Metropolitan Planning Organization
Regular MeetingCleveland, TN · August 2, 2017
Agenda
TOM ROWLAND, CHAIRMAN
190 Church Street, N.E., P.O. Box 1519, Cleveland, TN
37364-1519
Phone (423) 479-1913 fax (423) 559 3373
http://clevelandtn.gov/index.aspx?nid=153
MPO Coordinator Greg Thomas, AICP
gthomas@clevelandtn.gov
Cleveland Urban Area MPO
WEDNESDAY, AUGUST 2, 2017, 11:00 O’CLOCK AM, 2nd FLOOR CITY COUNCIL
MEETING ROOM, MUNICIPAL BUILDING, 190 CHURCH STREET NE, CLEVELAND, TN
AGENDA
1. Call MPO meeting to order
2. Approval of meeting minutes— July 12, 2017
3. New Business
A. IMPROVE Act and related changes to the 2040 Regional Transportation Plan
and 2017-2020 Transportation Improvement Program
B. 2018-2019 Unified Planning Work Program (UPWP)
4. Old Business---none
5. Comments by federal, state, local agencies
6. MPO Coordinator/staff comments
7. Public comments
8. Next regular MPO meeting date is Wednesday, September 20, 2017 at 11
a.m.
9. Adjourn
1 of 19
TOM ROWLAND, CHAIRMAN
190 Church Street, N.E., P.O. Box 1519, Cleveland, TN
37364-1519
Phone (423) 479-1913 fax (423) 559 3373
http://clevelandtn.gov/index.aspx?nid=153
MPO Coordinator Greg Thomas, AICP
gthomas@clevelandtn.gov
MPO Executive Board
WEDNESDAY, July 12, 2017, 11:00 O’CLOCK AM, 2nd FLOOR CITY COUNCIL
MEETING ROOM, MUNICIPAL BUILDING, 190 CHURCH STREET NE, CLEVELAND,
TN
MINUTES
1. Call MPO meeting to order --- Chairman Mayor Tom Rowland called the meeting to
order and called the roll. The other MPO members in attendance were Bradley County
Mayor D. Gary Davis, Chris Kleehammer (proxy for Nancy Sutherland of SETHRA), and
Sara Elmore of TDOT. Others in attendance included Sean Santalla of FHWA., Calvin
Abram and Antoine Hanes of TDOT, Larry Bowers of the Cleveland Daily Banner, and
Greg Thomas of the City of Cleveland and Cleveland MPO.
2. Approval of meeting minutes— May 3, 2017--- Mayor Rowland introduced the
item and called for discussion or a motion. D. Gary Davis moved that they be approved
and the motion was seconded by Chris Kleehammer and approved unanimously.
3. New Business –
A. IMPROVE Act and related changes to the 2040 Regional Transportation Plan
and 2017-2020 Transportation Improvement Program--- Mayor Rowland
introduced the item and Greg Thomas provided a staff report. No action was
needed at this time as staff and TDOT were still working together to determine the
necessary changes.
B. Mobile LIDAR data gathering for multi-modal improvements on Georgetown
Road Corridor and other locations--- Mayor Rowland introduced the item and
Greg Thomas provided a staff report. He explained that cost information gathered
by staff indicated that mobile LIDAR data could be collected on several roadway
sections in need of multi-modal improvements while spreading the project
mobilization costs over several roads. It is also possible that the City would join in
the project to collect data on other roadways using other funds; staff was proposing
that the multimodal FTA 5303 funds be used for the multi-modal road section
2 of 19
mobile LIDAR data collection. Vice-Mayor Johnson made a motion to approve the
staff proposal and it was seconded by Chris Kleehammer.
C. 2018-2019 Unified Planning Work Program (UPWP)---- Mayor Rowland
introduced the item and Greg Thomas provided the staff report. The TDOT
comments had been addressed and the draft UPWP had been submitted to
FHWA/FTA for comments. Federal comments were expected on or about July 21,
2017. No action was needed at this time.
D. Critical Urban Freight Corridors--- Mayor Rowland introduced the item and Greg
Thomas provided the staff report. The MPO had the opportunity to respond to
TDOT with information on Critical Urban Freight Corridors in the MPO area. The
MPO affirmed the following as critical urban freight corridors.
