Finance Committee
Regular MeetingClarksville, TN · February 25, 2020
Agenda
FINANCE COMMITTEE
FEBRUARY 25, 2020
AGENDA
TIME: 3:30 p.m.
LOCATION: City Hall Conference Room
1) CALL TO ORDER
2) ATTENDANCE
3) ADOPTION OF MINUTES: January 28
4) DEPARTMENT REPORTS
1. PURCHASING Camille Thomas
a) Report of bids
b) Report of award of professional service contracts
● Design of an additional parking lot at Fort Defiance from Moore
Engineering in the amount of $7,500.00.
● Demolition plans and oversight for the partial demolition of the
Frosty Morn building from K & S Engineering in an amount not to
exceed $9,500.00.
c) Report of sale of surplus property on GovDeals.com January: $36,164.00.
2. GENERAL FUND
a) Monthly report Laurie Matta
3. DEPARTMENT OF ELECTRICITY
a) Monthly reports David Johns, Christy Batts
4. CITY ATTORNEY
a) Report of payment of legal expenditures Lance Baker
● Burr & Forman, TN Riverkeepers v. City - $19,881.72
● Bradley Arant, Jeff Robinson v. City - $15,360.01
● Bradley Arant, Employment Matters - $2,047.50
● Bradley Arant, Kimberly Black v. City - $4,700.41
5) COMMITTEE ACTION
None.
6) CITY COUNCIL ACTION
None.
7) PUBLIC COMMENTS (3 individuals allowed; 5 minutes each)
8) ADJOURNMENT
FINANCE COMMITTEE
JANUARY 28, 2020
MINUTES
CALL TO ORDER
The regular monthly meeting of the City of Clarksville Finance Committee was called to
order by Chairman Jeff Burkhart on Tuesday, January 28, 2020, at 3:30 p.m. in the City
Hall Conference Room, 1 Public Square, Clarksville, Tennessee.
ATTENDANCE
PRESENT: Jeff Burkhart, Tim Chandler, Valerie Guzman, Jeff Henley, Stacey
Streetman
ADOPTION OF MINUTES
Councilman Henley made a motion to adopt the December 23, 2019 minutes as
presented. The motion was seconded by Councillady Guzman. A voice vote was taken;
the motion passed without objection.
PURCHASING DEPARTMENT
Director of Purchasing Camille Thomas presented the monthly bid summary and noted
vendor interest had increased since bids were now being posted on a national data base.
Ms. Thomas reported award of the following professional service contracts:
● Recreation - Chlorine and Air Sampling Testing at the New Providence Pool from
GHP Environmental and Architecture in the amount of $2,970.00.
● Recreation/Project Management - Boundary & Topographic Survey of 1004
Franklin Street from McKay-Burchett & Co. in an amount not to exceed
$1,500.00.
● Recreation/Project Management - Design Services for the Improvements at Pettus
Park from Moore Engineering in the amount of $25,000.00.
● Street Department - Design Services for the 4th Street and College Street Signal
from KCI Technologies, LLC in the amount of $14,675.00.
● Street Department - Design Services for a New Retaining Wall for the Riverview
Cemetery from K & S Engineering in the amount of $1,500.00.
● Street Department - Intersection Improvements at Ted Crozier Blvd./Dunlop
Lane, Allen Rd./Tiny Town Rd. and Glendale Dr./Ashland City Rd. from
Civil-Site Clarksville, PLLC in the amount of $79,750.00.
● Gas &Water - Fee Increase for Additional Flow Monitoring Services from ADS
Environmental Services (1st Contract Renewal) in the amount of $58,200.00.
● Gas &Water - Tower Climber Training from Honeywell/Miller Training in the
amount of $7,969.50.
● Project Management - Boundary & Topographic Survey of the Frost Morn
Property from McKay-Burchett & Co. in an amount not to exceed $6,500.00.
Ms. Thomas also reported sales of surplus property on GovDeals.com during December
2019 in the amount of $38,896.00.
GENERAL FUND REPORT
Chief Financial Officer Laurie Matta said revenues had exceeded expenditures by
$769,000 during the first six months of FY20, $9.1 million more than the previous year.
She said revenue collections were 3% ahead of projections with 48% of budgeted
revenues already collected, including $17.4 million in property taxes. Local Option Sales
Tax collections were 1.8% more than the previous year with a total of $5.9 million; $ 1.4
million for the General Fund, $72,000 for the Road Fund, and $7.4 million for schools.
Ms. Matta said $2.7 million of $30.2 million invested had been spent on capital projects
during the current fiscal year. The audited beginning FY20 Fund Balance was $28.2
million or 27% of expenditures. There was no grant activity during December. Ms.
Matta said she would research smaller investment options because the LGIP rate had
increased. Mayor Pitts said the General Fund audit was completed on time and with no
findings.
DEPARTMENT OF ELECTRICITY REPORT
CDE Chief Financial Officer David Johns said repairs to the electrical plant following the
November storms totaled $3 million for which the department would be requesting
reimbursement from FEMA. The Electric Division had earned $6.4 million through
December and the Broadband cash balance had reached $5.8 million with a net income of
$433,000. Christy Batts said Broadband was selling more services to existing customers.
CITY ATTORNEY REPORT
City Attorney Lance Baker reported payment of the following legal expenditures:
● Bradley Arant, Kimberly Black v. City - $4,633.00
● Bass Berry & Sims, Environmental Matters - 180.97
Mr. Baker noted the Tennessee River Keepers showed no interest in settling prior to their
filing of a lawsuit against the City.
COMMITTEE ACTION
No committee action was required.
RESIDENTIAL PLUMBING FEE
ORDINANCE 54-2019-20 (First Reading) Amending the Official Code relative to
residential new construction plumbing permit fee
Building & Codes Interim Director David Smith said this proposed change would
streamline payments for new residential construction by creating a flat fee. The
recommendation of the Public Safety Committee was for approval. Councilman
Henley made a motion to forward this ordinance to the City Council with a
recommendation of approval. The motion was seconded by Councilman
Chandler. A voice vote was taken; the motion passed without objection.
EAST MONTGOMERY UTILITY DISTRICT
RESOLUTION 41-2019-20 Authorizing an interlocal agreement with East
Montgomery Utility District for sanitary sewerage services
Gas & Water General Manager Marks Riggins said this agreement would allow
developers to extend gravity sewer into the utility district service area. The
recommendation of the Gas & Water Committee was for approval. Councilman
Henley made a motion to forward this ordinance to the City Council with a
recommendation of approval. The motion was seconded by Councillady
Streetman. A voice vote was taken; the motion passed without objection.
TODD COUNTY FISCAL COURT AGREEMENT
RESOLUTION 42-2019-20 Authorizing an interlocal agreement with Todd County
Fiscal Court for natural gas infrastructure
Mr. Riggins said the City will have four representatives (Councillady Valerie
Guzman, Suzanne Langford, Troy Jones, and Mark Riggins) on this board and noted
that Todd County will own the gas lines and the City of Clarksville will be the
end customer. The recommendation of the Gas & Water Committee was for
approval. Councillady Guzman made a motion to forward this resolution to the
City Council with a recommendation of approval. The motion was seconded by
Councilman Chandler. A voice vote was taken; the motion passed without
objection.
POLICE DISTRICT 3 PRECINCT
ORDINANCE 55-2019-20 (First Reading) Accepting donation of property from the
Industrial Development Board and Montgomery County Commission for Police District 3
Project Manager David Smith said the IDB had agreed to donate .13 acres of land
in the Industrial Park needed to build Police District 3 next to Fire Station 12.
The recommendation of the Public Safety Committee was for approval.
