Wastewater Treatment Board
Regular MeetingCortland, NY · July 24, 2017
Minutes
CITY OF CORTLAND
WASTEWATER TREATMENT
FACILITY
Meeting Minutes
Members:
Da te : 7/ 24 /17
Ti me : 5 :30 p m
Chairman John Troy – Present
C on fe r en ce R o om ,
C or t la nd Wa st e wa t e r Vice Chair William Starr – Absent
Commissioner Todd Morris – Present
Commissioner Diann Potter – Absent
Commissioner Gary Thomas- Present
Village of McGraw Mayor Allan Stauber – Present
Bruce Adams, Supt. of Wastewater – Present
Edward Poole, Chief Operator - Present
Meeting called to order at 5:29 p.m.
Minutes from June 26, 2017, meeting for approval.
Motion to approve the minutes from June 26, 2017, meeting by Gary Thomas. Seconded by Todd Morris.
UNANIMOUS
Superintendent's Report:
Superintendent's Report
for
July 24, 2017
(as written by Supt. Adams)
Administration–
Despite a Byzantine online portal, I have managed to upload the data required to proceed to a contract with
DEC for the vermicycle pilot project. Larsen Engineering will start working on the steps necessary to gain a
DEC permit for the project. Bill Bastuk of Larsen tells me DEC has expressed a great deal of interest in the
project.
I am nearing completion of the 2018 Wastewater Department budget. I only need the debt, GF transfer and
HR expenses from the Finance Department to finish. We are expecting lower costs for chemicals and
utilities. Upon review and possible adjustment by the Finance Department and Mayor, that budget will then
be presented to the Common Council.
Hubbard Construction has begun excavating for the new digester. They have already relocated the primary
sludge and yard hydrant lines. We are still finalizing plans for how best to relocate the 48" effluent line.
The CESIR High Level Assessment Report from National Grid is now considerable overdue. This report will
tell us whether there will be any additional expensive requirements placed upon our generator interconnect.
Cedarwood Engineering is doing what they can to get National Grid to deliver the report.
Cortland County Civil Service informs us two of our employees have never taken the tests for their positions.
Civil Service is not sure how this happened but it must be corrected. Civil Service will offer the tests later
this year and we do not anticipate that either employee will have difficulty retaining their positions.
Bruce Adams
Superintendent of Wastewater
Bruce reported that he had attended the Homer Village Board meeting this month as a resident;
however, a presentation by Barton and Loguidice on the I&I project effort was on the agenda and
Bruce participated. He will be working with them further in trying to determine a breaking point for
getting the project funded.
Motion to approve the Superintendent's Report by Todd Morris. Seconded by Gary Thomas. UNANIMOUS
WWAB Minutes 24 July 2017 Page 2 of 5
Plant Manager’s Report:
Plant Managers Report
for
July 24, 2017
(as written by Edward Poole, Chief Operator)
Operations-
The process is running well. Despite higher than normal flows in June, removal rates are still 94 percent or
better.
There were no violations for the month of June.
The digesters are doing well. Detention times are increasing because of more efficient dewatering on our
Gravity Belt Thickener. We are hoping this will help dewatering of our digested sludge and reduce polymer
cost.
I continue to send a monthly update to May El Prince, our DEC inspector via email.
Because of higher than normal rainfall, we were forced to move SBR startup date again to August. Dennis
Barnes, the process engineer for Xylem, will be onsite August 16th to the 18th to provide process training and
support.
Chlorine season is going well. All issues with the Dechlor analyzer have been resolved.
Maintenance-
The maintenance staff and I continue to work on creating entries in our computerized maintenance management
system for the new equipment.
Work continues on preventative maintenance on the process tanks. The maintenance staff and I have come up
with a list of repairs needed in the Final Settling Tanks. We are still waiting on a quote for equipment
replacement and structural repairs.
We have finally received our Return Activated Sludge pump back after being rebuilt by Daman Industries. We
will be installing it this week and should have it painted and laser alignment done by the end of the week.
The Maintenance and Operations staff just completed a major service on the belt press.
Some of the work completed includes changing belts, rebuild of shower assemblies, changing oil in all
gearboxes and hydraulic unit, replacement of conditioning blocks and doctor blades. Because of cooperation
between the staff members, this work was able to be completed in less than 8 hrs.
