Historic Preservation & Architectural Review Board Agendas and Minutes
Regular MeetingCohoes, NY · November 16, 2021
Minutes
MINUTES OF THE COHOES HISTORIC PRESERVATION AND ARCHITECTURAL
REVIEW BOARD MEETING HELD VIRTUALLY VIA ZOOM ON WEDNESDAY,
November 16, 2021 AT 6:30PM
MEMBERS PRESENT: Daniele Cherniak, Chairperson
Barbara Hildreth, Vice Chair
Evan Lamb
MEMBERS ABSENT: John Frainier
Thomas Rifenberg
ALSO PRESENT: Joseph Seman-Graves, City Planner
Sharon Butler, Administrative Assistant
Chairperson Cherniak called the November meeting of the Historic Preservation and
Architectural Review Board to order at 6:30PM.
CONSIDERATION OF THE SEPTEMBER 21, 2021 AND OCTOBER 20, 2021
MEETING MINUTES
Chairperson Cherniak; first item on the agenda is consideration of 2 sets of minutes from
September 21st and October 20th. Have board members had time to look at the minutes?
Member Lamb; I’ll make the motion to approve
Vice Chair Hildreth; I’ll 2nd it
All in favor; AYE motion carried to approve both meeting minutes
YES NO ABSTAIN
Daniele Cherniak X
Barbara Hildreth X
Thomas Rifenberg ABSENT
Evan Lamb X
John Frainier ABSENT
CONSIDERATION OF A HANGING SIGN AND 2 WINDOW DECALS AT 192
REMSEN STREET
Chairperson Cherniak; so our next item on the agenda is 192 Remsen Street, is the applicant
here?
Ms. Lamiano; yes
Chairperson Cherniak; ok can you tell us a little bit about what you plan to do?
Ms. Lamiano; this is for the sign right?
Chairperson Cherniak; yes
Ms. Lamiano; we’re doing a new sign for the store. There should be design for them in there,
they were dropped off.
Vice Chair Hildreth; you’re the apothecary
Ms. Lamiano; yes, it’s pretty much the decals on the window
Vice Chair Hildreth; the grand opening is tomorrow at 2
Chairperson Cherniak; are there any questions for the applicant?
Vice Chair Hildreth; what color is the sign, black and white?
Ms. Lamiano; yes
Chairperson Cherniak; is this a new support bracket or is there an existing one?
Ms. Lamiano; it’s a new one
Chairperson Cherniak; where will it be located on the building facade?
Ms. Lamiano; I believe they are putting, they wanted it on the corner so you could see it from
both sides. Sign Studio is doing it, but we’ll put it wherever we have to I’m not to picky about
that.
Vice Chair Hildreth; you’re going to take the Metro signs down off the windows right?
Ms. Lamiano; they’re already gone
Chairperson Cherniak; so it will be installed on along this area? (Pointing to picture in packet)
Ms. Lamiano; yes
Chairperson Cherniak; ok, are there any other questions? Do I have a motion to approve the
application?
Member Lamb; I’ll make the motion
Chairperson Cherniak; do I have a 2nd?
Vice Chair Hildreth; 2nd All in favor AYE motion carried
YES NO ABSTAIN
Daniele Cherniak X
Barbara Hildreth X
Thomas Rifenberg ABSENT
Evan Lamb X
John Frainier ABSENT
Joe Seman-Graves; can you make sure that it is adjacent to or above the light because if it’s any
lower, the Mayor is like 6’2” so don’t want him hitting his head
Ms. Lamiano; yes Sign Studio is going to be doing it so I’ll make sure it done right
CONSIDERATION OF A HANGING SIGN ON THE EXISTING BRACKET AT 25
WHITE STREET
Chairperson Cherniak; ok, our next item on the agenda is 25 White Street, can you tell us a little
bit about what you’re planning to do
Ms. Ford; yes, so the previous owners was Spades and I just want to take that sign off and put
my logo up. I want to keep it in the same spot so it’s going to be the same size sign just with my
logo on it.
Chairperson Cherniak; ok
Sharon; you are using the existing bracket too correct?
Ms. Ford; yes
Chairperson Cherniak; so you also want to add the restaurant name on the window as well?