Councilman Henley made a motion to forward this ordinance to the City Council
with a recommendation of approval. The motion was seconded by Councilman
Chandler. A voice vote was taken; the motion passed without objection.
K-9 DONATION
RESOLUTION 39-2019-20 Authorizing retirement of Patrol Service Dog Leonidas
from the K-9 Unit and further authorizing donation of same to Police Officer Gary
Mefford
Police Chief Al Ansley said this service dog had been part of the K-9 Unit for
nine years and had suffered a severe spinal injury. The recommendation of the
Public Safety Committee was for approval. Councillady Guzman made a motion
to forward this resolution to the City Council with a recommendation of approval.
The motion was seconded by Councillady Streetman. A voice vote was taken; the
motion passed without objection.
POLICE-APSU AGREEMENT
RESOLUTION 40-2019-20 Authorizing a Mutual Aid Agreement with Austin Peay
State University for police services
Chief Ansley said this agreement would give the university police access to the
CPD radio frequency at no cost to the City. The recommendation of the Public
Safety Committee was for approval. Councilman Henley made a motion to
forward this resolution to the City Council with a recommendation of approval.
The motion was seconded by Councillady Guzman. A voice vote was taken; the
motion passed without objection.
OPEN ROADS POLICY
RESOLUTION 43-2019-20 Authorizing an Interlocal Agreement with the Tennessee
Department of Safety and Homeland Security
Chief Ansley said this resolution would renew the 2015 agreement to clear and
keep state roadways open after a vehicle crash. Councilman Henley made a
motion to forward this resolution to the City Council with a recommendation of
approval. The motion was seconded by Councillady Streetman. A voice vote
was taken; the motion passed without objection.
PUBLIC COMMENTS
There were no public comments.
ADJOURNMENT
The meeting was adjourned at 4:08 p.m.
CITY GENERAL
BID SUMMARY
FEBRUARY 25, 2020
The following bids/proposals have been solicited, opened and have been approved by the Purchasing Director.
All are low bid/proposal except where noted.
BID # DEPT. DESCRIPTION AWARDED TO AMOUNT
4000 PM Heritage Park Safe Route
To Schools Adams Contracting $ 292,937.00
4005 G&W Kraft Street Sewer Rehab Granite Inliner $ 357,420.00
4006 G&W WWTP Primary Treatment Building
HVAC Replacement Triple S Contracting $ 281,570.00
4008 G&W Ringgold Rd. Sewer Rehab Granite Inliner $ 383,311.92
4014-P G&W Utility Rate Study/General Facilities
Charges Update Raftelis $ 48,500.00
4015 CDE Hardware Upgrades Zcorum $ 335,866.45
4019 Recreation Concession Services for the
Heritage Park Complex C&T Concessions $ 1,550.00 /mth
SOLE SOURCE PURCHASES:
1. G&W. - Future purchases of Performance Pipe/Disco 8100 Series pipe from Consolidated Pipe.
3. G&W – Future purchases of HC-100 Handheld Controllers from E.H. Wachs.
4. G&W – Future purchases and services of MR Systems products from MR Systems, Inc.
5. G&W – Future purchases and services of cellular gateway & spread spectrum radios from Microhard
Systems.
6. G&W- Future purchases and services of Microfiltration System equipment from Pall Corporation.
7. G&W – Future purchases of Watson Marlow and Bredel pumps from Eco-Tech, Inc.
8. G&W – Future purchases of Belgas regulators from Tri-State Meter.
9. G&W – Future purchases of Root rotary meters from Tri-State Meter.
10. CDE – Future purchases and services of Adaptive Wi-Fi Cloud from Plume.
11. CDE – Future purchases of Plume PODs from Plume.
12. Police Dept. – Future purchases of complex DNA testing from Cybergenetics.
13. Police Dept. – Future purchases of Stop Stick tire deflation devices from Stop Stick. Ltd.
PROPRIETARY PURCHASE:
1. G&W. – Future manhole utility work for TDOT resurfacing projects from CK Masonry Co.
STATE CONTRACT PURCHASES:
1. G&W – Two 2020 Ford F150 trucks from Lonnie Cobb Ford in the amount of $ 53,320.00.
2. I.T. – VMware software form CDW-Government in the amount of $ 5,162.24.
Bid # 4000– PM –Heritage Park Safe Route to Schools:
Adams Contracting $ 292.937.00*
Sessions Paving $ 320,712.40
CD Steger $ 321.248.40
Pride Concrete $ 336,263.53 Local
AGG Concrete No Response
Beech Construction No Response
Carver Construction No Response
Colditz Trucking No Response
Fulgham MacIndoe & Associates No Response
Jarrett Builder No Response Local
Leland Inc. No Response
Precision Concrete Cutting No Response
PRI of East TN No Response
Queen City Asphalt No Response Local
RAWSO Constructors No Response
Reed Construction No Response
S&W Contracting No Response Local
Two Rivers Roofing No Response
Bell & Associates Construction No Response
Byard Construction No Response Local
Crowder Construction No Response
Gibbs Brothers Construction No Response
Hall Construction No Response Local
Jones Brothers Contractors No Response Local
Maynard Construction No Response Local
Pavement Restoration No Response
Pinnacle Construction Partners No Response
RG Anderson No Response
REJ Construction No Response
Rogers Group No Response
The Gravel Co. No Response
Pride Construction Solution No Response
V-Barr Group No Response
Bid # 4005– G&W – Kraft Street Sewer Rehab:
Granite Inliner $ 357,420.00*
Insituform $ 422,200.00
SAK Construction $ 514,662.00
Gulf Coast Underground No Bid
Beech Construction No Response
Carver Construction Co No Response
Colditz Trucking No Response
Crowder Construction No Response
Curl Construction & Excavating No Response
Elitte Septic Tank & Grease Trap No Response
Fulghum MacIndoe & Associates No Response
Gregory Construction No Response
ITS Maintenance No Response
Jarrett Builders No Response Local
Jones Brothers Contracting No Response Local
Leland Inc. No Response
McCall’s Contracting No Response Local
Northstar Environmental Group No Response
PRI of East TN No Response
R Roese Contracting No Response
RAWSO Construction No Response
Reed Construction No Response
S&W Contracting No Response
Thalle Construction Co. No Response
Two Rivers Roofing No Response
Byard Construction No Response Local
Civil Constructors No Response
Elk Mountain Construction No Response
Franklin Construction No Response
J&H Construction of Cookeville No Response
J&S Construction No Response
Mike Smith Dump Service No Response
Moore Construction Co. No Response Local
