City Council
Regular MeetingElverson, PA · August 27, 2019
Minutes
MABE Meeting Minutes August 27, 2019
In Attendance: Absent: Others in Attendance:
Lori Sifford Floyd Jennelle Dave Friedman, EEMA
Darrell Gibble
Jose Colon
Steve Keech
Stephen Kalis, Fox Rothschild
Keith Showalter, Systems Design
Tom Unger, Systems Design
Charlotte Gehman
Meeting called to order at 7:03p
Meeting Minutes
Motion by Darrell to Approve Minutes of July 30, 2019 Board Meeting with noted correction to engineering section.
Second by Floyd. Motion approved.
Public Comment
None
Correspondence/Communication
None
Operator’s Report
The plant is running well.
HVAC – Well Water Plumbing Quote – EEMA is still working on the quote. When the plant is running well, it is not a high
priority. PA One calls are still coming in. Both generators have been serviced and the battery has been replaced in the
portable generator.
Influent Pump Station Repair and Spare Repair Quote – Did not receive a second quote from Pikeland to include
pumping and hauling.
Decant Pump – Only one is currently working. Dave recommends repairing before December.
Aeration Tank Painting Quote – Two viable quotes to consider.
Blower #2 Evaluation – Getting a quote from Excelsior. The motor is good, it’s the blower that is a problem.
Aeration Tank Improvements Quote – Quotes still being considered.
WG Malden Quote – The influent sampler needs a new refrigeration unit and sensor. Quote of $1,998.00 received. Also
presented a quote of $1,455.00 for the ProMag Output card for tracking outgoing flow which is not working. Motion to
approve Both WG Malden quotes by Steve. Second by Jose. Motion approved. Lori requests the outgoing flow be
added to the monthly operator’s report.
Blower Panel Amperage problem – After start-up testing was unsuccessful, EEMA began testing the EQ tank pumps.
There appears to be a lot of flowback caused by the pumps not being seated correctly, causing them not to be pumping
efficiently. Dave does not have a firm quote but expects the costs to be like the Influent pump station repair quotes.
Motion by Steve to reduce the $9,000.00 maximum approved at the July meeting for PS1 repair to a maximum of
$8,000.00 and to reassign the funds to the EQ tank pumps repair. Second by Darrell. Motion approved.
A13 Manhole Insert – Dave will follow up with John to see if an insert has been put into manhole A-13 on S. Chestnut.
Upon review of the many plant repair quotes, Dave suggests that the Decant and two Pump Station repairs should be
done this year. Tank painting and improvements can wait until next year.
Page 1 of 3
MABE Meeting Minutes August 27, 2019
Engineer’s Report
Blower Panel Project/Change Order #3 – Motion to approve Change Order #3 in the amount of $157.56 to increase the
side of the blower panel breakers by Jose. Second by Darrell. Motion approved.
Blue Rock Project – Keith reviewed the revised plans. Need to acquire the easement for the property including the area
where the sewer lines belong to MABE. Plan is not at a point for final approval. DEP will require a permit for the lines
within the easement. Keith presented some rough estimates for improvements to the Corbett Pump Station as part of
the developer’s contribution. Keith will get Charlotte the information to approach the homeowner about increasing the
size of the easement. Motion by Darrell to approve the Planning Module pending approval by the engineer and
solicitor. Second by Steve. Motion approved. SDE will send a letter to Mr. Margusity outlining the decisions of the
Board.
Main St. Manholes, A-Series Manholes – Want to revisit the manholes after construction. Steve recommends wrapping
the manholes that are exposed now in the sidewalk. Keith will contact PennDOT to see if wrapping can be added at this
point.
Review Connection Request Process and Standards Draft Documents - Document revised and presented for review.
Motion by Jose to approve the Connection Procedures document as presented by SDE. Second by Darrell. Motion
approved.
51 W. Main St. Connection – PennDOT permit received. Must wait until final restoration is completed to get PennDOT
sign off.
Metering Study/Inspection Target Area – Review of the suggested next areas of focus. Motion by Darrell to approve
cost of next 71 homes for sewer plumbing inspection to be completed by October 31, 2019. Second by Steve. Motion
approved.
Solicitor’s Report
Blue Rock HOA Review – Stephen made suggestions for components that should be included in the HOA documents and
maintenance escrow considerations for the future of the development.
Ordinances for Codification Review – Review of the suggestions from the third-party organization assisting the Borough
with review and codification of Ordinances in place. Stephen has reviewed the suggested improvements and has no
objections. Charlotte will confirm with the Borough that the MABE review of the two ordinances is complete.
Old Business
PMAA Regional Dinner November 14, Norristown – Lori will attend.
Annual Plant Tour – Planned for 6:00p prior to the September Board meeting.
New Business
Borough Pipe/Swale Work- Charlotte reviewed the Borough’s plan for emergency repairs to the storm sewer pipes.
MABE will grant the selected contractor access to swale/storm sewer area through the plant property.
Treasurer’s Report
Sign Checks - Motion by Jose to approve the August payables as presented. Second by Darrell. Motion approved.
Admin Update
Plumbing Inspections – Inspections are going well, and great majority of residents are cooperating.
Executive Session
Meeting adjourned to executive session at 8:43p
Page 2 of 3
MABE Meeting Minutes August 27, 2019
Meeting Adjourned 8:56p
Next Scheduled MABE Meeting is Tuesday, September 24, 2019 at 7:00p. Plant tour will occur at 6:00p prior to the
meeting.
Page 3 of 3