City Council
Regular MeetingBig Bear Lake, CA · November 5, 2024
Agenda
BOARD OF WATER AND POWER COMMISSIONERS
ADJOURNED REGULAR MEETING AGENDA
November 5, 2024
10:00 AM
CITY OF BIG BEAR LAKE,
Service, Quality, Community DEPARTMENT OF WATER AND POWER
41972 GARSTIN DRIVE
BIG BEAR LAKE, CALIFORNIA 92315
WWW.BBLDWP.COM
BOARD MEMBERS
Bob Tarras, Chair
Barbara Willey, Vice-Chair
Craig Hjorth, Treasurer
Joe Cylwik, Commissioner
Jim Smith, Commissioner
This meeting will be held at the DWP Office at 41972 Garstin Drive, Big Bear Lake, CA 92315,
ZOOM ACCESS INFORMATION
This meeting will be available at: https://us02web.zoom.us/j/85359418109
Passcode: bigbear
Meeting ID: 833 4812 6937
You may also call into the meeting by dialing one of the phone numbers below, entering the meeting ID, and entering the
passcode.
Meeting ID: 833 4812 6937
Passcode: 985264
+1 669 900 9128 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 301 715 8592 US (Germantown)
+1 312 626 6799 US (Chicago)
+1 646 558 8656 US (New York)
OPEN SESSION
CALL MEETING TO ORDER
PLEDGE OF ALLEGIANCE
PUBLIC FORUM
All remarks shall be addressed to the Board as a body only. There is a three-minute maximum time limit when addressing the
Board. Please note that California law prohibits the Board from taking action on any item not appearing on the agenda.
1. DISCUSSION/ACTION ITEMS
1.1 Motive Solar and Backup Generator Proposal
Agreement with Motive Energy for the Garstin Water Operations Facilities Project – Solar and Generator Backup
2. CLOSED SESSION
2.1 Closed Session Pursuant to Section 54957, Public Employee Performance Evaluation
Title: General Manager
Regular Meeting Agenda
November 5, 2024 Page 2 of 2
ADJOURNMENT
I hereby certify under penalty of perjury, under the laws of the State of California, that the foregoing agenda was posted in
accordance with applicable legal requirements. Dated this 28th of October 2024.
______________
Sam Armstrong, Board Secretary, DWP Board of Commissioners
The City of Big Bear Lake, Department of Water and Power strives to make all of its public meetings accessible to everyone. If you
need any special assistance or disability-related accommodation in order to participate in this meeting, please contact the Board
Secretary at (909) 866-5050. Notification 48 hours prior to the meeting will enable the DWP to make reasonable arrangements to
ensure accessibility to this meeting.
We are an equal opportunity provider and employer.
AGENDA REPORT
Service, Quality, Community
DATE: November 5, 2024
TO: Board of Commissioners
FROM: Reginald A. Lamson, General Manager
RE: Agreement with Motive Energy for the Garstin Water Operations
Facilities Project – Solar and Backup Generator
Background:
The Garstin Water Operations Facilities Project includes solar panels and a diesel backup
generator that will provide power for the new Garstin facilities, Lake Plant Well No.5 Pumping
Plant, and Lake Plant Well No. 6 Pumping Plant.
Motive Energy provided the attached proposal based on the annual energy demand for the proposed
Garstin Water Operations Facilities and the two well pumping plants. The proposed solar system will
include 368 solar panels, which will be mounted on the operations building and parking structure, an
automatic transfer switch, 1,000A net meter electrical service, and diesel generator. The estimated
payback period is 11.3 years and the electric bill savings over the 30-year project life are estimated at
$5,062,631. The estimated net total cash flow over the 30-year life of the project is $3,710,521. The
typical lifespan of solar panels is greater than 30 years. The current Garstin Solar System saves about
$25,000 per year. The proposed Garstin Solar System will save an estimated $98,854.
With the passage of the Inflation Reduction Act (IRA) the long-standing Investment Tax Credit (ITC)
program for solar projects was modified. Now municipalities and nonprofit organizations can apply for
a 30% rebate via the ITC program. Motive Energy evaluated the requirements for the ITC’s 40% rebate
and DWP qualifies for the solar portion of the project.
During the October 22, 2024 Board meeting, the following questions were asked:
1) Diesel versus Natural Gas Standby Generator? A natural gas engine/generator is more
commonly used as a primary power source that operates on a regular basis. A standby
generator operates intermittently and for short periods of time. A diesel engine/generator is
more reliable operating within standby conditions. Also, during an earthquake, natural gas lines
can fail, and natural gas engine generators will not operate.