Parchaman Construction No Response Local
REJ Construction No Response
Tennessee Concrete Construction No Response
Bid # 4006– G&W– WWTP Primary Treatment Building HVAC Replacement:
Triple S Contracting $ 281,571.00* Local
Main Stream Heating & Cooling $ 305,660.00 Local
Action Air No Response Local
Anderson Lumber Co. No Response
Archer Air Conditioning Service No Response
ATECH Inc. No Response Local
Autumn Comfort Heating & Cooling No Response Local
Bernhard Energy Solutions No Response
Brymak & Associates No Response
Durcap Asphalt Paving Co. No Response
EDI No Response
Freeman Mechanical No Response Local
Hathaway Demo Construction No Response
John Bouchard & Sons No Response
Knight Electric No Response Local
Leland No Response
Maynard Select No Response
Modern Heating Cooling Roofing No Response Local
Morton Mechanical No Response Local
Premiere Building Maintenance No Response
S&W Contracting No Response
Smithfield Construction No Response
Southeast Contractors No Response
Two Rivers Roofing No Response
Air Conditioning Service No Response
Bentley’s Air Conditioning No Response
Charles Stone Heating & Cooling No Response
C-Tech Controls No Response
Hall Construction No Response Local
Kings Air Conditioning & Heating No Response
Liberty Heating & Cooling No Response
Music City Mechanical No Response
Siemens Industry No Response
Trane No Response Local
Xenergy No Response
Bid # 4008– G&W – Ringgold Rd. Sewer Rehab:
Granite Inliner $ 383,311.92*
Insituform $ 738,325.50
SAK Construction $ 697,980.00
IPR Southeast $ 1,186,270.00
Gulf Coast Underground No Bid
Beech Construction No Response
Carver Construction Co No Response
Colditz Trucking No Response
Crowder Construction No Response
Curl Construction & Excavating No Response
Elitte Septic Tank & Grease Trap No Response
Fulghum MacIndoe & Associates No Response
Gregory Construction No Response
ITS Maintenance No Response
Jarrett Builders No Response Local
Jones Brothers Contracting No Response Local
Leland Inc. No Response
McCall’s Contracting No Response Local
Northstar Environmental Group No Response
PRI of East TN No Response
R Roese Contracting No Response
RAWSO Construction No Response
Reed Construction No Response
S&W Contracting No Response
Thalle Construction Co. No Response
Two Rivers Roofing No Response
Byard Construction No Response Local
Civil Constructors No Response
Elk Mountain Construction No Response
Franklin Construction No Response
J&H Construction of Cookeville No Response
J&S Construction No Response
Mike Smith Dump Service No Response
Moore Construction Co. No Response Local
Parchaman Construction No Response Local
REJ Construction No Response
Tennessee Concrete Construction No Response
Proposal # 4014-P– G&W – Utility Rate Study/General Facilities Charges Update:
Raftelis $ 48,500.00 **
The Tenergy Corp No Response
Black & Veatch No Response
Pendulum Energy No Response
Willis Graves & Associates No Response
PHG Energy No Response
Power of Clean Energy No Response
Allen Sign Company No Response
BDB Co. No Response
Blue Cypress Consulting No Response
Brett Design/Build No Response
Designsensory No Response
Engage Collaborative Management No Response
Environmental Leverage No Response
Frost Environmental Services No Response
Fulgham MacIndoe & Associates No Response
PSD Software No Response
Quantum Environmental & Engineering No Response
Raymond James & Associates No Response
Reed Construction No Response
Vexus International No Response
Xperience Technical Group No Response
*This was a proposal where price was not the only factor in award.
** Not to exceed.
Bid # 4015– CDE– Hardware Upgrades:
Zcorum $ 335.866.45*
Layer 3 Communication $ 354,344.50
enfoPoint Solutions $ 356,987.56
MCA Technology Solutions $ 373,305.00
Bid # 4019– Recreation – Concession Services for Heritage Par Complex:
C&T Concession $ 1,550.00**
Benny Cushman No Response Local
KAC Concession No Response Local
Conditt Enterprise No Response
Bobby Smith No Response Local
Snack Shack No Response Local
Top Self Concessions No Response
Allen Sign Co. No Response Local
Ms. Pete’s Café & Catering No Response Local
Reed Construction No Response
The Choppin Block No Response Local
Beyond Details No Response
Black Eyed Pea Restaurant & Catering No Response
Blue Coast Burrito No Response
C&G Fine Foods No Response
Carolyn & Glenn Catering No Response
Catering Events by Suzette No Response
Catering Concepts by Timothy No Response
Epic Hospitality Group No Response
Food Sales East No Response
J&J Concession No Response
Jessica’s Cupcakes No Response
LA Hacienda Mexican Restaurant No Response Local
Menu Makers Catering No Response
Ray’s BBQ & Catering No Response
Roscoe’s Smoked Bar B Que No Response
Sydnor Boys BBQ No Response
Sysco Nashville No Response
Tasty Dog Vending & Catering No Response
The Livery Stable No Response
The Open Door No Response
The Very Idea No Response
Tircor Nashville No Response
Universal Contract No Response
VCE No Response
White House Foodland No Response
** Paid to The City monthly.
Department Recommendation
Department of Finance & Revenue
January 2020 Financial Review
Fiscal Year 2020
Clarksville, Tennessee
January 31, 2020
General Fund Revenues vs. Expenditures
Fiscal Year 2020
As of January 31, 2019
FY 2020 Monthly
FY 2020 Revenues
Expenditures Variance
July $ 5,454,774 $ 8,407,620 $ (2,952,846)
August 5,286,834 6,844,729 (1,557,895)
September 4,836,616 8,912,821 (4,076,205)
October 5,059,424 8,818,714 (3,759,290)
November 7,710,416 6,798,578 911,838
December 18,909,185 6,760,944 12,148,240
January 7,924,680 9,198,711 (1,274,031)
February -
March -
April -
May -
June -
YTD Total $ 55,181,929 $ 55,742,118 $ (560,189)
$20,000,000
$18,000,000
$16,000,000
$14,000,000
$12,000,000
$10,000,000
FY 2020 Revenues
$8,000,000
FY 2020 Expenditures
$6,000,000
$4,000,000
$2,000,000
$-
General Fund Revenue Comparison
Fiscal Year 2020
As of January 31, 2019
FY 2020 FY 2019
Variance
Revenue Revenue
July $ 5,454,774 $ 4,091,658 $ 1,363,116
August 5,286,834 $ 6,447,488 (1,160,655)
September 4,836,616 $ 4,448,778 387,838
October 5,059,424 $ 4,797,738 261,686
November 7,710,416 $ 7,399,053 311,362
December 18,909,185 $ 10,970,345 7,938,839
January 7,924,680 $ 17,899,039 (9,974,359)
February - -
March - -
April - -
May - -
June - -
YTD Total $ 55,181,929 $ 56,054,101 $ (872,172)