APD-40 US74/SR 311 from I-75 Exit 20 to US 64 Waterlevel Highway to the Polk County line. This route
connects with the Inland Port soon to be completed in US 411 near Chatsworth, GA (see attached). The
rural portions of US 64 and US 411 are being recommended for designation by the RPO staff. Connection
to Interstates and intermodal facilities are among the criteria for inclusion.
APD-40 US74/SR 311 from I-75 Exit 20 to SR 60 Dalton Pike to the MPO boundary. RPO staff are
recommending the designation for the rest of Dalton Pike to the Whitfield County, GA line. The Dalton
MPO has two projects in their 2040 long range transportation plan that would connect Dalton Pike as it
extends into Georgia as the Cleveland Highway from Prater’s Mill Road through Varnell, GA to I-75 at
Tunnel Hill. The Thrive 2055 regional transportation planning effort has considered such a by-pass route
allowing trucks and other traffic to avoid the I-75/I-24 split in Chattanooga while continuing their journey
along the I-75 corridor.
20th Street NE from APD-40 SR60 to Michigan Avenue Road and Michigan Avenue Road to the northern
end of the Whirpool SIA project. This long sought after improvement would eliminate a narrow curved
road section for industrial traffic from Tasso Lane and further west; it would improve truck access for the
former Honeywell site adjacent to the railroad, improve an at-grade rail crossing for trucks and other
users, eliminate 20th Street flooding from Little Chattata Creek east of the railroad, and improve a bad
intersection at 20th and Michigan Avenue Road down to Whirlpool.
SR 108 Lauderdale Highway including I-75 Exit 33 to US 11 SR 2 North Lee Highway crossing the
railroad and connecting with Dry Valley, and US 11 from Lauderdale Highway north to Bowater Road SR
163. This roadway area serves existing industry including Olin Chemical, Resolute Forest Products,
Wacker Chemie, Amazon, and GE. The City of Charleston has sought improvements that will provide
relief for residential and commercial areas from industrial traffic. Walker Valley High School on
Lauderdale Highway also experiences the impact of industrial traffic
4. Old Business---none
5. Comments by federal, state, local agencies--- Mayor Rowland addressed bus
wrapping for the Cleveland Urban Area Transit buses. He also addressed his
interactions with Lee University concerning a cooperative effort to locate a bus
shelter near the library parking lot.
3 of 19
6. MPO Coordinator/staff comments—Greg Thomas shared the update on the ADA
Transition Plan data collection. Sidewalk data collection was nearly complete.
7. Public comments
8. Next regular MPO meeting date is Wednesday, August 2, 2017 at 11 a.m.
4 of 19
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 27, 2017
SUBJECT: IMPROVE Act related changes to TIP and RTP
Staff has worked with TDOT to identify the following TIP amendments needed to
implement projects stemming from the recent IMPROVE Act. Staff proposes to release
these TIP amendments for public review and comment and that there would be a public
hearing for adoption of these amendments at the MPO meeting September 20, 2017 at
11:00 a.m.
TIP Amendment 2017-04:
TIP Project Number 2017-09 (new), widen Interstate 75 from 4 lanes to 6 lanes divided freeway,
from near Interchange 33 (SR-308) to near the Bradley-McMinn County Line.
TIP Amendment 2017-05:
TIP Project Number 2017-10 (new), SR-2 (US-11), spot improvements from near Anatole
Lane to SR 308 in Charleston, including turn lanes at intersections.
TIP Amendment 2017-06:
TIP Project Number 2017-11 (new), Corridor improvements from near SR 306
(Freewill/Eureka Road) to the Bradley/Hamilton County line. Includes constructing a 3-
lane section for 3 miles, installing a passing lane in each direction, and resurfacing for
0.6 miles. Full project length extends to near SR 58 in Hamilton County; details on the
portion in Hamilton County can be found in the TIP for the Chattanooga/Hamilton
County/North Georgia Transportation Planning Organization.
