Utilities Commission Meeting
Regular MeetingBaxter, MN · March 4, 2026
Minutes
UTILITIES COMMISSION MEETING
MINUTES
Wednesday, March 04, 2026 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
The regular meeting of the Baxter Utilities Commission was called to order at 5:30 p.m. by Chairman Rock Yliniemi.
ROLL CALL
Members Present: Commissioner Douglas Stenberg, Jack Christofferson, Douglas Wolf, Council Liaison Mark Cross
and Chairman Rock Yliniemi.
Members Absent: Commissioner John Brenny.
Staff Present: Public Works Director/City Engineer Trevor Walter, Assistant City Engineer Trevor Thompson and
Administrative Assistant Mary Haugen.
Other Present: SEH Consulting Engineer Neil Heinonen, WiDSETH Consulting Engineers Aric Welch, Alex Bitter and
Civil Engineer in Training Avery Mulholland.
CONSENT AGENDA
1. Approve the Utilities Commission Minutes from February 5, 2026
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to approve the
Utilities Commission minutes from February 5, 2026. Motion carried unanimously.
BUSINESS ITEMS
2. Approve the Essentia Health Construction Repair and Maintenance Agreement for Sanitary Sewer
and Water Main
Assistant City Engineer Thompson reviewed the Essentia Health Construction Repair and Maintenance
Agreement for Sanitary Sewer and Water Main with the commission.
Essentia Health is proposing to use approximately 60 percent of the building with 40 percent remaining
vacant. The project team has reached out to the city and would like to install a sewer service to the
vacant part of the building to allow for the ability to add another tenant if they would like in the future.
Mr. Thompson stated the sanitary sewer installed in 2025 by Essentia Health is an 8-inch pipe that has
enough capacity to support the additional sewer service. A sanitary sewer manhole will need to be
installed where the new sewer service will connect in with the existing 8-inch sewer pipe. Essentia
Health is dedicating an easement connecting the new manhole to the existing easement downstream.
The easement will allow city maintenance staff to clean the sewer line with the rest of the City’s system
on a four-year rotation; however, it still requires the property owner to be responsible for all repair
and replacement costs.
3/4/2026 Utilities Commission Meeting Minutes Page 2
Mr. Thompson had no concerns with the agreement and recommended approval.
MOTION by Commissioner Wolf, seconded by Commissioner Christofferson to recommend City
Council approve the Essentia Health Construction Repair and Maintenance Agreement for Sanitary
Sewer and Water Main. Motion carried unanimously.
3. Recommend Planning & Zoning Commission Approve the Five Below Conditional Use Permit
Amendment and setback Variances with the Condition Outlined in the Staff Recommendations
Assistant City Engineer Thompson reviewed the Conditional Use Permit to amend joint-access and for
front yard setback variances. The building is proposed to be constructed on the south side of the Hobby
Lobby building and will be connected to the existing building.
Mr. Thompson explained the variances are to allow for a building and trash enclosure to be
constructed within the 35-foot setback. The building is proposed to be constructed 25 feet from the
property line (10’ within the setback requirement) and the trash enclosure is approximately 15 feet
from the property line.
With the reduced building setback, it creates a shorter distance from the store front to the city street
providing concern with vehicles backing up into the city street. The developer has addressed this
concern by diverting the pedestrian traffic coming into the store to the north, allowing more stacking
in front of the store. Additionally, there is a dedicated turn lane on Glory Road for this property, so if
the traffic backs up, it will back up in the turn lane and will not impact the flow of the city street.
There is an existing sidewalk on the south side of the building that will be removed with the
construction of this building. The sidewalk provides connectivity of pedestrian traffic from the Glory
Road/Elder Drive signal to the existing sidewalk in front of the building which connects the business
store fronts east of Elder Drive. The developer is proposing a new sidewalk on the south side of their
building to provide the same trail connectivity as what is currently in place.
The project improvements remove 44 parking stalls that are not being accounted for anywhere else
on site. The Community Development Department has completed a parking stall count, with the cross-
access parking, and the development still meets the parking requirements.
The application included a full set of Civil Plans showing the sewer and water services along with
stormwater improvements required with the construction of the new building. These improvements
will require inspection services.
The proposed site design decreases the impervious surface by 5,377 square feet therefore there are
no additional stormwater treatment improvements required with this development and no
stormwater agreement. The existing stormwater facilities maintenance agreement is sufficient.
Commissioner Christofferson inquired on the purpose of the second island. Public Works Director/City
Engineer Walter stated the island is to direct the flow of pedestrian traffic.
Council Liaison Cross inquired if there is any future need for additional right-of-way for the dual left
turn lanes as outlined with the overpass project. Mr. Thompson stated future right-of-way had been
acquired with the development of Zips Car Wash on Glory Road. Mr. Walter stated that in 2034 the
3/4/2026 Utilities Commission Meeting Minutes Page 3
signal light at that intersection will be at the end of its useful life and construction of a roundabout is
being considered.