$63,000,000
$53,000,000
$43,000,000
$33,000,000 FY2019 YTD Revenue
FY2020 YTD Revenue
$23,000,000 FY2020 YTD Budgeted Revenue
$13,000,000
$3,000,000
GENERAL FUND REVENUES
Fiscal Year 2020
As of January 31, 2020
Total Budget YTD Month
TAXES
Prior Year Property Taxes 1,020,975 790,772 36,692
2019 Property Taxes 32,000,000 19,081,822 2,483,998
PiLOTS 105,140 90,175 764
Local Option Sales Tax 20,492,455 10,526,370 1,572,114
Beer & Liquor Tax 4,291,557 2,596,662 420,270
Business License 2,648,841 560,513 109,023
Franchise Tax (cable) 1,501,048 335,337 46,113
Hote/Motel 425,000 278,346 35,164
Other Taxes 482,100 170,471 16,734
TOTAL TAXES 62,967,116 34,430,469 4,720,873
LICENSES AND PERMITS
Building Permits 1,925,000 1,455,092 178,916
Other Permits 132,269 59,930 8,180
TOTAL PERMITS 2,057,269 1,515,022 187,096
INTERGOVERNMENTAL
Grant reimbursements 295,888 10,078 -
State Shared Revenues
TVA Replacement Tax 1,552,000 817,498 408,749
State Sales Tax 11,712,375 7,046,704 1,013,296
State Street Aid 5,339,000 3,077,796 430,487
Other Taxes 2,161,008 982,235 86,065
TOTAL INTERGOVERNMENTAL 21,060,271 11,934,311 1,938,596
OTHER REVENUES
Charges for Services 933,050 406,598 54,727
Recreation 634,155 280,726 38,828
Golf Courses 645,975 305,581 13,047
Fines and Forefeitures 582,056 308,777 37,505
Investment & Interest Earnings 351,500 228,517 33,705
Other Misc. Revenues 288,362 730,320 176,769
Transfer from CDE 4,800,000 2,714,879 392,432
Transfer From CGW 3,954,295 2,102,264 329,525
Other Transfers 443,025 224,464 1,577
TOTAL OTHER REVENUES 12,632,418 7,302,127 1,078,114
TOTAL REVENUES GENERAL FUND 98,717,074 55,181,929 7,924,680
General Fund Expenditure Comparison
Fiscal Year 2020
As of January 31, 2019
FY 2020 FY 2019
Variance
Expenditures Expenditures
July $ 8,407,620 $ 8,104,262 $ 303,358
August 6,844,729 $ 6,305,053 539,676
September 8,912,821 $ 7,022,647 1,890,175
October 8,818,714 $ 7,220,036 1,598,678
November 6,798,578 $ 6,961,101 (162,523)
December 6,760,944 $ 6,546,791 214,154
January 9,198,711 $ 7,912,332 1,286,380
February - -
March - -
April - -
May - -
June - -
YTD Total $ 55,742,118 $ 50,072,221 $ 5,669,897
$62,000,000
$52,000,000
$42,000,000
FY2019 YTD Expenditures
$32,000,000
FY2020 YTD Expenditures
$22,000,000 FY2020 YTD Budgeted
Expenditures
$12,000,000
$2,000,000
General Fund Year-to-Date Departmental Budget vs. Actual Expenditures
Fiscal Year 2020
As of January 31, 2019
$30,000,000
Expenditures Estimated Variance
FY 2019 YTD YTD Budget (Over)Under $25,000,000
Departmental:
$20,000,000
Police $ 17,791,978 $ 18,344,841 $ 552,863
$15,000,000 FY 2020 Actual
Fire 10,593,017 11,080,335 487,318
YTD
Highway & Street 8,779,956 8,504,052 (275,905) $10,000,000
Parks & Rec. & Golf 4,583,540 5,619,203 1,035,663 $5,000,000
Building & Codes 1,155,645 1,276,569 120,924 FY2020 Total
$0
Info. Technology 1,164,748 1,082,436 (82,312) Budget
Finance 1,000,702 1,057,622 56,920
City Garage 664,250 765,351 101,101
Municipal Properties 322,930 427,622 104,691
Human Resources 531,085 641,042 109,957
Legislative / Admin. 459,919 445,798 (14,121)
Mayor's Office 376,217 390,724 14,507
City Court 266,039 265,228 (811) $1,100,000
Legal 272,174 275,228 3,055 $1,000,000
$900,000
Internal Audit 217,247 253,585 36,337 $800,000
Purchasing 126,027 130,429 4,402 $700,000
Departmental Total 48,305,475 50,560,064 2,254,589 $600,000
$500,000 FY 2020
$400,000 Actual YTD
Nondepartmental: $300,000
Debt 3,582,886 5,667,618 2,084,732 $200,000 FY2020 Total
Transit 1,368,844 1,449,532 80,688 $100,000 Budget
$0
Retirees 359,614 916,466 556,852
Other 2,125,298 2,351,551 226,253
YTD Total $ 55,742,118 $ 60,945,232 $ 5,203,114
Schedule of Sales Tax Collections
Fiscal Year 2020
As of January 31, 2019
City of Clarksville
Local Sales & Use Tax
Net Collections Net Collections Net Collections Net Collections
FY 2017 FY 2018 FY 2019 FY 2020
July $ 1,291,892 $ 1,425,145 $ 1,524,372 $ 1,607,009
August 1,394,223 1,453,282 1,552,311 1,584,610
September 1,312,394 1,376,154 1,461,197 1,553,548
October 1,305,179 1,330,621 1,576,737 1,541,129
November 1,362,262 1,443,473 1,509,818 1,547,242
December 1,275,621 1,357,713 1,602,804 1,559,998
January 1,356,898 1,454,962 1,559,092 1,649,239
February
March
April
May
June
YTD Total $ 9,298,469 $ 9,841,350 $ 10,786,331 $ 11,042,774
City of Clarksville
$12,500,000
$10,500,000
$8,500,000
$6,500,000
$4,500,000
$2,500,000
$500,000
FY 2017 FY 2018 FY 2019 FY 2020
Local Sales Tax Collections
Fiscal Year 2020
As of January 31, 2019
TOTAL NET COLLECTIONS PAID TO GROSS COLLECTIONS
UNICORPORATED
NET COLLECTIONS COUNTY CITY CITY ROADS SCHOOLS AREA CITY LIMITS PAID TO STATE
July $ 6,902,369 $ 113,097 $ 1,531,859 $ 75,150 $ 5,182,264 $ 900,496 $ 6,080,408 $ 78,535
August 6,720,676 106,434 1,510,507 74,103 5,029,633 801,486 5,995,658 76,468
September 6,460,371 96,698 1,480,898 72,650 4,810,125 655,748 5,878,129 73,506
October 6,395,968 95,166 1,469,060 72,069 4,759,673 637,600 5,831,141 72,773
November 6,395,605 94,012 1,474,887 72,355 4,754,350 614,102 5,854,271 72,769
December 6,384,366 90,981 1,487,046 72,952 4,733,387 554,474 5,902,534 72,641
January 6,800,429 99,211 1,572,114 77,125 5,051,979 637,609 6,240,195 77,375
February -
March -
April -
May -
June -
YTD TOTAL $ 46,059,784 $ 695,599 $ 10,526,370 $ 516,404 $ 34,321,411 $ 4,801,515 $ 41,782,337 $ 524,068
Monthly Distribution
1.64%
22.19%
1.09% COUNTY
CITY
75.08% CITY ROADS
SCHOOLS
Capital Project Status Report
Fiscal Year 2020
As of January 31, 2019
TOTAL ACTIVE
ACTIVE PROJECTS FY EXPENSES PROJECT
TOTAL FUNDING PROJECT
FY2019-2020 7/1/19-1/31/19 BALANCE
EXPENSES **
STREET DEPARTMENT:
93101 Rossview/Dunbar Cave/Cardinal Improvements 13,280,000 173,527 2,692,064 10,587,936
14301 Edmondson Ferry/1A Bypass Interesection Improvement 1,967,029 9,640 1,150,002 817,027
15306 Northeast Connector 16,808,700 318,521 1,194,562 15,614,138
17301 International & Dunlop Intersection Improvement 2,807,831 319,291 442,043 2,365,788
17304 Adaptaive Signal Control Project (Wilma) 1,200,000 0 0 1,200,000
17305 Tylertown & Oakland Intersection Improvement 10,000,000 188,163 761,371 9,238,629
17307 Tylertown & Trenton Drainage Overflow Project 1,040,185 5,494 73,747 966,438
18301 Drainage Mitigation FY2018 280,801 0 106,642 174,159
18302 New Sidewalks FY2018 934,954 44,257 115,797 819,157
