Regular Meeting
Regular MeetingBreedsville, MI · August 1, 2023
Agenda
Village of Breedsville
82 E Main St. PO Box 152
Breedsville, MI 49027
(269) 427-9029
Regular Meeting Agenda
Tuesday, August 1, 2023 - 7:00 PM
These proceeding tonight are being recorded to help prepare the minutes, after minutes are prepared this recording will be no longer available after
approval of the village council. Michigan Open Meetings Act MCL 15.262(1).
Page
1. CALL TO ORDER:
2. PLEDGE OF ALLEGIANCE:
3. ROLL CALL:
4. AGENDA
4.1 Agenda presented for approval
5. CONSENT AGENDA:
5.1 Minutes from the previous meetings 3-5
Regular Meeting - 11 Jul 2023 - Minutes - Pdf
5.2 Expenditures 6
General fund check detail - Aug 2023
6. REPORTS:
6.1 Sheriff Deputy
6.2 VBC Commissioner (Kurt Doroh)
6.3 ZONING Report 7
Agenda Item Report - AIR-23-009 - Pdf
7. UNFINISHED BUSINESS:
8. NEW BUSINESS:
8.1 County Drain Dix Road - Road Damage 8 - 10
IMG-3133
IMG-3134
IMG-3135
8.2 Building Inspector 11 - 21
Village of Breedsville cover letter 8-2023
building valuation board approval documents 8-1-2023
BCC324_GENERIC_BUILDING_PERMIT_8-1-23
8.3 Deputy Clerk
9. PUBLIC COMMENTS:
Page 1 of 21
10. BOARD COMMENTS:
10.1 Trustee L. Weniger
Trustee P. Cooley
Trustee T. Weniger
Trustee Yeager
President Rogusta
11. FINAL ANNOUNCEMENTS:
Next Meeting September 05, 2023, @ 7:00 pm
12. ADJOURNMENT
12.1 Adjournment
Page 2 of 21
Village of Breedsville
82 E Main St. PO Box 152
Breedsville, MI 49027
(269) 427-9029
Regular Meeting Minutes
Tuesday, July 11, 2023 7:00 PM Village Hall
1. CALL TO ORDER:
Call to order @ 7:00pm
2. PLEDGE OF ALLEGIANCE:
Led by all
3. ROLL CALL:
PRESENT: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven
Rogusta,
EXCUSED:
4. AGENDA
4.1 Agenda presented for approval.
Moved by Trustee Larry Weniger, seconded by Trustee - Pro Temp William "Billy"
Yeager, Motion accept agenda with addition of 8.4.
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
5. CONSENT AGENDA:
5.1 Minutes from the previous meetings
Moved by Trustee - Pro Temp William "Billy" Yeager, seconded by Trustee Paul
Cooley, Motion to approve minutes from previous meeting
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
Page
Page31ofof21
3
5.2 Expenditures
Moved by Trustee Larry Weniger, seconded by Trustee Paul Cooley, Motion to
approve Expenditures as presented.
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
6. REPORTS:
All reports on file
6.1 ZONING Report
6.2 Sheriff Deputy/Fire Dept
6.3 VBC Commissioner (Kurt Doroh)
7. UNFINISHED BUSINESS:
No unfinished items
8. NEW BUSINESS:
8.1 ORDINANCE PROHIBITING HUNTING WITHIN THE VILLAGE
Moved by Trustee - Pro Temp William "Billy" Yeager, seconded by Trustee Larry
Weniger, Motion to table more information.
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
Moved by Trustee - Pro Temp William "Billy" Yeager, seconded by Trustee Paul
Cooley, Motion to place on webpage
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
8.2 Flag line going across Road.
Moved by Trustee Larry Weniger, seconded by Trustee - Pro Temp William "Billy"
Yeager, Motion to repair the line going across the road. Stainless steel cable.
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
Page
Page42ofof21
3
8.3 Audit Report
Moved by Trustee Larry Weniger, seconded by Trustee - Pro Temp William "Billy"
Yeager, Motion to approve the Audit as submitted.
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
8.4 Deputy Clerk
Moved by Trustee - Pro Temp William "Billy" Yeager, seconded by Trustee Tim
Weniger, Motion to hire Tiffany as Deputy Clerk at the rate of $50.00 per month
pending background check.
