Environmental Impact Commission
Regular MeetingDanbury, CT · January 8, 2025
Minutes
Posted in City of Danbury Town Clerk’s office on January 23, 2025 at 1:20 p.m.
CITY OF DANBURY
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
ENVIRONMENTAL IMPACT COMMISSION (203) 797-4525
www.danbury-ct.gov (203) 797-4586 (FAX)
REGULAR MEETING
ENVIRONMENTAL IMPACT COMMISSION
MINUTES
CITY HALL – 155 DEER HILL AVENUE
City Council Chambers
Wednesday, January 8, 2025
7:00 p.m.
ROLL CALL:
Chairman Matthew Rose called the meeting to order at 7:00 p.m. Present by roll call:
Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz, and Elizabeth Falk. Staff
present was Melissa Llera, Secretary, and Larry Liebman, Environmental Compliance Inspector.
Chairman Rose seated alternate Gary Dufel for Geoff Herald.
PLEDGE OF ALLEGIANCE:
The Pledge of Allegiance was led by Elizabeth Falk.
ACCEPTANCE OF MINUTES: December 18, 2024
Motion to accept the minutes of December 18, 2024 as presented was made by Elizabeth
Falk; seconded by John Schwartz. No remarks. All in favor with Ayes of those eligible to vote:
Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk, and Matthew
Rose.
Next regular meeting is scheduled for January 22, 2025.
OLD BUSINESS:
#1106R 7B Judith Drive, Gontijo, Alaor & Vasquez, Saul, (D08082), RA-40 Zone,
Construction of single family dwelling, septic, and well
No one present for the application.
Motion to table No. 1106R, 7B Judith Drive, until the next regularly scheduled meeting
was made by Elizabeth Falk; seconded by John Schwartz. All in favor with Ayes: Gary Dufel,
Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk, and Matthew Rose.
EIC Minutes – January 8, 2025
Page 2
#1228 2 Great Pasture Road, 2 GPS Owner LP, Benjamin V. Doto III, P.E., Agent,
(K15109), IL-40 Zone, Expand outdoor storage, drive aisles and parking at existing industrial
warehouse site
Benjamin Doto, professional engineer, was present to represent the application. He is
joined by James McManus, soil scientist, and Barbara Constable, landscape architect. Mr. Doto
said they are here to continue with the application that was introduced on December 18th. The
limits were staked on the property as requested. He is aware of site walks that were performed,
and received some feedback through Mr. Liebman. He then provided an environmental
summary to the Commissioners that was completed by a LEP.
The property has a 115,000 sq. ft building on 15.6 acres. There is currently about 15,000
sq. ft. of outdoor storage. They are proposing to add 66,000 sq. ft. of outdoor storage, along with
a driveway on the left which would link to the other in the rear. With the proposal, they would
be removing 2,900 sq. ft. of wetlands and filling about 160 cubic yards of floodplain. They
would be adding about 11,000 sq. ft. of wetlands, and there would be a net gain of floodplain
storage after the work. Other improvements would include landscaping, drainage, stormwater
quality, sidewalks, etc.
Mr. Doto then clarified some errors that had been listed in a recent article in the
newspaper. The property owner lives in New York, not Greenwich as the newspaper stated. The
property management company is located in Greenwich. The newspaper also brought up a lot of
debris on the site which would be cleaned up as part of the project. In addition, the property was
purchased in 2022, and was not simply acquired. The site is currently listed for sale or lease, but
that is a result of a current tenant having a lease that will be expiring.
In regards to the environmental summary, their LEP, Paul Tanner, went through the
records and compiled a summary and map for the Commission. The contaminants that were
found were hydraulic oils with PCBs. The site was cleaned between 1995-2006, and then the
ELUR was done. There are no residential uses permitted on the site. The LEP overlayed the
ELUR on the site plan. Mr. Doto reviews some of the areas specified on the map with their
restrictions. There was also groundwater monitoring on site, and did not find a reason for
remediation. He then directs the Commission to page 3 of the report for a summary on the
environmental conditions and reads a portion of it. The construction would reduce the potential
for erosion and infiltration due to the increase in paving. It is important that the work be done
with a soil management plan in place. There are details listed in the LEP’s report. DEEP would
have input on the soil management plan. It would ensure that any soil is either reused in the
same area or tested before being taken off-site or moved.