TIP Amendment 2017-07:
TIP Project Number 2017-12 (new), Widen I-75 from 4 to 6 lanes from Exit 20 (APD-40,
SR 311) to the Bradley/Hamilton County line. Full project length extends to US 64 in
Hamilton County; details on the portion in Hamilton County can be found in the TIP for
the Chattanooga/Hamilton County/North Georgia Transportation Planning Organization.
Page 1 of 2
5 of 19
Amendments are also proposed to the 2040 RTP in order to implement the IMPROVE
Act projects. Staff proposes to release these 2040 RTP amendments for public review
and comment and that there would be a public hearing for adoption of these
amendments at the MPO meeting September 20, 2017 at 11:00 a.m.
In the 2016-2025 horizon, the project description for RTP Project #70 on North Lee
Highway (US 11/SR 2) is being modified from “widening” to “spot improvements”. The
RTP Project # 86 Georgetown Road SR 60 project terminus is being changed from
“Rabbitt Valley Road” to “Hamilton County line” and the project description is being
changed from “widen from 2 to 5 lanes” to “widen from 2 to 3 lanes”. The RTP Project #
101A is being added to widen I-75 from 4 to 6 lanes from SR308 to the McMinn
County/Bradley County line.
In the 2026-2040 horizon, the 2040 RTP is being amended to delete Project #70 North
Lee Highway widening and Project Number 86 Georgetown Road widening ---both
projects were modified and included in the earlier horizon. Project 101B was added to
the 2026 to 2040 horizon to widen I-75 from APD-40 to SR 308 from 4 to 6 lanes (this
means that the widening of I-75 from 4 to 6 lanes throughout Bradley County is in the
RTP---project 105 in the 2026-2040 horizon would widen I-75 from Hamilton County line
to APD-40). Project 103 the widening of Georgetown Road SR 60 from Rabbit Valley
Road to the Hamilton County line is being removed from the unfunded “Illustrative
Projects” list since it is being replaced by the funded project #86 as modified by the
amendment discussed above.
Page 2 of 2
6 of 19
FY 2017-2020 TIP Amendment – August 2017
TIP Amendment # 2017-04
TIP Project # 2017-09 (new)
LRTP Project# 101
Project: I-75 widening near Bradley/McMinn county line
Requested By: TDOT
Phase: Preliminary Engineering
(NEPA/environmental and design)
Fiscal Year(s): 2018
Proposed Action: Add project to TIP
Total Project Cost: $29.3 million
FY Work Funding Total Federal State Local
2018 PE-N NHPP $1,000,000 $800,000 $200,000 $0
2018 PE-D NHPP $1,700,000 $1,360,000 $340,000 $0
Description:
Widen from 4-lane to 6-lane divided freeway from near Interchange 33 (SR 308) to near
Bradley/McMinn county line.
Background:
This project is being initiated this year through funding generated by the IMPROVE
Act. It is a portion of Project 101 in the MPO’s Regional Transportation Plan, which
proposes to widen I-75 from Exit 20 (APD-40/SR 311) north toward the
Bradley/McMinn county line. Project 101 was not expected to be completed until
after 2026.
In order for TDOT to start the portion of the project that lies north of Exit 33 (SR 308),
an amendment is proposed to the Regional Transportation Plan to break Project
101 into two segments, north and south of SR-308. The northern segment would
become Project 101A and would be moved to the 2016-2025 horizon of the plan.