Mr. Cross stated this development seemed like a real push for him and inquired if there were any other
open lots in the area rather than adding onto an existing building. Mr. Walter stated lots in this area
are already taken and have shared parking, access, sanitary sewer and water. Mr. Thompson stated
that Public Works staff have thoroughly reviewed and the developer has addressed all the concerns of
the Public Works Department regarding this development.
Council Liaison Cross stated that by the time he is able to review and comment the development has
been through all commissions/departments. Mr. Thompson noted his concern and stated he would
pass the information on.
Mr. Thompson stated that he had no concerns with the development and recommended approving
the Conditional Use Permit and Variances with the following conditions:
1. Enter into an Escrow Agreement prior to issuance of a building permit.
MOTION by Commissioner Stenberg, seconded by Commissioner Wolf to recommend Planning and
Commission approve the Five Below Conditional Use Permit and setback Variances with the condition
outlined in the Staff Recommendations. Motion carried unanimously.
4. Approve Five Below Escrow Agreement for Inspection Services and Asbuilts
Assistant City Engineer Thompson reviewed the Civil Drawings for the site improvements which consist
of storm sewer, water service, and sanitary sewer. The Escrow Agreement will include inspection
services and asbuilts. The asbuilts are required to show storm sewer improvements, impervious
surface calculations, and sanitary sewer & water service improvements.
Mr. Thompson had no concerns with the agreement and recommended approval.
MOTION by Commissioner Wolf, seconded by Commissioner Christofferson to recommend City
Council approve the Five Below Escrow Agreement for inspection services and asbuilts. Motion carried
unanimously.
5. 2026 Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements
Monthly Update
SEH Consulting Engineer Heinonen informed the commission that the bid opening is scheduled for
March 10th in the council chambers.
6. Accept the True North Controls Quote in the amount of $30,479.00 for Radio Telemetry Equipment
at the East Tower and associated radios and equipment related to the 2026 Clearwater Road, North
Lynndale Area, & Brentwood Circle Street & Utility Improvements Project, Municipal Project No.
4068
SEH Consulting Engineer Heinonen reviewed True North Controls Quote in the amount of $30,479.00
for Radio Telemetry Equipment at the East Tower and associated radios and equipment related to the
2026 Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements
Project.
3/4/2026 Utilities Commission Meeting Minutes Page 4
Mr. Heinonen stated the City has experienced several radio issues due to outdated equipment
throughout the past year. During 2025,True North Controls completed a study to identify the cause of
numerous communication issues related to several lift station sites. This evaluation led to maintenance
upgrades at select locations that have provided temporary improvements. The work included field
investigation and troubleshooting and led to the understanding that the City’s equipment is outdated
and needs to be updated. The City’s current system has radios that are no longer available for purchase
as of December of 2025, and finding equipment on the secondary market has become increasingly
difficult.
The quote provided quote for a new Migration Master Station (MMS) device at the East Water Tower,
and for 3 each 4RF Aprisa Licensed Radios. The installation of the MMS unit allows the City to complete
one-by-one site upgrades, thus does not require replacement of all radios at the same time. Secondly,
the upgrade will require the City to get a NEW FCC license with a 12.5Khz channel width (faster
throughput), as the current license is limited to 6.25Khz and will not work with the newer radios. True
North Controls will apply for the new license as part of the quote.
Mr. Heinonen noted that a separate line in the quote is for the purchase of new radio antennas. The
elements of the existing radio antennas were cut to length to tune them to the City’s current radio
frequency of 173.39625Mhz. It is likely a new FCC frequency in the 173Mhz range cannot be obtained,
so new radio antennas will need to be purchased and tuned to match the new frequency.
This is a project cost that was not included in the previously approved feasibility report. The intention
is to include this work with the 2026 Clearwater Road, North Lynndale Area, & Brentwood Circle Street
& Utility Improvements Project.
The commission held an extensive discussion on radio frequency, obsolete equipment and antennas.
Assistant City Engineer Thompson stated the new radios and network monitoring means that faulty or
failed RTUs can be easily identified which strengthens reliability in the SCADA system.
MOTION by Commissioner Christofferson, seconded by Commissioner Stenberg to recommend City
Council accept the True North Controls Quote in the amount of $30,479.00 for Radio Telemetry
Equipment at the East Tower and associated radios and equipment related to the 2026 Clearwater
Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements Project, Municipal
Project No. 4068. Motion carried unanimously.
7. Approve AE2S Contract in the Not To Exceed Amount of $34,429 for SCADA Integration for Lift
Station 27 and for Radio Telemetry upgrades at the East Water Tower site related to the 2026
Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements Project,
Municipal Project No. 4068
SEH Consulting Engineer Heinonen reviewed the AE2S Contract for SCADA Integration for Lift Station
27 and for Radio Telemetry upgrades at the East Water Tower site related to the 2026 Clearwater
Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements Project.