Mr. Doto then addresses comments received after the site walks. The surface debris will
be removed. There is currently about 15,000 sq. ft of outdoor storage which is mostly the fenced
in area by the roofing company. They are proposing adding 66,000 sq. ft. There would be about
650 linear feet of new driveway. The area behind the trailers in front will be stabilized, and will
be shown on the revised plans that will be forthcoming. The detention system shown on the
plans is a tight system which means is it not perforated and does not sit on gravel. This is to
prevent any contamination. A construction sequencing plan will also be done and provided to
the Commission. There was also a question about whether the 24” culvert they walked over was
sized properly; Mr. Doto said it is not, but due to the sizing of other culverts on the neighbor’s
property, increasing the size would not make a difference. They will be decreasing the flows
with the proposed project though. The Commission also asked if they could flip the restoration
EIC Minutes – January 8, 2025
Page 3
area with another area on the plans; Mr. Doto said this would result in more wetland disturbance
and fill.
Ms. Falk asks if there is a calculation of the change in impervious surface. Mr. Doto said
with the buildings and pavement, it is currently about 31%/ 4.8 acres. With the proposed project,
they would increase by 2.25 acres for a total of 7.1 acres/ 45%. The building itself is about 17%
coverage.
James McManus, certified professional soil scientist, then spoke on the application. He
was on site first in July 2023 to delinate wetlands in the NE corner. He recently revisited the
site. He will provide a full report next meeting. The NE corner that he flagged is an isolated
pocket that seems to have been cut off from a larger system when they put in the sewer
easements. It is pretty disturbed and has invasive species. The southern part of the site and the
NW corner also have wetlands. They are all wooded swamps and seasonally saturated. The NW
corner is more disturbed with the existing railroad spur and previous tracks. There are seven
principle functions in the wetlands which will be outlined in his report. There is a fair amount of
invasive species on the property. The ones they can get to will be removed, and some will be
taken with the construction itself. Almost all of the wetlands follow along the fill boundary.
Mr. Liebman states that the wetlands were flagged 24 years ago by Mr. Muller. The
Commissioners felt the site should be revisited because they could change in size. They would
like an updated flagging and report of all the wetlands on site. Mr. McManus doesn’t feel there
has been a changed. Mr. Doto acknowledges the request, and said any changes can be flagged.
Mr. Liebman said that the Commission feels this could warrant a public hearing for a significant
activity, so they would like the wetlands reflagged to hopefully avoid that process.
Mr. Schwartz request copies of the correspondence with DEEP for the ELUR release
when it is done. Mr. Doto agrees, and said a copy of the soil management plan would also be
provided. Mr. Schwartz states he did some research on previous testing, etc. on the site. It
appears there was more testing on the site, and he requests that the LEP add to the plan any
sample locations from the past. Mr. Doto agrees to that. Mr. Schwartz also asks if any testing
was done for Cronium which was shown on hazardous waste manifests for the site when Fuel
Cell was there. Mr. Doto said he will look into it. Mr. Schwartz also asks if DEEP will require
an ecological assessment due to the significant disturbance to the wetlands. Mr. McManus
responds that his report will show the functions and values for the wetlands. Mr. Schwartz
requests the reflagging of wetlands with an updated survey.
Mr. Flanagan asks if the railroad ties will be removed. Mr. Doto said they would be
disposed of properly off site once they are removed.
Barbara Constable, landscape architect, then spoke on the application. She noted
multiple invasive species on the site. They will be providing a mitigation plan to address the
ones in the work area and a removal plan specific to each species.
Mr. Liebman then summarizes the requests from the Commission. They want the plan
revisions for the area behind the trailer, a report from Mr. McManus with a functional value
assessment, an invasive removal plan, sample locations for the property, and the soil
management plan through DEEP. Mr. Doto replies that the wetland confirmation flagging will
be first in case there are any changes. The soil management plan will come at the end before
construction, but we will be included in that and the ELUR release information. Mr. Doto will
provide updates to staff throughout the process.
EIC Minutes – January 8, 2025
Page 4
Motion to table No. 1228, 2 Great Pasture Road, until the next regularly scheduled
meeting was made by Elizabeth Falk; seconded by John Schwartz. All in favor with Ayes: Gary
Dufel, Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk, and Matthew Rose.
#1229 160-162 Deer Hill Avenue, First Congregational Church & Ecclesiatical Society,
Virbickas, Dainius, Agent; (I14104 & I14105), RH-3 Zone, Construction of apartment building,
along with parking, walkways, landscaping, and storm drainage system
Dainius Virbickas, professional engineer with Artel Engineering, was present to represent
the application. He is following up from last meeting, and he is aware staff and the Commission
members performed site walks. Staff had asked for an updated drawing adding the cut fill
calculations which he has provided. He also received the Project Impact Report, and accepts the
proposed conditions of approval.
