Downtown Review Board
Regular MeetingBlue Springs, MO · March 16, 2017
Agenda
East Conference Room – 903 W. Main Street – City Hall
DOWNTOWN REVIEW BOARD
MEETING AGENDA
Thursday, March 16, 2017 - 4:00 p.m.
Board Members please call 228-0207 if unable to attend
1 CALL TO ORDER
A. Approval of February 22, 2017 & March 2, 2017 meeting minutes
2 REVIEW OF PROJECT APPLICATIONS
A. DRB-03-17-5726 / 902 SW South Avenue / Contractor Storage – Conditional Use Permit and Site Plan
Design Review
3 OTHER BUSINESS
4 ADJOURN
If special accommodations are required for citizen participation in this meeting,
PLEASE CALL 228-0207 (VOICE) OR 228-0250 (TDD)
03.16.2017 Page 1 of 1
kf
City of Blue Springs
903 Main
Blue Springs, Missouri 64015
Downtown Review Board
MINUTES
Wednesday, February 22, 2017
A meeting of the Downtown Review Board of the City of Blue Springs was held in the City Hall East Conference
Room located at 903 W. Main Street on Wednesday, February 22, 2017 with the following members, guests and
staff in attendance:
ATTENDANCE Jennifer Hauschild Scott Allen, Community Dev.
Joe Haney, PC Rep. Chris Sandie, Public Works
Cindy Miller, Chairman Kent Edmondson, Councilman
STAFF Matt Wright, Senior Planner
ABSENT Yvonne Woods
Councilman Chris Lievsay
Jackie Fairbanks, PC Alt. Rep.
James Wallace, PC Rep.
Karen Findora, Recording Secretary
CALL TO ORDER Chairman Cindy Miller called the meeting to order at 4:00 p.m.
CONSENT AGENDA Chairman Miller requested action on the Consent Agenda with a motion by
APPROVAL Board Member Jennifer Hauschild, to approve the minutes for November 18,
2016, a second from Board Member Joe Haney, and a unanimous vote, the
Minutes of November 18, 2016, were approved as submitted.
AGENDA ITEM 2A. Matt Wright, Senior Planner, stated before the Downtown Review Board is
DRB-02-17-5693 / “1204 a request for approval for the replacement of a deck located at 1204 NW B
NW B Street” / New Deck Street. The deck consists of a 10 X 10 (100 sq. ft.) wood deck and associated
stairs at the front entrance of the house.
APPLICANT Kay Murphy, owner stated that the old porch consisted of concrete. It
expanded the entire front left side of the house. To clear the stairs, the
DRB Minutes – 02.22.2017 Page 1 of 3
kf
previous owners had to build a bigger deck over the concrete deck and the
concrete deck is now falling away from the house. Water is now getting in
there and the new owner will need to remove the concrete as well and install
a smaller deck.
QUESTIONS Scott Allen, Director, Community Development, asked if the request was just
for the deck since other work is going on at that location. Mr. Wright stated
that it’s just for the deck.
MOTION Board Member Joe Haney moved to approve DRB-02-17-5693 / “1204 NW
AGENDA ITEM 2A. B Street” / New Deck.
DRB-02-17-5693 / “1204
NW B Street” / New Deck
SECOND Seconded by Board Member Jennifer Hauschild.
Yvonne Woods – Absent James Wallace – Absent
VOTE Joe Haney – Aye Kent Edmondson – Aye
Jennifer Hauschild - Aye Chris Lievsay – Absent
Scott Allen – Aye Jackie Fairbanks – Absent
Cindy Miller, Chairman - Aye Chris Sandie – Aye
(APPROVED 6-Aye, 0-No)
AGENDA ITEM 2B. Matt Wright, Senior Planner, stated before the Downtown Review Board is
DRB-02-17-5694 / “816 SW a request for a new home located at 816 SW Jones Street. John Broker is the
Jones Street” / New House applicant with Michael Yancik being the property owner. The applicant is
requesting to build a 1,289 sq. ft. single-family house in the Downtown
Zoning District.
APPLICANT The applicant was absent.
QUESTIONS Chris Sandie, Director, Public Works, asked if the alley in the back of the
property would affect the setbacks. Mr. Wright stated that it would not. The
alley way is not abandoned. Councilman Edmondson asked if the applicant
could come to the City and ask to abandoned it. Mr. Sandie stated that they
could, but he wasn’t sure if there were any utilities in the alley way. When
you abandon an alley, half goes each direction. Mr. Wright stated that the
alleys are treated like a side yard.
