City Council
Regular MeetingBelton, TX · July 11, 2017
Minutes
Belton City Council Meeting
July 11, 2017 - 5:30 P.M.
The Belton City Council met in regular session in the Wright Room at the Harris
Community Center with the following members present: Mayor Marion Grayson, Mayor
Pro Tern Craig Pearson and Councilmembers David K. Leigh, Paul Sanderford, Dan
Kirkley, and John Holmes. Councilmember Guy O'Banion was absent. Staff present
included Sam Listi, John Messer, Gene Ellis, Amy Casey, Brandon Bozon, Bruce
Pritchard, Chris Brown, Bob Van Til, Angellia Points, Judy Garrett, Matt Bates, Paul
Romer, Charlotte Walker, Jen Wesley, Dan Berg, Jeff Booker, Wes Gilbreath, Susan
Allamon, Jeremy Allamon, Kelly Trietsch, Cynthia Hernandez and Kim Kroll.
The Pledge of Allegiance to the U.S. Flag was led City Manager Sam Listi, the Pledge
of Allegiance to the Texas Flag was led by Councilmember Paul Sanderford, and the
Invocation was given by Darren Walker, Pastor of First United Methodist Church.
1. Call to order. Mayor Marion Grayson called the meeting to order at 5:30 p.m.
2. Public Comments. Mayor Grayson thanked City Staff for their hard work in
providing another great 4th of July parade and celebration.
3. Consider the minutes of the June 27, 2017, City Council Meeting.
Upon a motion by Councilmember David K. Leigh and a second by Councilmember
Dan Kirkley, the minutes were unanimously approved upon a vote of 6-0.
Miscellaneous
4. Hold a public hearing and consider a resolution adopting the revised
Strategic Drainage Plan regarding the City's policies, guidelines, and
standards for public and private drainage.
Director of Public Works Angellia Points said that the purpose of the Strategic
Drainage Plan is:
• To protect the welfare and safety of Belton citizen and visitors;
• To provide orderly, acceptable development of existing drainage basins;
• To develop drainage management policies that meet Federal, State and
Local mandates and goals;
• To assist the development community with information and guidance during
property development; and
• To organize drainage project priorities for capital improvement programs
over the long term.
She reviewed the history of the Strategic Drainage Plan, and the work that has
been accomplished to date, to get these revisions approved. She explained that
Belton City Council Meeting
July 11, 2017- Page 2
there have been three Stakeholder meetings and a Council workshop to review the
proposed changes.
Mrs. Points provided an overview of the proposed revisions which include:
1. Describe and acknowledge adherence to Federal, State, and Local Law
regarding stormwater issues
2. Creation of stormwater policies, guidelines, and management tools
0 Design and construction shall contain the element of positive overflow
0 Detention and Retention Ponds
0 Identified strategic locations for placement of ponds to serve
regional drainage systems
0 Outflow sizing for downstream and upstream conditions
0 Pilot channels
0 Safety measures
0 Outfall structures that are less than 36" in diameter shall be
designed using outflow/discharge weirs
° Conditions may require a 6-foot high perimeter fence
0 Design a shelf inside the detention pond for the 25-year storm to be
used as a safety zone
0 Signage
3. Section VI - Identification of appropriate maintenance measures for drainage
basins
4. Section VII - Floodplain management and flood damage prevention
° Flood Plain Cumulative Effects, Executive Order 13690 & Senate Bill 936
Establish goal of preparing streamlined methods for demolition
0
procedures, building permits issuance, and property damage
assessments in case of flood and tornado catastrophic events.
Develop procedures for assessing drainage ways to protect stream beds
0
and stream banks from excessive degradation and aggregation.
Establish a goal to research the Buy-Out Program provided and
0
administered by the Texas Water Development Board .
Implement Assessment Program for existing drainage features in order to
0
project annual budgets required to provide proper maintenance and
needed upgrades to the drainage systems in the City.
Include the design considerations outlined in this Strategic Drainage Plan
0
as part of the Belton Design Manual.
5. Exhibits: Updated the map and included a map of privately owned and
maintained detention ponds
Belton City Council Meeting
July 11, 2017 - Page 3
Mayor Grayson opened the public hearing. Seeing none wishing to speak for or
against the item, she closed the public hearing.
Councilmember Leigh asked if language could be added to the signage which lets
the public know that this is an EPA requirement, and not a City requirement. Mrs.
Points said that can be accomplished.
Councilmember Paul Sanderford asked if the requirements of the policy would apply
retroactively. Mrs. Points explained that the requirements are not retroactive except
for City-owned drainage structures.
Upon a motion by Councilmember John Holmes, Sr. and a second by
Councilmember Leigh, the following captioned resolution was approved upon a vote
of 6-0.
RESOLUTION NO. 2017-22-R
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELTON, TEXAS,
ADOPTING A REVISED STRATEGIC DRAINAGE PLAN.
5. Hold a public hearing and consider an ordinance adopting the 2015
International Fire Code.
Fire Chief Bruce Pritchard explained that the Fire Department is currently seeking
"Best Practices Recognition" through the Texas Fire Chiefs Association, and
adoption of the latest Fire Code is a requirement. He said he supported the code
change that will be presented by Fire Marshal Jeff Booker.
Mr. Booker explained that the International Fire Code (IFC) establishes rules and
regulations for fire prevention and safety. The City of Belton currently operates under
the 2009 International Fire Code, and he added that area cities have adopted the
2015 International Fire Code. He reviewed three noted changes the Fire Department
desires when adopting the 2015 IFC. These include: (1) removal of the requirement
for occupant-use hose lines, as the Fire Department will provide its own hoses; (2)
artwork and educational materials in classrooms may only cover 50% of the walls
unless fire retardant paper is used; and (3) in theaters, auditoriums and similar
assemblies, an audible announcement shall be made not more than 10 minutes prior
to the start of each program to notify the occupants of the location of the exits to be
used in the event of a fire or other emergency. Booker said that the City updates the
Fire Code approximately every six years, and it is time to adopt this update.
Mayor Grayson opened the public hearing. Seeing none wishing to speak for or
against the item, she closed the public hearing.
Upon a motion by Mayor Pro Tern Craig Pearson and a second by Councilmember
Dan Kirkley, the following captioned ordinance was approved upon a vote of 6-0.
Belton City Council Meeting
July 11, 2017 - Page 4
ORDINANCE NO. 2017-17
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BELTON, TEXAS,
AMENDING CHAPTER 6, ARTICLE II OF THE CODE OF ORDINANCES OF THE
CITY OF BELTON DEALING WITH THE "FIRE CODE"; PROVIDING A SAVINGS
CLAUSE; PROVIDING AN EFFECTIVE DATE; PROVIDING A SEVERABILITY
CLAUSE; AND PROVIDING AN OPEN MEETINGS CLAUSE.