19301 Lilac Lane 100,000 0 1,600 98,400
19302 Whitfield Road Improvements 3,350,000 241,489 449,818 2,900,182
19303 Spot Intersection Improvements 1,500,000 35,702 41,902 1,458,098
20301 Dunbar Cave Road Bridge 600,000 0 0 600,000
20302 4th Street and College Signal 400,000 0 0 400,000
20303 New Sidewalks FY20-24 900,000 275,255 275,255 624,745
20304 Drainage Mitigation FY20-24 450,000 0 0 450,000
20305 Cemetary Retaining Wall 330,000 0 0 330,000
$ 55,949,500 $ 1,611,342 $ 7,304,803 $ 48,644,697
PARKS & RECREATION:
16503 Athlectic Complex 5,650,000 53,601 4,525,361 1,124,639
16504 Red River East Trail Project 2,146,832 823,644 2,075,447 71,385
17501 Valleybrook Park & Upland Trail Connection 160,000 0 0 160,000
17502 Public Spaces 150,000 0 148,750 1,250
17503 Edith Pettus Park Renovations 201,800 15,000 23,615 178,185
17504 Crow Community Center Renovation 120,000 0 119,866 134
17505 Liberty Park/Marina Remediation 905,218 24,556 85,080 820,138
17506 Swan Lake Renovations 1,046,605 223 1,039,218 7,387
19502 Pollard Road Additional Parking 304,199 34,244 42,244 261,955
19503 Billy Dunlop Pavillion & Restroom 382,485 97,134 99,134 283,351
19504 Heritage Park Improvements 1,000,000 283,148 501,016 498,984
19505 Regional Community Center 500,000 0 0 500,000
20501 Red River Pedestrian Bridge 3,068,233 0 0 3,068,233
20502 Mason Rudolph Cart Path Paving 125,000 0 0 125,000
20503 Swan Lake Cart Path Paving 190,800 32,400 32,400 158,400
$ 15,951,172 $ 1,363,950 $ 8,692,131 $ 7,259,041
FIRE DEPARTMENT:
16221 Fire Maintenance Facility 314,352 12,000 13,300 301,052
20221 Renovation of Station 10 125,000 0 0 125,000
20222 Custom Engine (replaces 1999 model) 450,000 0 0 450,000
$ 889,352 $ 12,000 $ 13,300 $ 876,052
POLICE DEPARTMENT:
19211 District 3 Precinct Building 3,500,000 176,550 176,550 3,323,450
$ 3,500,000 $ 176,550 $ 176,550 $ 3,323,450
GENERAL GOVERNMENT:
41016 Corporate Business Park Expansion $ 14,368,821 $ - $ 14,092,700 $ 276,121
13101 Clarksville Performing Arts & Conf Center 1,613,963 3,000 179,907 1,434,056
15102 TDOT 2013 Multimodal Access 906,017 40,950 169,830 736,187
16103 2015 Multimodal Access Grant 915,758 100,939 222,043 693,715
19101 New Council Chambers 0 0 0 0
19102 Structural Repairs - Cumberland Garage 1,099,036 0 0 1,099,036
$ 18,903,595 $ 144,889 $ 14,664,480 $ 4,239,115
debt issuance costs
Total Spent YTD: Major Projects $ 95,193,619 $ 3,308,730 $ 30,851,264 $ 64,342,355
* Fiscal Year to date invoices paid (July 1st to current month end)
** Total Active Expenses includes all expenses paid during the life of a project, not just the current fiscal year.
Fund Balances
Fiscal Year 2020
As of January 31, 2019
Estimated
Estimated Ending
Beginning Fund Revenues Expenditures
Fund Fund Balance
Balance YTD YTD
1/31/20
7/01/19
General Fund: $ 29,943,642 $ 52,681,929 $ 55,742,118 $ 26,883,453
Capital Projects Fund: 2,556,107 1,704,975 3,308,730 952,352
Debt Service Fund: 474,377 3,950,970 3,941,238 484,109
Internal Service Funds: 6,300,385 5,566,018 9,591,078 2,275,325
Non-Major Governmental Funds:
Drug Fund 502,153 293,839 53,751 742,242
Road Improvement Fund 1,094,794 516,404 0 1,611,198
Police Special Fund 191,193 283,741 496,221 (21,288)
Parks Special Fund 362,757 252,028 297,271 317,513
Other Special Revenue Fund* 840,479 295,214 360,091 775,601
Community Development 460,231 1,147,534 1,310,062 297,703
Capital Projects Revenue District Fund 78,179 2,500,000 382,629 2,195,549
* Includes: Fire Spec. Rev., Traffic Camera Police & Parks, SRF
Notice of Grant Applications
Fiscal Year 2020
As of January 31, 2019
Date Funding Funds Match
Submitted Project Title Agency Requested Required Status Notes
Transportation TN Dept of $1,994,338 $498,584 Funding for a pedestrian bridge over the Red River to complete the connection
10/03/18 Awarded
Alternative Program Transportion $1,818,233 $674,689 between the Red River Trail and the Greenway
Assistance to Dept of Homeland To purchase 82 sets of ballistic protective equipment for firefighters in the
10/26/18 $127,846 $12,784 Not funded
Firefighters Grant Security (FEMA) event of an active shooter/mass casualty situation.
2018 Fire Prevention Dept of Homeland To purchase a new fire safety trailer used for public education programs and to
12/06/18 $56,840 $2,841 Not funded
& Safety Grant Security (FEMA) pay for 2 fire staff to become certified as Fire and Safety Educators.
Sam's Club (LG Requested their community grant program funding to support our 2019
02/15/19 Riverfest $2,000 $0 Awarded
Highway) Riverfest event.
TN Highway Safety For continued fuding for alcohol and impaired driver countermeasures. This
03/15/19 Office 2020 Alcohol THSO $90,000 $0 Awarded grant pays for overtime for police officers to conduct DUI checkpoints and
Impairment saturation patrols for a one year period.
Heritage Park Dog Boyd Foundations Requested funding to purchase new agility and play equipment as well as
05/30/19 $12,045 $0 Submitted
Park Enhancement Dog Park Dash amenities for Heritgage dog park
2019 TAEP Tree
TN Dept of
06/07/19 Planting at Billy $2,743 $2,743 Awarded To purchase 25 new trees to be planted at Billy Dunlop Park.
Agriculture
Dunlop Park
Annually shared with Montgomery County Sheriff's Office. CPD will use our
08/23/19 2019 JAG Grant US Dept of Justice $59,459 $0 Awarded share to purchase a 3D laser scanner to analyze crime scenes. The Sheriff will
use their share for wireless communication services for dupites in the field.
US Conf of To strt a new Athletic Leqgue Scholarship Program. Awards will be $125,000
2020 Childhood Mayoers/American and $25,000 for 1st and 2nd places, respectively. Low income youth can
08/30/19 $120,000 $0 Not funded
Obesity Prevention Beverage compete for scholarships to any of the City's athletic leagues by submitting an
Foundation application and essay.
Transportation TN Dept of Funding to construct new sidewalks to benefit Clarksville High School,
10/03/19 $493,176 $123,294 Submitted
Alternative Program Transportion Richview Middle School and Pisgah Elementary School.
Notice of Grant Applications
Fiscal Year 2020
As of January 31, 2019
Date Funding Funds Match
Submitted Project Title Agency Requested Required Status Notes
TAEP Farmers TN Dept of
11/25/19 $750 $0 Submitted Funding to advertise and promote the downtown market.
