Public Hearing Notice
Regular MeetingBlue Springs, MO · November 2, 2020
Agenda
NOTICE TO TAXING JURISDICTIONS
To: Taxing Jurisdictions (Distribution List attached)
Re: Notice of Industrial Development Project for Blue Springs 70 Logistics, LLC
On behalf of the City of Blue Springs, Missouri (“City”), please find enclosed a copy of the
proposed Plan for an Industrial Development Project (“Plan”) for Blue Springs 70 Logistics, LLC
(“Company”), which also contains a Cost Benefit Analysis on the affected taxing jurisdictions.
The City anticipates considering an Ordinance to approve the Plan at its regular meeting on
Monday, November 2, 2020 scheduled to begin at 6:00 PM in the City Council Chambers at the
Howard L. Brown Public Safety Building, Blue Springs, Missouri. The Plan, if approved, consists
of the design and construction of an approximately 584,820 square-foot Class A industrial
building in the City, for purposes as further described in the attached Plan.
The City invites all affected taxing districts to attend the meeting on November 2, 2020 and to make
oral comments on the proposed Plan to the City or to provide written comments to the City on the
Plan prior to the meeting. All comments of the taxing districts will be fairly and duly considered
by the City.
A copy of the Plan and Cost Benefit Analysis for the proposed project is enclosed and also will be
on file in the office of the City Clerk and will be available for public inspection during normal
business hours.
Any questions should be directed to Mike Mallon, Acting Director of Community Development
for the City at (816) 228-0124.
Dated: October 13, 2020.
CITY OF BLUE SPRINGS, MISSOURI
903 West Main Street
Blue Springs, Missouri 64015
City of Blue Springs Jackson County Assessment Department
City Clerk Director
903 West Main Street 415 E. 12th Street, 1M
Blue Springs, MO 64015 Kansas City, MO 64106
Jackson County Jackson County Collections Department
County Executive Director
415 E. 12th Street, 2nd Floor 415 E. 12th Street, Suite 100
Kansas City, MO 64106 Kansas City, MO 64106
Jackson County Community Mental Grain Valley School District
Health Attn: Superintendent
Executive Director 31606 E. Pink Hill Road
1627 Main Street, Suite 500 Grain Valley, MO 64029
Kansas City, MO 64108
Mid-Continent Public Library Developmental Disability Services of
Director Jackson County – eitas
15616 East Highway 24 Executive Director
Independence, MO 64050 8511 Hillcrest Road
Kansas City, MO 64138
Central Jackson County Fire Protection State Tax Commission of Missouri
District 301 W. High Street, Room 840
Attn: Fire Chief P.O. Box 146
805 N.E. Jefferson St. Jefferson City, MO 65102
Blue Springs, MO 64014
Missouri Department of Revenue Missouri Director of Revenue
County Tax Section County Tax Section
State Blind Pension Fund Merchants/Manufacturers Replacement Tax
301 West High Street, Room 330 Fund
Jefferson City, MO 65105 301 West High Street
P.O. Box 453
Jefferson City, MO 65102-0453
____________________________
CITY OF BLUE SPRINGS, MISSOURI
PLAN FOR AN INDUSTRIAL DEVELOPMENT PROJECT
AND COST-BENEFIT ANALYSIS
FOR
BLUE SPRINGS 70 LOGISTICS, LLC
NOVEMBER 2, 2020
_____________________________
TABLE OF CONTENTS
Page
I. PURPOSE OF THIS PLAN .......................................................................................................... 1
II. DESCRIPTION OF CHAPTER 100 FINANCINGS.................................................................. 1
General............................................................................................................................................ 1
Issuance and Sale of Bonds ........................................................................................................... 1
Property Tax Abatement............................................................................................................... 2
III. DESCRIPTION OF THE PARTIES ............................................................................................ 2
Blue Springs 70 Logistics, LLC... ....................................................Error! Bookmark not defined.