Planning and Zoning
6. Continue consideration of a replat for Burnet South Addition, Phase II, a 0.759
acre tract of land, located on the west side of South Burnet Street, generally
south of 1st Avenue and north of Avenue B.
Director of Planning Erin Smith said that this 3-lot subdivision is proposed as Burnet
South Addition, Phase II. This property is currently one lot, and the applicant is
proposing to replat this 0.759 acre lot into three separate lots. The property currently
contains a mobile home. The applicant has stated that the mobile home will be
moved to one of the lots, and the other two lots will be for additional development.
Mrs. Smith explained that the applicant has submitted a variance letter requesting to
waive the perimeter street improvement requirements. She reminded the Council
that this item was tabled at their June 27, 2017, meeting, and they requested cost
estimates for including ribbon curbing along this development. Smith provided a
video view of the street along the proposed development. She said that there is no
curb and gutter along the street, and noted that there are portions of the roadway
where the edges are deteriorating.
Mrs. Smith stated that Staff has three alternatives for the Council to consider. They
are:
Alternative No. 1 - a variance for all perimeter street improvements.
Alternative No. 2 - full compliance with the Subdivision Ordinance's perimeter street
improvements which includes 18-inch ribbon curb and mill/overlay on half of the
street to the new curb line at an estimated cost of $20,652.
Alternative No. 3 - a partial perimeter street improvement for both Phase I and 11,
which includes 18-inch ribbon curb with proper base and street edge extension, for a
total for both phases of $17,000 (Phase I= $3,905 and Phase II= $13,095).
Mrs. Smith said that Staff is recommending Alternative No. 3.
The applicant's engineer, Lina Chtay of Belton Engineering, said she would answer
any questions from the Council. Councilmember Leigh asked her what she thought
Belton City Council Meeting
July 11, 2017 - Page 5
of the alternatives. She responded that the applicant would prefer Alternative No.1
because the other alternatives make the project cost prohibitive.
Councilmember Kirkley said that he drove the entire area after the last Council
meeting. He said that he is concerned about the lack of affordable housing in Belton,
and he added that he's afraid that "we are ordinancing ourselves out of housing that
is affordable." He said on his drive in the area, he noticed a very small percentage of
streets with curb and gutter. He thinks Alternative No. 1 is the best alternative in this
situation.
Mayor Pro Tern Craig Pearson agreed with Councilmember Kirkley. He said that
these streets are on a plan for improvement, but that plan is not funded at this time.
He said he understands the concern about "who pays" for the improvement, but he
does not want to miss the opportunity to develop some affordable housing in infill
areas. He added that he thinks it is time to review the City's ordinance to include
some stipulation that allows infill housing with reduced requirements.
Councilmember Leigh asked if the properties will be sold or rented. The applicant,
Larry Guess of the Better Belton Foundation, said that the properties are being
developed to sell. Mr. Leigh said his concern is that the City is adding street
improvement costs that must be funded by the City when developers should be
paying for those improvements at the time development occurs. He said that, at a
minimum, a ribbon curb should be included to protect the edge of the street. Mr.
Guess said that if a curb is installed where the curb will need to be when the street is
widened, then the street will also need to be paved at this time as well because five
feet of roadway will be missing. He said that the Better Belton Foundation will be
glad to connect the driveways and clean up the edge of the pavement.
Councilmember Kirkley said the City's inventory of vacant, unused infill properties
will continue to grow if developers who desire to build affordable housing are unable
to afford to do so.
Mayor Grayson said the ordinance could be changed to say that infill housing that
develops on streets with curb and gutter will require curb and gutter, and infill
housing that develops on streets without curb and gutter will not require curb and
gutter. She said she would be in favor of Alternative No. 1 at this time, and then work
on the ordinance.
Councilmember Leigh said there are two reasons the pavement will fail: (1) people
drive on the edge, and (2) water runs along the edge. He asked if the improvements
can be designed in such a way that this failure is minimized. He added that with the
increased number of houses, it puts an increased load on the street, and that
becomes a cost burden to the entire city instead of the 2-3 homeowners who utilize
the street regularly. Leigh said he struggles with the fairness in that situation, and he
does not want to set a precedent.
Belton City Council Meeting
July 11, 2017- Page 6
City Manager Sam Listi asked Director of Public Works Angellia Points to address
concerns of City Staff regarding construction of the ribbon curb adjacent to the
existing pavement. Mrs. Points said that Staff's general concern is the pavement that
currently exists will be removed because the street will be widened when it is
reconstructed . She said that Mr. Guess has stated that he is willing to clean-up the
edges of the pavement between the driveways, and she felt that would be a good
alternative to help with the pavement deterioration.
Councilmember Kirkley made a motion to approve the replat of Burnet South
Addition, Phase II, with a variance for perimeter street improvements (Alternative
No. 1), but requiring the driveways to be constructed of concrete and for the
driveways to be connected with an 8-inch ribbon curb with reinforced steel, adjacent
to the existing pavement according to the City of Belton standards. The motion was
seconded by Mayor Pro Tern Pearson, and was approved upon a vote of 6-0.
7. Consider an ordinance abandoning a portion of a sanitary sewer easement
located within the Red Rock Hills Subdivision and the Law Addition.
Director of Planning Erin Smith explained that, in 2001, a portion of the Red Rock
Hills sanitary sewer line easement was abandoned when it was determined that a
new alignment was required to prevent conflict with existing trees behind homes in
the Red Rock Hills subdivision. When two of the lots were replatted into the Law
Addition in 2000, the plat showed that the remaining sanitary sewer easement was
"To Be Abandoned ," and would be recorded through a separate instrument. She
said that after researching files at the County Clerk's Office and the Appraisal
District, as well as City files, a recording of such instrument could not be located.
She added that recently, a realtor contacted the Planning Department regarding the
sale of one of the lots in the Law Addition. The potential buyer desires to build a pool
in the backyard, and the realtor noticed that there is still a sanitary sewer easement
across the property reflected on the plat. The Appraisal District could not locate a
recording document for the abandoned easement, so Staff believes it did not occur
as intended. The proposed ordinance is the instrument necessary to abandon the
remaining sanitary sewer easement which is no longer needed by the City since the
sewer line was constructed to the south, along the property line.
Upon a motion by Councilmember Leigh and a second by Mayor Pro Tern Pearson,
the following captioned ordinance was approved upon a vote of 6-0.
ORDINANCE NO. 2017-18
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BELTON, TEXAS,
PROVIDING THAT A PORTION OF A CERTAIN SANITARY SEWER EASEMENT
IN THE RED ROCK HILLS SUBDIVISION, PHASE 1, AND IN THE LAW
ADDITION TO THE CITY OF BELTON, TEXAS, BE CLOSED, ABANDONED AND
VACATED.