Chairman Miller asked if Mr. Yancik owns the property to the west. Mr.
Wright stated that he does. He further stated that this was the property they
requested to demolish with the Historic Preservation Commission. The
Commission wanted to see that house remain, but was okay with him
parceling it off to another house between the existing house at 202 and this
lot. The City hasn’t heard of any other plans for that home.
As far as the alley goes the owner would have to work with the owner of 803
Walnut to vacate the alley. It could potentially be a utility easement.
DRB Minutes – 02.22.2017 Page 2 of 3
kf
MOTION Councilman Kent Edmondson moved to approve DRB-02-17-5694 / “816
AGENDA ITEM 2B. SW Jones Street.”
DRB-02-17-5694 / “816 SW
Jones Street” / New House
SECOND Seconded by Board Member Jennifer Hauschild.
VOTE Yvonne Woods – Absent James Wallace – Absent
Joe Haney – Aye Kent Edmondson – Aye
Jennifer Hauschild - Aye Chris Lievsay – Absent
Scott Allen – Aye Jackie Fairbanks – Absent
Cindy Miller, Chairman - Aye Chris Sandie – Aye
(APPROVED 6-Aye, 0-No)
OTHER BUSINESS Chairman Miller stated that the Design Team formed a sub-committee to look
at design review guidelines and recommendations, to help people coming in
the district with their renovation projects. They are currently working on
pictures that deal with awnings, signage, materials, lighting, etc. The
Committee is looking at what other cities are doing. The information will be
added to the booklet that talks about the CDBG and MCRC funding. Once
the draft is completed it will be presented to the DRB.
The plan is to have it completed by the Design Team Sub-Committee by
March and then the draft will be presented to the DRB and Historic
Preservation Commission so that they can review and make
recommendations. The draft will go to City Council in April.
Chairman Miller thanked Matt Wright for all the work that he has put in to
this project.
Chairman Miller stated that the next Design Team meeting would be March
10th. Those folks that attended the meetings are Steve Miller, Jeff Sykes,
James Wallace, Matt Wright, Pam Abarelli, Shauna Markley, Cindy Miller,
John Broker, Lyle Shaver, Randy Sallee. The City appreciates the builders’
input.
MEETING ADJOURN With no further discussion, a motion was made by Board Member Jennifer
Hauschild to adjourn at 4:14 p.m. Seconded by Councilman Kent
Edmondson.
_______________________________
Respectfully Submitted by,
Karen Findora, Recording Secretary
____________________________________ __________________________
Cindy Miller, Chairman Date
DRB Minutes – 02.22.2017 Page 3 of 3
kf
City of Blue Springs
903 Main
Blue Springs, Missouri 64015
Downtown Review Board
MINUTES
Thursday, March 2, 2017
A meeting of the Downtown Review Board of the City of Blue Springs was held in the City Hall East Conference
Room located at 903 W. Main Street on Thursday, March 2, 2017 with the following members, guests and staff in
attendance:
ATTENDANCE Jennifer Hauschild Scott Allen, Community Dev.
Joe Haney, PC Rep. Chris Sandie, Public Works
Cindy Miller, Chairman Kent Edmondson, Councilman
STAFF Matt Wright, Senior Planner
ABSENT Yvonne Woods
Councilman Chris Lievsay
Jackie Fairbanks, PC Alt. Rep.
James Wallace, PC Rep.
Karen Findora, Recording Secretary
CALL TO ORDER Chairman Cindy Miller called the meeting to order at 4:00 p.m.
AGENDA ITEM 2A. Matt Wright, Senior Planner, stated before the Downtown Review Board is
DRB-02-17-5699 / “803 W a request for approval for solar panel installation at 803 W Main Street. The
Main Street” / Solar Panels applicant is proposing 26 solar panels on the front side of the building. The
Installation City doesn’t have any regulations in the Downtown Development Code for
solar panels so staff didn’t make a recommendation. Staff is looking to the
DRB for their recommendations on how we should proceed with solar panels
in the downtown area in the future.
Councilman Edmondson questioned if the applicant would be placing the
panels along the front slope of the home along Main Street.