In collaboration with work proposed to be completed by True North Controls, this contract includes
work items for SCADA and Controls Integration needed for SCADA related work at the East Water
Tower site. This work at the East Water Tower site is being completed to provide various equipment
and professional services to integrate Radio Telemetry Equipment at the location of the Lift Stations
Master Telemetry Control Panel. These telemetry upgrades will allow for one-by-one upgrades of
radios for the City’s lift station sites as the existing radios have been discontinued.
3/4/2026 Utilities Commission Meeting Minutes Page 5
This is a project cost that was not included in the previously approved feasibility report. The intention
is to include this work with the 2026 Clearwater Road, North Lynndale Area, & Brentwood Circle Street
& Utility Improvements Project.
MOTION by Commissioner Stenberg, seconded by Commissioner Wolf to recommend City Council
approve the AE2S Contract in the Not To Exceed Amount of $34,429 for SCADA Integration for Lift
Station 27 and for Radio Telemetry upgrades at the East Water Tower site related to the 2026
Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements Project,
Municipal Project No. 4068. Motion carried unanimously.
8. Accept Holden Electric Quote in the amount of $10,440.00 for labor and equipment for installation
of antennas for radio upgrades related to the 2026 Clearwater Road, North Lynndale Area, &
Brentwood Circle Street & Utility Improvements Project, Municipal Project No. 4068
SEH Consulting Engineer Heinonen reviewed the Holden Electric Quote for labor & equipment for the
installation of antennas for radio upgrades related to the 2026 Clearwater Road, North Lynndale Area,
& Brentwood Circle Street & Utility Improvements Project.
Mr. Heinonen stated the quote is for labor and equipment for installation of the new antennas at each
site. This is a project cost that was not included in the previously approved feasibility report. The
intention is to include this work with the 2026 Clearwater Road, North Lynndale Area, & Brentwood
Circle Street & Utility Improvements Project.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to recommend City
Council accept the Holden Electric Quote in the amount of $10,440.00 for labor and equipment for
installation of antennas for radio upgrades related to the 2026 Clearwater Road, North Lynndale Area,
& Brentwood Circle Street & Utility Improvements Project, Municipal Project No. 4068. Motion carried
unanimously.
9. Approve the SEH Topographic Survey Services Contract in the Not to Exceed Amount of $14,900.00
for the Elder Drive and Foley Road Intersection Improvements Project
SEH Consulting Engineer Heinonen reviewed the SEH Contract in the Not to Exceed amount of
$14,900.00 to perform topographic survey services for the Elder Drive and Foley Road Intersection
Improvements Project. This contract is a direct result of MnDOT’s proposed conversion of the Trunk
Highway 210 and Highway 371 intersection into a grade-separated overpass to be constructed in 2028
and 2029.
Mr. Heinonen stated it is anticipated the need to close the Elder Drive at-grade railroad crossing in
conjunction with the overpass project. It is anticipated that these roadway and utility improvements
would be bid and constructed with MnDOT’s project, with this phase of the overall project starting
immediately after the permanent closure of the Elder Drive railroad crossing. Preparation of a project
information and survey work notification letter to adjacent property owners and facilitation of an early
private utility coordination meeting are included in the scope.
Public Works Director/City Engineer Walter stated the Elder Drive and Foley Road Intersection
Improvements would be eligible for State Aid Funding; however, he is not sure if the project will be bid
separately or with MnDOT. Plans must be at 90% completion in order to bid with MnDOT and they
would need to be ready by September.
Mr. Heinonen noted that the Design Phase Contract will be at the April meeting for approval.
3/4/2026 Utilities Commission Meeting Minutes Page 6
MOTION by Commissioner Stenberg, seconded by Commissioner Wolf to recommend City Council
approve the SEH Topographic Survey Services Contract in the Not to Exceed Amount of $14,900.00 for
the Elder Drive and Foley Road Intersection Improvements Project. Motion carried unanimously.
10. Approve the SEH Topographic Survey Services Contract in the Not to Exceed Amount of $14,200.00
for the Foley Road and Forthun Road/Isle Drive Intersection Improvements Project
SEH Consulting Engineer Heinonen reviewed the SEH Contract in the Not to Exceed amount of
$14,200.00 to perform topographic survey services for the Foley Road and Forthun Road/Isle Drive
Intersection Improvements Project. This contract is a direct result of MnDOT’s proposed conversion of
the Trunk Highway 210 and Highway 371 intersection into a grade-separated overpass to be
constructed in 2028 and 2029.
The project will consist of improvements to the Foley Road and Forthun Road/Isle Drive intersection
consisting of the construction of turn lanes on Foley Road and a median on Forthun Road/Isle Drive as
a result of the overpass project relocating the at-grade railroad crossing from Elder Drive to Forthun
Road/Isle Drive. Mr. Heinonen noted there is a 900 feet of Forthun Road/Isle Drive pavement between
Foley Road and the Forthun Road/ Isle Drive mini roundabout that needs resurfacing. Combining these
areas into one project would be cost effective and lessen future inconveniences.