Market Promotion Agriculture
Investment Report
Fiscal Year 2020
As of January 31, 2019
ISSUER NAME PAR VALUE CUSIP COUPON RATE
LOCAL GOVERNMENT INVESTMENT POOL
SELF-INSURANCE $ 589,697 1.690
CAPITAL PROJECTS FUNDS 1,799,706 1.690
INVESTMENT ACCOUNT 23,435,257 1.690
2016 BOND ISSUANCE 1,269,946 1.690
1.690
LGIP TOTAL / AVERAGE $ 27,094,606 1.690
2016 BOND ISSUANCE CAPITAL PROJECTS
FUNDS
SELF-INSURANCE
INVESTMENT ACCOUNT
CDE Lightband
Rolling 4 month Balance Sheet - Broadband Division
January 31, 2020
1/31/19 % Change 1/31/20 12/31/19 11/30/19 10/31/19
Assets
Current Assets:
Cash -Operating Account $ 5,675,212.13 8.95% $ 6,182,946.05 $ 5,782,103.72 $ 5,349,809.45 $ 4,777,111.30
Accounts Receivable:
Subscribers, less allowance 1,434,276.31 1.59% 1,457,037.97 1,457,895.08 1,564,329.62 1,526,832.05
Other 54,510.44 -46.91% 28,940.80 31,626.26 33,491.64 39,361.94
Temporary advances - Electric 1,890,403.22 9.81% 2,075,870.24 2,111,484.45 1,922,993.89 2,036,753.81
Inventory 294,919.75 86.61% 550,340.11 359,898.95 357,999.18 368,714.01
Total Current Assets $ 9,349,321.85 10.12% $ 10,295,135.17 $ 9,743,008.46 $ 9,228,623.78 $ 8,748,773.11
Noncurrent Assets:
Construction Work In Progress $ 287,587.49 -86.33% $ 39,319.54 $ 35,325.52 $ 47,140.12 $ 53,995.46
Telecommunications Plant 8,157,140.56 4.42% 8,517,887.25 8,528,124.09 8,330,510.51 8,352,476.84
Accumulated Depreciation (5,528,490.88) -0.13% (5,521,341.28) (5,483,574.14) (5,438,505.75) (5,434,505.37)
Deferred Debit - Software & Outflows of Resources 248,871.95 84.58% 459,361.48 475,674.15 518,065.15 573,896.61
Total Noncurrent Assets $ 3,165,109.12 10.43% $ 3,495,226.99 $ 3,555,549.62 $ 3,457,210.03 $ 3,545,863.54
Total Assets $ 12,514,430.97 10.20% $ 13,790,362.16 $ 13,298,558.08 $ 12,685,833.81 $ 12,294,636.65
Retained Earnings and Liabilities:
Retained Earnings (Deficit):
Retained Earnings - Beginning of Year $ (3,011,499.48) -126.69% $ 803,836.93 $ 803,836.93 $ 803,836.93 $ 803,836.93
Retained Earnings - YTD 1,780,300.70 31.18% 2,335,433.99 1,901,478.98 1,513,391.29 1,089,570.29
Retained Earnings - Current 378,612.36 -28.96% 268,974.40 433,955.01 388,087.69 423,821.00
Total Retained Earnings (Deficit) $ (852,586.42) -499.75% $ 3,408,245.32 $ 3,139,270.92 $ 2,705,315.91 $ 2,317,228.22
Current Liabilities:
Accounts Payable $ 1,859,156.74 24.52% $ 2,315,093.95 $ 2,121,870.47 $ 1,972,333.14 $ 1,997,353.59
Unearned Revenue $ 609,040.12 12.06% $ 682,497.65 $ 682,497.65 $ 682,497.65 $ 682,497.65
Other Accrued Payables 259,097.84 10.00% 285,018.50 254,664.91 224,253.79 195,582.92
Total Current Liabilities $ 2,727,294.70 20.36% $ 3,282,610.10 $ 3,059,033.03 $ 2,879,084.58 $ 2,875,434.16
Noncurrent Liabilities:
Customer Deposits $ 2,944.42 -56.27% $ 1,287.48 $ 1,337.48 $ 1,712.48 $ 1,556.04
Postretirement Benefits 332,853.14 4.45% 347,674.13 348,371.52 349,175.71 349,873.10
Deferred Inflows of Resources 7,994.00 1208.66% 104,614.00 104,614.00 104,614.00 104,614.00
Long Term Debt to the Electric Division 10,295,931.13 -35.45% 6,645,931.13 6,645,931.13 6,645,931.13 6,645,931.13
Total Noncurrent Liabilities $ 10,639,722.69 -33.27% $ 7,099,506.74 $ 7,100,254.13 $ 7,101,433.32 $ 7,101,974.27
Total Liabilities $ 13,367,017.39 -22.33% $ 10,382,116.84 $ 10,159,287.16 $ 9,980,517.90 $ 9,977,408.43
Total Liabilities & Retained Earnings $ 12,514,430.97 10.20% $ 13,790,362.16 $ 13,298,558.08 $ 12,685,833.81 $ 12,294,636.65
CDE Lightband
Income Statement - Broadband Division
1/31/2020
%
1/31/19 Change 1/31/20 12/31/19 11/30/19 10/31/19
Operating Revenue:
Programming Revenue $ 442,767.51 1.66% $ 450,116.78 $ 420,910.58 $ 416,042.03 $ 415,438.17
Internet Revenue 1,142,183.01 9.99% 1,256,338.36 1,246,310.72 1,239,727.41 1,241,498.87
Telephone Revenue 144,770.22 -0.76% 143,662.93 149,107.17 148,439.97 145,469.66
Miscellaneous Fee Revenue 146,735.24 -5.41% 138,794.88 165,298.91 134,359.00 153,641.20
Total Operating Revenues 1,876,455.98 5.99% 1,988,912.95 1,981,627.38 1,938,568.41 1,956,047.90
Cost of Programming & Services 719,388.49 4.44% 751,303.36 694,224.24 699,421.65 694,974.02
Gross Revenue: $ 1,157,067.49 6.96% $ 1,237,609.59 $ 1,287,403.14 $ 1,239,146.76 $ 1,261,073.88
Operating Expenses:
Network Support Expense-Video $ 35,207.63 8.86% $ 38,326.29 $ 33,675.63 $ 36,748.70 $ 34,613.02
Network Support Expense-Internet 127,935.06 10.38% 141,213.22 136,706.60 134,576.52 134,539.68
Network Support Expense-Phone 15,718.40 12.64% 17,705.78 15,620.16 15,650.86 15,712.26
Network Admin. & Oper. Expense 118,786.39 9.65% 130,249.45 114,004.43 111,419.34 118,895.51
Building & Office Expense 8,047.00 0.00% 8,047.00 8,047.00 8,047.00 8,047.00
Depreciation & Amortization Expense 59,761.44 75.82% 105,071.45 101,515.03 96,261.58 99,066.10
General & Administrative Expense 165,168.07 1.19% 167,126.36 196,112.78 199,233.90 178,211.62
Station Apparatus Expense 129,069.85 51.79% 195,913.24 120,996.87 120,298.34 109,969.06
Customer Service Expense 60,844.28 -3.41% 58,770.19 52,149.24 64,251.27 52,680.97
Marketing Expense 42,601.68 132.69% 99,131.08 67,010.53 55,381.24 75,964.54
Total Operating Expenses $ 763,139.80 26.00% $ 961,554.06 $ 845,838.27 $ 841,868.75 $ 827,699.76
Operating Income (Loss) $ 393,927.69 -29.92% $ 276,055.53 $ 441,564.87 $ 397,278.01 $ 433,374.12
Interest Expense 12,242.24 -67.26% 4,008.04 4,536.77 6,117.23 6,480.03
Other Expenses - Tax Equivalent 3,073.09 0.00% 3,073.09 3,073.09 3,073.09 3,073.09
Other Expense - Loss on Retirement of Equipment $ - $ - $ - $ - $ -
Total Other Expenses (Income) $ 15,315.33 -53.76% $ 7,081.13 $ 7,609.86 $ 9,190.32 $ 9,553.12