Belton City Council Meeting
July 11, 2017 - Page 7
F2018 Budget
8. Receive presentations on the proposed Water and Sewer budget for FY 2018,
including:
A. Financial Summary (see Exhibit "A")
B. Operations (see Exhibit "B")
A. Director of Finance Brandon Bozon presented a financial summary of the Water
and Sewer Fund showing that the beginning fund balance proposed at 10/1/17
is estimated at $6.08M. The proposed FY2018 budget includes a small increase
to the fund balance.
The City's Fiscal Policy requires that the City maintain three months of operating
expenses in addition to the annual debt service. The projected fund balance in
excess of the required minimum is $2,898,396.
Water sales are up, and Mr. Bozon estimates that there will be $4.7M in water
sales this year. Sewer revenues are also up from last year and are projected to
be on budget as well.
Mr. Bozon presented the proposed FY2018 rates that resulted from the 2015
Utility Rate Study.
Mr. Bozon presented a comparison of City of Belton utility rates to other similar
sized entities' rates. Belton's rates are comparable to the rates for cities our size
with both the water and sewer rates being slightly below the average. Rates will
increase $0.50 in the base rates of both water and sewer for a total impact of $6
per year for water only customers or $12 per year for water and sewer
customers.
Councilmember Leigh asked how Belton rates compare with the neighboring
cities. Mr. Bozon said he will research that information and provide it to the
Council soon.
Mr. Bozon gave an overview of the expenditures for FY2017 and the proposed
budget for FY2018. The budget includes replacement of an F-150 and an F-250.
Mr. Bozon said that the Water Meter Replacement Plan is fully funded at
$221,688. He added that the FY2018 contribution covers 2018 and the 2017
under contribution. He said that the plan will cost an estimated $153,00 per year
moving forward.
Bozon also discussed the following capital outlay expenditures ($950,000):
• Small line replacements/upgrades
Belton City Council Meeting
July 11, 2017 - Page 8
• SCADA system upgrade
• "Cushion" for debt funded projects
Debt funded capital projects include:
• Wastewater Treatment Plant- Phase II
• Waco Road Sewer
• Main Lift Main Replacements
• Issuance Cost
The Bell County WCID related debt is nearing retirement, and the FY2018 debt
issuance assumptions include:
• $8.625M twenty-year Certificate of Obligation at 4% interest
• Debt service costs to complement existing schedule; increase in FY2029
Councilmember Leigh asked if the sale of effluent water from the Wastewater
Treatment Plant to Panda Energy affects the Water and Sewer Fund. Mr. Bozon
said that it is considered a sale of City assets, so the revenue from the sale is in
the General Fund .
B. Director of Public Works Angellia Points presented the mission, accomplish-
ments and goals for the Public Works Department which includes Utility
Administration, Water, Sewer, and Lift Stations in the Water and Sewer Fund.
Councilmember Leigh asked why the water sales were up given the wet spring. Mr.
Bozon said that although there have been several rainy days, there have also been
several hot, dry days. Mr. Leigh wondered if it could also be higher due to the
number of new apartment complexes that have opened. Mr. Bozon offered to
research and provide the data.
No action was required by the Council on this item.
9. Receive a presentation on the proposed Drainage budget for FY 2018.
Director of Finance Brandon Bozon presented a financial summary of the Drainage
Fund showing that the beginning fund balance proposed at 10/1 /17 is estimated at
$267,121. The FY2018 budget proposes to spend into the fund balance by $98,838
in order to cover additional costs needed to replace a street sweeper. The City's
Fiscal Policy requires that the City maintain three months of operating expenses in
addition to the annual debt service. The projected fund balance in excess of the
required minimum is $72,585.
Mr. Bozon said that the budget is not balanced at this time. An increase to the
residential drainage fee of $2 is proposed in the FY2018 budget to help fund the
street sweeper estimated to cost $250,000. He added that the fee has not been
Belton City Council Meeting
July 11, 2017 - Page 9
increased since its inception in 2009. Even with the fee increase, Belton's
residential rate is still less than the neighboring cities.
FY2018 goals for Drainage include:
• Reshape the channel and detention pond for Dawson Ranch and Red Rock Hills.
• Adopt a Strategic Drainage Plan.
• Implement the revised Design Manual.
Mayor Grayson clarified that the street sweeper is not to keep Belton beautiful, but
it is used to remove debris before it can enter the City's drainage system.
Mayor Pro Tern Pearson said he continues to see landscaping companies and
residents blowing grass into the street. He asked if it was just a matter of education
that yard clippings do not belong in the street. Mrs. Points said that it is a matter
education and monitoring.
Councilmember Sanderford asked if there is an ordinance that Staff can point to for
regulating yard clippings. Mrs. Points said that enforcement would be mainly
through our permits and the best practices that have been adopted by the
department. Chief Ellis said that there is no recourse for enforcement.
Councilmember Leigh and Manager Listi both said that the subject was something
that has been discussed in the past, but no specific ordinance has been developed.
Councilmember Leigh asked about the personnel portion of the budget. He
wondered if the $400 increase in budget for personnel was correct, and if it included
a merit increase. He asked for information on how personnel are budgeted. Mr
Bozon said three dedicated personnel are budgeted 100% in the Drainage Fund.
Other support personnel are budgeted at a percentage of their actual salary costs.
He added that there has also been turnover in the department which allows for a
smaller increase.
No action was required by the Council on this item.
Councilmember Kirkley left the meeting at 6:40 p.m.
10. Receive presentations from the following City departments concerning their
mission, annual accomplishments and goals:
A. Police
B. Fire
C. Planning & Inspections
D. Public Works
Department Heads presented their mission, FY2017 accomplishments, as well as
FY2018 goals and priorities, for their respective departments (see Attachment "C").
Belton City Council Meeting
July 11, 2017- Page 10
A. Police
Assistant City Manager/Chief of Police Gene Ellis presented the mission,
accomplishments and goals for the Police Department.
B. Fire
Fire Chief Bruce Pritchard presented the mission, accomplishments and goals
for the Fire Department.
C. Planning & Inspections
Director of Planning Erin Smith presented the mission, accomplishments and
goals for the Planning Department including Building Inspections and GIS.
D. Public Works
Director of Public Works Angellia Points presented the mission, accomplish-
ments and goals for the Public Works Department which includes Engineering,
Streets, Brush Collection, Fleet Maintenance, and Building Maintenance in the
General Fund.
Councilmember Leigh asked about the sidewalk maintenance that the City is
performing along FM439, a State-owned roadway. Mrs. Points said that the City
has an interlocal agreement with TxDOT that establishes sidewalk maintenance
as a responsibility of the City.
No action was required by the Council on this item.
There being no further business, the Mayor adjourned the meeting at 7:20 p.m.