City of Blue Springs, Missouri. ..................................................................................................... 2
IV. REQUIREMENTS OF THE ACT................................................................................................ 2
Description of the Project. ............................................................................................................. 2
Estimate of the Costs of the Project. ............................................................................................ 2
Source of Funds to be Expended for the Project......................................................................... 2
Statement of the Terms Upon Which the Project is to be Leased or Otherwise
Disposed of by the City. ............................................................................................................. 3
Affected School District, Fire Protection District, County and City.Error! Bookmark not
defined.
Current Assessed Valuation. ......................................................................................................... 3
Payments in Lieu of Taxes. ........................................................................................................... 3
Cost-Benefit Analysis and Discussion of Exhibits. ...................................................................... 4
V. ASSUMPTIONS AND BASIS OF PLAN .................................................................................... 4
ATTACHMENT A – SUMMARY OF KEY ASSUMPTIONS
ATTACHMENT B – MAP OF PROJECT SITE
EXHIBIT 1 - PROJECT ASSUMPTIONS
EXHIBIT 2 - SUMMARY OF COST BENEFIT ANALYSIS
EXHIBIT 3 - PROJECTED TAX REVENUES ON PROJECT SITE WITHOUT PROJECT (NO ABATEMENT)
EXHIBIT 4 - PROJECTED TAX REVENUES ON PROJECT SITE WITH PROJECT (NO ABATEMENT)
EXHIBIT 5 - PROJECTED VALUE OF TAX ABATEMENT
EXHIBIT 6 - PROJECTED PAYMENT IN LIEU OF TAXES
EXHIBIT 7 - PROJECT SALES AND USE TAX EXEMPTION ON CONSTRUCTION MATERIALS
* * *
CITY OF BLUE SPRINGS, MISSOURI
_________________________________
PLAN FOR AN INDUSTRIAL DEVELOPMENT PROJECT
AND COST-BENEFIT ANALYSIS
FOR BLUE SPRINGS 70 LOGISTICS, LLC.
I. PURPOSE OF THIS PLAN
The City Council of the City of Blue Springs, Missouri (the “City”) will consider an ordinance
approving this Plan (defined below) and authorizing the issuance by the City of its taxable industrial
development revenue bonds in the approximate aggregate principal amount of $30,000,000 (the “Bonds”),
to finance the costs of an industrial development and commercial project (the “Project”) for Blue Springs
70 Logistics, LLC or its successors and assigns (the “Company”). The Bonds will be issued pursuant to
the provisions of Sections 100.010 to 100.200 of the Revised Statutes of Missouri, as amended, and Article
VI, Section 27(b) of the Missouri Constitution, as amended (collectively, the “Act”).
This Plan for an Industrial Development Project and Cost-Benefit Analysis (the “Plan”) has been
prepared to satisfy requirements of the Act and to analyze the potential costs and benefits, including the
related tax impact on all affected taxing jurisdictions, of using industrial development revenue bonds to
finance the Project and to facilitate abatement of ad valorem taxes on the bond-financed property.
II. GENERAL DESCRIPTION OF CHAPTER 100 FINANCINGS
General. The Act authorizes cities, counties, towns and villages to issue industrial development
revenue bonds to finance the purchase, construction, extension and improvement of warehouses,
distribution facilities, research and development facilities, office industries, agricultural processing
industries, service facilities that provide interstate commerce, industrial plants and other commercial
projects.
Issuance and Sale of Bonds. Revenue bonds issued pursuant to the Act do not require voter
approval and are payable solely from revenues received from the project. The municipality issues its bonds
and in exchange, the benefited company promises to make payments that are sufficient to pay the principal
of and interest on the bonds as they become due. Thus, the municipality merely acts as a conduit for the
financing and is not responsible to pay debt service on the bonds from its own funds.
Concurrently with the closing of the bonds, the company will convey to the municipality title to
the site on which the industrial development project will be located, including all improvements built on
the site. (The municipality must be the legal owner of the property while the bonds are outstanding for the
property to be eligible for tax abatement, as further described below.) At the same time, the municipality
will lease the project site and the improvements thereon back to the benefited company pursuant to a lease
agreement. The lease agreement will require the company, acting on behalf of the municipality, to use the
bond proceeds to pay the costs or reimburse the costs of purchasing, constructing and installing the project,
as applicable.