Mr. Flanagan asks if the discharge for the roof runoff from the Church had been
determined. Mr. Liebman responded that he did receive that information after they had opened
the manhole and located any connections. Mr. Flanagan also noticed the remanents of an old
fence by the Blind Brook on the property, and wondered if that fence would be restored and a
gate added for access. Mr. Botelho, current property owner, said they had not planned to
because they didn’t want the area used as a cut thru. He would certainly take any advisement
from the City if they feel access would be needed to that area.
Motion to approve No. 1229, 160-162 Deer Hill Avenue, with the 7 conditions noted in
the staff report was made by Elizabeth Falk; seconded by Michael Flanagan. All in favor with
Ayes: Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk, and
Matthew Rose.
#1231 18 Christopher Columbus Avenue, City of Danbury Public Utilities Dept., Tata &
Howard Inc., Agent; (D15022), IL-40 Zone, Kenosia Wellfield PCE and PFAS Treatment
Upgrades including construction of new treatment building
David Day, Superintendent of Public Utilities for the City of Danbury, was present to
represent the application. It is a very important water project to be completed. There is an
existing Kenosia wellfield. However, they have discovered low levels of VOCs and PFAS in it.
That is the reason why they need a treatment system. The City of Danbury is required by
Department of Public Health to maintain a margin of safety greater than 1.15. The margin of
safety is the ratio of available water to demand. The project would be essential to maintain this
margin of safety.
Matt Morganelli from Tata & Howard, the design consultant for the project, then spoke
on the application. The treatment facility would have a 44’ x 57’ building that would be 30’ tall.
It would house treatment equipment for the wellfield. Inside there will be carbon treatment for
PFAS removal. Outside there will be two towers for VOC removal. The existing site is at 18
Christopher Columbus Avenue (Lake Kenosia Park). The building would be at the southwest
corner of the site. Currently there is a water department building and a flood skimming station
that takes the surface water from Lake Kenosia and transfers it to the West Lake Reservoir. The
groundwater wells are currently active, but haven’t been used in awhile due to the levels of
VOCs. There are wetlands on the south and west corner of the parcel. They are about 90 ft.
away on the west side and closest to the building is about 30 ft. There would be erosion controls
EIC Minutes – January 8, 2025
Page 5
in place for the duration of construction. There are also stormwater controls installed to treat
water from the building roof leaders which will go to an infiltration basin; infiltration basin is
sized for the 25 and 100 year storm. There is an overflow for the infiltration basin that would
discharge to a rip rap swale heading toward the wetlands. The project is within the 100 year
floodplain. They would lose about 280 cubic yards of flood storage with the project, but would
add 294 cubic yards for a net gain of 14 cubic yards. They would be excavating to install the
building foundation, along with utility work for a water main and electrical work for updates.
The wells would also be rehabilitated. The wells would be surged and pumped, and discharged
to a sedimentation basin. Any sediment would be removed, and it would then be released at a
low volume to prevent any scouring.
Mr. Schwartz asks about the process of redeveloping the wells. He expresses his
concerns about the treatment of the discharge during the process. Mr. Morganelli and Mr.
Schwartz have a discussion about testing that was done and treatment possibilities during the
process. Mr. Liebman asks if a detention basin may be appropriate during the surge and purge to
capture material and ensure volitiles are not redistributed.
Mr. Day then provided clarification on the phasing of the project. The treatment system
would be built and operational first. They are looking to redevelop the wells to maximize the
diversion. The have a permit for 2.5 million gallons per day, but are currently only getting 1.8
mgd. When it comes time to redevelop the wells, they will work with the consultant to ensure
the process doesn’t put anything with high concentrations on the ground whether they use a tank
or run it through the system.
Mr. Dufel asks if this will be a temporary treatment system. Mr. Day says they are using
the Kenosia floodskimming, but DPH wants that to stop. They took the wellfields offline
voluntarily because of the VOCs, but need to get them going now. They plan to keep them in
operation in the future. Mr. Dufel asked where the VOCs may have come from. Mr. Day said
they haven’t pinpointed it, but believe it could be from the Mill Plain Road area. There is a
groundwater monitoring plan in place, and determined it is not from the Kenosia site. This
would be a first phase treatment, and then pumped to the West Lake Reservoir. Mr. Liebman
informs the Commission that with this happening, they may need to come up with a program
regarding the boat docks on Lake Kenosia.