ATTEST:
Amy M. Casey, City Clerk
EXHIBIT A
FY 2018 Proposed Budget
- Water & Sewer Fund -
Beginning Fund Balance $5,501,614
Projected Revenues $ 7,749,966
Projected Expenditures $ (7,172,715)
Net Impact of Budget on Fund Balance $ 577,251
Projected Ending Fund Balance $ 6,078,865
- Water & Sewer Fund -
Estimated Beginning Fund Balance $ 6,078,865
Proposed Revenues $ 8,026,513
Proposed Expenditures $ (8,022,232)
Net Impact of Proposed Budget $ 4,281
Proposed Ending Fund Balance $ 6,083,146
Less: Minimum Balance (3 months O&M) $ (1,144,680)
Less: Annual Debt Service $ (2,040,070)
Proposed Fund Balance in Excess of Minimum $ 2,898,396
FY 2016 FY 2017 FY 2017 FY 2018 Change from 2017 Budget
Description Actual Budget Projected Proposed Amount %
Water $4,030,216 $4,174,198 $4,543,937 $4,710,989 $536,791 12.9%
Sewer $2,468,700 $2,744,358 $2,821,629 $2,936,924 $192,566 7.0%
Other Fees $359,081 $267,600 $334,400 $313,600 $46,000 17.2%
Misc Income $45,398 $10,000 $10,000 $15,000 $5,000 50.0%
Transfers In $0 $0 $0 $0 $0 0.0%
Interest Income $15,805 $14,000 $40,000 $50,000 $36,000 257.1%
Total Revenues $6,919,200 $7,210,156 $7,749,966 $8,026,513 $816,357 11.3%
Sewer
36% Other Fees
4%
Water
59% Interest Income
1%
Millions
- 100 200 300 400 500 600 700 800 900 1,000
130 116 184 224
129 109 182 236
129 107 131 210
125 107 152 219
157 133 167 251
159 126 141 169
Water Sales
196 132 157 277
212 144 170 319
159 120 169 266
In Million Gallons
193 137 222 364
265 135 210 314
224 158 217 321
177 139 209 285
Jul-Sep
187 123 175 335 Apr-Jun
Jan - Mar
Oct - Dec
183 144 189 314
210 157 224
Table 1: Recommended Water Rates
2015 2016 2017 2018 2019
Minimum Bill $15.00 $15.50 $16.00 $16.50 $17.00
Volumetric Rate
(Per Thousand Gallons) $3.49 $3.49 $3.70 $3.70 $3.70
Table 2: Recommended Wastewater Rates
2015 2016 2017 2018 2019
Minimum Bill $12.00 $12.50 $13.00 $13.50 $14.00
Volumetric Rate
(Per Thousand Gallons) $4.00 $4.50 $5.00 $5.00 $5.00
Customer Impact
$6 per year for water only customers
$12 per year for water and sewer customers
Residential Water Rates
Population 20K - 25K
10,000 Gal Fee 5,000 Gal Fee
$83.57
High (Corsicana)
$66.32
$58.00
Average
$38.34
$46.10
Belton
$27.60
$45.10
Low (Converse)
$27.05
2017 TML
Residential Sewer Rates Rate Survey
Population 20K - 25K
10,000 Gal Fee 5,000 Gal Fee
$87.87
High (Midlothian)
$56.12
$54.68
Average
$33.92
$53.50
Belton
$28.50
$29.50
Low 10,000 Gal (Plainview)
$24.25
$41.50
Low 5,000 Gal (University Park)
$20.75
Belton rates reflect implementation of FY 2018 proposed rates
FY 2016 FY 2017 FY 2017 FY 2018 Change from 2017 Budget
Description Actual Budget Projected Proposed Amount %
Oper & Maint:
Personnel $1,372,440 $1,441,990 $1,441,990 $1,553,647 $111,657 7.7%
Supplies $109,445 $87,488 $93,326 $115,719 $28,231 32.3%
Repairs & Maint $197,576 $243,744 $265,363 $272,774 $29,030 11.9%
Services $305,684 $323,293 $315,553 $325,392 $2,099 0.6%
Water Purchases $1,427,315 $1,502,918 $1,496,330 $1,143,072 ($359,846) -23.9%
Sewerage Treat $630,961 $654,563 $553,408 $619,337 ($35,226) -5.4%
Contingency $0 $51,956 $51,956 $45,000 ($6,956) -13.4%
Operating Transfers $359,805 $448,379 $448,379 $503,779 $55,400 12.4%
O&M Expenditures $4,403,225 $4,754,331 $4,666,305 $4,578,720 ($175,611) -3.7%
Debt Service $1,316,225 $1,540,774 $1,540,774 $1,536,325 ($4,449) -0.3%
Anticipated Debt Service $0 $0 $0 $503,745 $503,745
Capital Transfers $586,200 $790,636 $790,636 $1,288,442 $497,806 63.0%
Capital Outlay $255,607 $124,000 $175,000 $115,000 ($9,000) -7.3%
Total Expenditures $6,561,257 $7,209,741 $7,172,715 $8,022,232 $812,491 11.3%
Vehicle and Equipment Plan Fully Funded ($116,754)
Replacing F-150 and F-250 in FY 2018
Next significant equipment purchase will be a dump truck in FY 2019
Water Meter Replacement Plan Fully Funded ($221,688)
FY 2018 contribution covers 2018 and 2017 under-contribution
Plan will cost an estimated $153,000 per year moving forward
Capital Projects ($950,000)
Small line replacements/upgrades
SCADA system upgrade
“Cushion” for debt funded projects (TBWWTP, South Belton Sewer Line, Water Tank)
Debt Funded Projects Project Cost FY 2018 Issue FY 2019 Issue
WWTP Phases II $ 7,500,000 $ 7,500,000 $ -
WWTP Phases III-IV $ 3,000,000 $ 3,000,000
Waco Road Sewer $ 300,000 $ 300,000
Main Lift Main Replacements $ 700,000 $ 700,000
Issue Costs (2018) $ 125,000 $ 125,000 $ -
Issue Costs (2019) $ 45,000 $ 45,000
Total $ 11,670,000 $ 8,625,000 $ 3,045,000
Anticipated Debt Service Cost
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
BCWCID Existing FY 2018 Issue FY 2019 Issue
BCWCID related debt is nearing retirement
$535,750 in FY 2017 $139,579 in FY 2018 (final year)
FY 2018 issue assumptions
$8,625,000, twenty year certificate of obligation at 4% interest
Debt service costs to complement existing schedule; increase in FY 2029
Maturity ---Interest Rates--- Original Outstanding
Issue Date Low High Issue 10/01/17
2002 CO's - W&S Portion 8/1/2022 4.40% 4.40% $ 4,360,449 $ 1,650,000
2017 Refunding - W&S Portion 8/1/2027 1.05% 2.10% $ 1,350,000 $ 1,350,000
2008 CO's - W&S Portion 8/1/2028 4.19% 4.19% $ 180,000 $ 116,100
2015 CO's - W&S Portion 8/1/2035 2.00% 3.00% $ 8,595,000 $ 7,900,000
2016 CO's - W&S Portion 8/1/2036 3.00% 3.00% $ 9,585,000 $ 9,445,000
Total Revenue Debt Outstanding $ 20,461,100
Department operations and project presentation by Angellia Points, Director of
Public Works/City Engineer, to follow.