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
9. PUBLIC COMMENTS:
9.1 No Public Comments
10. BOARD COMMENTS:
10.1 Trustee L. Weniger - Ask for a second can for gas.
Trustee T. Weniger - nothing
Trustee P. Cooley - nothing
Trustee W. Yeager - nothing
President S. Rogusta - nothing
11. FINAL ANNOUNCEMENTS:
12. ADJOURNMENT
12.1 Adjournment
Moved by Trustee Larry Weniger, seconded by Trustee - Pro Temp William "Billy"
Yeager, Motion to adjourn at 7:40 pm
Carried by the following votes:
Ayes: Trustee Larry Weniger, Trustee Paul Cooley, Trustee Tim Weniger,
Trustee - Pro Temp William "Billy" Yeager, and President Steven Rogusta
Page
Page53ofof21
3
7:47 PM General Fund
07/31/23 Check Detail
July 11 through August 1, 2023
Type Num Date Name Item Account Paid Amount Original Amount
Check EFT 07/13/2023 CONSUMERS EN... 000.001 · Cash -98.24
270.921 · Utilities -98.24 98.24
TOTAL -98.24 98.24
Check EFT 07/26/2023 CONSUMERS EN... 000.001 · Cash -363.89
441.921 · Street Lig... -363.89 363.89
TOTAL -363.89 363.89
Check 4718 08/01/2023 ROBERT DE LOOFF 000.001 · Cash -260.00
101.808 · Zoning A... -260.00 260.00
TOTAL -260.00 260.00
Check 4719 08/01/2023 VAN BUREN REMI... 000.001 · Cash -173.00
101.900 · Printing ... -173.00 173.00
TOTAL -173.00 173.00
Page 1
Page 6 of 21
AGENDA ITEM REPORT
Meeting Date: August 01, 2023
Staff Contact: Robert Delooff, Blight/Zoning Administrator
Department: Other
Subject: ZONING Report
Recommendation(s):
I guess my report this past month is looking forward to the board searching for a building
inspector so we can move forward with the properties that are for sale in our area. I have had
inquiries about building and have no answer for them.
Page 7 of 21
Page 8 of 21
Page 9 of 21
Page 10 of 21
Village of Breedsville 8-1-2023
Building Valuation Data square foot construction cost updated every February &
August of every year to keep with the up-to-date cost of construction in all
building type & use. Asking the board to make a motion to allow the most current
Building Valuation Date Sheet to be used every time they are updated. I still will
be using the current 2013 Building permit fee schedule from the Bureau of
Construction Codes. This will make it easier than bringing it to the board every six
months for approval. Using the current building square foot cost keeps the
buildings in line with the assessor’s records.
Thank you,
Rich McGrew
Building Official, inspector, and plan reviewer
Page 11 of 21
BUREAU OF CONSTRUCTION CODES
PERMIT AND INSPECTION FEE SCHEDULE
ESTABLISHED UNDER THE STILLE-DEROSSETT-HALE STATE CONSTRUCTION
CODE ACT, 1972 PA 230, MCL 125.1501 ET SEQ.
BUILDING PERMIT FEE SCHEDULE
The total cost of improvement is based on the Bureau of Construction Codes Square Foot
Construction Cost Table. Plan review fees for use groups R-3 and R-4 only are included in this
computation. Prcmunul'actured unit Fees are based upon 50% of’ the normal on-site construction
permit fee. The ?rst Eli
I 00.00 oi‘:-inapplication fee is non-refundable.
to I3I .000 (includes one inspection only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75.00
$1,000 to $10,000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75.00 plus $l0 per I ,0()0 over I .000
$10.00! to $100,000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $165.00 plus $3 per 521 .000 over $l0.000
.‘Sl00,000 to $500000 . . . . . . . . . . . . . . . . . . . . . . . . . . . 53435.0() plus $2 per $1,000 over 55I 00.000
S50(),000 plus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I ,235.00 plus per $1 .000 over 3500000
All work not involving a square Footcomputation:
Plan review and administration base fee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00
plus $100.00 for each inspection
Additionzil inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00
Special inspection (pertaining to sale ofbuilding) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00
Demolition:
Plan review and adininistrzttionbase fee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$I00.00
plus .‘i30.07
per square foot on demolition
Certiliczite ol"Occup2mcy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00
(Required for all building, permits except demolition permits)
—
Approved by Construction Code Commission FclnwimgvI3. 20l3
Page 12 of 21
—
E§|:lI)IISIl(‘(l by Director, Dcpartnient of Licensing and Regulatory Affairs February 26, 2013
—
Effective Date April I, 2013
/Zeé Z0} 3
For purposes of establishing the Permit Fee Multiplier,
The BVD is not intended to apply to alterations or the estimated total annual construction value for a given
repairs to existing buildings. Because the scope of time period (1 year) is the sum of each building's value
alterations or repairs to an existing building varies so (Gross Area x Square Foot Construction Cost) for that
greatly, the Square Foot Construction Costs table does time period (e.g., 1 year).
not re?ect accurate values for that purpose. However,
the Square Foot Construction Costs table can be used The Square Foot Construction Cost does not include
to determine the cost of an addition that is basically a the price of the land on which the building is built. The
stand-alone building which happens to be attached to Square Foot Construction Cost takes into account
an existing building. In the case of such additions, the everything from foundation work to the roof structure
only alterations to the existing building would involve the and coverings but does not include the price of the land.
attachment of the addition to the existing building and The cost of the land does not affect the cost of related
the openings between the addition and the existing code enforcement activities and is not included in the
building. Square Foot Construction Cost.