2) Does the solar equipment include more than one (1) inverter? Yes, there is one SE80K inverter
and one SE120K inverter. The 368 solar panels each have an optimizer, which allows them to
operate independently of each other and optimizes their power production.
Garstin Solar and Backup Generator Project
November 5, 2024
Page 2 of 2
3) Does PBK’s scope of work include the design of the solar and standby generator equipment?
No, PBK’s agreement states, “Photovoltaic panels are expected to be incorporated into the
design of the warehouse facilities.”
4) What components of the solar and standby generator equipment are eligible for the 40%
rebate? The solar system, 1,000-amp electrical switch gear, conduits, and conductors are
eligible for the 40% rebate. The standby generator is not eligible.
The cost breakdown for the above facilities is as follows:
ITEM TOTAL ($) NOTES
Solar Panels $721,416.13 368 Panels, Mounting Hardware, Conduits,
Conductors, & Installation
Conduit, Conductors, $301,949.85 Lake Plant Well Nos. 5&6 Electrical Service
and Trenching for Upgrades, Conduits, Conductors, Trenching, and
Well Plants Installation
1,000-amp Service $235,926.53 Furnish and Install Net Meter Panel per BVES
Main Specifications.
Solar Sub-Total $1,259,292.51 Solar Equipment Eligible for the 40% Rebate
400 KW Standby $531,903.12 Furnish and Install 400 KW, Deisel Generator,
Generator Automatic Transfer Switch, 24-Hour Fuel Tank,
and Ventilation Equipment
Total $1,791,195.63
Less 40% Solar $503,717.00 $1,259,292.51 X 40%
Components Rebate
Net Total Cost $1,287,478.63
Financial Impact:
If approved, funds in the amount of $1,880,756 will be appropriated for these services.
Recommendation:
Award a design-build agreement with Motive Energy for the Garstin Solar and Backup Generator
Project for $1,791,196, and budget internally $89,560 for a 5% contingency for a total amount of
$1,880,756.
- Pricing includes a Generac SD400 - 400 kW diesel generator with ~24 hour backup capability.
- Pricing includes 1000A 480/277V 3Ph main electrical switchgear(30KAIC NEMA 3R), It excludes any upstream electrical equipment
including transformer and downstream electrical equipment including any subpanels & associated breakers.
- Pricing assumes single POI interconnect at 277/480V 3Ph.
- Trenching, conductors and conduit for LP5 and LP6 are included in price.
- PV O&M cost for the first year is $4,765 which is excluded from the proposal. Estimated annual price escalation shall be 4%.
- Steel Racking is TAA (Trade Agreement Act) and BAA (Buy American Act) compliant.
- Total consumption is assumed to be combined into one rate schedule (A-3).
- kWh usage data for LP5 and LP6 have been estimated using a 12-hour daily operation schedule, taking into account averages of
the kW values from pump efficiency reports.
- Permit costs/AHJ fees are excluded and would be a pass-through.
- Proposal assumes 30%Investment Tax Credit doesn't apply to backup Diesel Generator.
- Proposal assumes the Energy Community Tax Credit 10% Bonus; customer will be required to apply for Bonus Credit Program.
Table of Contents
1 Project Summary 4
2 Project Details 5
2.1 Combined Office + Wells (interval) 5
2.1.1 PV System Details 5
2.1.2 Rebates and Incentives 6
2.1.3 Utility Rates 7
2.1.4 Current Electric Bill 7
2.1.5 New Electric Bill 8
3 Cash Flow Analysis 9
3.1 Cash Purchase with Equipment Replacement 9
4 Assumptions and Exclusions 10
Prepared By: Shiv Desai
Page 3
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
1 Project Summary
Payment Options Cash Purchase with Equipment Replacement
IRR - Term 9.3%
LCOE PV Generation $0.123 /kWh
Net Present Value $938,369
Payback Period 11.3 Years
Total Payments $1,791,196
Total Incentives $503,717
Net Payments $1,287,479
Electric Bill Savings - Term $5,062,631
Upfront Payment $1,259,293
Combined Solar PV Rating
Power Rating: 202,400 W-DC
Power Rating: 179,029 W-AC-CEC
Cumulative Energy Costs By Payment Option
$6,000,000
$5,000,000
Cumulative Energy Costs
$4,000,000
$3,000,000
$2,000,000
$1,000,000
$0
Year 0 Year 4 Year 8 Year 12 Year 16 Year 20 Year 24 Year 28
Avoided Utility Cost Cash Purchase with Equipment Replacement
Prepared By: Shiv Desai
Page 4
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
2.1.1.1
2 PVOffice
Project
Combined System
Details
+ Details
Wells (interval)
General Information Solar PV System Rating
Facility: Combined Office + Wells (interval) Power Rating: 202,400 W-DC
Address: 41972 Garstin Dr Big Bear Lake CA 92315 Power Rating: 179,029 W-AC-CEC
