Wastewater Treatment Board
Regular MeetingCortland, NY · June 26, 2017
Minutes
CITY OF CORTLAND
WASTEWATER TREATMENT
FACILITY
Meeting Minutes
Members:
Da te : 6/ 26 /17
Ti me : 5 :30 p m
Chairman John Troy – Present
C on fe r en ce R o om ,
C or t la nd Wa st e wa t e r Vice Chair William Starr – Absent
Commissioner Todd Morris – Present
Commissioner Diann Potter – Present
Commissioner Gary Thomas- Present
Village of McGraw Mayor Allan Stauber – Present
Bruce Adams, Supt. of Wastewater – Present
Edward Poole, Chief Operator - Present
Meeting called to order at 5:26 p.m.
Minutes from May 22, 2017, meeting for approval.
Motion to approve the minutes from May 22, 2017, meeting by Diann Potter. Seconded by Todd Morris.
UNANIMOUS
Superintendent's Report:
Superintendent's Report
for
June 26, 2017
(as written by Supt. Adams)
Administration–
The site visit from EFC went very smoothly. They were pleased with what they saw and had no complaints
regarding Cortland’s participation in the requirements for utilizing EFC funding.
On 6/20 the Common Council approved moving ahead on completing the new anaerobic digester and
committed unallocated reserve funds for doing so.
On 6/20 the Council also approved declaring two old submersible pumps as surplus and transferring them to
the County landfill operation. The landfill hopes to use them as leachate transfer pumps. The gas-powered
non-submersible pumps they’ve been using have been short-lived and unreliable.
The PWOA has requested a change to the weekend schedule wherein instead of one operator working 8
hours on Saturday and another one 8 hours on Sunday, each operator would work 4 hours each day. This
schedule allows for two hours of overlap each weekend day, which should allow for better attention to tasks
that benefit from such, for example pressing sludge. Ed and I have agreed to implement the schedule change
on a trial basis.
Ed, Phil and I attended a workshop in Hemlock, NY on 6/20 focused on a data management product from
Hach. Most of the data management this department does is done in tools that I have developed in MS
Access, MS Excel and Visual Basic. I would like to move the department to a third-party tool well prior to
my retirement and the Hach product has features that could be advantageous to our operation.
Last week we dug an exploratory hole to locate the 48” secondary effluent pipeline. As feared, it runs too
close to the existing digesters to place the new digester where initially planned. We are now looking at
placing the new digester farther to the East, displacing the driveway to the rear of the facility. A new drive
would be laid to the West of the existing digesters to enable access to the rear of the facility.
Bruce Adams
Superintendent of Wastewater
Motion to approve the Superintendent's Report by Todd Morris. Seconded by Diann Potter. UNANIMOUS
WWAB Minutes 26 June 2017 Page 2 of 4
Plant Manager’s Report:
Plant Managers Report
for
June 26, 2017
(as written by Edward Poole, Chief Operator)
Operations-
The process is running well. Because of tank cleaning and maintenance, removal rates are lower than last month
but still 90 percent or better.
There were no violations for the month of May.
The digesters are doing well despite having an issue with the heating on the North digester, which killed much
of our methane formers and in turn soured the digester.
We treated with a ton and a half of lime and after three weeks, it is finally getting back to normal.
I continue to send a monthly update to May El Prince, our DEC inspector via email.
Because of higher than normal rainfall, we were forced to move SBR startup date to July. On July 17th, Dennis
Barnes, the process engineer for Xylem, will be onsite to provide process training and support
Chlorine season is going well. However, we are having issues with the dechlor analyzer and are feeding in a
manual set point. The parts for the analyzer have been ordered and we should be back in automated feed
shortly.
Maintenance-
The maintenance staff and I continue to work on creating entries in our computerized maintenance management
system for the new equipment.
Work continues on preventative maintenance on the process tanks. The maintenance staff and I are making
evaluations of the work that needs to be done and the cost associated with it.
The work is complete on the aeration basins for SBR startup. As previously mentioned, we are waiting for flows
to go down.
Edward Poole
Chief Operator
Motion to approve the Plant Manager’s Report by Diann Potter. Seconded by Todd Morris. UNANIMOUS
WWAB Minutes 26 June 2017 Page 3 of 4
Finance: Financial statements and abstracts dated 5/31/17, and 6/15/17, were submitted for approval.
Motion to approve financial statements and abstracts by Todd Morris. Seconded by Diann Potter.
UNANIMOUS
Sewer Grievance:
A sewer grievance was submitted by Patricia Noecker on 5/25/17, for property located
at 97 Wheeler Avenue, City of Cortland. Ms. Noecker reported that her water and sewer
bill had been damaged/lost by the post office and she did not receive the bill until
5/11/17. The sewer bill was due by 5/01/17, after which a penalty charge was added.
Ms. Noecker is requesting reimbursement for the penalty charge on her sewer bill.
The board reviewed Ms. Noecker’s grievance and a motion was made by Diann Potter to
issue a credit for the penalty charge.
Motion to approve a credit of $4.49, by Diann Potter. Seconded by Todd Morris . UNANIMOUS
Sewer Grievance:
Darrin Osborne submitted a sewer grievance on 6/9/17, for property located at 21
Arthur Avenue, City of Cortland. Mr. Osborne reported that he contacted the plumber,
W2Operator Training Group, the day he received his water and sewer bill. Repairs were
made to the sewer line and water supply on 4/27/17. He is requesting an adjustment to
his sewer billing as water caused by the leak went into the ground instead of the sewer.
Mr. Osborne’s grievance was reviewed by the board. After discussing Mr. Osborne’s
grievance, Gary Thomas made a motion to grant a credit of $129.00.
Motion to approve a credit of $129.00, by Gary Thomas. Seconded by Diann Potter. UNANIMOUS
New Business: No new business
Old Business: No old business
Motion to Adjourn at 5:49 p.m. by Gary Thomas. Seconded by Todd Morris. UNANIMOUS
Respectfully submitted by:
City of Cortland WWTF
WWAB Minutes 26 June 2017 Page 4 of 4
Agenda
CITY OF CORTLAND
WASTEWATER TREATMENT
FACILITY
AGENDA
Call to Order
Approval of Previous Meeting Minutes –
Da te : 6/ 26 /17
May 22, 2017
Ti me : 5 :30 p m
Superintendent's Report
C on fe r en ce R o om ,
C or t la nd Wa st e wa t e r Plant Manager’s Report
Finance
Approve Bills
Abstracts dated – 5/31/17 &
6/15/17
Financial Statements
Grievance Applications:
Patricia Noecker
Darrin Osborne
New Business
Old Business
Next Advisory Board Meeting – 7/24/17
Adjournment