EXHIBIT "B"
Public Works Department
WATER AND SEWER FUND
Belton Water and Sewer Facts
Belton Water Facts
Belton water is provided by contract with BCWCID #1 from Lake Belton.
Belton owns the rights to 8,566 acre feet of water, which is equivalent to approximately 2.8 billion gallons.
Over the last five years, Belton has purchased an average of 1 billion gallons per year.
Average daily water demand is 2.95 MGD (June 1, 2016 to June 30, 2017).
Peak demand day was August 8, 2016 with a usage of 5.86 MGD.
A single 21” water transmission line extends from Lake Belton, down Sparta Road, to serve Belton’s water
customers, and can deliver 8 MGD.
As we regularly begin using 6 MGD – 7 MGD in water, we will need to plan a second pipeline for delivery of
water to Belton.
Emergency connections are possible with 439 WSC and CTWSC. A feasibility study was performed to
determine if an emergency connection to Temple was feasible. Instead of a connection with Temple, a
second pipeline for water delivery from BCWCID is recommended.
Belton Sewer Facts
100% of Belton’s sewer is sent to the Temple-Belton Wastewater Treatment plant,
jointly owned with City of Temple.
Temple contributes 75% of the total flow to the plant and Belton contributes 25%. This
determines the cost share between the two cities.
Plant is permitted to treat 10 MGD on annual average and 30 MGD for peak flows.
Over the past 12 months, the annual average flow was 1.75 MGD (Belton) & 6.94
MGD (combined) and the highest flow of 6.24 MGD (Belton) and 29.48 MGD
(combined) occurred on April 11, 2017.
The plant is under design to replace the headworks, increase the capacity, and
address odor.
Public Works – Water and Sewer Fund
Utility Administration
Water Department
Sewer Department
Lift Station Department
Utility Director of Public Works – Angellia Points, P.E.
Administration
Assistant Director of Public Works – Jeremy Allamon
Mission: To provide
Administrative Assistant – Marcie Seele
administrative
functions, oversight Part-time Administrative Assistant – Beverly Bingham
and support of water
and sewer
FY18 Request: Environmental Compliance Tech
department (Backflow Inspections, FOG Inspections, Water
operations. Sampling, System mapping, etc.)
Assistant Director of Public Works Administrative Assistant Part-time Administrative
Jeremy Allamon Marcie Seele Assistant
Beverly Bingham
FY17 – Utility Administration Accomplishments
Designed 3rd elevated water storage tank.
Begin planning for next sewer main improvements.
Promoted Belton Water’s Mascot.
Oversaw design and construction of Temple Belton Waste
Water Treatment Plant improvements project Phase I.
Constructed South Main Street Water Main and Sidewalk
Project.
Begin construction of the South Belton Sewer System Project.
FY18 – Utility Admin Goals
Complete construction of the South Main Street Waterline and Sidewalk Project.
Complete construction of the South Belton Sewer System Project.
Planning for next sewer main improvements due to South Belton Sewer System.
Oversee design and construction of TBWWTP improvements project Phase I and Phase II.
Begin construction of the North Belton Water Tank.
Implement backflow device testing and fats, oils, and grease programs.
Design the Waco Road Sewer Line Replacement.
Design the Mary Jane Utilities Replacement Project (seeking CDBG funding).
Replace SCADA system for water and add lift stations.
Water
Department 9 Personnel in the Water Department:
Mission: To provide a safe Water/Wastewater Superintendent – Larry Zehr
and adequate potable 1 Senior Maintenance Worker – Vacant
water supply and
distribution system which 1 Maintenance Worker II – Aldo Aguilar
meets or exceeds the
standards for a “superior” 4 Maintenance Worker I – Ashton Milton, Ryan Deeters, Fred
water system for the Robles, and Jakub Davis
domestic, industrial and
2 Meter Readers – Maribel Hernandez and Marcus Guzman
fire protection needs of
the City’s customers in a
manner that conserves
and best utilizes crucial
water resources.
FY17 – Water Department Accomplishments
Completed water tower inspections and repairs.
2 employees obtained basic TCEQ water operator certifications and 1
employee obtained a Class C water distribution certifications.
All lead and copper water sample results were lower than the TCEQ
minimum action levels.
Installed new waterline along Main Street between 8th and 10th.
No positive total coliform water sample results.
Received and complete approximately 3,800 Texas 811 line locate tickets.
Replaced Sparta Road Pump Station pump drives.
FY18 – Water Department Goals
Continue training employees so all employees receive
TCEQ water distribution/operator licenses.
Replace SCADA and train two employees.
Add six additional water sample stations.
Conduct additional water sampling required by EPA.
Receive training and updates on standard operating
procedures from Texas 811 for locating utilities.
Replace the pressure reducing valve at 10th and College
Street.
4 Reporting to Water/Wastewater
Sewer Superintendent
Department
1 Senior Maintenance Worker –
Mission: Provide an Terrence LaTouche
efficient sewerage
2 Maintenance Worker II –
system to protect the James Killion and Russell Kuder
public health, safety
and water quality of 1 Maintenance Worker Il –
Austin Collins
the community.
FY17 – Sewer Department Accomplishments
Replaced sewer main behind Bella Oaks Apartments.
Received positive recognition from the EPA on treatment plant and lift
stations operations and maintenance.
Managed the wastewater system to minimize overflows.
Sent four employees to TCEQ training classes for basic certifications.
Expanded sewer CCN service area to unserved locations.
Map 10% of the sanitary sewer system.
FY18 – Sewer Department Goals
Map 25% of the sewer mains and appurtenances.
Ensure there are no preventable sanitary sewer overflows.
Redesign and replace the sewer main on Smith and W. 3rd Ave.
Perform annual audit of residents on septic systems to verify billing is correct.
Clear and maintain all City sewer easements.
Replace trouble sewer lines to decrease sewer washing.
Reporting to Water/Wastewater Superintendent
1 Lift Station Mechanic – Ray Jordan
Lift Station
Department
Mission: To provide
for the operation and
maintenance of the
lift stations which are
a vital element of the
sewer collection
system
FY17 – Lift Station Accomplishments
Managed and maintained 17 lift stations in compliance with TCEQ standards.
Installed additional signage with 911 addresses to every lift station site.
No sewer overflows occurred at the lift stations.
Added potable water service to 2 lift stations.
Replaced the fence at Dunns Canyon Lift Station.
FY18 – Lift Station Goals
Install potable water to 5 lift stations. (7 lift stations remain)
Replace lift station alert system with new SCADA system.
Record all the LS performance and operational data into the asset management
software and/or SCADA system.
Research and test alternate pumps and motors in order to find more energy efficient
pumps and increased reliability in equipment.
Eliminate 1 lift station.