Solar PV Equipment Description Energy Consumption Mix
Solar Panels: (368) Thornova Solar TS-BG72(550) Annual Energy Use: 341,052 kWh
Inverters: (1) SolarEdge SE80KUS, (1) SolarEdge SE120K
Solar PV Equipment Typical Lifespan
Solar Panels: Greater than 30 Years
Inverters: 15 Years
Solar PV System Cost and Incentives
Solar PV System Cost $1,259,293
Direct Pay ITC -$503,717
Net Solar PV System Cost $755,576
Utility -35,750 kWh (0.00%)
Solar PV 376,802 kWh (100.00%)
Monthly Energy Use vs Solar Generation
45,000
40,000
35,000
Energy (kWh)
30,000
25,000
20,000
15,000
-2 -3 -4 -5 -6 -7 -8 -9 -1 -1 -1 -1
/24 /24 /24 /24 /24 /24 /24 /24 0/ 1/ 2/ /24
24 24 24
1/24 2/24 3/24 4/24 5/24 6/24 7/24 8/24 9/ 10 11 12
24 /2 /2 /24
4 4
Energy Use (kWh) Solar Generation (kWh)
Prepared By: Shiv Desai
Page 5
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
2.1.2 Rebates and Incentives
This section summarizes all incentives available for this project. The actual rebate and incentive amounts for this
project are shown in each example.
Direct Pay, Investment Tax Credit (ITC) - 30% (with Adders)
The Inflation Reduction Act (IRA) of 2022 contains a "direct pay" provision that enables certain tax-exempt
customers, including state and local government, to receive a direct cash payment in lieu of an investment tax credit
(ITC). Entities that qualify for direct pay are eligible to receive a 30% direct payment, assuming they meet the IRA
established prevailing wage and apprenticeship requirements in order to qualify for the full 30% “increased rate”,
rather than a 6% “base rate”. The IRA states that direct pay is only available for entities, including: an entity exempt
from the tax, any State government (or political subdivision thereof), the Tennessee Valley Authority, an Indian tribal
government, an Alaska Native Corporation, any corporation operating on a cooperative basis which is engaged in
furnishing electric energy to persons in rural areas. These entities may take direct pay for solar and storage in the
ITC and PTC as well as the ITC/PTC when tech neutral starts after 2025. In addition to the 30% ITC, the IRA establishes
three different types of ITC “Adders”, which provide additional tax credits of up to 10% each, for projects that meet
specified requirements. (1) Energy Community, projects sited in an “energy community”, which includes brownfield
sites, census tracts where a coal mine closed after 1999 or a coal-fired power plant was retired after 2009, or areas
where 25% of local tax revenues are related to the extraction, processing or storage of coal, oil, or natural gas at any
time beginning in 2010. (2) Low-income, projects located in a qualified “low-income community”, which is defined as
a census tract with a poverty rate of at least 20%, as well as a census tract where the median family income (MFI) is
80% or less of statewide MFI, or on “Indian land”, which is defined as land located within the boundaries of an Indian
reservation or lands held by a tribe. (3) Domestic Content, for projects that meet specified domestic content
requirements which will be set by Treasury, including 100% steel/iron for manufactured products with a 40%
requirement through 2024 followed by 45% in 2025, 50% in 2026, and 55% in 2027 and beyond. Manufactured
content is further explained: the products which are components of a qualified facility upon completion will be
deemed to have been produced in the United States if the adjusted percentage of the total costs of all such
manufactured products of the facility are attributable to manufactured products which are mined, produced, or
manufactured in the United States.
Total Incentive Value: $503,717
Prepared By: Shiv Desai
Page 6
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
2.1.3 Utility Rates
The table below shows the rates associate with your current utility rate schedule (A-3 - 3/15/2023). Your estimated
electric bills after solar are shown on the following page.
Customer Charges Energy Charges Demand Charges
Charge A-3 - Rate A-3 - Charge Rate A-3 -
Season Rate Type Season Charge Type Season
Type 3/15/2023 Type 3/15/2023 Type Type 3/15/2023
W Flat Rate per day $6.60 W T < 657.5 kw Import $0.26946 W Flat Rate Import $9.00
S Flat Rate per day $6.60 W 657.5 kw < T Import $0.31869 S Flat Rate Import $9.00
S T < 657.5 kw Import $0.26946
S 657.5 kw < T Import $0.31869
2.1.4 Current Electric Bill
The table below shows your annual electricity costs based on the most current utility rates and your previous 12
months of electrical usage.