Ms. Ford; no we want to do LED lights with an open sign other than that….
Chairperson Cherniak; so is that an existing LED open sign or would you be adding that?
Ms. Ford; I will be adding that
Vice Chair Hildreth; so you’re putting an open sign in the window?
Ms. Ford; yes
Chairperson Cherniak; in the past we sort of
Vice Chair Hildreth; I know but every store has one
Chairperson Cherniak; yeah…
Vice Chair Hildreth; without the LED lights inside you can’t tell if a business is open or not
because they don’t know, so you’ve got to have that sign in the window
Ms. Ford; that what we were debating on because otherwise….
Vice Chair Hildreth; you can’t tell it’s open
Ms. Ford; right, and I’m only open Thursday, Friday and Saturday and I don’t want to confuse
the customers
Chairperson Cherniak; right. Ok any other questions for the applicant?
Vice Chair Hildreth; you’re not changing the front at all, just putting a new sign up
Ms. Ford; just putting a new sign up with my logo
Chairperson Cherniak; ok do I have a motion to approve?
Vice Chair Hildreth; I make a motion to approve
Member Lamb; 2nd all in favor AYE motion carried.
YES NO ABSTAIN
Daniele Cherniak X
Barbara Hildreth X
Thomas Rifenberg ABSENT
Evan Lamb X
John Frainier ABSENT
CONSIDERATION OF A HANGING SIGN AND EXTERIOR LIGHTING AT
HOLIDAY TIMES AT 129 REMSEN STREET
Chairperson Cherniak; ok, what about this 129 Remsen Street
Sharon; she took her daughter to Disney for her birthday, so she said she wasn’t going to be here.
I think she’s relatively simple
Chairperson Cherniak; I guess I did have a question on where the sign would be located because
I don’t see that information. There’s a bracket but it doesn’t say where the location is of the sign
and is that a new bracket, is it existing?
Sharon; that’s a new bracket I don’t think there’s one there now.
Chairperson Cherniak; but we would all need to know where it will be located and I have
questions about this other holiday lighting, where those would be
Sharon; it would be inside the windows, is there a picture of the place, do you have one of the
building?
Joe; I don’t I can go get one
Chairperson Cherniak; it says lights on the outside of the building in the application
Sharon; I need to see a picture of the building
Chairperson Cherniak; technically it’s a basically a holiday decoration so we really don’t have
approval of that, but I was just curious
Sharon; that’s what she said like for the holidays, she is going to have a company come in to do
the decorating in the windows.
Chairperson Cherniak; if people put up pumpkins or wreaths, we really don’t have
Sharon; picture of building on Joe’s phone showed members where holiday displays would be in
the windows and where on the outside of the building any holiday lighting would be, she said she
might put some outside lights there. It’s more decoration inside the display window
Chairperson Cherniak; we really wouldn’t have jurisdiction over that
Vice Chair Hildreth; no
Chairperson Cherniak; so there’s already a sign there, if the sign will be in that same location
Sharon; we can just tell her the sign has to go in the same location
Chairperson Cherniak; yes, if she’s changing the bracket, the bracket is fine
Member Lamb; yes
Chairperson Cherniak; ok are there any more questions? If not we can have the motion that as
long as the sign is in the existing location
Member Lamb; ok, do we have to mention anything about the lights?
Chairperson Cherniak; and the lights, in a sense, because it is a temporary holiday decoration, we
really don’t have jurisdiction over that. But if they were going to keep them on all the time, then
it would be different
Sharon; no, she said Christmas, Halloween, 4th of July,
Member Lamb; she’s got them all on the application, Valentine’s, St. Patrick
Vice Chair Hildreth; 4th of July, Memorial Day red, white and blue
Chairperson Cherniak; ok so do I have a motion to accept the application with that stipulation
about the location of the sign
Member Lamb; I’ll make the motion
Chairperson Cherniak; do I have a 2nd
Vice Chair Hildreth; I 2nd it all in favor AYE motion carried
YES NO ABSTAIN
Daniele Cherniak X
Barbara Hildreth X
Thomas Rifenberg ABSENT
Evan Lamb X
John Frainier ABSENT
CONSIDERATION FOR 2 MOCKUP WINDOWS AT 97 MOHAWK STREET
Joe Seman-Graves; would it help if I got my big set of plans?
Chairperson Cherniak; sure that probably would be
Joe Seman-Graves; ok so the start of this process, probably a year ago or more. The goal is we
have 330 windows in City Hall, not all of them need to be replaced but we need to know the size
for replacements. We did this at the music hall and the original ones that were ordered, not all of
them but some were about a half inch off. Because when you take these out you realize that there
is, the dimensions aren’t what you think. So ultimately this is a review for 2 mock up windows,
you can see multiple sets of drawings. One window is going to be in this room and one is going
to be in my office. They were taken out a few weeks ago to get measured and ultimately they’re
going to come back next week to do molds, then they get sent off for 4 weeks to get constructed.
Vice Chair Hildreth; they’re going to replace all 3 right?
Joe Seman-Graves; the mock up is just going to be this one (went over to the window that will be
replaced) because ultimately State Historic gave us approval for 2 mockups nothing else. They
want to see what they look like in there first, before anything else can be looked at. These are
going to be, while wood replicas and, so wood replicas and there’s nothing visibly that is going
to change on these windows from the outside, the one caveat is the glass. SHPO is concerned
that the tint of the glass will not be the same so they want to see the mockup in there first before
allowing anything else to happen. The size is going to be the same, the curvature is going to be
the same, we going to be restoring the transoms on top or if you’re looking at this window unit
(went over to the windows) the only things coming out are these 2 pieces (just the actual
window) the bases are all staying the same, the will be peeled down, recoated and restored.
Vice Chair Hildreth; they’re going to be refinished
Joe Seman-Graves; tops are going to be refinished they’re not touching those at all, just the two,
these 2 pieces specifically are coming out. We’re looking to get Kolby which is what we have at
the music hall wood replacement windows. So you can see the existing window elevations
(showing members on the drawing), and the proposed, identical same with the curved glass.
These are going to be identical, nothing’s going to be changing with the angles, and nothing’s
changing with the thickness of the wood. The only thing that would be changing from the
original would be the pulley system are not going to be left in tacked. They’re going to be pretty
much, not removed necessarily but they’re not—what’s happening is the system is already within
the wall, if you’re looking at the window or at the wall, so they’re in here (pointed to the casing
of window where pulley system is located) so pretty much the chain is coming out and then they
are sealing that up and then the replica will be placed as is no so you won’t have that ease
necessarily but just a normal window action—open and close. We went through 3 sets of revised
plans for SHPO we got approval. The reason I wanted to go through it, we are actually spending
our own money for this so we don’t need to get approval through SHPO they really only have
prevue when we either have grants, state funding or we have something in place that makes us go
through the Secretary of Interior Standards. In the past we have received grants that put let’s say
a 5 to 10 year time period on how long we have to be maintaining the building per Secretary of
Interior Standards so I talked with them and they said you don’t need our approval of this
however we can afford 2 windows but when we go back for grants we’ll need their approval. So
I wanted to go through the hardest part now saying ok if you’re approving this to the fullest
extent then we will be able to come back later and should be able to get approved ideally.
Although you’re dealing with human beings over there so it tends to change. So ideally these
will be put in as soon as the weather turns better in the spring, because we’re going to need 4
months to build them.
Vice Chair Hildreth; you’re doing it at a good time
Joe Seman-Graves; we started a year ago so it just worked out like this. These are actually
supposed to be taken out and stopped with insulated plywood, but the way these windows were
constructed we were actually able to take them out without damaging anything and put them
back, only thing is they can’t open any more so….
Vice Chair Hildreth; but you don’t need to open them
Joe Seman-Graves; no you don’t have to but I was happy to see them put back in without
damage for the winter. So that’s the request, I believe I attached SHPO’s approval letter in there
and it specifically has the 2 mockups, nothing more nothing less. The reason we’re doing these 2
in particular is we need to get the dimensions on both curved and standard. We have different
sized windows in the building, but if we get the dimensions and we are increasing height and not
necessarily the width of them because they are all the same width should be go through and do a
more detailed restoration of the building SHPO wants a window by window analysis before so it
will take quite some time. I did bring up the fact with them that if we were able to restore certain
windows but not others would they have any issues with the look because if you put a new one in
no matter how good the paint job is it’s not going to look exactly like the old one next door they
said they would prefer to retain as much as possible and they’re ok with replacements if it
doesn’t match 100% of what you’re seeing next door, to the other window, I had questioned that
but that is up to them and they are going to want to see a survey I think that will give them an
idea of west elevation do x amount of windows what do we think that is going to look like. Are
we going to have window replacement, restoration or taking out a full swath of it – they’re going
to want more detail. We also picked these 2 sides so we can see how the sun is hitting the glass
respectively which is a big sticking point with them. We decided to not go with the tinted glass at
all so we trying to go basic clear see through however their point is you’re going to have a
different tint regardless because of the age of the glass and how it was made, so even with no tint
in it we’ll …
Vice Chair Hildreth; true, look at that window over there
Joe Seman-Graves; I don’t think this is glass anymore
Vice Chair Hildreth; is it plastic?
Joe Seman-Graves; it’s plastic, We also have pending grant applications for roof work and new
HVAC, which the HVAC shouldn’t poke outside, but there was $500,000 for windows so this
hopefully will get the ball rolling if we are fortunate to get that grant we’ll have an idea of how
best we can utilize the $500,000. It’s going to be way more than that at the end of the day
unfortunately but that’s just how it goes with old buildings, and government work everything is
prevailing wage and we pay a lot more than we have to otherwise. So I don’t want to give you
the quotes I got for the whole building. So that is what’s here, that’s what I’ve got today.
Thoughts, questions?
Vice Chair Hildreth; it’s a big project
Joe Seman-Graves; the 2 windows are a big project in itself.
Chairperson Cherniak; but it is laying the ground work for the future, so this is getting all the
approvals getting all the reviews
Vice Chair Hildreth; and then inside are we going to have identical shades so they look the
same? Because when you drive by here the shades and blinds are in all different directions, it’s a
mess
Joe Seman-Graves; I think the shades have to come out altogether, I’m working on the windows
the shades are something separate.
Vice Chair Hildreth; I don’t care how beautiful your windows are, if you don’t have consistency
to the window shades it’s not going to make any difference
Joe Seman-Graves; I can tell you they are going to get destroyed when the windows have to
come out, but I think the good thing is the window shades will not make it through the process,
we’ll have to get new ones. Another big thing is we applied for HVAC because we don’t want to
put air conditioning units back in. These nice windows if we get them or restore the old ones, just
does so much damage over the years so HVAC is important but it’s a whole building restoration.
I mean the roof needs major work, the heating and cooling need major upgrades, windows, not to
mention accessibility. We had 3 people down stairs for a meeting last week, they couldn’t hear
anything because our camera wasn’t working, so they were just sitting downstairs because they
couldn’t get up here, so major work has to get done this is definitely laying the ground work, but
there is a lot more that needs to happen if you want to keep this building up to literally up to
code, we not even up to code and insulated
Vice Chair Hildreth; and an elevator was never a thought
Joe Seman-Graves; we have a grant application in for accessibility with Mark Fowler. And part
of that is seeing the feasibility where could we put an elevator. I think there is really only one
spot that would work, we used Mark Fowler because he did a project that he showed us
where—if you picture where the police stairs are that is really the only feasible spot that we
could put an elevator. And if you are just thinking elevator right there, it just isn’t going to be
right, He showed us a project that he did where it was the same kind of situation and the building
didn’t lose character, they did it in a way that retained it
Vice Chair Hildreth; but it makes sense to put it down there because that has a handicap
entrance. No sense in putting an elevator in front when people can’t walk up those stairs
Joe Seman-Graves; the thing is, is there is a—the best spot would be on the back side but we
can’t because there is a private house there and that is there entrance, that is their driveway there.
Vice Chair Hildreth; but it’s got to be near an entrance that is handicap accessible
Joe Seman-Graves; yes. Well that whole thing would come out if they way that Mark is like
talking about it. It wouldn’t look anything like it currently is. Big issue over there is our utilities
come in right under the police stairs, so there is only so much that you can really do. This is very
far out though we’re talking a very long time. We’ll work on mock up windows first then we can
talk about full façade restoration and changing the layout. Now is the time to speak up on
anything you don’t like because they’re …
Chairperson Cherniak; this looks like the way to go and if SHPO is happy then we are ok
So do we have any other topics to discuss this evening?