FY 2018 Proposed Budget
- Drainage Fund -
Beginning Fund Balance $260,326
Projected Revenues $391,935
Projected Expenditures: ($385,140)
Net Impact of Budget on Fund Balance $6,795
Projected Ending Fund Balance $ 267,121
- Drainage Fund -
Estimated Beginning Fund Balance $ 267,121
Proposed Revenues $ 517,640
Proposed Expenditures $ (616,478)
Net Impact of Proposed Budget $ (98,838)
Proposed Ending Fund Balance $ 168,283
Less: Minimum Balance (3 months O&M Budget) $ (70,397)
Less: Annual Debt Service $ (25,301)
Proposed Fund Balance in Excess of Minimum $ 72,585
FY 2016 FY 2017 FY 2017 FY 2018 Change from 2017 Budget
Description Actual Budget Projected Proposed Amount %
Drainage Fees $377,991 $384,000 $390,000 $515,640 $131,640 34.28%
Interest Income $930 $800 $1,935 $2,000 $1,200 150.00%
Total Revenues $378,921 $384,800 $391,935 $517,640 $132,840 34.52%
Street Sweeper
No plan currently in place due to funding constraints
Street sweeper is near end of life, approximate replacement cost of $250,000
Significant Projects (FY 2014 – FY 2017)
Connell Street: $522,606
Sparta Road: $252,077
Wheat Road: $193,327
Studies (Nolan Creek, Dawson, Red Rock, MS4 Permit, Master Plan): $107,815
Development agreements (Dawson, Bella Rose): $30,913
Average of approximately $276,000/year in project needs
Future Projects
Red Rock Pond Improvements
Liberty Hill Drainage Improvements
Mitchell Branch Drainage Study and Improvements downstream of Connell
Drainage Improvements to Blair and 4th Ave
Rate Belton Cove Georgetown Harker Heights Killeen Temple
Residential $ 5.00 $ 6.00 $ 6.50 $ 6.00 $ 6.00 $ 6.00
Non-Residential
Min $ 10.00 $ 6.00 $ 6.50 $ 7.20 $ 8.30 $ 12.00
Max $ 200.00 $ 60.00 $ 306.59 $ 350.00
Other $17.86/acre $6.50/2,808 sf
Actual Actual Actual Actual Actual Actual Actual Actual Projected Budget
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY2018
Residential 4,212 4,293 4,387 4,438 4,582 4,737 4,782 4,827 4,939 5,087
Non-Residential 457 455 462 472 477 482 489 492 501 501
Total 4,669 4,748 4,849 4,910 5,059 5,219 5,271 5,319 5,440 5,588
Average Monthly Billings $27,765 $28,578 $29,238 $29,106 $29,966 $30,663 $30,002 $31,499 $32,500 $42,970
Annual Revenue $333,178 $342,930 $350,856 $349,273 $359,592 $367,956 $360,021 $377,991 $390,000 $515,640
Increase % 2.93% 2.31% -0.45% 2.95% 2.33% -2.16% 4.99% 3.18% 32.22%
$550,000
$500,000
$450,000
$400,000
$350,000
$300,000
$250,000
$200,000
$150,000 Annual Revenue
$100,000
$50,000
$0
FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY2018
FY 2016 FY 2017 FY 2017 FY 2018 Change from 2017 Budget
Description Actual Budget Projected Proposed Amount %
Personnel $172,965 $200,059 $200,059 $200,554 $495 0.25%
Supplies $13,170 $15,580 $15,188 $24,412 $8,832 56.69%
Repairs & Maint $31,669 $30,435 $29,435 $35,230 $4,795 15.75%
Services $19,329 $17,437 $19,231 $21,391 $3,954 22.68%
Debt Service $25,694 $25,062 $25,227 $25,301 $239 0.95%
Capital $0 $0 $0 $259,590 $259,590
Transfers $110,000 $96,000 $96,000 $50,000 ($46,000) -47.92%
Total Expenditures $372,826 $384,573 $385,140 $616,478 $231,905 60.30%
Mission: To provide and maintain a storm water management system to efficiently
convey storm water in a safe manner and prevent flooding
Dedicated Personnel (3)
1 Senior Maintenance Worker
2 Maintenance Worker I
Support Personnel
Director of Public Works
Assistant Director of Public Works
Street Superintendent
Construction Inspectors
GIS Analyst
Complete Year 3 of the Storm Water Management Plan.
Improve the Dawson Ranch drainage channel.
Remove gravel and debris from Nolan Creek after major storm events.
Increase mobilization of street sweeper.
Revise the Strategic Drainage Plan.
Improve drainage in the 800 block of Estate Drive.
Improve the Turtle Creek storm drain (removal of sewer line obstruction and
installation of protective grate).
Install bilingual and no swimming signs on drainage signage.
Implement FY18 Strategic Drainage Plan priority items.
Replace the failing drainage pipe on Mesquite Road.
Implement Year 4 of the Storm Water Management Plan.
Increase maintenance/mowing of drainage and detention pond areas per
increased development.
Train employees in the use of storm water best management practices on internal
projects.
Angellia Points, Director of Public Works
Brandon Bozon, Director of Finance
EXHIBIT "C"
Prevention Focused
FY 2018
Prevention
We are a PREVENTION FOCUSED
Community Policing
Department
QUALITY
Of
Safety LIFE Partnerships
We are committed We maintain strong
We are dedicated to to creating an relationships with our
keeping our community environment stakeholders built on trust and
and roadways safe. whereby our transparency.
community can
enjoy an excellent
quality of life.
Team
We value all members
of our team.
Goals Status
Crime Rate Reduction -5%
Complete remodel of original PD building In progress Aug ‘17
Phase 3 of Central Texas Firearms Training Center
Training ALL Staff in De-escalation
Implemented New Fitness Program using Rowers
Maintain Recognition status (accreditation) 7 years
Expanded Community Outreach CPA 8,
NNO=18,
CPA, NNO, CHIPS, Explorer, Coffee with a Cop, RUOK, CWC=6,
Youth Police Academy, Clergy-Police Partnership CHIPS=100
RUOK=135
Clergy=18
Increase informal contacts with citizens In progress Sep ‘17
Continued Capital Equip. Replacement w/ Finance 4 New Cars
Succession Planning
Prevention
1. Remain prevention
focused
2. Expand crime
Safety Partnerships
prevention education
1. Develop a plan for 3. Add an online 1. Expand neighborhood
Traffic Safety Team reporting portal video partnership
program
2. Concentrate traffic
enforcement in 2. Enhance Clergy-Police
accident or crime Partnership
prone areas (DDACTS)
3. Continue community
outreach programs
Team
1. Develop a staffing plan
2. Leadership training for
command staff
3. Implement succession
plan
Succession Plan
Sufficient Staff to
Meet Service Demands
Patrol
Traffic Safety Team
Investigations
Staff Retention
◦ Competitive pay and benefits
Mobile Crime Scene Unit
◦ 93 International (Old Ambulance)
The mission of the Belton Fire Department is to provide the highest level of fire
protection and emergency medical services possible. The citizens of Belton
deserve to be protected at all times regardless of the threat or danger. The Fire
Department does this through prompt emergency response, advanced personnel
training, fire prevention, public education, and code enforcement. The Belton Fire
Department stands ready to protect and serve our community and others in our
service area, as well as visitors.