Under the lease agreement, the company typically: (1) will unconditionally agree to make payments
sufficient to pay the principal of and interest on the bonds as they become due; (2) will agree, at its own
expense, to maintain the project, to pay all taxes and assessments with respect to the project, and to maintain
adequate insurance; (3) has the right, at its own expense, to make certain additions, modifications or
improvements to the project; (4) may assign its interests under the lease agreement or sublease the project
while remaining responsible for payments under the lease agreement; (5) will covenant to maintain its
corporate existence during the term of the bond issue; and (6) will agree to indemnify the municipality for
any liability the municipality might incur as a result of its participation in the transaction.
Property Tax Abatement. Under Article X, Section 6 of the Missouri Constitution and Section
137.100 of the Revised Statutes of Missouri, all property of any political subdivision is exempt from
taxation. In a typical transaction, the municipality holds fee title to the project and leases the project to the
benefited company. Although the Missouri Supreme Court has held that the leasehold interest is taxable,
it is taxable only to the extent that the economic value of the lease is less than the actual market value of
the lease. See Iron County v. State Tax Commission, 437 S.W.2d 665 (Mo. 1968) (en banc). If the rental
payments under the lease agreement equal the actual debt service payments on the bonds, the leasehold
interest should have no “bonus value” and the bond-financed property should be exempt from ad valorem
taxation so long as the bonds are outstanding.
If the municipality and the company determine that partial tax abatement is desirable, the company
may agree to make “payments in lieu of taxes” (sometimes called “PILOTS”). The amount of payments in
lieu of taxes is negotiable. The payments in lieu of taxes are payable by December 31 of each year, and are
distributed to the municipality and to each political subdivision within the boundaries of the project in the
same manner and in the same proportion as property taxes would otherwise be distributed under Missouri
law.
III. DESCRIPTION OF THE PARTIES
Blue Springs 70 Logistics, LLC The Company is a limited liability company organized and
existing under the laws of the State of Missouri.
City of Blue Springs, Missouri. The City is a constitutional charter city and political subdivision
organized and existing under the laws of the State of Missouri. The City is authorized and empowered
pursuant to the provisions of the Act to purchase, construct, extend and improve certain projects (as defined
in the Act) and to issue industrial development revenue bonds for the purpose of providing funds to pay the
costs of such projects and to lease or otherwise dispose of such projects to private persons or corporations
for manufacturing, commercial, warehousing and industrial development purposes upon such terms and
conditions as the City deems advisable.
IV. REQUIREMENTS OF THE ACT
Description of the Project. The project to be financed by the Bonds consists of building an
approximately 585,660 square-foot Class A industrial building. The real property improvements being
financed by the Bonds are referred to as the “Project Improvements” which are located on real estate
referred to as the “Project Site.” The existing Project Site has an estimated current market value of $19,950
and an assessed value of $2,394. The Project Improvements together with the Project Site are referred to
as the “Project.”
Estimate of the Costs of the Project. The Project is expected to cost approximately $30,000,000,
with approximately $9,855,950 estimated to be spent on construction materials. The Project Improvements
will be developed and constructed in 2021.
Source of Funds to be Expended for the Project. The sources of funds to be expended for the
Project, including the Project Site with existing improvements and the Project Improvements, will be the
proceeds of the Bonds in an approximate principal amount $30,000,000, to be issued by the City and
purchased by the Company or its designee (the “Bondholder”) and, if needed, other available funds of the
Company. The Bonds will be payable solely from the revenues derived by the City from the lease or other
disposition of the Project (as further described below). The Bonds will not be an indebtedness or general
-2-
obligation, debt or liability of the City or the State of Missouri within the meaning of any charter, statutory
or constitutional debt limitation or provision.