Square Foot Construction Costs 3-"l°
Group (2021 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB
A-1 Assembly, theaters, with stage 338.88 327.46 319.76 307.63 289.42 280.47 298.24 268.37 259.83
A-1 Assembly. theaters. Withdut stage 310.12 298.70 291.00 278.87 260.66 251.71 269.48 239.62 231.07
A-2 Assembly. nightclubs 275.09 266.93 259.34 250.54 234.96 228.26 241.54 213.57 206.65
A-2 Assembly. restaurants. bars» banquet halls 274.09 265.93 257.34 249.54 232.96 227.26 240.54 211.57 205.65
A-3 Assembly. Churches 314.65 303.24 295.53 283.41 265.65 256.70 274.02 244.61 236.06
A-3 Assembly, general, community halls, libraries,
museums 268.44 257.02 248.32 237.19 218.26 210.31 227.80 197.22 189.68
A-4 Assembly. arenas 309.12 297.70 289.00 277.87 258.66 250.71 268.48 237.62 230.07
3 Business 263.16 253.51 244.15 233.85 213.00 204.65 224.67 187.98 179.49
E Educational 280.42 270.83 263.70 252.34 235.54 223.64 243.64 205.87 199.45
F-1 Faetery and industrial.mederate hazard 161.70 154.21 144.70 139.94 124.72 118.51 133.72 103.40 96.83
F-2 Faetery and industrial» l0W hazard 160.70 153.21 144.70 138.94 124.72 117.51 132.72 103.40 95.83
H-1 High Hazard. explosives 150.85 143.36 134.84 129.08 115.17 107.96 122.87 93.86 N.P.
H234 High Hazard 150.85 143.36 134.84 129.08 115.17 107.96 122.87 86.28
93.86
H-5 HPM 263.16 253.51 244.15 233.85 213.00 204.65 224.67 187.98 179.49
l-1 institutional.supervised enyirenrnent 264.93 255.57 _ 246.84 238.11 217.64 211.63 238.15 195.82 189.67
l-2 institutional.hdsbitals 438.26 428.62 419.26 408.96 386.98 N.P. 399.78 361.97 N.P.
nursing homes
l-2 institutional. 304.86 295.22 285.86 275.55 256.23 N.P. 266.37 231.21 N.P.
l-3 lnstitutl°nal- restrained 298.67 289.02 279.66 269.36 250.30 240.95 260.18 225.29 214.80
day Care facilities
l-4 institutional. 264.93 255.57 246.84 238.11 217.64 211.63 238.15 195.82 189.67
M Mercantile 205.22 197.06 188.47 180.67 164.83 159.13 171.67 143.44 137.53
R-1 Residential.hotels
Page 13 of 21
267.42 258.06 249.33 240.60 220.62 214.60 240.64 198.79 192.64
R-2 Residential.multiple tarnily 223.61 214.25 205.52 196.79 177.77 171.76 196.82 155.95 149.80
R-3 Residential. One- and tW0-family "
Important Points
6.. 3522--
For purposes of establishing the Permit Fee Multiplier.
- The BVD is not intended to apply to alterations or the estimated total annual construction value for a given
repairs to existing buildings. Because the scope of time period (1 year) is the sum of each buildings value
alterations or repairs to an existing building varies so (Gross Area x Square Foot Construction Cost) for that
greatly. the Square Foot Construction Costs table does time period (e.g., 1 year).
not reflect accurate values for that purpose. However,
the Square Foot Construction Costs table can be used The Square Foot Construction Cost does not include
to determine the cost of an addition that is basically a the price of the land on which the building is built. The
stand-alone building which happens to be attached to Square Foot Construction Cost takes into account
an existing building. in the case of such additions, the everything from foundation work to the roof structure
only alterations to the existing buildingwould involve the and coverings but does not includethe price of the land.
attachment of the addition to the existing building and The cost of the land does not affect the cost of related
the openings between the addition and the existing code enforcement activities and is not included in the
building. Square Foot Construction Cost.
Square Foot Construction Costs 3- '=-°
Group (2021 International Building Code) lA ll3 llA IIB lllA l|lB lV VA VB
A4 Assembly. tl1e3t8|'S~Wlttl5l€l99 341 .86 330.34
_
322.57 310.34 291.96 282.93 300.86 270.73 262.11
theaters» Wlltl0UlStage
A_->t_V/V\SS0:1lJty. 312.84 301.33 293.56 281.32 262.95 253.92 271.85 241.72 233.10
4-? /\SS0mbtY."lQlttClUl35 259.34 250.54 228.26
P275.09266.93 234.96 241.54 213.57 206.65
, A-2 Assernbiy. restaurants. bars. banquet halls 274.09 265.93 257.34 249.54 232.96 227.26 240.54 211.57 205.65
"A-3Assembiy.churci1es 317.43 305.92 298.14 285.91 267.99 258.96 276.44 246.76 238.14
A-3 Assembly, general, community halls. libraries,
museums _
270.80 259.29 250.52 239.28 220.19 212.16 _229.81 198.96 191.35
A-4 Assembty?ren?s 311.84 _300.33 291.56 280.32 260.95 252.92 270.85 239.72 232.10
3 BUSllt'3S5 265.63 255.90 246.45 236.05 215.01 206.57 226.78 189.75 181.18
E EdUCatl0"3l 282.69 273.02 265.84 254.38 237.44 225.45 245.61 207.53 201.06
m°d9l3te
F-1 Factory and ln<tUSl'lal~ ll?laltl 161.70 154.21 144.70 139.94 124.72 118.51 133.72 103.40 96.83
F-2 Factory and industrmttowhazard 160.70 153.21 144.70 138.94 124.72 117.51 132.72 103.40 95.83
H4 Hlgll Hazard. e><Pl05tV9S 134.84 129.08 115.17
150.85 143.36 107.96 122.87 93.86 N.P.
H234 Hist) Hazard 150.85 143.36 134.84 129.08 115.17 107.96 122.87 93.86 86.28
‘+5 l1l°lVl 265.63 255.90 246.45 236.05 215.01 206.57 226.78 189.75 181.18
M Insmurionat.supervisedenvironmem 269.11 259.88 252.15 241.97 222.52 216.37 242.28 199.48 193.49
l-2 Institutional.
t10SrJttalS 442.38 432.64 423.19 412.79 390.61 N.P. 403.53 365.36 N.P.
nursing homes
I—2InsmutionaI. 307.72 297.98 288.54 278.13 258.63 N.P. 268.87 233.38 N.P.
Al‘3l'l5lllUll°ll5ll-lesllallled 301.48‘ 291.74 282.29 271.89 252.65 243.22 262.63 227.40 216.82
Mtnstilutionat.davcarefacitiltes 269.11 259.88 252.15 241.97 222.52 216.37 242.28 199.48 19349
M Metcalltlle 205.22 197.06 188.47 180.67 164.83 159.13 171.67 143.44 137.53
R~1ResidemlaI.hoteis 271.95 262.72 254.98 244.80 225.03 218.88 245.11 201.99 _198.00
R-2 Residential.mutlintetamity 227.64 218.41 210.68 200.50 _182.02 175.88 200.81 158.99 153.004
Page 14 of 21
843 Residential. 0116- and two-family “ 212.00 206.26 200.94 195.99 190.28 183.39 192.66 176.52 166.08
R-4 Residential.Cate/assisted facilities
llVl"9
important Points
P5i, 20 Z L
o For purposes of establishing the Permit Fee Multiplier,
a
the estimated total annual construction value for a given
The BVD is not intended to apply to alterations or
time period (1 year) is the sum of each building’s value
repairs to existing buildings. Because the scope of
(Gross Area x Square Foot Construction Cost) for that
alterations or repairs to an existing building varies so
greatly, the Square Foot Construction Costs table does time period (e.g., 1 year).
- The Square Cost does
'Seq?Ue;teaiSg$aCE:xgtiifiL:r(§2::Sp:ari§i:S;nH§évE:::i
Fhoet include Foot Construction not
the the building built.
io Cieieimine iiie Cost of an addiiion ihai is basicaiiy a the price of land on which is The
stand-alone building which happens to be attached to Squaw Foot Constmctio” Cost takes into accomt
an existing building in the case of such additions the everything from foundation Work to me roof Strucme
. . . . . and coverings but does not include the price of the land.
id. i
g?glcilit?gitilOoriisi?iztgggiiilg?rig
; bi'iri1i:;(i)i:;ea2§ The cost of the land does not affect the cost of related
the openings between the addition and the existing is not included in the
building.
gait:r:ni§%§f81:i::if:JigiQE?eéO:Td
Square Foot Construction Costs 8-'=~°
Group (2021 international Building Code) IA IB IIA IIB lllA lllB IV VA VB
C
MAssembIy.theaters.wimsiage 309.06 298.66 291.64 280.58 263.98 255.82272.02 244.80 237.02
A-1Assembly.theaters.wimoutsta9e 282.85 272.45 265.42 254.37 237.77 229.61A245.81218.59 210.80“
A~2AssembIy.nigmclubs 237.31 230.23 224.56 215.36 202.99 197.40 207.69 183.68 1771.40”
A-2Assemb1y.resiaurams.barsmanuuethalls 236.31 229.23 222.56 214.-36- 206.69‘
200.99 196.40’ 181.68 17A6:lt)“
A-3AssembIy.churches 286.90 276.49 269.47 258.42 242.23 234.07_ 249.86 223.05__2_15.26
A-3 Assembly, general, community halls, libraries,
Aniuseums 244.77 234.37 198.94 191.79) 207.73 179.77 172.98
226.34-216.29
/-\—4AssembIv.a»'e«1as 281.85 271.45 263.42 253.37
235.77 228.61A244.81216.59 209.80
BB_'-Isiness _,
240.90 232.07 223.51 214.08
194.91 187.36 205.68 172.02 164.34
E?ducanonai 257.70 248.89 242.35 231.90
216.47 205.54 _223.92 _189.21 183.31
F-1Factoiyancundusiriai.moderatehazard 144.93 138.11 130.39 125.40
112.49 107.10 120.02 92.69 86.88
F-2Facioryandinuusmai.Iowhazard _-143.93137.11 130.39 124.40
112.49 106.10 119.02 92.69 85.88
H-1Hi9hHazard.e§;l0Sive$ -135.29128.47 121.75115.76 104.14 97.75 110.39_ 84.34 N.P.