Public Works Director/City Engineer Walter stated that doing the topographic survey now is necessary
to keep the project on schedule for construction in 2027. The survey work would also be utilized to
enhance the future feasibility study required if special assessments are to be levied for resurfacing
work.
Commission Christofferson inquired why a roundabout was not considered in this area. Mr. Heinonen
noted that roundabouts are generally not constructed directly on top of or immediately adjacent to
railway crossings primarily because of severe safety risks, traffic flow issues, and logistical
constraints. Public Works Director/City Engineer Walter stated that MnDOT has already modeled this
as a three-way stop. Mr. Walter noted that an Intersection Control Evaluation (ICE) Report will need
to be completed for this area.
Mr. Heinonen noted that the Design Phase Contract will be at the April meeting for approval.
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to recommend City
Council approve the SEH Topographic Survey Services Contract in the Not to Exceed Amount of
$14,200.00 for the Foley Road and Forthun Road/Isle Drive Intersection Improvements Project. Motion
carried unanimously.
11. Lift Station No. 18 Reconstruction Project Monthly Update
There was no new information or questions from the commission or the public.
12. Approve the Quality Flow Systems, Inc. Equipment Proposal in the amount of $58,650.00 for the Lift
Station 18 Control Panel, Pumps, Accessories and Hatches
WiDSETH Consulting Engineer Welch reviewed the Quality Flow quote in the amount of $58,650.00 for
two pumps, control panel, two aluminum access hatches, pump base elbows, submersible pressure
transducer, two backup floats and accessories for the reconstruction of Lift Station No. 18.
3/4/2026 Utilities Commission Meeting Minutes Page 7
Mr. Welch stated this is a proprietary system that is on all lift stations, which is why there is only one
quote being submitted to the commission.
MOTION by Commissioner Christofferson, seconded by Commissioner Stenberg to recommend City
Council approve the Quality Flow Systems, Inc. Equipment Proposal in the amount of $58,650.00 for
Lift Station 18 Control Panel, Pumps, Accessories and Hatches. Motion carried unanimously.
13. Approve the Widseth Proposal for Professional Design and Bidding Related Engineering Services in
the Not to Exceed Amount of $62,340.00 for the TH 371 and TH 210 Interchange Project
WiDSETH Consulting Engineer Welch reviewed the WiDSETH Proposal for Design and Bidding in the
Not to Exceed amount of $62,340.00 related to services for utility modifications related to the TH 371
and TH 210 Interchange Project. Mr. Welch stated the interchange project planned for 2028 and 2029
will require removal, relocation and modifications to the existing municipal sanitary sewer and water
distribution system located along TH 371.
The project will consist of the following project areas and improvements:
Watermain removal at the TH 371 and TH 210 Intersection.
Industrial Park Road watermain improvements.
Forcemain Improvements.
Sanitary Sewer removal on Fairview Road.
Split casing installation at Excelsior Road.
The watermain removal and casing pipe extension work will be completed in 2027 with the remaining
work completed in conjunction with the MnDOT interchange project in 2028 and 2029.
The proposed Scope of Services includes the following:
Preliminary Engineering and Survey Services
Pipe Cleaning and Televising
Design Services
Advertising/Bidding/Award Services
Public Works Director/City Engineer Walter explained that funding for the project will likely come from
the City’s Municipal State Aid Construction account as these improvements are associated with the TH
371 and TH 210 improvements. The exact funding has not been determined at this time but there may
be costs that will need to be paid from the Water Enterprise or Sanitary Sewer Enterprise Fund.
MOTION by Commissioner Christofferson, seconded by Commissioner Wolf to recommend City
Council approve the WiDSETH Proposal for Professional Design and Bidding Related Engineering
Services in the Not to Exceed Amount of $62,340.00 for the TH 371 and TH 210 Interchange Project.
Motion carried unanimously.
14. Approve the WiDSETH Proposal for Professional Engineering Services in the Not to Exceed Amount
of $1,750.00 for Bridge Safety Inspection Services for 2026-2027
WiDSETH Consulting Engineer Bitter reviewed the Proposal for Professional Engineering Services in the
amount of $1,750.00 for Bridge Safety Inspection for 2026-2027. Widseth will perform routine bridge
safety inspection and prepare electronic inspection report for the Excelsior Road Pedestrian Bridge.
Inspection and Report will be consistent with NBIS and MnDOT standards and recorded using SIMS.
3/4/2026 Utilities Commission Meeting Minutes Page 8
The inspection report will be submitted to the Program Administrator for review after the inspection
is completed.
Mr. Bitter stated the Bridge Inspection will be completed no later than November 31, 2026 and submit
the inspection report no later than January 15, 2027. This timeline falls in line with the required
inspection every 2 years.