Motion to table No. 1231, 18 Christopher Columbus Avenue, until the next regularly
scheduled meeting was made by Elizabeth Falk; seconded by John Schwartz. All in favor with
Ayes: Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk, and
Matthew Rose.
#1232 16 Sage Road, Swergold, Gary, Hadaya, Eedeet, Agent; (H22109), RA-20 Zone,
Construction of addition and temporary access for construction
Chairman Rose informed the Commission that the applicant requested the matter be
tabled. Mr. Liebman informed the Commission that new information was received Tuesday
afternoon, and he hadn’t had a chance to do his full review.
Motion to table No. 1232, 16 Sage Road, until the next regularly scheduled meeting was
made by Elizabeth Falk; seconded by John Schwartz. All in favor with Ayes: Gary Dufel,
Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk, and Matthew Rose.
EIC Minutes – January 8, 2025
Page 6
APPLICATION FOR ADMINISTRATIVE APPROVAL:
#1233 6 Marion Street, Caetano Construction; (H22124), RA-20 Zone, Construction of
addition
Mr. Liebman informed the Commission that the project is for a second floor addition by
Lake Waubeeka. The only disturbance would from the hand excavation to install the 10 piers for
the base of the addition.
Motion to grant Administrative Approval for No. 1233, 6 Marion Street, with the 6
conditions noted in the staff report was made by Elizabeth Falk; seconded by John Schwartz. All
in favor with Ayes: Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth
Falk, and Matthew Rose.
VIOLATIONS:
1. Halas, Barnum Road, Danbury, CT- Cease & Desist
Chairman Rose informed the Commission that they are just waiting for the executed copy
of the “draft agreement” the Commission has been provided.
Motion to table Halas violation was made by Elizabeth Falk; seconded by John Schwartz.
All in favor with Ayes: Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz,
Elizabeth Falk, and Matthew Rose.
2. Show Cause Hearing- Cease & Desist: 196-200 Franklin Street Extension
Mr. Liebman informed the Commission that the homeowner is present. He then read the
“Matter of Record” which is as follows:
MATTER OF RECORD, 196-200 Franklin Street Extension
Prepared by Lawrence Liebman, Environmental Compliance Inspector
1/6/2024
10/30/2024 -Complaint received from property owner of 212 Franklin Street Extension stating that his property
was experiencing additional amounts of water and that there has been “noise of heavy equipment” all summer
long. L. Liebman walked to the rear of the property and followed watercourse to 196 -200 Franklin Street
Extension where it was observed that the pond was recently dredged, weirs and walls reconstructed. Returned to
car and drove to 196-200 Franklin Streety extension Left white and yellow tag. Returned to office and reviewed
air photos on GIS which reviled extensive work being done. Reviewed w R. Boggan Associate Director of
Environmental Health. Instructed to send notice to inspect.
10/31/2024 -Sent Notice to inspect both regular mail and certified mail. Property owner Ruby Rodriquez called
office and scheduled site walk for 11/4/24
11/4/2024-Researched land records, R. Rodriquez closed on property 6/6//2024
L. Liebman & R. Boggan inspected property w Property owner Rodriquez was present.
EIC Minutes – January 8, 2025
Page 7
OBSERVATIONS
• Pond has been dredged
• A dam has been constructed at the inlet side which is backwatering onto adjacent properties
• A stone groin has been constructed, possible connection to island that was created during dredge
• Active irrigation and aeration system installed
• Pond spoils pushed onto southern banks of pond against trees
• Main dam has been reworked
• Photos taken
Retrieved EIC permit #1072 for pond dredging issued 1/10/2018 ** NO CONDITIONS OF PERMIT WERE
EXECUTED
11/05/2024 L. Liebman called M. Mazzucco engineer of record, he was unaware of any activity
11/6/2024-Liebman inspected property w/EIC Commissioner Herald, His recollection was that additional
clearing and grading was preformed
11/14/2024-Liebman sent draft Cease and desist to Corporation Counsel.
12/30/2024-Cease and Desist sent certified
1/6/2025-Liebman spoke w Ruby Rodriquez and informed re show cause hearing on 1/8/2024 @7:00 pm
POSSIBLE ACTIONS
*The Commission shall consider the facts presented at the hearing and within ten (10) days of the completion of
the hearing notify the person by certified mail that the original order remains in effect, that a revised order is in
effect, or that the order has been withdrawn. The Commission shall publish notice of its decision in a newspaper
having a general circulation in the municipality. The original order shall be effective upon issuance and shall
remain in effect until the Commission affirms, revises or withdraws the order.