DRB Minutes – 03.02.2017 Page 1 of 2
kf
APPLICANT James Dawson, KC Electrical Contractors
Mr. Dawson stated that there will be four panels along the front slope. Mr.
Dawson stated that there are eight (8) panels facing the south and nine (9)
panels facing the east and west.
QUESTIONS Chairman Miller asked the applicant why they were wanting to install the
panels. Mr. Dawson stated that the applicant would like to basically diminish
their electric bill. They have engineers that take the wattage that is used
throughout the year and build a sized system that fits between 90% & 95%
of their electric bill. Mr. Dawson stated that electric companies don’t like to
receive a buyback of electricity, they try to keep it just below the 100% range.
When they do have an over production during the month, they only get $0.02
on the dollar. If a home owner buys 110% of their electric bill that extra 10%
they will never pay off, because they will never get enough money from the
electric company to cover that cost. The engineer designs it and tries to keep
it at about 95% so that it keeps the homeowner at the best production as
possible.
Chairman Miller informed the applicant that the Downtown Design Team has
formed a Sub-Committee to work on design guidelines for the downtown
area. Solar panels have yet to be looked at within the guidelines. There was
concern that the panels would be very visible and don’t fit in the downtown
area. Chairman Miller pulled some photos of examples of the mounted solar
panels on homes from the internet.
Councilman Edmondson asked the applicant if they have looked at ground
mounts in the back yard so that it wouldn’t be seen from the street. They
would have to look at the setbacks. Mr. Wright stated that they would be
treated as an accessory so it would be 2 1/2 ft. from the side and rear property
lines. Mr. Dawson stated that they would be 40 ft. long and 10 ft. wide.
There was further discussion and the Board decided to table this project until
the Downtown Design Sub-Committee presents their approved Design
Guidelines. This should take place in late April – early May of 2017.
OTHER BUSINESS Mr. Wright stated that the next item to be heard on March 16th is the Clay
Swope property located at 902 SW South Ave. Councilman Edmondson was
concerned with the lighting for the project. Mr. Wright will take a close look
at the lighting for that location.
MEETING ADJOURN With no further discussion, a motion was made by Board Member Jennifer
Hauschild to adjourn at 4:37 p.m. Seconded by Board Member Joe Haney.
_______________________________
Respectfully Submitted by,
Karen Findora, Recording Secretary
____________________________________ __________________________
Cindy Miller, Chairman Date
DRB Minutes – 03.02.2017 Page 2 of 2
kf
DOWNTOWN REVIEW BOARD
STAFF REPORT
Meeting Date: March 16, 2017 Agenda Item: 2A
Case File Number: DRB-03-17-5726
Project Name: Contractor Storage
Type of Application: Conditional Use Permit & Site Plan Design Review
Request: Approve a Conditional Use Permit for a “Warehouse,
Residential Storage” use and a “Small Commercial
Building” type for Contractor Storage at 902 SW South
Avenue. Approve a Site Plan Design Review for a
5,600-sq. ft. warehouse, residential storage facility.
Applicant: Contractor Storage / Clay Swope
Property Owner: Clay & Donna Swope
Engineer: Joe Lampen, Lampen Engineering, Inc.
Architect: N/A
Location (Address): 902 SW South Avenue
General Location: South of SW South Avenue, approximately 220 feet
east of SW 10th Street
Area: 0.55 +/- acres
Proposed Lots: 1
Existing Zoning: “T5” (Urban Center)
Proposed Zoning: “T5” (Urban Center)
Existing Land Use: Vacant (former single family house)
Proposed Land Use: Warehouse, Residential Storage
Comprehensive Plan
Designation: Distinct Destination
Attachments: DRB Application
Site Plan
Building Elevations
Downtown Review Board: March 16, 2017
Planning Commission: March 27, 2017
City Council: N/A
Planner: Matt Wright, Senior Planner
Page 1 of 6
Project: Contractor Storage Conditional Use Permit & Site Plan Design Review
Figure 1. Vicinity Map / General Location Map
Figure 2. Project Site (Aerial Photo)
Page 2 of 6
Project: Contractor Storage Conditional Use Permit & Site Plan Design Review
BACKGROUND INFORMATION/SUMMARY:
The applicant is requesting approval of a Conditional Use Permit to allow a “Warehouse,
Residential Storage” use and a “Small Commercial Building” type at 902 SW South
Avenue. The applicant is also requesting approval of a Site Plan Design Review for
Contractor Storage, which includes a 5,600-square foot warehouse, residential storage
building on a 0.55 +/- acre site. The subject property previously had a single-family home
and detached garage, which were demolished in spring 2016. The property was rezoned
from “T3” (Sub-Urban) to “T5” (Urban Center) in September 2016, which would allow a
warehouse, storage use with a Conditional Use Permit. The applicant also owns 806 and