MOTION by Commissioner Wolf, seconded by Commissioner Stenberg to recommend City Council
approve the WiDSETH Proposal for Professional Engineering Services in the Not to Exceed Amount of
$1,750.00 for Bridge Safety Inspection Services for 2026-2027. Motion carried unanimously.
15. Approve the Widseth Proposal for Professional Design and Bidding Related Engineering Services in
the Not to Exceed Amount of $42,500 for the Industrial Park Road Full Depth Reclamation and Storm
Sewer Improvements
WiDSETH Consulting Engineer Welch reviewed the Proposal for Professional Design and Bidding
Related Engineering Services for the Industrial Park Road Full Depth Reclamation and Storm Sewer
Improvements.
The project was originally scheduled for 2027 as part of the Pavement Management Plan; however, it
is being separated from the 2027 street project for the following reasons:
Storm sewer modifications are necessary to accommodate stormwater overflow from the
TH 371 and TH 210 interchange project. A series of infiltration basins are proposed along
the east side of TH 371 north of Industrial Park Road. WSB is designing the basins with an
overflow to the south into the storm sewer system on Industrial Park Road which will require
storm sewer and pipe sizing modifications. Stormwater overflows are planned to be routed
into the MnDOT stormwater basin located at the south end of their parking lot and then
into the College Road stormwater basin.
The City submitted a PROTECT grant application for Phase 2 of the stormwater outlet project
that will ultimately route stormwater overflows from the College Road basin to the
Mississippi River. The City was the only grant applicant in the latest round of funding
applications. The City is currently working with MnDOT staff to either modify the current
grant application or submit a second application to securing funding for the remaining
phases of the project. It is very likely the City will be successful in this effort.
MnDOT may be able to utilize LRIP funding by completing a cooperative roadway and storm
sewer project with the City vs. paying an assessment on a City lead project. Utilizing the LRIP
funding source is a benefit to MnDOT as they have limited funding sources to pay for local
assessments.
It may be possible to accelerate the project with construction in 2026.
The project limits will be modified and include only roadway that abuts the College Road stormwater
basin to the Widseth entrance as this corresponds with the area needed for the storm sewer
modifications. The remaining southern portion of the roadway would be reconstructed with the
proposed roundabout at the College Road and Douglas Fir Drive intersection scheduled for
construction in 2027.
3/4/2026 Utilities Commission Meeting Minutes Page 9
The proposed Scope of Services includes the following:
Preliminary Engineering and Survey Services
Design Services
Advertising/Bidding/Award Services
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to recommend City
Council approve the Widseth Proposal for Professional Design and Bidding Related Engineering
Services for the Industrial Park Road Full Depth Reclamation and Storm Sewer Improvements in the
Not to Exceed Amount of $42,500.00. Motion carried unanimously.
16. Approve the Widseth Proposal for Professional Design and Bidding Related Engineering Services in
the Not to Exceed Amount of $130,500.00 for the 2027 Fairview Road Extension to Excelsior Road
Improvements Project
WiDSETH Consulting Engineer Welch reviewed the WiDSETH Proposal for Design and Bidding related
services for the 2027 Fairview Road Extension to Excelsior Road. Widseth is familiar with this project
and has assisted the City with the following tasks to date:
Preparation of the 2017 Excelsior Road and Edgewood Drive Commercial Area Improvements
Project Feasibility Report accepted by the Council on February 21, 2017. The report included
the extension of Fairview Road through the Fruth property to the Excelsior Road.
Updated layouts and cost estimates for the Fairview Road extension to the Excelsior Road
roundabout in 2019 (connection at Edgewood Drive roundabout).
Preparation of the 2027 Fairview Road Utility, Roadway and Trail Extension to Excelsior Road
Feasibility Report accepted by the Council on September 17, 2024 (connection at Edgewood
Drive roundabout).
As part of the preparation for the TH 371 and TH 210 interchange project, the City is pursuing the
alternate alignment of the Fairview Road extension to Excelsior Road with the connection at Forest
Drive. The project includes the construction of a watermain and 32’ wide rural bituminous roadway
and associated stormwater treatment facilities. The project will also require a right-of-way plat,
property acquisition and modifications to existing site private site layouts.
The proposed Scope of Services includes the following:
Preliminary Environmental Services
Geotechnical Evaluation
Pipe Cleaning & Televising
Preliminary Engineering & Survey Services
Preliminary Assessment Services
Design Services
Right-of-Way Plat Services
Property Acquisition Services
Advertising/Bidding/Award Services
Public Works Director/City Engineer Walter stated this project may be eligible for MSAS funding as
MnDOT will need access for the overpass project.
3/4/2026 Utilities Commission Meeting Minutes Page 10
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to recommend City
Council approve the Widseth Proposal for Professional Design and Bidding Related Engineering
Services in the Not to Exceed Amount of $130,500.00 for the 2027 Fairview Road Extension to Excelsior
Road Improvements Project. Motion carried unanimously.
