location could lead to compliance issues elsewhere where it may present significant safety issues.
Mr. Heinonen reviewed the two types of signs that can be used for bus stops:
Black & White Signage that reads – “State Law Stop for School Bus When Red Lights Flashing”
Graphic yellow & black sign
Council Liaison Cross stated he thought the graphic yellow & black sign be placed on the top with the
black & white signage under it. People see graphics better than reading signs. Mr. Heinonen will review
with the traffic engineer. Public Works Director/City Engineer Walter stated that costs are estimated
between $500.00 - $600.00.
Council Liaison Cross stated there are five (5) lanes of traffic and it is very hard to see or maybe with
people not having to stop on divided highways they don’t think they need to stop. Mr. Cross inquired
about the cul-de-sac radius not being large enough for the buses to turn around. Mr. Walter stated
that is correct.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to install both bus
stop style signs in both directions. Motion carried unanimously.
3. 2025 Thein Well Inspection Report Update
SEH Consulting Engineer Heinonen informed the commission that SEH had reviewed the information
from the Thein Well Annual Inspections of the City’s wells.
Thein noted in their inspection documents that the flow rate for each well increased relative to the
prior year as well with the variable frequency drives (VFDs) set to a similar speed. Well No. 2 had the
greatest increase at 9% and Well No. 4 had the lowest increase at 1%.
Mr. Heinonen stated that as a final recommendation, Thein stated that additional water supply sources
should be sought in a different vicinity, in concurrence with ongoing water supply improvements
projects completed or in progress. The 2025 inspection well inspection results suggest the wellfield
operation recommendations made by SEH in 2024 have prevented the well capacity from declining
further.
Public Works Director/City Engineer Walter mentioned that a couple of the well capacities have seen
a slight increase since the rehabilitation was completed.
4. Approve the KLM Engineering Proposal in the Amount of $4,000.00 to Perform a Cleanout and
Disinfection of the 400,000 Gallon South Water Tower
SEH Consulting Engineer Heinonen informed the commission with construction of Wells 5 & 6 this
summer, the South Water Tower will be needed for water storage while this work is being completed.
The South Water Tower needs to be cleaned out and disinfected before it can be used for water
storage.
Council Liaison Cross inquired about leaving the South Water Tower in service all year instead of
draining it every year, so the City does not need to reinstall it every year. Public Works Director/City
Engineer Walter stated that the City does not need that much water in the winter, and it is better to
turn the water over in the tanks for water quality purposes.
4/2/2025 Utilities Commission Meeting Minutes Page 3
Mr. Walter stated the it was included in the Water Enterprise Fund budget submittal. Mr. Walter had
no concerns with the proposal and recommended approval.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to approve the KLM
Engineering Proposal in the Amount of $4,000.00 to Perform a Cleanout and Disinfection of the
400,000 Gallon South Water Tower. Motion carried unanimously.
5. 2025 Water Supply Improvements - Wells 5 & 6 Monthly Update
SEH Consulting Engineer Heinonen informed the commission that bids were opened at City Hall at 2:00
p.m. on March 18, 2025. A total of three (3) bids were received ranging between $1,124,854.10 and
$1,356,577.55. The low grand total bid was submitted by Pratt’s Affordable Excavating, Inc. of
Merrifield, Minnesota in the amount of $1,124,854.10.
Mr. Heinonen stated the contract award was taken directly to the City Council on April 1, 2025 in order
to expedite the project schedule and allow Pratt’s Affordable Excavating to begin working on
submittals and ordering materials.
6. Water Enterprise Fund 20-year CIP and 2025 CAMP Update Monthly Update
There was no new information or questions from the commission or the public.
7. Accept Memo and Water CIP Summary for the Water Enterprise Fund 20-year CIP
SEH Consulting Engineer Heinonen reviewed the CIP which is intended to assist staff with reviewing
future water project needs to assist with long term financial planning and establishing water rates for
users.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to accept the Memo
and Water CIP Summary for the Water Enterprise Fund 20-year CIP. Motion carried unanimously.
8. Approve the SEH Contract in the Not to Exceed Amount of $29,418.00 for the Fats, Oils, and Grease
(FOG) Control Program
SEH Consulting Engineer Heinonen informed the commission that with the revisions to the Sewer Use
and Service Code. The Fats, Oils, and Grease (FOG) provisions and City’s FOG program materials need
to be updated.
Public Works Director/City Engineer Walter stated that several applications have been submitted that
do not fit in with the ordinance with terminology and it needs to be updated to today’s standards and
terminology.