Net Income (Loss) $ 378,612.36 -28.96% $ 268,974.40 $ 433,955.01 $ 388,087.69 $ 423,821.00
EBITDA $ 453,689.13 $ 381,126.98 $ 543,079.90 $ 493,539.59 $ 532,440.22
CDE Lightband
Cash Flow Statement - Broadband Division
January 31, 2020
RECONCILIATION OF OPERATING INCOME TO
NET CASH PROVIDED BY OPER ACTIVITIES:
Operating income (loss) $ 276,055.53
Adjustments to reconcile oper income to cash
provided (used) by operating activities
Depreciation and amortization 105,071.45
Changes in:
Accounts receivable 3,542.57
Advances to Electric 35,614.21
Inventory (190,441.16)
Accounts payable 193,223.48
Accrued expenses 29,656.20
Customer deposits (50.00)
Other 9,231.54
Net Cash Provided by Operating Activities 461,903.82
CASH FLOWS FROM FINANCING ACTIVITIES:
Payment of long term debt -
Additions to plant (61,061.49)
Net Cash Used by Financing Activities (61,061.49)
NET INCREASE IN CASH AND CASH EQUIVALENTS $ 400,842.33
CASH AND CASH EQUIVALENTS - BEG OF MONTH 5,782,103.72
CASH AND CASH EQUIVALENTS - END OF MONTH $ 6,182,946.05
CDE Lightband
Rolling 4 Month Balance Sheet - Electric Division
January 31, 2020
Prior Year
1/31/2019 % Change 1/31/2020 12/31/2019 11/30/2019 10/31/2019
UTILITY PLANT
1 Electric Plant $ 290,005,656.47 6.18% $ 307,916,645.32 $ 307,045,501.33 $ 304,657,982.11 $ 300,452,462.74
2 Less Depreciation (99,956,889.92) 5.42% (105,371,738.29) (104,975,954.84) (104,311,877.66) (103,673,881.42)
3 Total $190,048,766.55 6.58% $202,544,907.03 $202,069,546.49 $200,346,104.45 $196,778,581.32
4 Unamortized acq. adj. 87,131.37 -41.38% 51,077.01 54,081.54 57,086.07 60,090.60
6 Total Plant - Net $190,135,897.92 6.55% $202,595,984.04 $202,123,628.03 $200,403,190.52 $196,838,671.92
OTHER PROPERTY AND INVESTMENTS
8 Interdivisional loan 10,295,931.13 -35.45% 6,645,931.13 6,645,931.13 6,645,931.13 6,645,931.13
9 Sinking Funds 8,611,290.94 -1.12% 8,515,130.42 8,013,295.02 7,011,557.17 7,010,755.22
12 Other Special Funds - - - - -
13 Total 18,907,222.07 -19.81% 15,161,061.55 14,659,226.15 13,657,488.30 13,656,686.35
CURRENT AND ACCRUED ASSETS
14 General Cash/temp cash investments 13,975,177.96 -48.52% 7,194,544.01 9,056,555.66 11,245,414.07 8,898,292.93
14.1 Reserved Cash 27,024,923.23 -8.33% 24,775,088.86 24,533,763.23 24,300,764.44 24,107,520.37
15 Accounts Receivable 12,883,855.62 -13.32% 11,168,075.66 11,466,436.60 11,089,948.30 11,309,682.26
16 Materials and Supplies 4,056,258.87 -2.29% 3,963,458.05 4,320,330.04 4,040,648.07 4,447,827.39
18 Other Current Assets 19,257,838.52 29.07% 24,856,935.56 24,598,318.37 23,220,172.82 28,830,985.01
19 Total 77,198,054.20 -6.79% 71,958,102.14 73,975,403.90 73,896,947.70 77,594,307.96
DEFERRED DEBITS
22 Clearing Accounts - 25,148.97 26,037.26 26,825.55 27,663.84
24 Energy Service Loans Rec 2,969,361.64 -33.72% 1,967,971.58 2,043,088.40 2,121,949.44 2,194,489.47
26 Other Deferred Debits 3,469,768.60 25.25% 4,345,780.64 4,455,350.59 4,356,545.96 4,365,544.04
27 Total 6,439,130.24 -1.56% 6,338,901.19 6,524,476.25 6,505,320.95 6,587,697.35
28 TOTAL ASSETS & OTHER DEBITS $292,680,304.43 1.15% $296,054,048.92 $297,282,734.33 $294,462,947.47 $294,677,363.58
CAPITAL
EARNINGS REINVESTED IN SYSTEM ASSETS
33 Beginning of year 171,989,065.77 5.62% 181,656,853.69 181,656,853.69 181,656,853.69 181,656,853.69
34 Current Year to Date 6,091,187.44 2.61% 6,250,073.47 6,446,929.65 5,465,999.21 6,677,685.35
35 Total 178,080,253.21 5.52% 187,906,927.16 188,103,783.34 187,122,852.90 188,334,539.04
Long Term Debt
39.1 Bonds and other Long Term Debt 62,600,000.00 -4.89% 59,540,000.00 59,540,000.00 59,540,000.00 59,540,000.00
40 Debt Premium and discount 8,279,124.94 -7.17% 7,685,904.94 7,735,339.94 7,784,774.94 7,834,209.94
41 Total 70,879,124.94 -5.15% 67,225,904.94 67,275,339.94 67,324,774.94 67,374,209.94
OTHER NON-CURRENT LIABILITIES
41.9 Post Retirement Benefits 1,430,571.07 12.47% 1,608,934.90 1,612,709.90 1,616,371.11 1,619,303.74
42 Energy Service Loans - Advances 3,078,287.04 -33.29% 2,053,407.99 2,132,834.77 2,204,317.62 2,299,937.91
44 Total 4,508,858.11 -18.77% 3,662,342.89 3,745,544.67 3,820,688.73 3,919,241.65
CURRENT AND ACCRUED LIABILITIES
46 Accounts Payable 28,664,701.15 -9.64% 25,901,677.14 27,165,854.21 25,377,232.87 24,276,279.61
47 Customer Deposits 6,591,015.52 6.19% 6,999,310.12 6,982,503.70 6,953,733.22 6,980,198.21
52.2 Interest Accrued - Other 1,211,499.76 -10.57% 1,083,463.50 866,770.80 650,078.10 433,385.40
53 Other Current Liabilities 2,744,851.74 19.29% 3,274,423.17 3,142,937.67 3,213,586.71 3,359,509.73
54 Total 39,212,068.17 -4.98% 37,258,873.93 38,158,066.38 36,194,630.90 35,049,372.95
58 TOTAL LIABILITIES AND OTHER CREDITS $ 292,680,304.43 1.15% $ 296,054,048.92 $ 297,282,734.33 $ 294,462,947.47 $ 294,677,363.58
CDE Lightband
Revenues and Expenses ‐ Electric Division
1/31/2020
Prior Year Prior 3 Months
1/31/2019 % Change 1/31/2020 12/31/2019 11/30/2019 10/31/2019
OPERATING REVENUE
59 Electric Sales Revenue 15,168,778.70 ‐4.42% 14,497,796.21 14,350,440.27 12,344,396.07 13,326,383.59
60 Revenue from Late Payments 152,390.66 ‐2.49% 148,603.08 123,409.35 91,438.14 136,391.41
61 Misc Service Revenue 127,057.88 3.38% 131,357.04 121,452.14 104,521.17 131,143.16
62 Rent from Electric Property 299,724.12 3.92% 311,468.49 308,183.59 308,766.89 309,043.19
63 Other Electric Revenue 1.27 ‐15504.72% (195.64) 0.56 (0.91) 1.42
64 Total Operating Revenue 15,747,952.63 ‐4.18% 15,089,029.18 14,903,485.91 12,849,121.36 13,902,962.77
PURCHASED POWER