_H234HighHazarc1_ 135.29 128.47 __121.75 115.76 104.14) 97.75 _110.39 84.34, 77.53
H-5HPM_ 240.90 232.07 223.51_ 214.08 194.91 187.36 _20_5.68“_17__2.02 164.34
I-1Institutional.suinervisedenvironmem 244.45 236.08 229.06 219.82 202.16 196.58 220.10 181.25?175.81)
i«2Insmunonal.nosrmais 401.22 392.40 383.83 374.40 354.29 N.P. 366.00 331.40 N.P. M
i~2Insmmionai.nursinghomes 279.15 270.32 261.76 252.33 234.64 N.P. 243.93 211.75 N.P.
1-3Instiititiormrestrained 273.40 264.57 256.00 246.57 229.13 220.58 206.24 196.56
238.17*
‘I-4Insiittmonai.davcarefacilities 244.45 _236.08 229.06 219.82 202.16 196.58 220.10 181.25 175.81
Myerjgamiie _
177.02 169.94 163.27 155.07 142.48 137.88_ 147.40 _123.17 117.89
.R-1Residemiathoteis 246.94 238.56 231.54 222.30 204.35 198.77 222.58 183.44 178.00
Page 15 of 21 "82Resiaennai.mumpieramily 206.81 198.43 182.17 165.41 159.83 182.46 144.50
W19141 139.06:
_R-3Residepuai.one-andtwo-family" 192.58 187.37__]82.53 ___178.04 172.85 166.59 175.01 160.35 450.87
R-4Residential.care/assistediiviiwsfacilities
Important Points 1} Z./J2/9
or purposes of establish ng the Permit Fee lvlultiplier.
the estimated total annual construction value for a
The BVD is not intended to apply to alterations or
repairs to existing buildings. Because the scope of given time period (1 year) is the sum of each buildings
value (Gross Area x Square Foot Construction Cost)
alterations or.repairs to an existing building varies so
for that time period (e.g., 1 year).
greatly. the Square Foot Construction Costs table
does not reflect accurate values for that purpose.
The Square Foot Construction Cost does not include
However. the Square Foot Construction Costs table
can be used to determine the cost of an addition that is the price of the land on which the building is built. The
basically a stand-alone building which happens to be Square Foot Construction Cost takes into account
attached to an existing building. In the case of such everything from foundation work to the roof structure
additions, the only alterations to the existing building and coverings but does not include the price of the
would involve the attachment of the addition to the land. The cost of the land does not affect the cost of
existing building and the openings between the related code enforcement activities and is not included
addition and the existing building. in the Square Foot Construction Cost.
Square Foot Construction Costs 1”‘-l’-°
Group (2021 International Building Code) IA lt3 llA |lB IIIA lllB IV VA VB
A-1 Assembly. lli93lei5~Will‘Slag‘? 298.55 288.43 280.93 269.54 253.09 245.77 260.87
I 235.34 226.84 A
'}A-1 Assembly. theaters. without stage 273.51 263.39 255.89 6
244.51 228.06 220.73 235.84 210.31 201.80
A-2 Assembly. i1i9lilClUb5 233.39 226.42 220.85 211.80 199.64 194.14 204.26 180.65 174.48
1
A-2 Assembly. restaurants. bars. banquet halls 232.39 225.42 218.85 210.80 197.64 193.14 203.26 3
178.65 173.48
l /*3 /\S59ml3ly.0liUFCl195 276.84 266.72 259.22 247.83 231.83 225.68 239.17 214.08 205.57
A~3 Assembly, general. community halls, libraries.