Mr. Walter explained the documents have not had a comprehensive review or been updated since
2008- 2010. Mr. Walter feels it would be beneficial to update the ordinance and guidance materials
now in time for distribution to businesses at the front end of the 2025 busy summer season when FOG
generation is at its peak. It would enable the Ordinance/Code to be brought up to date with current
building code and industry language and definitions.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to approve the SEH
Contract in the Not to Exceed Amount of $29,418.00 for the Fats, Oils, and Grease (FOG) Control
Program. Motion carried unanimously.
4/2/2025 Utilities Commission Meeting Minutes Page 4
9. Approve the SEH Contract for Development Review Engineering Services in the Not to Exceed
Amount of $8,850.00 for the Southdale Acres Development
Chairman Yliniemi stated the contract appears to be a pass-through cost and inquired if any of the
commissioners had any concerns. The commissions had no concerns with the no concerns with the
contract.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to approve the SEH
Contract for Development Review Engineering Services in the Not to Exceed Amount of $8,850.00 for
the Southdale Acres Development. Motion carried unanimously.
10. 2026 Clearwater Road, North Lynndale Area, and Brentwood Circle Street & Utility Improvements
Project Monthly Update
There was no new information or questions from the commission or the public.
11. Adopt Resolution 2025-0xx Ordering Preparation of Report on the 2026 Clearwater Road, North
Lynndale Area, & Brentwood Circle Street & Utility Improvements Project, Municipal Project No.
4068
SEH Consulting Engineer Heinonen gave a brief update on the proposed project which has
approximately 72 parcels (and 97 equivalent residential units) adjacent to the following road
segments: Clearwater Road between Whipple Beach and Memorywood Drive, Lynndale Drive,
Lynndale Lane, Lynndale Court, and Brentwood Circle.
Public Works Director/City Engineer Walter stated that council Member Tabatt would like to have a
discussion on narrowing the right-of-way on a residential city street from 26-feet – 24-feet/22-feet and
reducing the right-of-way on a cul-de-sac radius and bituminous on the radius. Chairman Yliniemi
inquired on the ability of buses being able to turn around if the cul-de-sacs are reduced.
MOTION by Commissioner Christofferson, seconded by Commissioner Stenberg to adopt Resolution
2025-0xx Ordering Preparation of Report on the 2026 Clearwater Road, North Lynndale Area, &
Brentwood Circle Street & Utility Improvements Project, Municipal Project No. 4068. Motion carried
unanimously.
12. 2024 CSAH 77 Utility Improvements Project Monthly Update, Municipal Project No. 4118
Public Works Director/City Engineer Walter informed the commission the date has been set for the
condemnation and the City should title by the third week of June.
13. Approve the Pratt’s Affordable Excavating, Inc. Partial Pay Estimate No. 3 in the amount of
$17,484.69 for the 2024 CSAH 77 Utility Improvements Project
WiDSETH Consulting Engineer Welch reviewed the Pratt’s Affordable Excavating Partial Pay Estimate
No. 3 in the amount of $17,484.69 for the 2024 CSAH 77 Utility Improvements Project.
The payment is for materials on hand stored by the Contractor for installation later this year. The
Contractor is requesting payment for these stored materials because of the time extension requested
by the City in Change Order No. 2. The Contract documents allow for payment of materials on hand
with the submission of supplier invoice pricing information. Public Works Director/City Engineer
Walter questioned if the materials were on hand and Mr. Welch stated they are not on-site but are in
4/2/2025 Utilities Commission Meeting Minutes Page 5
the contractor’s yard, which is safer than the construction site. Council Liaison Cross requested that all
materials are documented and insured.
Mr. Welch had no concerns with Partial Pay Estimate No. 3 and recommends approval.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to approve the Pratt’s
Affordable Excavating, Inc. Partial Pay Estimate No. 3 in the amount of $17,484.69 for the 2024 CSAH
77 Utility Improvements Project. Motion carried unanimously.
14. Lift Station No. 17 Reconstruction Project Monthly Update
There was no new information or questions from the commission or the public.
15. Award the Lift Station No. 17 Reconstruction Project to Tom's Backhoe Service, LLC in the Lump Sum
Bid Amount of $135,000.00 and Update the Equipment and Construction Costs in the 20-Year Lift
Station Maintenance Plan to Reflect Current Pricing
WiDSETH Consulting Engineer Welch informed the commission that pursuant to authority of the City
Council and after proper legal advertisement, bids for the reconstruction of Lift Station No. 17 were
obtained on Thursday, March 20, 2025, at 10:30 A.M., at the Baxter City Hall.
The City received the following bids:
Tom’s Backhoe Service, Inc. $135,000.00
CCS Contracting, Inc. $148,000.00
Engineer’s Estimate $170,140.00
The apparent low bidder is Tom’s Backhoe Service, Inc. with a lump sum bid of $135,000.00. This bid
includes all work for the reconstruction of Lift Station No. 17, located at the intersection of Grand Oaks
Drive and Clearwater Road.
Public Works Director/City Engineer Walter recommends awarding the Lift Station No. 17
Reconstruction Project to Tom’s Backhoe Service, Inc.’s in the lump sum bid amount of $135,000.00
and update the equipment and construction costs in the 20-Year Lift Station Maintenance Plan to
reflect current pricing.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to award the Lift
Station No. 17 Reconstruction Project to Tom's Backhoe Service, LLC in the Lump Sum Bid Amount of
$135,000.00 and Update the Equipment and Construction Costs in the 20-Year Lift Station
Maintenance Plan to Reflect Current Pricing. Motion carried unanimously.
16. Accept the Widseth Memo dated March 6, 2025 Outlining Utility, Roadway and Trail Improvements
along Oakwood Drive from Cedar Scenic Road to Welton Road and Update the Capital Improvements
Plan
WSN Consulting Engineer Welch reviewed the draft concept plan and cost estimate for improvements
to Oakwood Drive from Cedar Scenic Road to Welton Road. The project consists of water, sanitary
sewer, roadway and trail improvements.
MOTION by Commissioner Christofferson, seconded by Commissioner Stenberg to accept the Widseth
Memo dated March 6, 2025 Outlining Utility, Roadway and Trail Improvements along Oakwood Drive
from Cedar Scenic Road to Welton Road and Update the Capital Improvements Plan
4/2/2025 Utilities Commission Meeting Minutes Page 6
17. Baxter 20-Year Public Works Facility Assessment Project Monthly Update
WiDSETH Consulting Engineer Bitter stated the draft Assessment is ready to be reviewed and Mr. Bitter
is requesting a special meeting to walk through the facility.
18. Set the Special Utilities Commission Meeting for the 20-Year Public Works Facility Assessment
Project on April 9th at 5:30 p.m. at the Public Works Facility
Public Works Director/City Engineer Walter requested the commission set a Special Utilities
Commission Meeting for Wednesday, April 9th at 5:30 p.m. to discuss and walk through the facility.
Council Liaison Cross requested the special meeting be held on April 23rd.
Mr. Walter informed the commission that City Council will be issued an invitation to attend the
meeting and walkthrough also.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to set the Special
Utilities Commission Meeting for the 20-Year Public Works Facility Assessment Project on April 23rd at
5:30 p.m. at the Public Works Facility. Motion carried unanimously.
INFORMATIONAL ITEMS
19. 2022 Full Depth Reclamation and Reconstruction Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
20. 2022 Trunk Highway 210 & Inglewood Drive Railway Crossing Improvements Project Update - City of
Baxter - Municipal Project No.: 4121
There was no new information or questions from the commission or the public.
21. 2023 Commercial and Residential Full Depth Reclamation and Quiet Zone Improvements Project
Monthly Update
There was no new information or questions from the commission or the public.
22. 2023 Knollwood Drive Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
23. 2024 Mill & Overlay and Full Depth Reclamation Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
24. 2024 South Forestview Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
25. 2025 Micro Surfacing Project Update
There was no new information or questions from the commission or the public.
4/2/2025 Utilities Commission Meeting Minutes Page 7
26. 2025 Commercial Full Depth Reclamation Improvements Project, Municipal Project 4425, Project
Monthly Update
There was no new information or questions from the commission or the public.
27. 2025 Well 1 and Well 4 Pump and Motor Replacement Monthly Update
There was no new information or questions from the commission or the public.
28. Eagle Drive Area Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
29. Evergreen Drive Improvements and Southeast Baxter Stormwater Overflow Improvements Project
Monthly Update
There was no new information or questions from the commission or the public.
30. Hach Service Report and Instrument Certification
There was no new information or questions from the commission or the public.
31. Holiday Station Store Contamination Project Monthly Update
There was no new information or questions from the commission or the public.
32. Inglewood Drive to Garrett Lane Flood Overflow Control Monthly Update
There was no new information or questions from the commission or the public.
33. Lift Station 13 Reconstruction Project Monthly Update
There was no new information or questions from the commission or the public.
34. Lift Station No. 15 Reconstruction Project Monthly Update
There was no new information or questions from the commission or the public.
35. Project Timber Wolf Project Monthly Update
There was no new information or questions from the commission or the public.
36. Wastewater Treatment Plant Charges for February 2025
There was no new information or questions from the commission or the public.
37. Whiskey Creek Planting Plans Project Monthly Update
There was no new information or questions from the commission or the public.
38. 2023 Whiskey Creek Pedestrian Bridge Inspection Project Monthly Update
There was no new information or questions from the commission or the public.
4/2/2025 Utilities Commission Meeting Minutes Page 8
OTHER BUSINESS
Public Works Director/City Engineer Walter informed the commission that crack sealing quotes were sent out this
week and staff would like to get the contract on the council agenda for the first meeting in May. Chairman Yliniemi
asked if this item could be placed on the Special Meeting Agenda on April 23rd. Mr. Walter stated this item could be
the first item on the agenda.
ADJOURN
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to adjourn the meeting at 6:45 p.m.
Motion unanimously approved.
Approved by: Respectfully submitted:
_______________________ ___________________________
Rock Yliniemi Mary Haugen
Chair Administrative Assistant
Agenda
UTILITIES COMMISSION MEETING AGENDA
Wednesday, April 02, 2025 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
ROLL CALL
CONSENT AGENDA
1. Approve the Utilities Commission Minutes from March 5, 2025
BUSINESS ITEMS
2. Cypress Drive and Greenwood Road Bus Stop Compliance Concerns
3. 2025 Thein Well Inspection Report Update
4. Approve the KLM Engineering Proposal in the Amount of $4,000.00 to Perform a Cleanout and
Disinfection of the 400,000 Gallon South Water Tower
5. 2025 Water Supply Improvements - Wells 5 & 6 Monthly Update
6. Water Enterprise Fund 20-year CIP and 2025 CAMP Update Monthly Update
7. Accept Memo and Water CIP Summary for the Water Enterprise Fund 20-year CIP
8. Approve the SEH Contract in the Not to Exceed Amount of $29,418.00 for the Fats, Oils, and Grease
(FOG) Control Program
9. Approve the SEH Contract for Development Review Engineering Services in the Not to Exceed
Amount of $8,850.00 for the Southdale Acres Development
10. 2026 Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements
Monthly Update
11. Adopt Resolution 2025-0xx Ordering Preparation of Report on the 2026 Clearwater Road, North
Lynndale Area, & Brentwood Circle Street & Utility Improvements Project, Municipal Project No.
4068
12. 2024 CSAH 77 Utility Improvements Project Monthly Update, Municipal Project No. 4118
13. Approve the Pratt’s Affordable Excavating, Inc. Partial Pay Estimate No. 3 in the amount of
$17,484.69 for the 2024 CSAH 77 Utility Improvements Project
14. Lift Station No. 17 Reconstruction Project Monthly Update
15. Award the Lift Station No. 17 Reconstruction Project to Tom's Backhoe Service, LLC in the Lump Sum
Bid Amount of $135,000.00 and Update the Equipment and Construction Costs in the 20-Year Lift
Station Maintenance Plan to Reflect Current Pricing
4/2/2025 Utilities Commission Meeting Agenda Page 2
16. Accept the Widseth Memo dated March 6, 2025 Outlining Utility, Roadway and Trail Improvements
along Oakwood Drive from Cedar Scenic Road to Welton Road and Update the Capital Improvements
Plan
17. Baxter 20-Year Public Works Facility Assessment Project Monthly Update
18. Set the Special Utilities Commission Meeting for the 20-Year Public Works Facility Assessment Project
on April 9th at 5:30 p.m. at the Public Works Facility
INFORMATIONAL ITEMS
19. 2022 Full Depth Reclamation and Reconstruction Improvements Project Monthly Update
20. 2022 Trunk Highway 210 & Inglewood Drive Railway Crossing Improvements Project Update - City of
Baxter - Municipal Project No.: 4121
21. 2023 Commercial and Residential Full Depth Reclamation and Quiet Zone Improvements Project
Monthly Update
22. 2023 Knollwood Drive Improvements Project Monthly Update
23. 2024 Mill & Overlay and Full Depth Reclamation Improvements Project Monthly Update
24. 2024 South Forestview Improvements Project Monthly Update
25. 2025 Micro Surfacing Project Update
26. 2025 Commercial Full Depth Reclamation Improvements Project, Municipal Project 4425, Project
Monthly Update
27. 2025 Well 1 and Well 4 Pump and Motor Replacement Monthly Update
28. Eagle Drive Area Improvements Project Monthly Update
29. Evergreen Drive Improvements and Southeast Baxter Stormwater Overflow Improvements Project
Monthly Update
30. Hach Service Report and Instrument Certification
31. Holiday Station Store Contamination Project Monthly Update
32. Inglewood Drive to Garrett Lane Flood Overflow Control Monthly Update
33. Lift Station 13 Reconstruction Project Monthly Update
34. Lift Station No. 15 Reconstruction Project Monthly Update
35. Project Timber Wolf Project Monthly Update
36. Wastewater Treatment Plant Charges for February 2025
37. Whiskey Creek Planting Plans Project Monthly Update
4/2/2025 Utilities Commission Meeting Agenda Page 3
38. 2023 Whiskey Creek Pedestrian Bridge Inspection Project Monthly Update
ADJOURN