Statement of the Terms Upon Which the Project is to be Leased or Otherwise Disposed of by the
City. The City will hold title to the Project during the term of the Bonds. The City will lease the Project
to the Company for lease payments equal to the principal and interest payments on the Bonds. Under the
terms of the lease agreement with the City, the Company will have the option to purchase the Project at any
time and will have the obligation to purchase the Project at the termination of the lease. The lease between
the City and the Company is expected to terminate in 2031, unless terminated sooner pursuant to the terms
of the lease.
Affected School District, Fire Protection District, County, and City. The Grain Valley R-V
School District is the school district affected by the Project. Jackson County, Missouri is the county affected
by the Project. The City is the city affected by the Project. The Central Jackson County Fire Protection
District is the fire protection district affected by the Project. The Cost-Benefit Analysis attached hereto
identifies all other taxing districts affected by the Project (other than those taxing entities solely affected by
the Project with respect to receipt of tax revenues from the commercial surcharge tax).
Current Assessed Valuation. The most recent equalized assessed valuation of the Project Site is
$2,394. The estimated total equalized assessed valuation of the Project Improvements after construction of
the Project Improvements (2022) is $6,440,508. This valuation was calculated based upon an assumed
appraised value of $20,126,589 (approximately 75% of construction costs) for the Project Improvements in
year 2022, multiplied by the assessment rate of 32%. The estimated total equalized assessed valuation of
the Project Site after construction (2022) is $1,011,446. This valuation was calculated based upon an
assumed appraised value of $3,160,768, multiplied by the assessment rate of 32%. The estimated total
equalized assessed valuation of the Project (2022), therefore, is $7,451,954.
Payments in Lieu of Taxes. If this Plan is approved by the City Council, the City intends to issue
the Bonds in 2020 and provide tax abatement to the Company of 100% of the property taxes to be paid
related to the Project during construction and for a period of ten years beginning in the year following
completion of construction of the Project Improvements; provided, however, that the abatement to the
Company of property taxes imposed by the Central Jackson County Fire Protection District shall only be
25%. The Company will not make PILOT payments on the Project to any taxing entity other than the
Central Jackson County Fire Protection District equal to 75% of the property taxes expected to be imposed
by the fire protection district.
Sales and Use Tax Exemption on Construction Materials. Qualified building materials purchased
for the construction of the Project Improvements are expected to be exempt from sales and use tax pursuant
to the provisions of Section 144.062 of the Revised Statutes of Missouri and the underlying bond documents
upon delivery of a project exemption certificate by the City to the Company.
The table below shows the approximate amount the Company intends to spend on construction
materials in each taxing jurisdiction:
Total Amount of Construction Materials: $9,855,950
Construction Materials to be purchased within the
State of Missouri (but outside Jackson County): $6,805,950
Construction Materials to be purchased within
Jackson County (but outside City of Blue Springs): $2,450,000
-3-
Construction Materials to be purchased
within the City of Blue Springs: $125,000
Cost-Benefit Analysis and Discussion of Exhibits. In compliance with Section 100.050.2(3) of the
Revised Statutes of Missouri, this Plan has been prepared to show the costs and benefits to the City and to
other taxing jurisdictions affected by the tax abatements and exemptions of the Project. The following is a
summary of the exhibits attached to this Plan that show the direct tax impact the Project is expected to have
on each taxing jurisdiction. This Plan does not attempt to quantify the overall economic impact of the
Project.
Project Assumptions. Exhibit 1 presents a list of the assumptions related to the
determination of assessed valuations and the tax formulas.
Summary of Cost-Benefit Analysis. Exhibit 2 presents a summary for each affected taxing
district of (1) the total estimated tax revenues that would be generated if the Project did not occur,
(2) the total estimated tax revenues that would be generated if the Project occurred but did not
receive tax abatement, and (3) the total estimated value of the abatement to the Company.
Real Property. Exhibit 3 provides the projected tax revenues which would be paid on the
Project Site without tax abatement and without the Project Improvements. Exhibit 4 provides the
projected tax revenues that would be generated from the Project if the Project Improvements occur
but without tax abatement. Exhibit 5 provides the projected value of the real property tax
abatement on the Project to the Company. Exhibit 6 provides the projected payments in lieu of
taxes payable to the fire protection district.
