Meeting called to order at 7:01p.
Meeting Minutes
Motion by Darrell to approve the Meeting Minutes of the November 28, 2017 Board Meeting. Second by Lori. Motion approved.
Public Comment
None
Correspondence
Hydraterra Rate Schedule - Review of the rate letter received. Motion by Lori accept the Hydraterra rate schedule as presented.
Second by Jose.
Treasurer’s Report
Motion by Lori to approve the Payables for November as presented. Second by Darrell. Motion approved.
Admin Update
Operator’s Report
Plant is running well. No violations. Sludge removal has increased as a result of cold weather operations. Blower maintenance has
been completed.
Disk Filter Acid Cleaning – Dave presented a quote for a butterfly valve to allow cleaning of the Disk Filter. It will be installed by
EEMA. Motion by Darrell to approve purchase of the butterfly valve not to exceed $940.00 and $715.95 for the new Chemical
Feed pump. Second by Jose. Motion approved.
Chemical Feed Pump Housing – The Chemical Feed pump gear box failed. Dave had previously asked Charlotte to order as new one
as this is critical to the system.
Pump Station Auto Dialers – TV Pump Station auto dialer has been installed.
Sunoco Response/Repair – Dave was contacted by Sunoco for a Sanitary Sewer Overflow (SSO). A PVC pipe was separated during
Sunoco excavation. Dave met with James on site to oversee the replacement of a section that was kinked and has made a report to
DEP. Hydraterra was on site as well. Hydraterra time on the project will be billed to Sunoco.
Scope of Services – Dave is satisfied with the scope of services per the meeting with Rick and Lori. Dave will present his contract
addendum at the January meeting.
Engineers Report
2017 Capital Improvement Plan Follow-up – Joe reviewed his recommended changes to the Capital Improvement Plan. Motion to
approve changing the recommended approval to $40,000 to proceed with rehabilitation of A-series manholes, with the exception
of A-3. Second by Lori. Motion approved.
Private Lateral Inspection/Borough Discussion – Review of the flow data indicates continuing I & I problems. Note: areas____. Joe
recommends televising during a rainstorm event as the best way to measure flow. This project is included in the capital
improvement plan.
NPDES Renewal – Joe has not heard anything in response to the revised report.
Master Casting Agreement – The signed agreement has been submitted. Additional approvals will be needed for the specific
materials needed for this project.
Page 1 of 2
MABE Meeting Minutes December 19, 2017
Per Dave’s recommendation Joe will look
Solicitors Report
Stoltzfus Holding Tank – Mr. Stoltzfus has provided a receipt for pumping and hauling. He will provide proof that the tank is disabled
by the end of the year.
Zoning/SALDO – MABE is waiting for opportunity to review the drafts. A hard copy is to be dropped off by the County this week.
Old Business
WWTP Fencing, Gate Repair – Board reviewed the quote provided by Allen Heilner. Motion by Jose to approve the Heilner quote as
presented. Second by Lori. Motion approved. Charlotte will check with Heilner to see if a wheel can be added to the bottom of
the gates to hold them open. Discussion of signage to identify the plant and restrict entrance. Charlotte will investigate options.
Roofing Contractor – Motion by Darrell to approve $200.00 for LD Contracting to replace a missing shingle and seal the roof
blowers to stop the water that is coming in. Second by Lori. Motion approved.
Chesco UCII Revisions – Joe provided some recommendations to update the UCII. Charlotte will provide the updated information to
the Borough which will be forwarded to the County.
MABE 2018 Budget – Motion by Darrell to approve the 2018 budget as presented. Second by Lori to approve the 2018 Budget.
Motion approved.
New Business
Summerfield Paving – Joe recommended replacing the manhole frame and covers for these manholes. Joe estimates the cost at
$3,000 per manhole. Charlotte will respond that the cost of riser rings will fall to the HOA and MABE needs clarification on exactly
what the final project plan is. MABE may consider improving the 12 manhole frames, covers and risers to improve the seal. Doing
the project in coordination with the HOA paving would save the cost of road restorations if done separately.
Motion by Lori to raise Charlotte’s salary $1.00 an hour effective January 1, 2018. Second by Darrell. Motion approved.
Meeting Adjourned: 8:10p
Next regular Board meeting will be on January 30, 2018 at 7:00p at Borough Hall.
Respectfully Submitted by Charlotte Gehman