Edward Poole
Chief Operator
WWAB Minutes 24 July 2017 Page 3 of 5
Motion to approve the Plant Manager’s Report by Todd Morris. Seconded by Gary Thomas. UNANIMOUS
Finance: Financial statements and abstracts dated 6/30/17, and 7/16/17, were submitted for approval.
Motion to approve financial statements and abstracts by Todd Morris. Seconded by Gary Thomas.
UNANIMOUS
Sewer Grievance:
A sewer grievance was received from Reese Weyant on 7/3/17, for property located at 10
Glyndon Avenue, City of Cortland. Mr. Weyant reported that he was charged a penalty for a bill
that he never received. He is requesting a credit on the penalty that was charged.
The board reviewed Mr. Weyant’s grievance. Gary Thomas made a motion to approve a credit
of $3.21, on Mr. Weyant’s sewer billing.
Motion to approve a credit of $3.21, by Gary Thomas. Seconded by Todd Morris. UNANIMOUS
Sewer Grievance:
Dianne C. Abrams submitted a sewer grievance on 7/7/17, for property located at 25 West Main
Street, City of Cortland. Ms. Abrams reported that her payment was never received and was
lost in the mail, resulting in a penalty charge on her account. She is requesting a credit on the
penalty charge.
Ms. Abrams’ grievance was reviewed by the board. Gary Thomas made a motion to approve a
credit of $3.21, on Ms. Abram’s sewer billing.
Motion to approve a credit of $3.21, by Gary Thomas. Seconded by Todd Morris. UNANIMOUS
Sewer Grievance:
A sewer grievance application was submitted by Lori A. Frisbie for property located at 23 Park
Street, City of Cortland, on 7/12/17. Ms. Frisbie reported that she received her water and
sewer bill for July 2017, and discovered that her April 2017 bill was never paid, resulting in a
penalty charge on her account. She further reported that her son had placed the payment for
the bill in the city’s drop box on 4/28/17. Ms. Frisbie spoke with the Water Department, who
reported no record of payment being processed on the account during that timeframe and
recommended that she check her records to see if the check for payment was cashed. Ms.
Frisbie reported that her son had looked through his records and noted that the check was
never cashed. She is requesting a credit on the penalty due to payment being lost after being
placed in the drop box.
After a brief discussion of Ms. Frisbie’s grievance by the board, Gary Thomas made a motion to
approve a credit of $5.46, on Ms. Frisbie’s sewer billing.
WWAB Minutes 24 July 2017 Page 4 of 5
Motion to approve a credit of $5.46, by Gary Thomas. Seconded by Todd Morris. UNANIMOUS
Sewer Grievance:
A sewer grievance application was submitted by Yefim Livchits on 7/18/17, for property located
10 Squires Street, City of Cortland. Mr. Livchits reports that his sewer billing charge is
incorrect.
Mr. Livchits was present at the meeting and stated that he had purchased the property in
November 2016, with no problems reported through inspections. He then stated that upon
receiving his water and sewer billing this month, he noticed an increase in his sewer billing. Mr.
Livchits then went to the Water Department and discussed the bill with them. The Water
Department went out to his property and checked his meter, discovering that it had been
installed backwards. The meter was then correctly reinstalled. He is requesting a credit on his
sewer billing.
The board reviewed and discussed the grievance. A recommendation was made by John Troy
that a possible credit of $78.00, could be granted. A motion was made by Gary Thomas to
grant the credit.
Motion to approve a credit of $78.00, by Gary Thomas. Seconded by Todd Morris. UNANIMOUS
New Business: No new business
Old Business: No old business
Motion to Adjourn at 5:56 p.m. by Todd Morris. Seconded by Gary Thomas. UNANIMOUS
Respectfully submitted by:
City of Cortland WWTF
WWAB Minutes 24 July 2017 Page 5 of 5
Agenda
CITY OF CORTLAND
WASTEWATER TREATMENT
FACILITY
AGENDA
Call to Order
Approval of Previous Meeting Minutes –
Da te : 7/ 24 /17
June 26, 2017
Ti me : 5 :30 p m
Superintendent's Report
C on fe r en ce R o om ,
C or t la nd Wa st e wa t e r Plant Manager’s Report
Finance
Approve Bills
Abstracts dated – 6/30/17 &
7/16/17
Financial Statements
Grievance Applications:
Reese Weyant
Dianne C. Abrams
Lori A. Frisbie
Yefim Livchits
New Business
Old Business
Next Advisory Board Meeting – 8/28/17
Adjournment
Get email alerts for Cortland
A daily email when new agendas and minutes are posted.