Fire
• Completed necessary documentation for Best Practices Recognition
February 2016
• Completed 2011 ICMA Study
• Completed ISO assessment to remain a Class 3
• Completed review of the 2015 IFC for Best Practices
• Completed one Fire Corps class
• All officers completed Fire Officer 1
EMS
• Conducted 3 Take 10 CPR classes (18 students)
• Received AHA Mission Lifeline Award
• Conducted CPR save
• Initiated the new ESO software for EMS/Fire reporting. Showed
improved response and travel times by 15% in a six month period
Fire
• Implement new fire/EMS districts
• Receive Assistance For Firefighters Grant to replace all air packs and
two cardiac monitors ($251,307)
• Send two fire officers to attend National Fire Academy
• Utilize Temple Fire and Rescue new Training Facility
• Establish community block parties to promote fire safety and
prevention
• Provide fire extinguisher training to corporate facilities and city
employees
EMS
• Receive DSHS Provider of the year
• Provide Take 10 CPR and First Aid to city employees
• Establish Continued Quality Improvement plan to analyze personnel
performance and benchmarks
GIS
AwesomeAnalyst
Planning
Planner
Director
Building
Building
of Intern
Clerks
Inspector
Official
Planning
Planning
Building
Inspections
GIS
Accomplishments
Planning
Coordinated Loop 121 widening with KTMPO/TXDOT - FM 439 to
IH-35
Developed and implemented a downtown signage plan
Worked with property owners on Façade Improvement Grants
Recommended amendments to the Subdivision Ordinance
Amended Sign Ordinance to allow 75’ pole sign height along IH-35
Facilitated growth management process, including annexations and
non-annexation development agreements
Coordinated plans for East Street (from Central to 1st Avenue) and 6th
Avenue (IH-35 to Main Street) with the Public Works Director
Recommended historic tax exemption policy
Completed evaluation of historic Belton standpipe
Accomplishments
Building Inspections
Provided timely and comprehensive inspection services
Improved documentation of inspection services
Worked with property owners to rehabilitate condemned
structures
Began review of the 2015 International Building Codes
GIS
Obtained 2015 aerial imagery and updated the GIS maps
Integrated new City limits/emergency response areas into GIS after
annexation
Upgraded internal and public mapping access and services
Updated and completed Street Maintenance Plan map for Public
Works
Integrated AMI project inventory into GIS database
Goals
Planning
Complete the Comprehensive Plan update
Achieve Certified Local Government status
Designate historic landmarks in the City
Develop ordinance for mobile food vendor, special events, and
food trucks
Represent the City of Belton in KTMPO
Manage annexation Development Agreements
Update the 2008 Sign Ordinance
Develop code amendments for Recreational Vehicle Parks
Achieve action items stated in the Comprehensive Plan
Goals
Building Inspections
Adopt 2015 International Building Codes
Create code amendments to the Housing Board of Adjustment structure
Begin to scan and digitize construction plans and floodplain permits
Prepare development process document
Obtain additional certifications of adopted codes
GIS
Obtain 2016/2017 aerial imagery and update the GIS maps
Begin to integrate sewer infrastructure into GIS
Integrate scanned construction plans and subdivision plats into GIS
Work with BCCC to produce public safety mapping for Fire and Police
Departments
Develop/Publish TABC, Annexation History, and E-Watch maps online
Expo Inn and Suites
Interesting Facts
Population Growth (20,517 to 21,214)
Single Family Building Permits
2016 – 81 permits
2017 (to date) – 76 permits UNDER CONSTRUCTION:
Two Family Permits UMHB Performing Arts Center, Commerce
2016 – 21 permits (42 units)
Marketplace, Expo Inn and Suites, Popeyes
2017 (to date) – 28 permits (56 units)
NAPA Auto Parts, Bell County Equestrian
Three Creeks
Center, UMHB Residence Hall, Lake Road
2015 – 19 permits
2016 – 114 permits office building, Sendero Shooting Range
2017 (to date) – 57 permits Commerce Marketplace
Total to date – 190 permits
City of Belton 2015 2016 2017 (to date)
Zoning Changes 27 18 8
Plats 23 32 12
Single Family
$21,965,729 $16,042,030 $15,269,484
Permit Valuation
Commercial
$42,065,455 $16,561,000 $41,050,000
Permit Valuation
Public Works Department
GENERAL FUND
Public Works – General Fund
Engineering
Streets
Brush Collection
Fleet Maintenance
Building Maintenance
Engineering
Mission: To provide City Engineer – Angellia Points, P.E.
administrative functions,
enforcement, and oversight Construction Inspector – Rick Hairston
on all design, construction,
Assistant Construction Inspector – Tim Minosky
and inspections of the City’s
Capital Improvement
Projects and programs to
promote public safety and
infrastructure needs while
maintaining the quality of
design, information, and
construction standards.
Assistant Construction Inspector
Tim Minosky
Construction Inspector
Rick Hairston
FY17 – Engineering Accomplishments
Constructed Industrial and Main Street Improvements.
Constructed MLK/Main Street Improvements.
Constructed IH-35 sidewalks along the interstate service road in South Belton.
Implemented revised design manual.
Master planned for water, wastewater, streets, drainage, and processes for the next 5 to
10 years.
Planned enhancements for E. 6th Ave.
Developed and implemented Year 3 street maintenance plan and street
reconstructions.
Developed plan for downtown beautification improvements for East Street.
Designed Phase II of the Chisholm Trail Hike and Bike Trail.
Constructed portions of the Sparta Road improvements and roundabout.
FY18 – Engineering Goals
Complete construction of the Sparta Road Reconstruction Project.
Identify funding and develop next cycle of street maintenance plan.
Complete design and ROW acquisition of Phase II of the Chisholm Trail hike
and bike trail.
Begin preliminary design of the South Connell Reconstruction Project, if
funded.
Design and construct East Street Sidewalks (seeking CDBG grant)
Design the South Belton hike and bike trail along IH-35, if funded (seeking TIP
Grant).
Continue efforts on E. 6th Ave improvements.
Participate in TxDOT planning and design of IH-14/US-190 expansion and Loop
121 expansion projects.
8 Personnel in the Street Department:
Streets Superintendent – Jeff Bolton
2 Heavy Equipment Operators – Dwade Dalton and Forest
Shope
1 Senior Maintenance Worker – Juan Dominguez
Streets
2 Maintenance Worker II – Derrick Flores and Randy Pierluisses
Mission: To provide 2 Maintenance Worker I – Melissa Saunders and a vacancy
and maintain a
transportation system
of streets, alleys, and
sidewalks for safe and
efficient vehicular and
pedestrian traffic.