Rate Schedule: BVES - A-3 - 3/15/2023
Time Periods Energy Use (kWh) Max Demand (kW) Charges
Bill Ranges & Seasons Total NC / Max Other Energy Demand Total
1/24/2022 - 2/24/2022 W 31,670 86 $205 $9,089 $774 $10,068
2/24/2022 - 3/24/2022 W 29,707 93 $185 $8,561 $837 $9,583
3/24/2022 - 4/24/2022 W 23,169 66 $205 $6,380 $594 $7,179
4/24/2022 - 5/24/2022 W / S 23,247 72 $198 $6,438 $640 $7,275
5/24/2022 - 6/24/2022 S 33,620 103 $205 $9,711 $927 $10,843
6/24/2022 - 7/24/2022 S 36,862 116 $198 $10,776 $1,044 $12,018
7/24/2022 - 8/24/2022 S 32,850 96 $205 $9,466 $864 $10,534
8/24/2022 - 9/24/2022 S 23,140 72 $205 $6,371 $648 $7,224
9/24/2022 - 10/24/2022 S 18,377 60 $198 $4,952 $540 $5,690
10/24/2022 - 11/24/2022 S / W 23,128 72 $205 $6,367 $636 $7,208
11/24/2022 - 12/24/2022 W 28,160 76 $198 $8,003 $684 $8,885
12/24/2022 - 1/24/2023 W 37,122 98 $205 $10,827 $882 $11,914
Total 341,052 - $2,409 $96,942 $9,070 $108,421
Prepared By: Shiv Desai
Page 7
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
2.1.5 New Electric Bill
Rate Schedule: BVES - A-3 - 3/15/2023
Time Periods Energy Use (kWh) Max Demand (kW) Charges
Bill Ranges & Seasons Total NC / Max Other Energy Demand Total
1/24/2022 - 2/24/2022 W 8,360 74 $205 $2,253 $666 $3,123
2/24/2022 - 3/24/2022 W -237 76 $185 $64 $684 $805
3/24/2022 - 4/24/2022 W -13,517 44 $205 $3,642 $396 $3,042
4/24/2022 - 5/24/2022 W / S -16,473 40 $198 $4,439 $360 $3,881
5/24/2022 - 6/24/2022 S -4,522 76 $205 $1,218 $684 $330
6/24/2022 - 7/24/2022 S 1,425 81 $198 $384 $729 $1,311
7/24/2022 - 8/24/2022 S -2,127 65 $205 $573 $585 $216
8/24/2022 - 9/24/2022 S -9,846 53 $205 $2,653 $477 $1,971
9/24/2022 - 10/24/2022 S -13,200 47 $198 $3,557 $423 $2,936
10/24/2022 - 11/24/2022 S / W -5,041 71 $205 $1,358 $567 $587
11/24/2022 - 12/24/2022 W 7,402 74 $198 $1,995 $666 $2,859
12/24/2022 - 1/24/2023 W 12,025 93 $205 $3,240 $837 $4,282
Total -35,751 - $2,409 $84 $7,074 $9,567
Annual Electricity Savings: $98,854
Prepared By: Shiv Desai
Page 8
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
3 Cash Flow Analysis
3.1 Cash Purchase with Equipment Replacement
Assumptions and Key Financial Metrics
IRR - Term 9.3% Net Present Value $938,369 Payback Period 11.3 Years
ROI 207.2% PV Degradation Rate 0.50% Discount Rate 5.0%
Energy Cost Escalation Rate 4.0% Federal Income Tax Rate 0.0% State Income Tax Rate 0.0%
Total Project Costs $1,791,196
Project Inverter Solar Production Electric Bill Direct Total Cash Cumulative Cash
Years
Costs Replacement Monitoring Services Savings Pay ITC Flow Flow
Upfront -$1,791,196 - - - - -$1,791,196 -$1,791,196
1 - - -$4,765 $98,854 $503,717 $597,806 -$1,193,390
2 - - -$4,956 $102,294 - $97,338 -$1,096,052
3 - - -$5,154 $105,851 - $100,697 -$995,354
4 - - -$5,360 $109,529 - $104,169 -$891,185
5 - - -$5,574 $113,332 - $107,758 -$783,427
6 - - -$5,797 $117,264 - $111,467 -$671,960
7 - - -$6,029 $121,329 - $115,300 -$556,660
8 - - -$6,270 $125,532 - $119,262 -$437,398
9 - - -$6,521 $129,877 - $123,356 -$314,043
10 - - -$6,782 $134,369 - $127,586 -$186,456
11 - - - $139,012 - $139,012 -$47,445
12 - - - $143,811 - $143,811 $96,367
13 - - - $148,772 - $148,772 $245,139
14 - - - $153,900 - $153,900 $399,039
15 - -$7,422 - $159,200 - $151,778 $550,817
16 - - - $164,678 - $164,678 $715,495
17 - - - $170,339 - $170,339 $885,835
18 - - - $176,190 - $176,190 $1,062,025
19 - - - $182,237 - $182,237 $1,244,262
20 - - - $188,485 - $188,485 $1,432,746
21 - - - $194,941 - $194,941 $1,627,687
22 - - - $201,612 - $201,612 $1,829,300
23 - - - $208,506 - $208,506 $2,037,805
24 - - - $215,627 - $215,627 $2,253,433
25 - - - $222,986 - $222,986 $2,476,419
26 - - - $230,587 - $230,587 $2,707,006
27 - - - $238,441 - $238,441 $2,945,446
