Muyni
← Back to Cabot

City Council

Regular Meeting

Cabot, AR · August 18, 2025

AgendaMinutes

Agenda

Cabot City Council – Work Session Agenda Cabot Justice Center 805 W. Main Street, Cabot, AR 72023 August 18, 2025 @ 6:30 pm CALL TO ORDER NOMINATING COMMITTEE – CHAIR STEPHEN REDD MUNICIPAL SERVICES COMMITTEE – CHAIR EDDIE LONG 1. An Ordinance Creating, Certifying, and Confirming Tax Liens Against Real Properties at Various Locations within the City of Cabot for Funds Expended to Pay for Services Rendered Due to Code Violations – Presented by Laura Nobles 2. An Ordinance Authorizing the Execution of Fifth Amendments to Lease Agreements as more Fully Described Herein; Authorizing City Officials to Execute Said Fifth Amendments; Confirming the Nonrecourse Nature of the City’s Financial Obligations Under and Pursuant to Lease Agreements as more Fully Described Herein – Presented by City Attorney Ben Hooper 3. A Resolution Requesting that Cabot’s Independent Commissions Take Notice of the Recent Changes Made to the Arkansas Freedom of Information Act – Presented by City Attorney Ben Hooper 4. A Resolution Authorizing the Mayor and City Clerk-Treasurer to Enter into an Agreement with HALFF Associates for the Old 67/ 1st Street Drainage Study Project – Presented by Brian Boroughs 5. A Resolution Recommending that the Contractor for the North Lincoln Sidewalk Project be Designated an Irresponsible Bidder in Regards to Solicitation of Competitive Bids for a Period of Three Years – Presented by City Attorney Ben Hooper 6. A Resolution Regarding GFL Environmental Inc.’s Request for a Rate Adjustment Under its Contract with the City – Presented by Laura Nobles BUDGET & PERSONNEL COMMITTEE – CHAIR BRANDON HILLENBURG POLICE & FIRE COMMITTEE – CHAIR STEPHEN REDD 1. A Resolution Authorizing the Mayor and City Clerk-Treasurer to Enter into an Agreement with Halff Associations to Provide Engineering, Design, and Related Services for the Cabot Indoor Firing Range Project – Presented by Brian Boroughs 2. A Resolution Authorizing the Mayor and City Clerk-Treasurer to Proceed with Planning and Implementation of the Cabot Indoor Firing Range Project – Presented by Brian Boroughs COMMUNITY DEVELOPMENT COMMITTEE – CHAIR MAGGIE COPE 1. A&P Report – Presented by Candance Tomboli MILITARY AFFAIRS COMMITTEE – CHAIR MATT WEBBER 1. A Resolution Reaffirming the City of Cabot as a Purple Heart City – Presented by Matt Webber 2. A Resolution Requesting that the Lonoke County Quorum Court Pass Legislation to Declare Lonoke County to be a Purple Heart County – Presented by Matt Webber GENERAL COMMUNITY INPUT ADJOURNMENT Municipal Services Item #1 An Ordinance Creating, Certifying, and Confirming Tax Liens Against Real Properties at Various Locations within the City of Cabot for Funds Expended to Pay for Services Rendered Due to Code Violations - Presented by Laura Nobles Municipal Services Item #2 An Ordinance Authorizing the Execution of Fifth Amendments to Lease Agreements as more Fully Described Herein; Authorizing City Officials to Execute Said Fifth Amendments; Confirming the Nonrecourse Nature of the City’s Financial Obligations Under and Pursuant to Lease Agreements as more Fully Described Herein – Presented by City Attorney Ben Hooper Municipal Services Item #4 A Resolution Authorizing the Mayor and City Clerk- Treasurer to Enter into an Agreement with HALFF Associates for the Old 67 / 1st Street Drainage Study Project - Presented by Brian Boroughs March 19, 2025 Mr. Brian Boroughs Special Programs Director City of Cabot 101 N Second Street Cabot, AR 72023 Re: Old 67/1st Street Drainage Study Dear Mr. Boroughs: Halff Associates, Inc. is pleased to provide you with a proposal for the Old 67/1 st Street Drainage Study. A complete description of the services provided is included as “Exhibit A: Scope of Services.” Additional services to expand the Candlewood Drainage study are also included in the scope of services. We hope this project will improve the City of Cabot’s ability to assess needs for drainage improvements and to effectively administer future capital improvement programs. The fee for conceptual design services described in the scope of work shall be provided on a lump sum basis for $98,000. A task order form is attached to this letter, which when signed and returned to Halff, will serve as authorization to proceed with the described scope of work. Halff appreciates the opportunity to be of service to you and the City of Cabot on this important project. Please do not hesitate to call if you have any question or concerns regarding the project. Sincerely, HALFF Brian Vines, P.E. Vice President, Operations Manager Attachments: 1. Task Order 2. Exhibit A: Scope of