Sales and Use Tax Exemption on Qualified Construction Materials. Exhibit 7 provides
the projected value of the sales and use tax exemption on qualified construction materials to the
Company.
V. ASSUMPTIONS AND BASIS OF PLAN
In preparing this Plan, key assumptions have been made to estimate the fiscal impact of the
abatement and exemptions proposed for the Project. See ATTACHMENT A for a summary of these
assumptions.
Information necessary to complete this Plan, has been furnished by representatives of the City,
representatives of the Company and its counsel, the Bondholder and other persons deemed appropriate and
such information has not been independently verified for accuracy, completeness or fairness.
* * *
-4-
ATTACHMENT A
SUMMARY OF KEY ASSUMPTIONS
1. The Project is estimated to cost approximately $30,000,000, with the Project Improvements
to cost approximately $26,835,452 and the existing Project Site to have an approximate current value of
$3,160,768 when acquired by the Company.
2. The construction of the Project Improvements are expected to be completed in 2021 and
the abatement period will begin January 1, 2022.
3. The investment in the Project Improvements will produce an assessed value for the Project
in the amount of $7,451,954, consisting of $1,011,446 for the Project Site and $6,440,508 for the Project
Improvements.
4. The Project Site will include the site outlined in red, as shown on Attachment B.
5. The Project will be owned by the City and leased to the Company with an option to
purchase. As long as the Project is owned by the City, it is expected to be exempt from ad valorem taxes.
6. The Project will be excluded from the calculation of ad valorem property taxes during
construction and for a period of ten years after construction is completed.
7. During the entire term of the Bonds (expected to be through 2031), the Company will not
be required to make payments in lieu of taxes except in accordance with that portion of Section IV above
in the Plan entitled “Payments in Lieu of Taxes.”
8. Commercial real property taxes are calculated using the following formula:
(Assessed Value * Tax Rate)/100
9. The assessed value of the Project Improvements is calculated using the following formula:
Estimated Value * Assessment Ratio of 32%
10. After development, the assessed value of the Project Improvements is subject to growth at
an estimated rate of 2% every year an assessment is made (every odd year).
11. The tax rates used in this Plan reflect the rates in effect for the tax year 2020. The tax rates
were held constant through the 2031 tax year.
* * *
A-1
ATTACHMENT B
MAP OF PROJECT SITE
B-1
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
COST BENEFIT ANALYSIS
PLAN FOR INDUSTRIAL DEVELOPMENT PROJECT
Table of Contents
Project Assumptions 1
Summary of Cost Benefit Analysis 2
Projected Tax Revenue on Project Site Without Project (No Abatement) 3
Projected Tax revenues on Project Site With Project (No Abatement) 4
Projected Value of Tax Abatement 5
Projected Payment In Lieu of Taxes 6
Projected Sales and Use Tax Exemption on Construction Materials 7
This information is provided based on the factual information and assumptions provided to Gilmore & Bell, P.C.
by a party to or a representative of a party to the proposed transaction. This information is intended to provide
factual information only and is provided in conjunction with our legal representation. It is not intended as financial
advice or a financial recommendation to any party. Gilmore & Bell, P.C. is not a financial advisor or a “municipal
advisor” as defined in the Securities Exchange Act of 1934, as amended.