28 - - - $246,553 - $246,553 $3,192,000
29 - - - $254,933 - $254,933 $3,446,933
30 - - - $263,589 - $263,589 $3,710,521
Totals: -$1,791,196 -$7,422 -$57,209 $5,062,631 $503,717 $3,710,521 -
Prepared By: Shiv Desai
Page 9
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
4 Assumptions and Exclusions
Assumptions
Proposal is valid for 15 days only.
Solar Panels: 30-year linear performance warranty, and 12-year product warranty
Li-Ion Battery Modules - 5 years
Power Conversion System: 3-years
Inverters: 12-years
Solar Racking System: 25-years
Switchgear: 10-years
Workmanship: One year warranty for the construction of the system
Workmanship: 10-year warranty when O&M Agreement Fully Executed
Interconnection work/outages will be scheduled during normal business hours
Building department and utility inspections will be scheduled during normal business hours
Pricing assumes the contractor’s employees will have free and clear access to all array locations simultaneously
during business hours (M-F 0700-1700)
The contractor will provide electrical drawings stamped by a licensed California Registered Electrical Professional
Engineer
Monitoring pricing based on availability of Cat 5 landline provided outside of building firewall. If no landline is
available pricing will be subject to increase.
The System & installation will meet all requirements for interconnection with appropriate documentation. The
contractor will be responsible for providing all documentation.
System layout is acceptable to AHJ in terms of clearances
Single mobilization and completion of project in one phase
As built plans are available for engineering reference
The contractor is not responsible for superficial marking of parking deck due to use of equipment
On-site staging areas are available for storage of equipment and materials
No special safety requirements beyond the contractor’s standard safety regulations will be enforced
7.49° tilt maximum on carports
10’ clear height maximum on carports except with a change order
All modules to be installed in portrait orientation
Pricing includes hot dip galvanizing of all bare steel columns & beams
Pricing includes NEMA 3R electrical equipment
Module pricing is based on current market value. Price is subject to adjustment based on market conditions at time
of contract.
Ground penetrating radar (GPR) is accurate down to a depth of 3’-4’. There may be underground utilities below this
level that are untraceable with GPR that would require the use of an underground camera to be located at
additional cost.
Pricing assumes the structure can support the additional loads of the PV array system as well as the required
erection equipment
Pricing is subject to change until site walk and validation of site conditions
Pricing is based on non-union Prevailing wage rates
Tax rate is assuming customer has filled the CA tax exemption form.
Prepared By: Shiv Desai
Page 10
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117
Exclusions
UL recertification of existing electrical equipment beyond our scope of work
Repairs of any electrical code violations at the existing facility
Removal and/or disposal of hazardous materials
Arc flash or breaker coordination studies
3rd party (private) locating services
Pedestrian & vehicle traffic control
Re-creation of building plan sets
Union project labor agreements
Lightning protection systems
Revenue grade metering
ADA design/compliance
ADA compliance improvements/work
Sprinklers & gutters
Inverter enclosures
Phasing
Bonding
CAISO study or approval costs
Rock drilling
De-watering, and/or caissons for collapsible soils
Prepared By: Shiv Desai
Page 11
P: (910) 977-7262, E: sdesai@motiveenergy.com
Motive Energy Storage Systems, Inc., CSLB# 1089117