808 SW South Avenue, which includes an existing warehouse, residential storage use.
PREVIOUS ACTIONS/APPROVALS:
On March 26, 2007, the Planning Commission recommended approval of a
rezoning from “LI” (Light Industrial) to “T3” (Sub-Urban) as part of the rezoning for
the Downtown Zoning District. The City Council approved the rezoning on April 2,
2007.
On August 31, 2016, the Downtown Review Board recommend approval of a
rezoning from “T3” (Sub-Urban) to “T5” (Urban Center) for Contractors Storage at
806-902 SW South Avenue. The Planning Commission recommended approval of
the rezoning on September 12, 2016. The City Council approved the rezoning on
September 19, 2016.
FUTURE APPLICATIONS/REVIEWS ANTICIPATED OR REQUIRED:
The applicant has submitted a Preliminary Plat and a Final Plat that will run concurrently
with the Conditional Use Permit and Site Plan Design Review. A Final Plat must be
approved and recorded prior to the issuance of a building permit for any new buildings or
additions. Permits for signage will be reviewed by the Downtown Review Board at a later
date.
ABUTTING ZONING AND LAND USES:
Direction Current Zoning Surrounding Land Uses
North: Right-of-Way SW South Avenue (Local)
South: Railroad Right-of-Way Kansas City Southern Railroad
East: “T3” (Sub-Urban) Single-Family Residential
West: “T3” (Sub-Urban) Single-Family Residential
DOWNTOWN DEVELOPMENT CODE (DDC):
The following items from the Downtown Development Code (DDC) (Section 404.240)
are applicable to the rezoning request:
Land Use: The proposed land use is “Warehouse, Residential
Storage,” which includes an “enclosed storage facility
containing independent, fully enclosed bays that are leased
to individuals exclusively for long-term storage of their
household goods or personal property.” The use is only
Page 3 of 6
Project: Contractor Storage Conditional Use Permit & Site Plan Design Review
permitted by a Conditional Use Permit in the “T5” (Urban
Center) zoning district. This use is an extension of an
existing storage use to the east, also owned by the
applicant.
Building Type: The proposed building type is a “Small Commercial
Building,” which is only permitted by a Conditional Use
Permit in the “T5” (Urban Center) zoning district per the
Downtown Development Code. The building type is the only
commercial building type that permits a single-story
building.
Height and Area: The minimum height from floor to ceiling of the first floor is
15-feet, measured from grade to eave. The one-story
building has a total height of 21.75-feet from grade to roof
peak.
Setbacks: The following setbacks apply to the development based on
the zoning district (T5) and frontage type (front yard):
Area Required Setback Proposed Setback
Front 0-ft. min. – 15-ft. max. 15-ft.
Side 0-ft. min. – 10-ft. max 10-ft.
Rear 5-ft. min. 42-ft.
Parking and other paved areas must be setback at least 25-
ft. from the right-of-way and at least 6-ft. from any property
line. Permanent parking has not been provided within 25-ft.
of the right-of-way. The only paved area within 25-ft. of the
right-of-way is associated with the access drive to the site
and storage bays.
Access & Parking: Access to the subject property is provided through a single
access on SW South Avenue. Access to the site is restricted
by residential to the west and the railroad tracks to the
south. There is not a specific parking requirement for
warehouse, residential storage in the DDC. A minimum of 1
space per 5 storage bays or 1 space per 1,000-s.f.,
whichever is less, is required per Section 407.010.A. Since
7 storage bays are proposed, only 1 parking space is
required. With the access drive and associated pavement,
parking can be provided in front of any storage bay, if
needed.
Sidewalk: The only sidewalk requirement is a 5-ft. sidewalk along SW
South Avenue which must be installed or a financial
guarantee submitted prior to approval of the Final Plat by
the City Council.