7 of 19
PROPOSED TIP AMENDMENT
FY2017-2020 Transportation Improvement Program
Project Name I-75 north of SR 308 Route Total Project Cost $29,300,000
TIP Number 2017-09 Long Range Plan # 101 TDOT # 124013.00 Fed Project #
Previous TIP # Sponsoring Agency TDOT Project Length 2.1 Amended
Termini/Intersecting Road Mod # 0 Adjusted
Project Description Widen I-75 from 4 to 6 lanes from near Exit 33 (SR 308) to near the Bradley/McMinn county line
Intersection HOV Lanes Pedestrian Turn Lanes Carpool TDM
Type of Improvement Signalization New Road Greenway Safety Rideshare Other
Road Widening Bicycle Lane ITS TSM Transit
3-R Bicycle Route Bridge Vanpool Park--Ride
Fiscal Year Phase Funding Source Fed Funding State Funding Local Funding Total Funding by FY
2018 PE-N NHPP $800,000 $200,000 $0 $1,000,000
2018 PE-D NHPP $1,360,000 $340,000 $0 $1,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Total Funding by Type $2,160,000 $540,000 $0 $2,700,000
8 of 19
FY 2017-2020 TIP Amendment – August 2017
TIP Amendment # 2017-05
TIP Project # 2017-10 (new)
LRTP Project# 70
Project: N. Lee Highway widening
Requested By: TDOT
Phase: Preliminary Engineering
(NEPA/environmental and design)
Fiscal Year(s): 2018
Proposed Action: Add project to TIP
Total Project Cost: $39.3 million
FY Work Funding Total Federal State Local
2018 PE-N S-STBG $1,000,000 $800,000 $200,000 $0
2018 PE-D S-STBG $2,700,000 $2,160,000 $540,000 $0
Description:
Spot improvements from near Anatole Lane to SR 308 in Charleston, including turn lanes at
intersections.
Background:
This project is being initiated this year through funding generated by the IMPROVE
Act. It addresses the same location as Project 70 in the MPO’s Regional
Transportation Plan, except that the plan proposes to widen the road from 2 to 5
lanes, rather than the spot improvements currently being proposed. When the
plan was adopted last year, Project 70 was not expected to be completed until
after 2026 due to funding limitations.
An amendment is proposed to the Regional Transportation Plan to modify the
project description to say “spot improvements” and to move the project to the
2016-2025 horizon of the plan.
9 of 19
FY2017-2020 Transportation Improvement Program
Project Name SR 2 /(US 11, N. Lee Highway) Route Total Project Cost $39,300,000
TIP Number 2017-10 Long Range Plan # 70 TDOT # 124018.00 Fed Project #
Previous TIP # Sponsoring Agency TDOT Project Length 4.4 Amended
Termini/Intersecting Road Mod # 0 Adjusted
Project Description Spot improvements from near Anatole Lane to SR 308 in Charleston, including addition of turn lanes at
intersections
Intersection HOV Lanes Pedestrian Turn Lanes Carpool TDM
Type of Improvement Signalization New Road Greenway Safety Rideshare Other
Road Widening Bicycle Lane ITS TSM Transit
3-R Bicycle Route Bridge Vanpool Park--Ride
Fiscal Year Phase Funding Source Fed Funding State Funding Local Funding Total Funding by FY
2018 PE-N S-STBG $800,000 $200,000 $0 $1,000,000
2018 PE-D S-STBG $2,160,000 $540,000 $0 $2,700,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Total Funding by Type $2,960,000 $740,000 $0 $3,700,000
10 of 19
FY 2017-2020 TIP Amendment – August 2017
TIP Amendment # 2017-06
TIP Project # 2017-11 (new)
LRTP Project# 86, 103
Project: Georgetown Rd (SR 60) widening west of SR 306
Requested By: TDOT
Phase: Preliminary Engineering
(NEPA/environmental and design)
Fiscal Year(s): 2018
Proposed Action: Add project to TIP
Total Project Cost: $21 million
FY Work Funding Total Federal State Local
2018 PE-N NHPP $800,000 $640,000 $160,000 $0
2018 PE-D NHPP $1,200,000 $960,000 $240,000 $0
Description:
Corridor improvements from near SR 306 (Freewill/Eureka Road) to the Bradley/Hamilton
County line. Includes constructing a 3-lane section for 3 miles, installing a passing lane in
each direction, and resurfacing for 0.6 miles. Full project length extends to near SR 58 in
Hamilton County; details on the portion in Hamilton County can be found in the TIP for the
Chattanooga/Hamilton County/North Georgia Transportation Planning Organization.
Background:
The project is being initiated this year through funding generated by the IMPROVE
Act. This location is addressed by two projects in the MPO’s Regional
Transportation Plan. First, Project 86 would widen the road from 2 to 5 lanes from
SR 306 to Rabbit Valley Road. Second, Project 103 would widen the portion from
Rabbit Valley Road to the Bradley/Hamilton county line. Project 103 was shown in
the plan’s “illustrative list” as a desired project for which funding was not projected
to be available.