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis 10/12/2020
Project Assumptions
Initial year taxes assessed 2022
Assessed value of project site $ 2,394
Appraised value of project site after construction $ 3,160,768
Investment in project improvements $ 26,835,452
75% of project improvements $ 20,126,589
Bi-annual growth rate of appraised value of real property 2.0%
Assessed value as a percentage of appraised value (real) 32.0%
Assessed value of project improvements $ 6,440,508
Assessed value of project site after construction $ 1,011,446
Terms of abatement:
Years 1 to 10 100%
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -1 - 10/12/2020
Summary of Cost Benefit Analysis
Projected Tax Projected Tax
Revenues on Revenues on Projected
Project Site Project Site With Projected Payment in
Without Project Project (No Value of Tax Lieu of
Taxing Jurisdiction Tax Rate (No Abatement) Abatement) Abatement Taxes
Board of Disabled Services 0.0649 $ 16 $ 50,840 $ 50,840 $ -
City - Blue Springs 0.6817 172 534,017 534,017 -
Fire District - Central Jackson 1.0886 274 852,767 213,192 639,575
Grain Valley School R-V 5.1059 1,285 3,999,765 3,999,765 -
Jackson County 0.6110 154 478,634 478,634 -
Mental Health 0.1056 27 82,723 82,723 -
Mid-Continent Library 0.3696 93 289,530 289,530 -
State Blind Pension 0.0300 8 23,501 23,501 -
8.0573 $ 2,028 $ 6,311,778 $ 5,672,203 $ 639,575
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -2 - 10/12/2020
Projected Tax Revenues on Project Site Without Project (No Abatement)
Estimated Assessed Value of Project Site $ 2,394 $ 2,442 $ 2,442 $ 2,491 $ 2,491 $ 2,541 $ 2,541 $ 2,591 $ 2,591 $ 2,643
Tax Rate per
Taxing Jurisdiction $100 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Board of Disabled Services 0.0649 $ 2 $ 2 $ 2 $ 2 $ 2 $ 2 $ 2 $ 2 $ 2 $ 2 $ 16
City - Blue Springs 0.6817 16 17 17 17 17 17 17 18 18 18 172
Fire District - Central Jackson 1.0886 26 27 27 27 27 28 28 28 28 29 274
Grain Valley School R-V 5.1059 122 125 125 127 127 130 130 132 132 135 1,285
Jackson County 0.6110 15 15 15 15 15 16 16 16 16 16 154
Mental Health 0.1056 3 3 3 3 3 3 3 3 3 3 27
Mid-Continent Library 0.3696 9 9 9 9 9 9 9 10 10 10 93
State Blind Pension 0.0300 1 1 1 1 1 1 1 1 1 1 8
8.0573 $ 193 $ 197 $ 197 $ 201 $ 201 $ 205 $ 205 $ 209 $ 209 $ 213 $ 2,028
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -3 - 10/12/2020
Projected Tax Revenues on Project Site With Project (No Abatement)
Estimated Assessed Value of Project Site with Project $7,451,954 $7,600,993 $7,600,993 $7,753,013 $7,753,013 $7,908,073 $7,908,073 $8,066,235 $8,066,235 $8,227,560
Tax Rate
Taxing Jurisdiction per $100 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Board of Disabled Services 0.0649 $ 4,836 $ 4,933 $ 4,933 $ 5,032 $ 5,032 $ 5,132 $ 5,132 $ 5,235 $ 5,235 $ 5,340 $ 50,840
City - Blue Springs 0.6817 50,800 51,816 51,816 52,852 52,852 53,909 53,909 54,988 54,988 56,087 534,017
Fire District - Central Jackson 1.0886 81,122 82,744 82,744 84,399 84,399 86,087 86,087 87,809 87,809 89,565 852,767
Grain Valley School R-V 5.1059 380,489 388,099 388,099 395,861 395,861 403,778 403,778 411,854 411,854 420,091 3,999,765
Jackson County 0.6110 45,531 46,442 46,442 47,371 47,371 48,318 48,318 49,285 49,285 50,270 478,634
Mental Health 0.1056 7,869 8,027 8,027 8,187 8,187 8,351 8,351 8,518 8,518 8,688 82,723
Mid-Continent Library 0.3696 27,542 28,093 28,093 28,655 28,655 29,228 29,228 29,813 29,813 30,409 289,530