*Suspend or revoke a permit if it finds that the permittee has not complied with the terms, conditions or
limitations set forth in the permit or has exceeded the scope of the work as set forth in the application including
application plans. Prior to revoking or suspending any permit, the Commission shall issue notice to the permittee,
personally or by certified mail, return receipt requested, setting forth the facts or conduct which warrants the
intended action.
*Issue a notice of violation to such person conducting such activity or maintaining such facility or condition,
stating the nature of the violation, the jurisdiction of the Commission, and prescribing the necessary action and
steps to correct the violation including, without limitation, halting work in wetlands or watercourses. Failure to
carry out the action(s) directed in a notice of violation may result in issuance of the order provided in Section
13.3.a or other enforcement proceedings as provided by law.
If the commission decides to issue a notice of violation the following is the actions are recommended;
*A CT Licensed Professional Engineer evaluate and certify that the work performed is in accordance with sound
engineering practices and if any remedial actions are required to eliminate/minimize impacts to adjoining
properties. The engineer shall evaluate what was constructed versus what was proposed.
*Prepare a revised survey indicating the current existing conditions to include wetland limits. depth of spoil,
irrigation/aeriation systems, heights and flow lines of weirs, walls etc.
*Test the spoil for any possible contaminates, ie heavy metals, TPH, pesticides etc.
* Prepare an ecological report on the current and future conditions of the watercourse.
EIC Minutes – January 8, 2025
Page 8
*Prepare a restoration plan to include planting and enhancement.
*Any other information that the DEIC deems necessary.
Mr. Liebman informs the Commission that the spoils that were spread had not been tested
to see if they were contaminated; therefore the whole area could be contaminated. The work that
was performed was not done with the benefit of an engineer. Upstream neighbors are now
getting more water. He then provides aerial pictures from multiple years that show the
Commissioners the changes of the area. Mr. Liebman says the homeowner states he bought the
property like this. He has not provided the contractor information who did the work with no
permits.
Ms. Britton asks for clarification about Mr. Liebman stating no conditions of the permit
were met. My. Liebman states an EIC permit was issued in 2018 with multiple conditions of
approval. They were not completed. The property is not visible in this area from the road, so
they were unaware of the work until they received a complaint.
Mr. Rodriguez, homeowner, was present. He is a resident and business owner of
Danbury. He was on site during Mr. Liebman’s November 4th site visit. He said the work was
already completed with the exception of the stone walls which is something he was having done.
The work on the pond was done 8-12 months ago according to Mr. Rodriguez.
Mr. Liebman shows Mr. Rodriguez the 2023 aerial photo which shows the area in
question to be vegetated and not a pond. He also states that an engineering review is needed
because of the potential impacts on the neighbors, especially if the dam fails. The sediment that
was spread should have been tested before dredging, so it could have been handled properly if it
was contaminated instead of spread throughout the property.
Mr. Dufel feels that impacting neighbors with water is a big deal that can have lasting
effects. It is especially wrong to do without the proper permits. He also states that by doing this
they have changed the whole biology of the system, and things have been changed, disturbed,
and destroyed.
Mr. Liebman says that Dr. Sacchi applied for the permit in 2018, which was granted, for
the pond dredging. It permits were pulled and staff notified, there would have been weekly
monitoring of the progress by City staff or outside professional. Mr. Liebman recommends a
Notice of Violation is issued.
Mr. Rose asks if Mr. Liebman if the homeowner has seen the recommendations. Mr.
Liebman stated that Mr. Rodriguez has received the Cease & Desist order. He will issue or
proceed with whatever action the Commission chooses. The Commission can choose to revoke
the 2018 permit, issue a Notice of Violation, go to court to have fines implemented, or add
whatever else they may feel required.
Ms. Britton asks when the complaints were received; Mr. Liebman responds 2024. Ms.
Britton feels it is likely that the work was done recently then.
Mr. Dufel feels revoking the permit doesn’t mean much since the work is basically
completed. Mr. Liebman said a judge could issue fines. Mr. Schwartz asks if they could impose
fines and issue something or revoke the permit; Mr. Liebman says they could. Mr. Liebman
feels potential actions could be based on the willingness of Mr. Rodriguez to rectify the situation.
The three options he provided were from the enforcement section of the Regulations. He
reiterates his recommendation to issue a Notice of Violation, and they could always assess fines
later. The forensic and engineering work that is required will be costly. If it is all contaminated
it could be classified as a brownfield.