17. Evergreen Drive Improvements and Southeast Baxter Stormwater Overflow Improvements Project
Monthly Update
WiDSETH Consulting Engineer Welch informed the commission the City had submitted a Promoting
Resilient Operations for Transformative, Efficient and Cost-Saving Transportation (PROTECT) program
fiscal year 2029 application for Phase 2 (CSAH 48 to Hastings Road/Douglas Fir Drive stormwater basin)
to the Central Minnesota Area Transportation Partnership (ATP-3).
18. Approve the Widseth Proposal for Professional Engineering Services in the Not to Exceed Amount of
$7,895.00 for Hydraulic Modeling of the Southeast Baxter Stormwater Overflow System
WiDSETH Consulting Engineer Welch informed the commission that the City was the only applicant for
fiscal year 2029 and 2030.
City staff met with MnDOT representatives on Thursday, February 12, 2026, to discuss funding options
for the remaining phases of the Southeast Baxter Stormwater Overflow project. MnDOT indicated the
ATP-3 may be open to funding Phase 4 of the project. This would be accomplished by modifying the
existing application or submitting a second application. MnDOT said additional funding for the project
would be discussed at the April ATP-3 meeting.
MnDOT indicated they would need assurance the proposed 24” pipe overflow was adequately sized
before they would recommend funding of the project through the PROTECT program which will require
hydraulic modeling of the system.
Public Works Director/City Engineer Walter stated that completing the hydraulic modeling for an
additional $7,895.00 in engineering could give the City access to the entire funds available in fiscal
year’s 2029 and 2030.
MOTION by Commissioner Christofferson, seconded by Commissioner Stenberg to recommend City
Council approve the Widseth Professional Engineering Services in the Not to Exceed Amount of
$7,895.00 for Hydraulic Modeling of the Southeast Baxter Stormwater Overflow System. Motion
carried unanimously.
19. 2026 Mill & Overlay Improvements Project Monthly Update
WiDSETH Consulting Engineer Bitter informed the commission that the Improvement Hearing is
scheduled for Thursday, March 5th at 6:00 pm.
20. Adopt Resolution No. 2026-XXX Ordering Improvement and Preparation of Plans for the 2026 Mill &
Overlay Improvements Project Municipal Project No. 4426
WiDSETH Consulting Engineer Bitter gave a brief review of the 2026 Mill & Overlay Improvements
Project Plans. Mr. Bitter reminded the commission that all full-depth reclamation streets were
removed, and the mill & overlay streets include the following:
Joneswood Circle
3/4/2026 Utilities Commission Meeting Minutes Page 11
Joneswood Drive
Joshua Tree Circle
Joshua Tree Drive
Knotty Pine Drive
Marble Road (West of Jasperwood Drive)
Cherrywood Drive
Timberlane Drive
Park Street
Woodland Drive
MOTION by Commissioner Stenberg, seconded by Commissioner Wolf to recommend City Council
adopt Resolution No. 2026-XXX Ordering Improvement and Preparation of Plans for the 2026 Mill &
Overlay Improvements Project Municipal Project No. 4426. Motion carried unanimously.
21. Adopt Resolution 2026-XXX Approving Plans and Specifications and Authorize Advertisement for
Bids for the 2026 Mill & Overlay Improvements Project, Municipal Project No. 4446
Mr. Bitter stated that to avoid the crown issues that occurred with the 2024 Mill & Overlay Project
slopes were added to the plan.
Mr. Bitter inquired on a possible lighting adjustment at the intersection of Cherrywood Drive &
Inglewood Drive. Mr. Thompson requested the light be moved to the west side of the trail, so it will
light the existing stop sign and trail.
Mr. Bitter questioned how to address the home located on the corner of Woodland Road, which has
two dirt path access points. Public Works Director/City Engineer Walter stated to bid the driveway in
the plans in order to clean up the right-of-way.
The section of Cherrywood Drive that occasionally experiences flooding will have 12-inch stormwater
piping installed to direct stormwater to Stormwater Water Inlet No. 2286 located by Christ Evangelical
Lutheran Church within the City of Baxter’s Winkler Park. Mr. Bitter noted that both permanent and
temporary easements will be required with the project.
MOTION by Commissioner Christofferson, seconded by Commissioner Stenberg to recommend City
Council adopt Resolution 2026-XXX Approving Plans and Specifications and Authorize Advertisement
for Bids for the 2026 Mill & Overlay Improvements Project, Municipal Project No. 4446. Motion carried
unanimously.
22. Accept the Inglewood Drive to Garrett Lane Flood Overflow Control Study
WiDSETH Consulting Engineer Welch gave a brief update on the approximately 204 acres of property
located east of Inglewood Drive and north of Woida Road. The area naturally drains to the south and
west based on the surrounding topography.
Mr. Welch stated the report has received several modifications which are summarized as follows:
Easement and appraisal process has been modified to match the City’s current practices.
Cost Estimates have been updated.
Added reference to Minnesota Statute 103E.411 which governs how a municipality can legally
use an existing county ditch as an outlet for stormwater or other municipal drainage.
3/4/2026 Utilities Commission Meeting Minutes Page 12
The City Attorney is in the process of drafting a letter to the County as a precursor to the formal petition
that is required by Statute. The letter along with the report will be forwarded to the County after the
Council accepts the report at the March 17, 2026 council meeting.
Mr. Welch stated if the City decides to proceed with the proposed drainage improvements, several
tasks will need to be completed prior to design and construction in order to ensure adequate system
design capacity and adherence to regulatory standards for wetland impacts and discharging into a
public waterway.
Public Works Director/City Engineer Walter stated that all this will do is fix the flood control system in
the along the corridor from the existing culvert under Inglewood Drive to County Ditch 10 that passes
under Garrett Lane and into Red Sand Lake.
MOTION by Commissioner Christofferson, seconded by Commissioner Wolf to recommend City
Council accept the Inglewood Drive to Garrett Lane Flood Overflow Control Study. Motion carried
unanimously.
INFORMATIONAL ITEMS
23. 2022 Trunk Highway 210 & Inglewood Drive Railway Crossing Improvements Project Update
There was no new information or questions from the commission or the public.
24. 2023 Knollwood Drive Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
25. 2024 Mill & Overlay and Full Depth Reclamation Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
26. 2024 South Forestview Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
27. 2025 Commercial Full Depth Reclamation Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
28. 2025 Design Road & TH 371 Stormwater Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
29. 2025 Water Supply Improvements - Wells 5 & 6 Monthly Update
There was no new information or questions from the commission or the public.
30. 2026 Lift Station 11 Service Area Smoke Testing
There was no new information or questions from the commission or the public.
3/4/2026 Utilities Commission Meeting Minutes Page 13
31. 2026 Large System Dave Neiman Source Water Protection Award
Commissioner Christofferson inquired on the Source Water Protection Award. Public Works
Director/City Engineer Walter stated the award is presented every year by the Minnesota Department
of Health (MDH) and Minnesota Rural Water Association (MRWA) jointly recognize public water
systems who demonstrate outstanding commitment to protecting their drinking water source.
The award was being presented at the Minnesota Rural Water Conference and Streets & Utilities
Supervisor James Lueck was in attendance to accept the award.
32. 2026 Micro Surfacing Project Update
There was no new information or questions from the commission or the public.
33. 2026 Thein Well Inspection Report Update
There was no new information or questions from the commission or the public.
34. 2027 CSAH 48 Trail (Highland Scenic Road) Trail Connection Project Monthly Update
There was no new information or questions from the commission or the public.
35. 2027 Mill & Overlay, Full Depth Reclamation and Reconstruction Improvements, Project Monthly
Update
There was no new information or questions from the commission or the public.
36. BPU Customer Class/Rate Change
There was no new information or questions from the commission or the public.
37. Eagle Drive Area Improvements Project Monthly Update
There was no new information or questions from the commission or the public.
38. Holiday Station Store Contamination Monthly Update
There was no new information or questions from the commission or the public.
39. Inglewood Drive to Garrett Lane Flood Overflow Control Monthly Update
There was no new information or questions from the commission or the public.
40. Wastewater Treatment Plant Charges for January 2026
There was no new information or questions from the commission or the public.
41. Water Service Saddle Review
There was no new information or questions from the commission or the public.
42. Water Treatment Plant HVAC Improvements Project Monthly Update
3/4/2026 Utilities Commission Meeting Minutes Page 14
There was no new information or questions from the commission or the public.
43. Whiskey Creek Pedestrian Bridge Inspection Project Monthly Update
There was no new information or questions from the commission or the public.
44. Whiskey Creek Planting Plans Project Monthly Update
There was no new information or questions from the commission or the public.
ADJOURN
MOTION by Commissioner Stenberg, seconded by Commissioner Christofferson to adjourn the meeting at 7:15
p.m. Motion unanimously approved.
Approved by: Respectfully submitted:
_______________________ ___________________________
Rock Yliniemi Mary Haugen
Chair Administrative Assistant
Agenda
UTILITIES COMMISSION MEETING AGENDA
Wednesday, March 04, 2026 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
ROLL CALL
CONSENT AGENDA
1. Approve the Utilities Commission Minutes from February 5, 2026
BUSINESS ITEMS
2. Approve the Essentia Health Construction Repair and Maintenance Agreement for Sanitary Sewer
and Water Main
3. Recommend Planning & Zoning Commission Approve the Five Below Conditional Use Permit
Amendment and setback Variances with the Condition Outlined in the Staff Recommendations
4. Approve Five Below Escrow Agreement for Inspection Services and Asbuilts
5. 2026 Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements
Monthly Update
6. Accept the True North Controls Quote in the amount of $30,479.00 for Radio Telemetry Equipment
at the East Tower and associated radios and equipment related to the 2026 Clearwater Road, North
Lynndale Area, & Brentwood Circle Street & Utility Improvements Project, Municipal Project No.