Streets – FY17 Accomplishments
Designed and constructed street/sidewalk improvements (i.e.,
street maintenance program, South Wall Sidewalks, South Main
Street Sidewalks, etc.)
Continued the street crack sealing maintenance program.
Provided support for the 4th of July Parade, Market Days, and
other community events.
Constructed IH-35 sidewalks along the service road in South Belton.
Develop and construct downtown beautification improvements,
including parking enhancements and sidewalks (i.e., East Street
Project).
Streets – FY18 Goals
Perform maintenance in preparation of
Year Four of the Street Maintenance Plan.
Repair sections of uneven sidewalk on
Lake Road.
Perform crack sealing of streets.
Refresh faded pavement striping.
Senior Maintenance Worker – John Williams
Brush Collection
Mission: To provide
residential brush [Insert photo of staff]
collection services
in a timely,
professional and
efficient manner.
FY17 – Brush Accomplishments
Placed the new brush truck in service.
Cross-trained alternate drivers to assist in times of increased
amounts of brush collection.
Participated in One Community One Day in bulk waste
collection operations.
Continued to educate the public on the brush pick up services
and requirements.
Continued to provide quarterly bulky waste drop off events.
FY18 – Brush Collection Goals
Respond to all brush
collection requests.
Educate public on the
brush pick up services
and requirements.
Fleet
Maintenance
4 Staff Members
Mission: To extend Fleet Superintendent – Gary Barber
the usable life of 2 Mechanic II – John Brewster and Roger Cyr
and ensure the
1 Mechanic I – Derrik Meriovsky – new FY17
safety of City
position!
equipment and
vehicles.
John Brewster,
Using online tool to
read vehicle codes
Gary Barber,
Superintendent
Welding
Roger Cyr
Preventative
maintenance
Derrick Mersiovsky
Preventative
maintenance
FY17 – Fleet Accomplishments
Hired 4th mechanic to address fleet needs.
One mechanic received Emergency Vehicle Training Certification in
two areas.
Utilized electronic manuals and diagnostic equipment to keep more
maintenance in-house.
Fully utilized the Public Works Work Order and Asset Management
System.
Assisted supervisors with the appropriate training on new or existing
equipment.
Repaired and shop-fabricated non-fleet items for other departments.
Maintained and improved the 1957 Police Vehicle for shows and events
for the Police Department.
FY18 – Fleet Maintenance Goals
Continue to implement a Preventative
Maintenance program.
Track and schedule all vehicle inspections.
Assist supervisors with the appropriate training on
new or existing equipment.
Utilize electronic manuals and diagnostic
equipment to keep more repairs and maintenance
in-house.
Add/obtain Emergency Vehicle Training and
applicable certifications for at least one additional
employee.
Building
4 Full-Time and 1 Part-Time Staff in Building Maintenance
Maintenance
Building Maintenance Superintendent – Scott Hodde
Senior Maintenance Worker – Eddy Bertrand
To maintain and
clean City owned 2 Full-Time Custodians – Dora Orellana and Ray Bottoms
buildings and 1 Part-Time Custodian – Bob Netupski
facilities to ensure a
safe and attractive
environment. FY18 Request: Maintenance Worker I Position
Building Maintenance Superintendent Senior Maintenance Worker
Scott Hodde Eddy Bertrand
2016 Leadership Award Employee of the Quarter
Custodian Part-Time Custodian
Custodian Bob Netupski
Ray Bottoms
Dora Orellana
20 years in October!
FY17 – Building Maintenance
Accomplishments
Completed all identified building improvements, including
portable building remodel at PD Range.
Evaluated all City facilities for annual capital planning for
building improvements.
Coordinate improvements to the HVAC system at Central Fire
Station and Fire Station 2.
Implement preventative maintenance for HVAC system
maintenance.
Replace or make modifications to frequent maintenance items
to increase efficiency of maintenance workers.
Develop GIS database for park lights and electrical boxes.
FY18 – Building Maintenance Goals
Continue to assist in implementation and installation of all identified
building improvements.
Utilize manuals, training, and diagnostic equipment to keep more
repairs and maintenance in-house.
Replace or make modifications to frequent maintenance items.
Evaluate and coordinate improvements to the HVAC system at
Central Fire Station, Police Department roof replacements, and
window replacements at City Hall and Library.
Continue annual capital planning for building improvements.
Agenda
City Council Meeting Agenda
Tuesday, July 11, 2017 - 5:30 p.m.
Wright Room, Harris Community Center
401 N. Alexander, Belton, Texas
Pledge of Allegiance. The Pledge of Allegiance to the U.S. Flag will be led by City
Manager Sam Listi.
Texas Pledge. The Pledge of Allegiance to the Texas Flag will be led by
Councilmember Paul Sanderford.
“Honor the Texas flag; I pledge allegiance to thee Texas, one state under
God, one and indivisible.”
Invocation. The Invocation will be given by Darren Walker, Pastor of First United
Methodist Church of Belton.
1. Call to order.
2. Public Comments.
Citizens who desire to address the Council on any matter may register to do
so prior to this meeting and speak during this item. Forms are located on the
table outside of the south side entry to the meeting room. Please state your
name and address for the record, and limit your comments to three minutes.
Also, please understand that while the Council appreciates hearing your
comments, State law (Texas Gov’t Code §551.042) prohibits them from: (1)
engaging in discussion other than providing a statement of specific factual
information or reciting existing City policy, and (2) taking action other than
directing Staff to place the matter on a future agenda.
3. Consider the minutes of the June 27, 2017, City Council Meeting.
Miscellaneous
4. Hold a public hearing and consider a resolution adopting the revised Strategic
Drainage Plan regarding the City’s policies, guidelines, and standards for public and
private drainage.
City Council Meeting Agenda
July 11, 2017
Page 1 of 2
5. Hold a public hearing and consider an ordinance adopting the 2015 International
Fire Code.
Planning and Zoning
6. Continue consideration of a replat for Burnet South Addition, Phase II, a 0.759 acre
tract of land, located on the west side of South Burnet Street, generally south of 1st
Avenue and north of Avenue B.
7. Consider an ordinance abandoning a portion of a sanitary sewer easement located
within the Red Rock Hills Subdivision and the Law Addition.
Budget FY2018
8. Receive presentations on the proposed Water and Sewer budget for FY 2018,
including:
A. Financial Summary
B. Operations
9. Receive a presentation on the proposed Drainage budget for FY 2018.
10. Receive presentations from the following City departments concerning their
mission, annual accomplishments and goals:
A. Police
B. Fire
C. Planning & Inspections
D. Public Works
The City Council reserves the right to adjourn into Executive Session at any time
regarding any issue on this agenda for which it is legally permissible.
City Council Meeting Agenda
July 11, 2017
Page 2 of 2