Page 4 of 6
Project: Contractor Storage Conditional Use Permit & Site Plan Design Review
Landscaping: The following landscaping requirements apply to the site:
Area Required Proposed
Landscaping Landscaping
Street 1 street tree per 25-ft. 4 street trees have
of street frontage been provided
(107.72’ / 25 = 4.3) =
4 street trees required
Front 10 plantings between 10 shrubs have been
front property line and provided in the building
front building line setback
Building Design: The applicant is proposing a 5,600-sq. ft. warehouse,
residential storage building that will include seven (7)
storage bays each with a garage door and separate
pedestrian entrance. The rectangular building (40-ft. by 140-
ft.) includes a mix of building materials, including brick
veneer, fiber cement siding, and 26-gauge metal panels.
The north façade, facing SW South Avenue, will include
brick veneer and fiber cement siding along with a metal
awning 10-feet above grade along the entire front. The east
façade includes seven (7) overhead doors for each storage
bay and seven (7) pedestrian doors for each storage bay.
The east façade includes brick veneer and fiber cement
siding. The west façade, facing single family residential,
includes brick veneer along the front 40-feet of the building,
but is predominantly fiber cement siding. The south façade,
facing the railroad tracks, will be entirely 26-gauge metal
panels. Due to the location and lack of visibility of this side,
staff is not concerned with the use of metal paneling on this
façade. The DDC requires at least 75% of the façade be a
mix of masonry and fiber cement siding. The applicant has
met this requirement with the doors subtracted out of the
façade area, as the doors cover over 20% of the façade by
themselves. The roofing consists of 26-guage metal panels.
The fiber cement siding and metal wall panels will be white
with a dark red metal roof. These will be similar colors to the
existing warehouse storage buildings to the east, also
owned by the applicant.
Lighting: An exterior lighting plan has not been submitted. However,
the applicant has stated that they will have building-
mounted lighting along the east building wall adjacent to the
storage bay doors. No ground-mounted lighting is planned.
An exterior lighting plan must be reviewed and approved
administratively through the building permit process.
Page 5 of 6
Project: Contractor Storage Conditional Use Permit & Site Plan Design Review
REVIEW CRITERIA:
The Downtown Review Board will make a recommendation to the Planning
Commission on the Conditional Use Permit request.
A Conditional Use Permit shall be reviewed according to the following criteria:
1. The application furthers the intent of the proposed zoning district and supports
that of any abutting districts.
2. Compliance of any proposed development with the requirements of this
Development Code.
3. Whether any additional site-specific conditions are necessary to meet the
purposes and intent of this Development Code and the intent or design
objectives of any applicable subsections of this Development Code.
4. The impact on the public realm, including the design and functions of
streetscapes and relationships of building and site elements to the streetscape.
5. The adequacy of drainage, utilities and other public facilities.
6. Compatibility with the character of the area in terms of building scale, building
form, landscape, and site design.
7. Compatibility with the area in terms of operating characteristics such as hours of
operation, visible and audible impacts, traffic patterns, intensity of use as
proposed or foreseeable, and other potential impacts on adjacent property.
8. The application will not prevent development and use of the neighboring property
in accordance with the applicable development regulations.
9. The long range plans applicable to the site and surrounding area are not
negatively impacted considering the permanence of the proposed use, the
permanence of existing uses in the area, and any changes in character occurring
in the area.
10. The recommendations of professional staff.
The Downtown Review Board will make a recommendation to the Planning
Commission on the Site Plan Design Review request.
A Site Plan Design Review shall be reviewed according to the following criteria:
1. Compliance with the requirements of the Development Code.
2. The application is consistent with any approved specific plans, overlay districts,
concept plans, or other specific design and development policies or standards
applicable to this site.
3. Whether any additional site-specific conditions are necessary to meet the intent
and design objectives of any of the applicable development standards.
4. The application meets the criteria for all other reviews needed to build the project
as proposed.
5. The recommendations of professional staff.
STAFF RECOMMENDATION:
Staff recommends approval of both the Conditional Use Permit and the Site Plan
Design Review requests. Staff will add conditions to both applications prior to submittal
to the Planning Commission for their review and approval. The Downtown Review Board
may recommend conditions be added for Planning Commission consideration.
Page 6 of 6
Get email alerts for Blue Springs
A daily email when new agendas and minutes are posted.