State Blind Pension 0.0300 2,236 2,280 2,280 2,326 2,326 2,372 2,372 2,420 2,420 2,468 23,501
8.0573 $ 600,426 $ 612,435 $ 612,435 $ 624,684 $ 624,684 $ 637,177 $ 637,177 $ 649,921 $ 649,921 $ 662,919 $6,311,778
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -4 - 10/12/2020
Projected Value of Tax Abatement
Estimated Assessed Value of Project Site with Project $ 7,451,954 $ 7,600,993 $ 7,600,993 $ 7,753,013 $ 7,753,013 $ 7,908,073 $ 7,908,073 $ 8,066,235 $ 8,066,235 $ 8,227,560
Abatement Percentage 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Tax Rate per
Taxing Jurisdiction $100 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Board of Disabled Services 0.0649 $ 4,836 $ 4,933 $ 4,933 $ 5,032 $ 5,032 $ 5,132 $ 5,132 $ 5,235 $ 5,235 $ 5,340 $ 50,840
City - Blue Springs 0.6817 50,800 51,816 51,816 52,852 52,852 53,909 53,909 54,988 54,988 56,087 534,017
Fire District - Central Jackson* 1.0886 20,280 20,686 20,686 21,100 21,100 21,522 21,522 21,952 21,952 22,391 213,192
Grain Valley School R-V 5.1059 380,489 388,099 388,099 395,861 395,861 403,778 403,778 411,854 411,854 420,091 3,999,765
Jackson County 0.6110 45,531 46,442 46,442 47,371 47,371 48,318 48,318 49,285 49,285 50,270 478,634
Mental Health 0.1056 7,869 8,027 8,027 8,187 8,187 8,351 8,351 8,518 8,518 8,688 82,723
Mid-Continent Library 0.3696 27,542 28,093 28,093 28,655 28,655 29,228 29,228 29,813 29,813 30,409 289,530
State Blind Pension 0.0300 2,236 2,280 2,280 2,326 2,326 2,372 2,372 2,420 2,420 2,468 23,501
8.0573 $ 539,585 $ 550,377 $ 550,377 $ 561,384 $ 561,384 $ 572,612 $ 572,612 $ 584,064 $ 584,064 $ 595,745 $ 5,672,203
*The company will pay a PILOT of 75% to the Central Jackson Fire Protection District. As a result, the abatement percentage for the Central Jackson Fire Protection District is 25%.
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -5 - 10/12/2020
Projected Payment in Lieu of Taxes
Estimated Assessed Value of Project Site with Project $ 7,451,954 $ 7,600,993 $ 7,600,993 $ 7,753,013 $ 7,753,013 $ 7,908,073 $ 7,908,073 $ 8,066,235 $ 8,066,235 $ 8,227,560
PILOT 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Tax Rate per
Taxing Jurisdiction $100 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total
Board of Disabled Services 0.0649 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
City - Blue Springs 0.6817 - - - - - - - - - - -
Fire District - Central Jackson* 1.0886 60,841 62,058 62,058 63,299 63,299 64,565 64,565 65,857 65,857 67,174 639,575
Grain Valley School R-V 5.1059 - - - - - - - - - - -
Jackson County 0.6110 - - - - - - - - - - -
Mental Health 0.1056 - - - - - - - - - - -
Mid-Continent Library 0.3696 - - - - - - - - - - -
State Blind Pension 0.0300 - - - - - - - - - - -
8.0573 $ 60,841 $ 62,058 $ 62,058 $ 63,299 $ 63,299 $ 64,565 $ 64,565 $ 65,857 $ 65,857 $ 67,174 $ 639,575
*The company will pay a PILOT of 75% to the Central Jackson Fire Protection District.
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -6 - 10/12/2020
Projected Sales and Use Tax Exemption on Construction Materials
Costs of
Applicable
Construction Exempt
Tax Materials Rate Amount
State of Missouri Sales Tax 6,805,950 4.2250% $ 287,551
State of Missouri Use Tax 3,050,000 4.2250% $ 128,863
Jackson County 2,450,000 1.3750% $ 33,688
Central Jackson County Fire Protection District 125,000 0.5000% $ 625
City of Blue Springs 125,000 2.5000% $ 3,125
$ 453,851
City of Blue Springs, Missouri
(Blue Springs 70 Logistics, LLC)
Cost Benefit Analysis -7 - 10/12/2020