Services TASK ORDER 44 TASK ORDER NO. Master Services Agreement dated: 9/13/2021 TASK ORDER DATE March 19, 2025 TASK ORDER REVISION SERVICES SCHEDULE 9 months SERVICE TASK TYPE: □ Time & Material □ Fixed Price X Other -Lump Sum The following is the scope of services for grant writing and engineering services Services 1. Survey ___________________________________________________ $8,000 2. Hydrologic and Hydraulic Modeling _________________________ $40,000 3. Design Layout and Estimates ________________________________ $30,000 4. Candlewood Existing Conditions______________________________ $ 8,000 1. SCOPE: 3. Candlewood Alternatives ___________________________________ $12,000 Total: $98,000 Additional services may be provided by a supplemental task order. The scope of services is attached for this Task Order. 2. LOCATION Drain 2 from Elm Street to the Union Pacific Railroad 3. SPECIAL PROVISIONS: NOTICE TO PROCEED DATE: Upon full execution of this Task Order by City of Cabot, Arkansas and ENGINEER, ENGINEER shall commence performance of the services defined herein in accordance with the terms and conditions provided herein. The specific services, fees and schedule, including commencement of services, shall be controlled by the specific terms of this Task Order. Halff Associates, Inc. CITY OF CABOT, ARKANSAS ________________________________ Signature of Authorized Representative Signature of Authorized Representative Brian Vines _________________________________ Vice President, Operations Manager Mayor 03/21/2025 _________________________________ Date Date Exhibit A – Scope of Services Old 67/1st Street Drainage Study Candlewood Additional Drainage Study Scope of Services GENERAL DESCRIPTION – Old 67/1st Street Drainage The Engineer will provide all professional services necessary to perform a flood hazard study of the Drain 2 in the vicinity of Old Highway 67 and contributing areas. The study area follows an open channel from the culvert crossing at the Union Pacific Railroad near the end of South Adams Street to the vicinity of South 6th Street. The study includes tributary areas to this channel. The study is more particularly defined by Tasks 1 and 2 (Data Collection and Survey & Existing Conditions Hydrologic and Hydraulic Modeling), and final deliverable includes a report with recommendations for future capital improvements. Task 1 - Data Collection and Survey 1.1 Data Collection and Review- Consultant shall collect and review relevant items to be utilized for the hydrologic and hydraulic modeling effort. Data includes, but is not limited to: • Most recent LiDAR terrain information • Stormwater GIS Inventory • Stormwater Drainage Basins (provided by City) • Existing FEMA Base Level Engineering Study 1.2 Limited Field Survey- Consultant shall determine the locations needed for field survey based on the data review. Anticipated required field survey includes, but is not limited to: • Roadway crossings (approx. 9 locations) – Measurements to verify dimensions and invert elevations • Open Channel cross sections of Drain 2 (approx. 10 locations) Task 2 - Hydrologic and Hydraulic Modeling 1) Hydrologic Modeling- Hydrologic analysis will be performed to generate flows and hydrographs for the 1D/2D Unsteady hydraulic model. City provided drainage areas will be subdivided to ensure adequate computational points and capture effects of significant hydrologic features such as culverts, major outfalls, railroad crossings, and other features. SCS Curve Number methodology will be used for infiltration and runoff parameters. NOAA Atlas 14 will be used for precipitation estimates for design storms. The hydrologic model will be executed for a range of storm events including the 5-, 10-, 25-, 50-, and 100-year storms. Results of the model will be reviewed/compared to existing models, if available. 2) Hydraulic Modeling- A 1D/2D, unsteady hydraulic model will be developed to estimate water surface elevations (WSEL) and flooding inundation for the simulated storm events. Channels and culvert crossings will be modeled in 1D and connected to the 2D surface. Page 1 of 3 Exhibit A – Scope of Services The model will reflect the most current terrain data and land use data for model parameters, including roughness values, obstructions, and ineffective flow areas. Culverts and storm pipes will be added to the model as needed based on GIS information and field survey data. The hydraulic model will be executed for a range of storm events including the 5-, 10-, 25-, 50-, and 100-year storms and compared to existing models, if available. 3) Identify improvement projects to improve drainage and reduce flooding within the basin. The proposed improvements may consist of detention and/or conveyance improvements including ditch widening, ditch cleanout, and culvert upsizing. Task 3 – Design Layouts and Estimates 4) Preliminary schematic drawings and estimates will be developed based on proposed improvement alternatives. 5) Final schematic drawings and construction budget cost estimates completed based on selected alternative(s). Deliverables: Engineer shall provide to the City the following: 1. Model files 2. BFE Elevations 3. Preliminary Areas of Flooding 4. Supporting GIS data 5. Preliminary projects list 6. Preliminary project drawings and estimates 7. Final project drawings and construction estimates Page 2 of 3 Exhibit A – Scope of Services GENERAL DESCRIPTION – Candlewood Additional Study The Engineer will provide all professional services necessary to perform additional flood hazard study of the Candlewood neighborhood. The study includes updating the existing conditions and analyzing additional alternatives. The study is more particularly defined by Tasks 1 and 2 (Existing Conditions Hydrologic and Hydraulic Modeling & Alternatives Analysis), and final deliverable includes a report with recommendations for future capital improvements. Task 4 - Hydrologic and Hydraulic Modeling 1) Existing Conditions Modeling- Update the previously developed 2-D HEC-RAS model to include the Wolfsbridge development. Incorporate the change in landuse and the detention pond within the development. The City will provide the development plans and proposed digital surface, if available. 2) Identify any potential downstream impacts to homes, roads, and drainage infrastructure from the Wolfsbridge development. Compare pre-development flows and water surface elevations to post-development. Task 5 – Alternatives Analysis Proposed conditions modeling will be performed for additional alternatives. Preliminary cost and feasibility will be performed for each alternative. The additional alternatives are outlined below: 3) Alternative 1 – North Channel. Extend proposed channel improvements from Lassiter Lane to Kerr Station Road. 4) Alternative 2 – Conveyance Improvements. Analyze neighborhood wide channel improvements and culvert capacity improvements. Determine the feasible level of service able to be provided through conveyance improvements only. 5) Alternative 3 – Regional detention. Analyze additional areas where regional detention could be located and determine potential benefits. 6) Alternative 4 – Buyouts. Determine feasibility and cost-effectiveness of buyouts in comparison to flood control projects. Identify if any locations would potentially qualify for funding. Deliverables: Engineer shall provide to the City the following: 1. Model files 2. BFE Elevations 3. Preliminary Areas of Flooding 4. Supporting GIS data 5. Drainage Report and Recommendations Page 3 of 3 Police & Fire Committee Item #1 A Resolution Authorizing the Mayor and City Clerk- Treasurer to Enter into an Agreement with HALFF and Associates to Provide Engineering, Design, and Related Services for the Cabot Indoor Firing Range Project - Presented by Brian Boroughs TASK ORDER TASK ORDER NO. Master Services Agreement dated: 9/13/2021 TASK ORDER DATE 10/16/2024 TASK ORDER REVISION SERVICES SCHEDULE SERVICE TASK TYPE: X Time & Material □ Fixed Price X Other -Lump Sum The following is the scope of services for engineering and design of the Fire and Police Facility and associated infrastructure at Kerr Station location). Site Planning for Fire and Police Facilities Phase 1 – Fire Site – design, plans, specification (Lump Sum) $33,000 Phase 2 – Police Site – design, plans, specification (Lump Sum) $25,000 Phase 3 – Subconsultant (Architectural – WD&D) (Lump Sum) $154,400 Phase 4 – Additional Services as needed (Time & Material) $10,000 (Estimated) 1. SCOPE: Total: $222,400 Additional Serivces: Geotechnical Service (if needed) – TBD Site Lighting Design (if needed) – TBD Fees for testing and permits during construction to be provided by the City. Cabot Fire and Police Facilities (Kerr Station) 3. SPECIAL PROVISIONS: NOTICE TO PROCEED DATE: Upon full execution of this Task Order by City of Cabot, Arkansas and ENGINEER, ENGINEER shall commence performance of the services defined herein in accordance with the terms and conditions provided herein. The specific services, fees and schedule, including commencement of services, shall be controlled by the specific terms of this Task Order. Halff CITY OF CABOT, ARKANSAS Signature of Authorized Representative Signature of Authorized Representative Director of Planning/Landscape Architecture Mayor Title Title 10/23/2024 Date Date

Get email alerts for Cabot

A daily email when new agendas and minutes are posted.

Report an issue with this meeting