.m,5euni5 231.62 221.50 213.00 185.16
_ 178.84 193.94 167.42 159.91 >
/*4 /\sseml>|v. arenas 272.51 262.39 253.89 243.51 226.06 219.73 234.84 208.31 #20080
_l3Bllsllless 240.93 232.14 224.41 213.38 194.94 187.44 204.97 171.50 163.65_
E E<lUi3€lli0i1al 253.16 244.50 238.07 227.82 212.65 201.92 219.97 185.88 180.09
and ll1€lUSlii9l-l“0‘l'3l3l9 hazard
F-1 F3Cl0iY 142.51 135.81 128.20 123.31 110.60 105.32 118.02 91.13 85.44
F-2 Factory and l”dU5l'i3l-l0W lialald 141.51 134.81 128.20 122.31 110.60 104.32 117.02 _
91.13__ 84.44
eXDl0SlVGS
_H~1High l'l6Z8l‘<l. 133.05 126.35 119.74 113.85 102.42 96.14 108.56 82.95 N.P.
_ V
H234 l’ll9l1l‘laZ€lF<l 133.05 126.35 119.74 113.85 102.42 96.14 108.56 82.95 76.26
l'l-5l1PlVl 240.93 232.14 224.41 213.38 194.94
_
187.44 204.97 171.50 163.65
eliVl‘0“""8“l
H lnslllulltmal.SUPER/l58<i 240.35 232.11 225.21 a 12
_
198.77 193.28 216.40 178.22 172.87
l*?-lliSlllUll0i18l~l10SPil3lS
l-2 l?sillllliolial. nursing li0lTl9S
leslial?ed
l‘3 l”5lllUll0"8l=
__
403.60
280.29
273.98
394.81
271.50
265.19
_
387.08
263.77
257.46
_ 356.54
252.74235.00
246.43 229.58
N.P.
N.P.
221.08
367.65
244.34
238.03
333.11
211.57
206.14
N.P.
NP.
196.29
l--4l?slllulloiial. day Cale lacllllles 240.35 232.11 225.21 216.12 198.77 193.28 216.40 178.22__ 172.87
M Mercantile 174.08 167.12 160.55 152.50 140.10 135.60 144.96 121.12 115.94
R4 ReSld9l‘ll8l_1_ii0l9lS 242.77 234.53 227.63 218.55 200.90 195.42 218.82 180.35 175.00%
R-2 Residential.multiple family 203.34 195.11 188.20
_
Page 16 of 21 179.12 162.64 157.15 179.40 142.08 136.73
R-3 Resltlenllal.one-and 1W0-family“ 189.34 184.22 179.47 175.04 169.94 163.79 172.07 157.66 148.33
13-4Resiclenllal.Cale/Hsslsletl living facilllies 240.35 232.11 225.21 216.12 198.77 193.28 216.40 178.22 172.87
Important Points 129 2.0 Z1For purposes of establishing the Permit Fee Multiplier.
The BVD is not intended to apply to alterations or the estimated total annual construction value for a given
repairs to existing buildings. Because the scope of time period (1 year) is the sum of each building's value
alterations or repairs to an existing building varies so (Gross Area x Square Foot Construction Cost) for that
greatly, the Square Foot Construction Costs table does time period (e.g., 1 year).
not reflect accurate values for that purpose. However,
the Square Foot Construction Costs table can be used The Square Foot Construction Cost does not include
to determine the cost of an addition that is basically a the price of the land on which the building is built. The
stand-alone building which happens to be attached to Square Foot Construction Cost takes into account
an existing building. In the case of such additions. the everything from foundation work to the roof structure
only alterations to the existing building would involve the and coverings but does not include the price of the land.
attachment of the addition to the existing building and The cost of the land does not affect the cost of related
the openings between the addition and the existing code enforcement activities and is not included in the
building. Square Foot Construction Cost.
Square Foot Construction Costs 5"-°
Group (2018 international Building Code) IA lB IIA IIB lllA IIIB IV VA VB
A-1Assembly.uweamwimsxage 253.05 254.15 247.55 237.53223.05 215.50 229.90 207.42 199.94
A-1Assembiwhearers.wimoutstage 241.02 232.11 225.51 215.49 201.01 194.55 207.85 185.38177.89~
_A—2Assemb1y.nightclubs 205.93 199.80 194.89_185.91 175.19 171.34 180.27 159.45 154.02)
A-2Assemb1y.restaurants.barsmanciuethails 204.93 198.80 192.89 185.91 174.19 170.34 179.27 157.45 153.02
A-3AssembIy.churches 243.83 234.92 228.32 218.30 204.21" 198.79 -210.57 188.58 -181.10
A-3 Assembly, general, community halls. libraries,
.nuse...;s 204.02 195.11 187.51 178.49 153.01 157.55 170.85 147.38 140.89
A-4Assembiy.arenas 240.02 231.11 223.51 214.49 199.01 193.55 205.85 183.38 175.89
Bsusiness 212.45 204.72 197.90 188.18 171.81 155.32 180.77 151.15 144.35
Ewueationai 222.59 214.99 208.81 199.81 185.17 175.74 192.93 152.78 157.80
F-1Factoryandindustrial.mocteratehazard 125.58 119.58 112.85 108.58 97.37 92.83 104.02 80.23 75.34
F-2Factoryandinduslrial.Iowhazard 124.58 118.88 112.88 107.58 97.37 91.83 103.02 80.23 74.34
_H-1HighHazar<1.exp1os1ves 117.37 111.47 105.55 100.47 90.40 84.87 95.81 73.27 N.P.
_
H2s4HighHazard 117.37 111.47 105.55 100.47 90.40 84.87 95.81 73.27 57.37
H-SHPM _212.46 204.72 197.90 188.18 171.81 155.32 180.77 151.15 144.35
I-1Insmuuonal.supervisedenvironmem 211.58 204.34 198.27 190.28 175.02 170.20 190.53 155.95 152.25
I—2Insmu1ianaI.lwosimais _
355.95 348.21 341.39 331.57 314.48 N.P. 324.25 293.82 N.P.
I—2Insmuu'onaI.nursinghomes 247.27 239.53" 232.71 222.99 207.35 N.P. 215.58 185.70 N.F'.
I-slnsmutional.restrained 241.59 233.85 227.03 217.31 202.45 194.97 181.80
209.90 173.00
I-Mnsmunonal.<1aycareraciImes 211.58 204.34 198.27 190.28 175.02 170.20 190.53 155.95 152.25
MMercantiIe 153.55 147.41 141.50 134.53 123.48 119.83 127.88 105.75 102.31
R-1Resi<1enuaI.hoteIs 213.59 _205.35 200.28 192.29 175.78 171.95 192.54 158.70 154.00
8-mes-dental.mumpietanwiw 179.04 171.80 155.73 157.74 143.25 138.43 157.99 125.18 120.47
Page 17 of 21
r<~3Res1denna1.one-anatwo-ramny“ 155.58 152.17‘ -157.99 154.10 149.51 144.19 151.48 138.79 130.58
84Residential.care/assistedIivingracnmes 211.58
BUILDING PERMIT APPLICATION PERMIT # ____________________
Village of Breedsville
Phone: (269) 228-3234 PARCEL # 80-40-_______________
Email: mcgrewbuilding@gmail.com
Rich McGrew Authority: 1972 PA 230. Completion: Mandatory to
88040 M-40 Highway, Lawton, MI 49065 obtain permit. Penalty: Application must be completed,
signed, and proper fee paid, or permit will not be issued.
Applicant to Complete All Items in Sections I, II, III, IV, V, VI and VII
Note: Separate Applications Must Be Completed for Plumbing, Mechanical, and Electrical Work Permits
I. PROJECT INFORMATION
PROJECT NAME ADDRESS
II. IDENTIFICATION
A. OWNER OR LESSEE
NAME ADDRESS
CITY TELEPHONE NUMBER EMAIL ADDRESS
B. ARCHITECT OR ENGINEER
NAME ADDRESS
CITY TELEPHONE NUMBER EMAIL ADDRESS
LICENSE NUMBER EXPIRATION DATE
C. CONTRACTOR
NAME TELEPHONE NUMBER EMAIL ADDRESS
ADDRESS CITY ZIP CODE
BUILDERS LICENSE NUMBER EXPIRATION DATE
FEDERAL EMPLOYER ID NUMBER OR REASON FOR EXEMPTION
WORKERS COMP INSURANCE CARRIER OR REASON FOR EXEMPTION
MESC EMPLOYER NUMBER OR REASON FOR EXEMPTION
III. TYPE OF IMPROVEMENT AND PLAN REVIEW
A. TYPE OF IMPROVEMENT
NEW CONSTRUCTION ALTERATION DEMOLITION ACCESSORY BUILDING MOBILE HOME SET-UP
ADDITION RE-ROOF BASEMENT FINISH DECKS/PORCHES ACCESSORY DWELLING
UNIT
POOL POOL FENCE
B. PLAN REVIEW REQUIRED
Complete Building Permit Application (with plot plan showing front, side, and rear setbacks, building location, etc.)
Plans – 2 Hard Copies and 1 Electronic Copy (must be sealed if commercial or residential over 3,500 sq. ft)
All Building Plans should show square footage on each level, example 1st floor, 2nd floor, garage, deck, porch etc.