Joe Seman-Graves; you need to take a vote
Chairperson Cherniak; we need to vote, what is it we are voting on?
Joe Seman-Graves; just approval on 2 mock up windows
Chairperson Cherniak; ok
Member Lamb; I’ll make a motion to approve
Vice Chair Hildreth; I’ll 2nd it all in favor AYE, motion carried
YES NO ABSTAIN
Daniele Cherniak X
Barbara Hildreth X
Thomas Rifenberg ABSENT
Evan Lamb X
John Frainier ABSENT
Joe Seman-Graves; we also have street scapes coming up we have a meeting tomorrow at 12:30
for design, everyone is more than welcome
Chairperson Cherniak; I thought it was 11?
Joe Seman-Graves; sorry 12:30 is National Grid it is 11. So we’re going to go over the basic
designs. It’s going to look very similar to Remsen Street not trying to change up the look to
much. There’s going to be some things we’re going to change obviously
Vice Chair Hildreth; where are you going to do this?
Joe Seman-Graves; so we’re working on designs for Howard, White and Ontario. We have
funding out there for White right now.
Vice Chair Hildreth; what are you going to do with it?
Joe Seman-Graves; the Remsen Street treatment lights, sidewalks, new….
Vice Chair Hildreth; have we finished the sidewalks all the way down Remsen Street yet?
Joe Seman-Graves; so, that is actually going to start this spring.
Vice Chair Hildreth; ok
Joe Seman-Graves; so that’s going to be done in the Spring minus the fire parcels, we’re going to
leave that for future developers so we don’t, they’re going to destroy it anyway when they come
in Also have an application in for the length of Columbia Street and White Street. And included
in the White Street is the pocket park over there which is now just a vacant piece of grass across
from the new building on White and Remsen. So we have designs we’re trying to finalize for
those 3 streets there’s funding out for one of them. I think I asked for funding for Ontario,
Howard is going to be the 3rd whenever that happens not in the next year or so. So we’re going to
look at those designs once they’re finalized design wise then will bring it to the board for final
approval. I’m not sure that happened with Remsen Street
Chairperson Cherniak; I don’t think so
Joe Seman-Grave; but it seems like an exterior alteration so it should come through this board.
That’s what I’ve got going on, the library is coming around you’ll notice the stone work is taking
a while because it’s cold but it’s happening.
Vice Chair Hildreth; we’ve been talking that when it opens we’ll have to bring in commercial
cleaners because that place has been vacant for how long and with all the rodents that normally
go in there we need to have professional cleaners go in there. Holiday Hope is usually there, but
we put them at the Senior Center
Joe Seman-Graves; have you been in there
Vice Chair Hildreth; no, I haven’t but there’s no way that Holiday Hope is going down in the
basement. I don’t know how dirty or clean it is, and we’ve got to clean that. The Library Board is
talking about professional cleaners to come in and clean
Joe Seman-Graves; ok. On the construction side of things it’s coming along. We’re waiting for
the lift to come out for the tower work, and that should be the last phase. Also when that
happens, we’re going to try to get the lift over to the Music Hall because there is some, its’ not
noticeable, but the back side of the chimney they need to repoint but, if you know how to get to
the roof of the Music Hall, you don’t want to bring your material up through the roof, so it’s
better to have a lift and just work that way, because that ladder is probably as old as the Music
Hall. So we’re going to try to come over there and do some light touchup. I don’t know if the
board wants to see it, it’s 2 or 3 bricks that are loose but where they are it’s just better to have
those guys do it rather than DPW going up there. But it’s not noticeable from the street at all
Chairperson Cherniak; that’s fine, they’re just repairing and repointing
Vice Chair Hildreth; it’s not like your changing it, you’re just repairing it
Joe Seman-Graves; no and we want to keep the bricks where they are and not in the street. That’s
what I got.
Chairperson Cherniak; ok so if there are no more topics for discussion do I have a motion to
adjourn?
Vice Chair Hildreth; I’ll make a motion to adjourn 2nd by Member Lamb all in favor AYE
motion carried to adjourn at 6:59PM