65 Total Power Cost 12,798,063.04 ‐11.89% 11,276,159.88 10,719,212.51 10,814,288.69 8,696,236.35
OPERATING EXPENSE
66 Transmission Expense 3,690.39 35.35% 4,994.95 2,998.66 2,803.51 3,633.00
67 Distribution Expense 377,971.40 14.47% 432,649.21 244,233.03 260,146.94 296,883.76
68 Customer Accounts Expense 370,633.13 ‐8.81% 337,991.94 285,176.54 287,576.35 358,650.28
69 Cust. Service and Inf. Exp. 21,015.89 65.45% 34,769.86 34,059.57 33,380.37 29,300.65
70 Sales Expense 10,969.62 12.37% 12,326.47 10,700.06 9,858.19 11,127.19
71 Admin. And General Expense 313,843.33 53.57% 481,954.44 397,032.37 347,309.08 333,644.47
72 Operating Expense 1,098,123.76 18.81% 1,304,686.87 974,200.23 941,074.44 1,033,239.35
MAINTENANCE EXPENSE
73 Transmission Expense 2,911.17 100.68% 5,842.08 1,312.51 3,739.27 2,131.61
74 Distribution Expense 343,219.72 101.18% 690,492.38 306,552.47 258,802.42 257,307.76
75 Admin. and General Expense 190,305.60 23.49% 235,012.20 169,526.25 286,338.53 147,232.29
76 Maintenance Expense 536,436.49 73.62% 931,346.66 477,391.23 548,880.22 406,671.66
OTHER OPERATING EXPENSE
77 Depreciation Expense 1,016,836.61 4.84% 1,066,093.88 1,054,320.53 1,052,901.15 1,052,720.36
78 Amort. of Acquisition Adjust. 3,004.53 0.00% 3,004.53 3,004.53 3,004.53 3,004.53
79 Taxes and Tax Equivalents 554,350.76 2.37% 567,466.90 560,410.72 569,678.30 538,770.21
80 Total other oper. Expense 1,574,191.90 3.96% 1,636,565.31 1,617,735.78 1,625,583.98 1,594,495.10
Total operating expense and
81 purchased power 16,006,815.19 ‐5.36% 15,148,758.72 13,788,539.75 13,929,827.33 11,730,642.46
INCOME
82 Operating Income (258,862.56) ‐76.93% (59,729.54) 1,114,946.16 (1,080,705.97) 2,172,320.31
83 Other Income 73,603.54 ‐31.14% 50,685.13 53,336.37 56,342.06 67,744.16
84 Total Income (185,259.02) ‐95.12% (9,044.41) 1,168,282.53 (1,024,363.91) 2,240,064.47
85 Misc Income Deductions (1,600.00) (425.00) ‐ ‐ ‐
86 Net Income before debt expense (186,859.02) ‐94.93% (9,469.41) 1,168,282.53 (1,024,363.91) 2,240,064.47
DEBT EXPENSE
90 Interest on Long Term Debt 242,538.83 ‐3.00% 235,270.09 235,270.09 235,270.09 235,270.09
92 Other Interest Expense 1,504.70 3.12% 1,551.68 1,517.00 1,487.14 1,533.23
93 Amort. of Debt Disc. and Exp. ‐ ‐ ‐ ‐ ‐
94 Amort. of Prem. on Debt (49,435.00) 0.00% (49,435.00) (49,435.00) (49,435.00) (49,435.00)
95 Total Debt Expense 194,608.53 ‐3.71% 187,386.77 187,352.09 187,322.23 187,368.32
NET INCOME
96 Income before Extraord. Items (381,467.55) ‐48.40% (196,856.18) 980,930.44 (1,211,686.14) 2,052,696.15
97 Extraordinary Items ‐ ‐ ‐ ‐ ‐
98 Net Income (381,467.55) ‐48.40% (196,856.18) 980,930.44 (1,211,686.14) 2,052,696.15
CDE Lightband
Cash Flow Statement - Electric Division
January 31, 2020
RECONCILIATION OF OPERATING INCOME TO
NET CASH PROVIDED BY OPER ACTIVITIES:
Operating income $ (59,729.54)
Adjustments to reconcile oper income to cash
provided (used) by operating activities
Depreciation and amortization 1,069,098.41
Changes in:
Accounts receivable 298,360.94
Materials and supplies 356,871.99
Interdivisional loan -
Accounts receivable - TVA Energy Service Loans 75,116.82
Advances - TVA Energy Service Loans (79,426.78)
Prepayments -
Other current assets (526,611.22)
Accounts payable (1,264,177.07)
Accrued expenses 216,692.70
Customer deposits 16,806.42
Other postemployment benefits (3,775.00)
Other 131,485.50
Net Cash from Operating Activities 230,713.17
CASH FLOWS FROM FINANCING ACTIVITIES:
Additions to plant (1,541,454.42)
Payment of long-term debt (49,435.00)
Net Cash used by Financing Activities (1,590,889.42)
NET DECREASE IN CASH AND CASH EQUIVALENTS $ (1,360,176.25)
CASH AND CASH EQUIVALENTS - BEG OF MONTH 41,844,939.54
CASH AND CASH EQUIVALENTS - END OF MONTH $ 40,484,763.29
CASH AND CASH EQUIVALENTS CONSIST OF:
Sinking Funds 8,515,130.42
Construction Funds -
General cash/temp cash investments 7,194,544.01
Reserved Cash 24,775,088.86
$ 40,484,763.29
CDE Lightband Subscriber Analysis
November 2019 - January 2020 Month End Reports
November 2019 December 2019 January 2020
Net Gain Growth % Net Gain Growth % Net Gain Growth %
November November November Over Prev. % Growth November Year over December December December Over Prev. % Growth December Year over January January January Over Prev. % Growth January Year over
Service Actual Budget Variance Month to Budget 2018 Actual Year Actual Budget Variance Month to Budget 2018 Actual Year Actual Budget Variance Month to Budget 2019 Actual Year
Video 5,146 5,275 (129) (29) -2% 5,544 -7% 5,070 5,273 (203) (76) -4% 5,508 -8% 4,950 5,271 (321) (120) -6% 5,383 -8%
LB Basic 371 317 54 6 17% 359 3% 373 316 57 2 18% 360 4% 375 316 59 2 19% 351 7%
LB Plus 1,923 1,583 340 12 21% 1,815 6% 1,915 1,582 333 (8) 21% 1,819 5% 1,881 1,581 300 (34) 19% 1,800 5%
LB Extra 2,821 3,376 (555) (45) -16% 3,328 -15% 2,751 3,375 (624) (70) -18% 3,289 -16% 2,664 3,373 (709) (87) -21% 3,193 -17%
Bronze Pkg 2 2 - - 0% 2 0% 2 2 - - 0% 2 0% 2 2 - - 0% 2 0%
Silver Pkg 2 2 - - 0% 2 0% 2 2 - - 0% 2 0% 1 2 (1) (1) -50% 2 -50%
Gold Pkg 27 35 (8) (2) -23% 38 -29% 27 35 (8) - -23% 36 -25% 27 35 (8) - -23% 35 -23%
Internet 20,249 20,037 212 (25) 1% 19,096 6% 20,251 20,166 85 2 0% 19,192 6% 20,249 20,243 6 (2) 0% 19,288 5%
Phone 2,549 2,576 (27) (1) -1% 2,587 -1% 2,544 2,587 (43) (5) -2% 2,575 -1% 2,527 2,595 (68) (17) -3% 2,560 -1%
Comm Internet 1,638 1,611 27 14 2% 1,481 11% 1,643 1,633 10 5 1% 1,490 10% 1,670 1,661 9 27 1% 1,492 12%
Broadband ONTs 23,007 22,370 637 25 3% 21,584 7% 23,014 22,450 564 7 3% 21,665 6% 23,407 22,540 867 393 4% 21,755 8%
Get email alerts for Clarksville