Copy of Builder’s License
Page 18 of 21
IV. PROPOSED USE OF BUILDING
A. RESIDENTIAL
1. ONE FAMILY 3. HOTEL, MOTEL 5. DETACHED GARAGE
NO. OF UNITS
2. TWO OR MORE FAMILY 4. ATTACHED GARAGE 6. OTHER
NO. OF UNITS
B. NON-RESIDENTIAL
7. AMUSEMENT 11. SERVICE STATION 15. SCHOOL, LIBRARY, EDUCATIONAL
8. CHURCH, RELIGION 12. HOSPITAL, INSTITUTIONAL 16. STORE, MERCANTILE
9. INDUSTRIAL 13. OFFICE, BANK, PROFESSIONAL 17. TANKS, TOWERS
10. PARKING GARAGE 14. PUBLIC UTILITY 18. OTHER
NONRESIDENTIAL-DESCRIBE IN DETAIL PROPOSED USE OF BUILDING, E.G. FOOD PROCESSING PLANT, MACHINE SHOP, LAUNDRY BUILDING
AT HOSPITAL, ELEMENTARY SCHOOL, SECONDARY SCHOOL, COLLEGE, PAROCHIAL SCHOOL, PARKING GARAGE FOR DEPARTMENT STORE,
RENTAL OFFICE BUILDING, OFFICE BUILDING AT INDUSTRIAL PLANT. IF USE OF EXISTING BUILDING IS BEING CHANGED, ENTER PROPOSED
V. SELECTED CHARACTERISTICS OF BUILDING
A. PRINCIPAL TYPE OF FRAME
1. MASONRY, WALL BEARING 2. WOOD FRAME 3. STRUCTURAL STEEL 4. REINFORCED CONCRETE 5. OTHER
B. PRINCIPAL TYPE OF HEATING FUEL
6. GAS 7. OIL 8. ELECTRICITY 9. COAL 10. OTHER
C. TYPE OF SEWAGE DISPOSAL
11. PUBLIC OR PRIVATE COMPANY 12. SEPTIC SYSTEM
D. TYPE OF WATER SUPPLY
13. PUBLIC OR PRIVATE COMPANY 14. PRIVATE WELL OR CISTERN
E. TYPE OF MECHANICAL
15. WILL THERE BE AIR CONDITIONING? YES NO 16. WILL THERE BE FIRE SUPPRESSION? YES NO
F. DIMENSIONS/DATA
EXISTING ALTERATIONS NEW
17. NUMBER OF STORIES 2. FLOOR AREA:
18. TOTAL HEIGHT TO PEAK __________
BASEMENT
19. USE GROUP
20. 1ST & 2ND FLOOR
CONST. TYPE
21. NO. OF OCCUPANTS PORCH/DECK
GARAGE
TOTAL AREA
G. PROJECT COST
___________________________________
Page 19 of 21
SIT
VI. SITE PLAN or PLOT PLAN– Applicant should indicate all proposed buildings as well as all existing buildings,
their dimensions to one another and the dimensions to the property lines and road right of ways. Also, indicate all
utilities and any public or private easements, lakes, ponds, rivers or streams.
The Department will not discriminate against any individual or group because of race, sex, religion, age, national origin, color, marital status, disability or political beliefs. If you need help with reading, writing,
hearing, etc., under the Americans with Disabilities Act, you may make your needs known to this agency.
VII. APPLICANT INFORMATION
APPLICANT IS RESPONSIBLE FOR THE PAYMENT OF ALL FEES AND CHARGES APPLICABLE TO THIS APPLICATION AND MUST PROVIDE THE
FOLLOWING INFORMATION.
NAME TELEPHONE NO.
ADDRESS CITY STATE ZIP CODE
FEDERAL I.D. NUMBER
I HEREBY CERTIFY THAT THE PROPOSED WORK IS AUTHORIZED BY THE OWNER OF RECORD AND THAT I HAVE BEEN AUTHORIZED BY THE
OWNER TO MAKE THIS APPLICATION AS HIS/HER AUTHORIZED AGENT, AND WE AGREE TO CONFORM TO ALL APPLICABLE LAWS OF THE
STATE OF MICHIGAN. ALL INFORMATION SUBMITTED ON THIS APPLICATION IS ACCURATE TO THE BEST OF MY KNOWLEDGE.
Section 23a of the state construction code act of 1972, 1972 PA 230, MCL 125.1523A, prohibits a person from conspiring to circumvent the
licensing requirements of this state relating to persons who are to perform work on a residential building or a residential structure. Violators
of section 23a are subjected to civil fines.
SIGNATURE OF APPLICANT
Page 20 of 21
VIII. LOCAL GOVERNMENTAL AGENCY TO COMPLETE THIS SECTION
ENVIRONMENTAL CONTROL APPROVALS
REQUIRED? APPROVED DATE NUMBER BY
A - ZONING YES NO
B - FIRE DISTRICT YES NO
C - POLLUTION CONTROL YES NO
D - DRIVEWAY YES NO
E - SOIL EROSION YES NO
F - FLOOD ZONE YES NO
G – SEWER CONNECTION FEE YES NO
H – WATER CONNECTION FEE YES NO
I - VARIANCE GRANTED YES NO
J - OTHER YES NO
IX. VALIDATION - FOR DEPARTMENT USE ONLY
USE GROUP BASE FEE
TYPE OF CONSTRUCTION NUMBER OF INSPECTIONS
SQUARE FEET
APPROVAL SIGNATURE
TITLE DATE
Building Official
Page 21 of 21
Get email alerts for Breedsville
A daily email when new agendas and minutes are posted.