An amendment is proposed to the Regional Transportation Plan to move both
projects to the 2016-2025 horizon of the plan.
11 of 19
PROPOSED TIP AMENDMENT
FY2017-2020 Transportation Improvement Program
Project Name SR 60 west of SR 306 Route Total Project Cost $21,000,000
TIP Number 2017-11 Long Range Plan # 86, 103 TDOT # 124020.00 Fed Project #
Previous TIP # Sponsoring Agency TDOT Project Length 5.1 Amended
Termini/Intersecting Road Mod # 0 Adjusted
Project Description Corridor improvements from near SR 306 (Freewill/Eureka Road) to the Bradley/Hamilton county line.
Includes constructing a 3-lane section for 3 miles, installing a passing lane in each direction, and
resurfacing for 0.6 miles. Full project length extends to near SR 58 in Hamilton County; details on the portion
outside the Cleveland MPO can be found in the TIP for the Chattanooga/Hamilton County/North Georgia
Transportation Planning Organization.
Intersection HOV Lanes Pedestrian Turn Lanes Carpool TDM
Type of Improvement Signalization New Road Greenway Safety Rideshare Other
Road Widening Bicycle Lane ITS TSM Transit
3-R Bicycle Route Bridge Vanpool Park--Ride
Fiscal Year Phase Funding Source Fed Funding State Funding Local Funding Total Funding by FY
2018 PE-N NHPP $640,000 $160,000 $0 $800,000
2018 PE-D NHPP $960,000 $240,000 $0 $1,200,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Total Funding by Type $1,600,000 $400,000 $0 $2,000,000
60
12 of 19
FY 2017-2020 TIP Amendment – August 2017
TIP Amendment # 2017-07
TIP Project # 2017-12 (new)
LRTP Project# 105
Project: I-75 widening from APD-40 to Hamilton Co. line
Requested By: TDOT
Phase: Preliminary Engineering
(NEPA/environmental and design)
Fiscal Year(s): 2018
Proposed Action: Add project to TIP
Total Project Cost: $58.6 million
FY Work Funding Total Federal State Local
2018 PE-N NHPP $1,525,000 $1,372,500 $152,500 $0
2018 PE-D NHPP $4,270,000 $3,843,000 $427,000 $0
Description:
Widen I-75 from 4 to 6 lanes from Exit 20 (APD-40, SR 311) to the Bradley/Hamilton County
line. Full project length extends to US 64 in Hamilton County; details on the portion in
Hamilton County can be found in the TIP for the Chattanooga/Hamilton County/North
Georgia Transportation Planning Organization.
Background:
The project is being initiated through funding generated by the IMPROVE Act.
13 of 19
PROPOSED TIP AMENDMENT
FY2017-2020 Transportation Improvement Program
Project Name I-75 south of Exit 20 Route Total Project Cost $58,560,000
TIP Number 2017-12 Long Range Plan # 105 TDOT # 124081.00 Fed Project #
Previous TIP # Sponsoring Agency TDOT Project Length 4.86 Amended
Termini/Intersecting Road Mod # 0 Adjusted
Project Description Widen I-75 from 4 to 6 lanes from APD-40/SR 311 (Exit 20) to Hamilton County line. Full project extends to US
64 in Hamilton County; details on the portion in Hamilton County can be found in the TIP for the
Chattanooga/Hamilton County/North Georgia Transportation Planning Organization.
Intersection HOV Lanes Pedestrian Turn Lanes Carpool TDM
Type of Improvement Signalization New Road Greenway Safety Rideshare Other
Road Widening Bicycle Lane ITS TSM Transit
3-R Bicycle Route Bridge Vanpool Park--Ride
Fiscal Year Phase Funding Source Fed Funding State Funding Local Funding Total Funding by FY
2018 PE-N NHPP $1,372,500 $152,500 $0 $1,525,000
2018 PE-D NHPP $3,843,000 $427,000 $0 $4,270,000
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
Total Funding by Type $5,215,500 $579,500 $0 $5,795,000
14 of 19
Chapter 5: Recommended Plan and Funding
Table 5.7: Proposed Roadway Projects, 2016-2025
15 of 19
Cost (YOE,
ID Type of Improvement Roadway From To Miles Description Agency Anticipated Funding
millions)
82 New Roadway Paul Huff Parkway Extension Freewill Road SR 60 (Georgetown Road) 0.8 Construct new 3-lane road Cleveland U-STBG 10.5
62 Road Widening 20th Street Shady Lane Old Tasso Road 0.7 Widen from 2 to 3 lanes Cleveland U-STBG 11.2
Widen from 2 to 3 lanes, including roundabouts at
112 Road Widening Georgetown Road N.W. 25th Street 20th Street 1.3 Cleveland U-STBG 9.4
major intersections
108 Reconstruction Michigan Avenue Road Minnis Road 20th Street 0.2 Reconstruct 2-lane road Cleveland HSIP, U-STBG 1.2
63 Road Widening 20th Street Old Tasso Road Michigan Avenue Road Widen from 2 to 3 lanes Cleveland HSIP, U-STBG 2.7
Intersection Widen North and South approaches from 4 to 5
7 25th Street (SR 60) @ Peerless Road Cleveland/TDOT U-STBG, S-STBG 0.5
Improvements lanes
Intersection
94 20th Street @ Michigan Ave Rd Safety improvements Cleveland HSIP, U-STBG 0.4
Improvements
Intersection
95 Georgetown Rd (SR 60) @ Candies Lane Realign intersection TDOT HSIP, S-STBG 3.2
Improvements
Intersection
96 N Ocoee Street (SR 74) 8th Street Construct roundabout TDOT HSIP, S-STBG 1.7
Improvements
Intersection
99 6th Street N.E. @ Gaut Street Safety improvements Cleveland U-STBG 0.6
Improvements
Intersection
110 Mouse Creek Road @ Paul Huff Pkwy Add lane to NB approach on Mouse Creek Rd Cleveland U-STBG 0.1
Improvements
Intersection Improve NB approach on Peerless Road from
111 Peerless Road @ Paul Huff Pkwy Cleveland U-STBG 0.5
Improvements intersection to Valleyhead Road
93 Safety Improvements SR 308 (Lower River Rd) Bowater Logging Rd I-75 0.9 Safety improvements TDOT HSIP, S-STBG 0.5
Road Widening
SR 308
70 Intersection N. Lee Highway (US 11/SR 2) Near Anatole Ln 4.3 Widen from 2 to 5 lanes Spot improvements TDOT S-STBG 50.5 39.3
(Lauderdale Mem Hwy)
improvements
Rabbit Valley Road 1.7
86 Road Widening Georgetown Road (SR 60) SR 306 (Eureka Rd) Widen from 2 to 5 lanes 3 lanes TDOT NHPP 60.5 21.0
Hamilton County line 5.5
101A Road Widening I-75 SR 308 (Exit 33) McMinn/Bradley Co line 2.1 Widen from 4 to 6 lanes TDOT NHPP 29.3
2040 Regional Transportation Plan 5-9
Chapter 5: Recommended Plan and Funding
Table 5.8: Proposed Roadway Projects, 2026-2040
16 of 19
Anticipated Cost (YOE,
ID Type of Improvement Roadway From To Miles Description Agency
Funding millions)
100 New Roadway Midtown Connector Construct bridge over RR in downtown Cleveland Cleveland U-STBG 2.2
Extend as 3-lane roadway, including RR overpass.
92 New Roadway SR 308 Extension SR 2/US 11 (N. Lee Hwy.) Chatata Valley Dr 0.5 TDOT S-STBG 18.2
Eastern terminus aligns with Upper River Rd N.E.
113 Road Widening Mouse Creek Road Robin Hood Drive Wedgewood Drive 0.1 Widen from 2 to 3 lanes Cleveland U-STBG, Local 2.1
114 Road Widening Mouse Creek Road Wedgewood Dr East Circle 0.4 Widen from 2 to 3 lanes Cleveland U-STBG, Local 7.4
115 Road Widening Mouse Creek Road East Circle Hunters Run 1.0 Reconstruct 2-lane road Cleveland U-STBG, Local 6.8
59 Road Widening 20th Street APD-40 (Bypass) Ocoee Street 1.3 Widen from 2 to 3 lanes Cleveland U-STBG 21.5
20 Road Widening Benton Pike APD-40 (Bypass) Michigan Avenue Rd 1.0 Widen from 2 to 3 lanes Cleveland U-STBG 16.5
60 Road widening Peerless Road 25th Street Georgetown Road 0.5 Widen from 2 to 3 lanes Cleveland U-STBG 8.6
55 Road Widening Georgetown Road 20th Street Harrison Pike (SR 312) 1.0 Widen from 2 to 3 lanes Cleveland U-STBG 9.6
72 Road Widening Spring Place Road (SR 74) APD 40 Kile Lake Road 1.7 Widen from 2 to 3 lanes TDOT S-STBG 35.2
Lynncrest Ave in Widen from 2 to 3 lanes, including improvements
104 Road Widening SR 163 (Etowah Rd) Lee Highway (US 11/SR 2) 0.6 TDOT S-STBG 13.3
Calhoun to narrow RR underpass
105 Road Widening I-75 Hamilton Co. line APD-40 2.5 Widen from 4 to 6 lanes TDOT NHPP, S-STBG 129.2
Bradley/McMinn line 14.4 242.9
101B Road Widening I-75 APD-40 (SR 311) Widen from 4 to 6 lanes TDOT NHPP, S-STBG
SR 308 12.3 213.6
86 Road Widening Georgetown Road (SR 60) Eureka Road Rabbit Valley Road 1.7 Widen from 2 to 5 lanes TDOT NHPP, S-STBG 60.5
N. Lee Highway SR 308 (Lauderdale
70 Road Widening Near Anatole Ln 4.3 Widen from 2 to 5 lanes TDOT NHPP, S-STBG 50.5
(US 11/SR 2) Mem Hwy)
Cleveland/Bradley
17 Reconstruction Mouse Creek Road City Limits Hoopers Gap 1.1 Reconstruct 2-lane road, turn lanes at Hoopers Gap HSIP, U-STBG 14.5
County
Upgrade lane width, shoulders; add left turns at
58 Reconstruction 20th Street Ocoee Street Georgetown Road 0.7 Cleveland HSIP, U-STBG 9.6
intersections
Upgrade lane width, shoulders; add turn lanes at
23 Reconstruction Hoopers Gap Road Frontage Road Mouse Creek Road 0.3 Bradley County U-STBG, Local 3.6
Mouse Creek Road
98 Reconstruction 9th Street S.E. Euclid Avenue S.E. Church Street 0.2 Align offset intersection at Euclid Ave. S.E. Cleveland Local 3.0
Intersection HSIP, U-STBG,
6 25th Street (SR 60) @ N Ocoee Street (SR 74) Widen N & S approaches, add dual left-turn lanes Cleveland/TDOT 11.8
Improvements NHPP
Intersection
10 Westside Drive @ Harrison Pike (SR 312) Widen approaches; consider signalization Cleveland U-STBG 0.4
Improvements
Intersection 20th St - Widen approaches to 5 lanes; Parker St -
9 20th Street @ Parker Street Cleveland U-STBG 0.9
Improvements Widen approaches to 3 lanes
Intersection
1 20th Street @ N. Ocoee Street (SR 74) Widen from 4 to 5 lanes, signalize Cleveland/TDOT U-STBG, S-STBG 0.3
Improvements
2040 Regional Transportation Plan 5-10
Chapter 5: Recommended Plan and Funding
17 of 19
Table 5.8: Proposed Road Projects, 2026-2040 (continued from previous page)
Anticipated Cost (YOE,
ID Type of Improvement Roadway From To Miles Description Agency
Funding millions)
Intersection
3 20th Street @ Keith Street (US 11/SR 2) Widen and relocate existing signal Cleveland/TDOT U-STBG, S-STBG 0.3
Improvements
Intersection
8 Peerless Road @ Norman Chapel Road Widen west approach from 2 to 3 lanes Cleveland U-STBG 0.3
Improvements
Intersection Intersection improvement with "flyover"; remove NHPP, S-STBG, U-
11 Keith Street (US 11/SR 2) @ N Ocoee Street (SR 74) TDOT/Cleveland 10.3
Improvements traffic signals and add lanes STBG
Interchange @ SR 308 (Lauderdale
83 I-75 Interchange modifications for increased capacity TDOT NHPP, S-STBG 19.3
Improvements Memorial Hwy.)
Intersection Improve NB approach on Peerless Rd from
111 Peerless Road @ Paul Huff Pkwy Cleveland U-STBG 0.3
Improvements intersection back to Valleyhead Rd
Intersection
97 Industrial Drive S.W. @ Old Chattanooga Pike Realign and improve rail crossing Cleveland Local 0.3
Improvements
Intersection
5 Spring Place Road (SR 74) @ Wildwood Ave (SR 311) Widen to 4 lanes on all approaches; modify signal Cleveland/TDOT S-STBG 0.8
Improvements
2040 Regional Transportation Plan 5-11
Unfunded (Illustrative) Projects
Several additional projects have been listed separately in Table 5.16 because they cannot be completed
without additional funding beyond what is projected to be available for the 2040 Plan. This list of
projects is termed “illustrative,” since it illustrates the system investments that would fully implement
the region’s transportation goals. Many of these projects have been proposed as part of other local and
regional planning efforts. The projects in Table 5.16 are not currently eligible for federal funds available
to the MPO since they are not part of the official fiscally constrained Plan, but they can be considered if
additional revenue becomes available, or in future Plan updates.
Table 5.16: Illustrative Projects (Unfunded)
ID Route Termini Description
71 S. Lee Hwy (US 11/SR 2) APD 40 to Black Fox Rd Widen from 2 to 5 lanes
SR 308 (Lauderdale Memorial Mouse Creek Rd N.W. to N. Lee Hwy (US
102 Widen from 2 to 3 lanes
Hwy) 11/SR 2)
Spring Place Rd to US 74/SR 40
27 Durkee Rd Reconstruct
(Waterlevel Hwy)
31 Mouse Creek Rd Hoopers Gap Rd to SR 308 Reconstruct
56 N. Ocoee St (SR 74) Keith St (US 11/SR 2) to 25th St (SR 60) Widen from 3 to 5 lanes
Mouse Creek Rd near Hooper Gap Rd to
91 Northwest Connector Construct new 2-lane road
N. Lee Hwy (US 11/SR 2)
103 Georgetown Rd (SR 60) Rabbit Valley Rd to Hamilton Co. line Widen from 2 to 4 lanes
N. Lee Hwy (US 11/SR 2) to Michigan Ave
19 Tasso Ln N.E. Widen from 2 to 3 lanes
Rd
78 Michigan Ave Rd 20th St to Stuart Rd Widen from 2 to 3 lanes
61 Michigan Ave Rd Stuart Rd to Tasso Ln N.E. Widen from 2 to 3 lanes
26 Peach Orchard Hill Rd Benton Pk to Chip Dr Reconstruct
77 Peach Orchard Hill Rd Chip Dr to Michigan Ave Rd Reconstruct
79 Westside Drive Georgetown Rd to SR 312 (Harrison Pk) Widen from 2 to 3 lanes
2040 Regional Transportation Plan 5-15
18 of 19
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 27, 2017
SUBJECT: 2018-2019 UPWP for public review and adoption
Staff has received and responded to the Federal comments on the DRAFT 2018-2019
UPWP. However, the UPWP needs to go through a public review and comment process
and be adopted by the MPO prior to the end of August. The UPWP and the Federal
comments with response were sent to the MPO and TCC by earlier email transmission.
Staff is proposing that the MPO hold a public hearing and, pending the addressing of
any public comments, adopt the 2018-2019 UPWP at a meeting to be called for August
23, 2017 at 11:00 a.m.
Page 1 of 1
19 of 19
Get email alerts for Cleveland
A daily email when new agendas and minutes are posted.