4068
7. Approve AE2S Contract in the Not To Exceed Amount of $34,429 for SCADA Integration for Lift
Station 27 and for Radio Telemetry upgrades at the East Water Tower site related to the 2026
Clearwater Road, North Lynndale Area, & Brentwood Circle Street & Utility Improvements Project,
Municipal Project No. 4068
8. Accept Holden Electric Quote in the amount of $10,440.00 for labor and equipment for installation of
antennas for radio upgrades related to the 2026 Clearwater Road, North Lynndale Area, &
Brentwood Circle Street & Utility Improvements Project, Municipal Project No. 4068
9. Approve the SEH Topographic Survey Services Contract in the Not to Exceed Amount of $14,900.00
for the Elder Drive and Foley Road Intersection Improvements Project
10. Approve the SEH Topographic Survey Services Contract in the Not to Exceed Amount of $14,200.00
for the Foley Road and Forthun Road/Isle Drive Intersection Improvements project
11. Lift Station No. 18 Reconstruction Project Monthly Update
12. Approve the Quality Flow Systems, Inc. Equipment Proposal in the amount of $58,650.00 for the Lift
Station 18 Control Panel, Pumps, Accessories and Hatches
3/4/2026 Utilities Commission Meeting Agenda Page 2
13. Approve the Widseth Proposal for Professional Design and Bidding Related Engineering Services in
the Not to Exceed Amount of $62,340.00 for the TH 371 and TH 210 Interchange Project.
14. Approve the Widseth Proposal for Professional Engineering Services for Bridge Safety Inspection
Services for 2026-2027 in the Not to Exceed Amount of $1,750
15. Approve the Widseth Proposal for Professional Design and Bidding Related Engineering Services for
the Industrial Park Road Full Depth Reclamation and Storm Sewer Improvements in the Not to
Exceed Amount of $42,500
16. Approve the Widseth Proposal for Professional Design and Bidding Related Engineering Services for
the 2027 Fairview Road Extension to Excelsior Road in the Not to Exceed Amount of $130,500
17. Evergreen Drive Improvements and Southeast Baxter Stormwater Overflow Improvements Project
Monthly Update
18. Approve the Widseth Proposal for Professional Engineering Services for Hydraulic Modeling of the
Southeast Baxter Stormwater Overflow System in the Not to Exceed Amount of $7,895.00
19. 2026 Mill & Overlay Improvements Project Monthly Update
20. Adopt Resolution No. 2026-XXX Ordering Improvement and Preparation of Plans for the 2026 Mill &
Overlay Improvements Project Municipal Project No. 4426
21. Adopt Resolution 2026-XXX Approving Plans and Specifications and Authorize Advertisement for Bids
for the 2026 Mill & Overlay Improvements Project, Municipal Project No. 4446
22. Accept the Inglewood Drive to Garrett Lane Flood Overflow Control Study
INFORMATIONAL ITEMS
23. 2022 Trunk Highway 210 & Inglewood Drive Railway Crossing Improvements Project Update
24. 2023 Knollwood Drive Improvements Project Monthly Update
25. 2024 Mill & Overlay and Full Depth Reclamation Improvements Project Monthly Update
26. 2024 South Forestview Improvements Project Monthly Update
27. 2025 Commercial Full Depth Reclamation Improvements Project Monthly Update, Municipal Project
4425
28. 2025 Design Road & TH 371 Stormwater Improvements Project Monthly Update
29. 2025 Water Supply Improvements - Wells 5 & 6 Monthly Update
30. 2026 Lift Station 11 Service Area Smoke Testing
31. 2026 Large System Dave Neiman Source Water Protection Award
32. 2026 Micro Surfacing Project Update
3/4/2026 Utilities Commission Meeting Agenda Page 3
33. 2026 Thein Well Inspection Report Update
34. 2027 CSAH 48 Trail (Highland Scenic Road) Trail Connection Project Monthly Update
35. 2027 Mill & Overlay, Full Depth Reclamation and Reconstruction Improvements, Project Monthly
Update
36. BPU Customer Class/Rate Change
37. Eagle Drive Area Improvements Project Monthly Update
38. Holiday Station Store Contamination Monthly Update
39. Inglewood Drive to Garrett Lane Flood Overflow Control Monthly Update
40. Wastewater Treatment Plant Charges for January 2026
41. Water Service Saddle Review
42. Water Treatment Plant HVAC Improvements Project Monthly Update
43. Whiskey Creek Pedestrian Bridge Inspection Project Monthly Update
44. Whiskey Creek Planting Plans Project Monthly Update
ADJOURN