EIC Minutes – January 8, 2025
Page 9
Multiple Commission members would like the name of the engineer Mr. Rodriguez plans
to hire submitted to City staff for approval.
Mr. Rodriguez states he is willing to cooperate with rectifying the situation. He would
like to hire a lawyer as well; Mr. Rose agrees that would be his right.
Motion to issue Notice of Violation with conditions was made by Elizabeth Falk;
seconded by Michael Flanagan.
The conditions were specified as follows:
*A CT Licensed Professional Engineer evaluate and certify that the work performed is in
accordance with sound engineering practices and if any remedial actions are required to
eliminate/minimize impacts to adjoining properties. The engineer shall evaluate what was
constructed versus what was proposed.
*Prepare a revised survey indicating the current existing conditions to include wetland limits.
depth of spoil, irrigation/aeriation systems, heights and flow lines of weirs, walls etc.
*Test the spoil for any possible contaminates, ie heavy metals, TPH, pesticides etc.
* Prepare an ecological report on the current and future conditions of the watercourse.
*Prepare a restoration plan to include planting and enhancement.
*Retain a professional engineer, and submit name for approval
*Reserve the right to impose fines in the future
*Any other information or activities that the DEIC deems necessary in the future.
All in favor with Ayes: Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz,
Elizabeth Falk, and Matthew Rose.
ADJOURNMENT:
Motion to adjourn was made by Elizabeth Falk; seconded by Michael Flanagan. All in
favor with Ayes: Gary Dufel, Cristina Britton, Michael Flanagan, John Schwartz, Elizabeth Falk,
and Matthew Rose.
Meeting adjourned at 8:47 p.m.
Respectfully submitted,
Melissa Llera
Recording Secretary
Agenda
Posted in City of Danbury Town Clerk’s office on January 6, 2025 at 3:44 p.m.
CITY OF DANBURY
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
ENVIRONMENTAL IMPACT COMMISSION (203) 797-4525
www.danbury-ct.gov (203) 797-4586 (FAX)
REGULAR MEETING
ENVIRONMENTAL IMPACT COMMISSION
AGENDA
CITY HALL – 155 DEER HILL AVENUE
City Council Chambers
Wednesday, January 8, 2025
7:00 p.m.
ROLL CALL:
PLEDGE OF ALLEGIANCE:
ACCEPTANCE OF MINUTES: December 18, 2024
Click here for: Minutes, December 18, 2024
Next regular meeting is scheduled for January 22, 2025
NEW BUSINESS: None
OLD BUSINESS:
#1106R 7B Judith Drive, Gontijo, Alaor & Vasquez, Saul, (D08082), RA-40 Zone,
Construction of single family dwelling, septic, and well
Click here for: Application Materials
______________________________________________________________________________
#1228 2 Great Pasture Road, 2 GPS Owner LP, Benjamin V. Doto III, P.E., Agent,
(K15109), IL-40 Zone, Expand outdoor storage, drive aisles and parking at existing industrial
warehouse site
Click here for: Application Materials
Supplemental Submitted Materials
EIC AGENDA – January 8, 2025
Page 2
#1229 160-162 Deer Hill Avenue, First Congregational Church & Ecclesiatical Society,
Virbickas, Dainius, Agent; (I14104 & I14105), RH-3 Zone, Construction of apartment building,
along with parking, walkways, landscaping, and storm drainage system
Click here for: Application Materials
Staff Report
_____________________________________________________________________________
#1231 18 Christopher Columbus Avenue, City of Danbury Public Utilities Dept., Tata &
Howard Inc., Agent; (D15022), IL-40 Zone, Kenosia Wellfield PCE and PFAS Treatment
Upgrades including construction of new treatment building
Click here for: Application Materials
______________________________________________________________________________
#1232 16 Sage Road, Swergold, Gary, Hadaya, Eedeet, Agent; (H22109), RA-20 Zone,
Construction of addition and temporary access for construction
Click here for: Application Materials
Supplemental Submitted Materials
APPLICATION FOR ADMINISTRATIVE APPROVAL:
#1233 6 Marion Street, Caetano Construction; (H22124), RA-20 Zone, Construction of
addition
Click here for: Application Materials
ADMINISTRATIVE STAFF ACTIONS: None
VIOLATIONS:
1. Halas, Barnum Road, Danbury, CT - Cease & Desist
2. Show Cause Hearing- Cease & Desist: 196-200 Franklin Street Extension
OTHER MATTERS:
CORRESPONDENCE:
ADJOURNMENT: